ABU DHABI OIL REFINING COMPANY
QUALITY CONTROL PLAN
UNLEADED GASOLINE/LOW SULPHUR GAS OIL
PROJECT
EPC WORKS
COMPANY Doc. No.: 5601-TEC-MW-002
TPIT Doc. No.: 2137-000-QCP-1399.02
Rev.
1
Page
1/3
QUALITY CONTROL PLAN
WELDING ACTIVITIES MANAGEMENT
TYPE OF QUALITYCONTROL REPORT
CERTIFICATION EXTENT
W 11 PIPING WELDING MAP
NDE 01/02/03/04 NDE PROCEDURES
W 01/02/03/04 NDE REPORTS
W 08 / W 40 PWHT DIAGRAM & SHEET
W 24 VISUAL TEST REPORT
W 25 RT & REPAIRING SUMMARY
W 10 PIPING SUMMARY
W 30 STRUCTURE SUMMARY
REF. DOCUMENTS:
5601-EPC-PA-078 (TPIT No 2137.000.PP 010) Site Inspection Coordination Procedure 5601-000-MS 0000.51 (TPIT No 2137.000.MS 0000.51) Job Constr. Spec. for Site Welder Management 5601-000-MS 0000.52 (TPIT No 2137.000.MS 0000.52) Job Constr. Spec. for Welding Activities Management 5601 DGS MW 001 Welding, NDE and Prevention of Brittle Fracture of Pressure vessels and
Heat Exchangers 5601 DGS MW 002 Welding, NDE and Prevention of Brittle Fracture of Piping ASME IX Welding and Brazing Qualification ASME V Non-Destructive Examination AWS D1.1 Structural Welding Code Steel
LEGENDH = HOLD (Work Stop for Inspection)W = WITNESS (RFI required)S = SURVEILLANCE (NO RFI)R = REVIEW of REPORTSN.A. = NOT APPLICABLEA = APPROVAL / AUTHORIZATION
1 30.05.2003 ISSUED FOR EXECUTIONBARRERA
MORUCCIMORUCCI/DEL
SERRONE
0 26.02.2003 ISSUED FOR EXECUTION TERENZI MORUCCIMORUCCI/DEL
SERRONE
A 22.01.2003 ISSUED FOR REVIEW TERENZI MORUCCIMORUCCI/DEL
SERRONE
REV. DATE STATUSWRITTEN BY(name & visa)
CHECKED BY(name & visa)
APPROVED/AUTHORIZED BY(name & visa) PMC COMPANY
DOCUMENT REVISIONS
TECHNIP ITALY S.p.A. - 00148 ROMA - Viale Castello della Magliana, 68
- Mod. 1809/E - Rev. C
ABU DHABI OIL REFINING COMPANY
QUALITY CONTROL PLAN
UNLEADED GASOLINE/LOW SULPHUR GAS OIL
PROJECT
EPC WORKS
COMPANY Doc. No.: 5601-TEC-MW-002
TPIT Doc. No.: 2137-000-QCP-1399.02
Rev.
1
Page
2/3
QUALITY CONTROL PLAN
WELDING ACTIVITIES MANAGEMENT
QUALITY CONTROL ACTIVITIES
Nr.CHECK AND
INSPECTION ITEM
APPLICABLESPEC. &CODES
QUALITYCONTROLREPORT
ACTIONNOTES
SUBCONT. CONTRACTOR COMPANY
A. BEFORE PRODUCTION 2137.000 MS 0000.512137.000 MS 0000.52
1. WELDERS PERFORMANCE QUALIFICATION 2137.000QCP 1399.01
2. WELDING PROCEDURES
2.1 WPS/PQRASME IX
AWS D1.1ASME OR
EQUIV.H A A
2.2 WELDING MAP H A A
- PIPING W 11
- OTHER BY SUBCONTRACT.
3. FILLER MATERIALS2137.000 MS 0000.52
3.1 STORAGE & HANDLING PROCEDURE BY SUBCONTRACTOR N.A. H A R
3.2 MATERIAL TEST CERTIFICATES BY SUBCONTRACTOR N.A. H R R
4. NON DESTRUCTIVE EXAMINATION METHOD ASME VNDE
01/02/03/04 or equivalent
H A R
5.POST WELD HEAT TREATMENT PROCEDURE
5601.DGS.MW 001
5601.DGS.MW 002W 40 H A R
6. DRAWINGS
6.1 ISO SPOOLLING N.A. N.A. H R R
6.2 JOINT IDENTIFICATION N.A. N.A. H R R
7. PERSONNEL QUALIFICATION FOR NDE N.A. N.A. H R R
B. DURING PRODUCTION 2137.000 MS 0000.52
1. DAILY MONITORING: W 24 H S S
- FIT-UP AND ALIGNMENT
- WELDING PARAMETERS
- WELDER IDENTIFICATION
2. NDE JOINT SELECTION 2137.000.MS 0000.52 N.A. H A R
- Mod. 1809/E - Rev. C
ABU DHABI OIL REFINING COMPANY
QUALITY CONTROL PLAN
UNLEADED GASOLINE/LOW SULPHUR GAS OIL
PROJECT
EPC WORKS
COMPANY Doc. No.: 5601-TEC-MW-002
TPIT Doc. No.: 2137-000-QCP-1399.02
Rev.
1
Page
3/3
Nr.CHECK AND
INSPECTION ITEM
APPLICABLESPEC. &CODES
QUALITYCONTROLREPORT
ACTIONNOTES
SUBCONT. CONTRACTOR COMPANY
3. REPORTS ACKNOWLEDGMENT
3.1 NDE REPORTS W 01/02/03/04 H R R
3.2 MONTHLY REPORTS DRAWER W 25 H R R
4.PWHT AND HARDNESS
5601.DGS.MW 001
5601.DGS.MW 002
4.1 PWHT SETUP H W R (1)
4.2 PWHT DIAGRAM DIAGRAM H R R
4.3 HARDNESS W 08 H S S
5. SUMMARY
5.1 PIPING ASME IX W 10 H R R
5.2 STRUCTURE AWS D1.1 W 30 H R R
5.3 OTHER BY SUBCON. H R R
NOTES:
(1) Contractor Welding Inspector shall sign the diagram before PWHT starts if he witnessed the setup.
- Mod. 1809/E - Rev. C