2

 · 2021. 1. 12. · On-Site Representative Present: Tom Fargo, Reidman Construction Site Notes: -Apartment structure is up and work continues on the building. -Excavation for the

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1:  · 2021. 1. 12. · On-Site Representative Present: Tom Fargo, Reidman Construction Site Notes: -Apartment structure is up and work continues on the building. -Excavation for the
Page 2:  · 2021. 1. 12. · On-Site Representative Present: Tom Fargo, Reidman Construction Site Notes: -Apartment structure is up and work continues on the building. -Excavation for the