2019 Federal Transportation Improvement Program San Bernardino County Local Highway Including Amendments 1-11 and 13-19_21 (In $000`s)

2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

2019 Federal Transportation Improvement Program San Bernardino County

Local Highway

Including Amendments 1-11 and 13-19_21 (In $000`s)

Page 2: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTAL… 1/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 200201 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

EXEMPT -93.126

TotalProject Cost$560

LeadAgency ADELANTO Modeling NO

County SanBernadino Primary Program Code NCR91 - UPGRADED FACILITI (NO LN

ADD) Air Basin RTP ID 200201

System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionIN ADELANTO, EL MIRAGE RD. FROM SR. 395 TO 1 MILE EAST TO ADELANTO RD. AND ON ADELANTO RD. FROM ELMIRAGE RD. TO 1 MILE SOUTH-AUBURN AVE. PAVE EXISTING 2 LANE RD.

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE SBD CO MEASURE I $70 - - - - - - - $70

Total Preliminary Engineering $70 - - - - - - - $70ROW SBD CO MEASURE I - $50 - - - - - - $50

Total Right of Way - $50 - - - - - - $50CON CITY FUNDS - $440 - - - - - - $440

Total Construction - $440 - - - - - - $440Total Programmed $70 $490 - - - - - - $560

5/12/2020 Public Project Listings

Page 3: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTAL… 2/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID SBD55011 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-02

ConformCategory

NON-EXEMPT

TotalProject Cost$5,500

LeadAgency

APPLEVALLEY Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin RTP ID SBD55011

System Local HwyProjectLimits From APPLE VALLEY RD to Rincon Road, Begin: 0 End:

DescriptionYUCCA LOMA RD.: FROM APPLE VALLEY RD. TO RINCON RD. (westerly segment) - WIDEN EXISTING 2 LANE RD. TO 4LANE RD. (2 LANES IN EACH DIRECTION) (1 MILE)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE SBD CO MEASURE I $500 - - - - - - - $500

Total Preliminary Engineering $500 - - - - - - - $500CON SBD CO MEASURE I - - - $5,000 - - - - $5,000

Total Construction - - - $5,000 - - - - $5,000Total Programmed $500 - - $5,000 - - - - $5,500

5/12/2020 Public Project Listings

Page 4: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTAL… 3/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 200202 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$584

LeadAgency CHINO Modeling YES

County SanBernadino Primary Program Code CAR63 - HWY/RD IMP-LANE ADD w/ NO

HOV LANE(S):NRS Air Basin SCAB RTP ID 200202

System LocalHwy

ProjectLimits From SIXTH STREET to MONTE VISTA, Begin: 0 End:

DescriptionIN CHINO - ON CHINO AVENUE FROM MONTE VISTA TO SIXTH STREET-WIDEN EXISTING 2 LANES TO 4 LANES ANDINSTALL SIGNAL AT INTERSECTION OF CHINO AVE. AND MONTE VISTA

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE DEVELOPER FEES - - $88 - - - - - $88

Total Preliminary Engineering - - $88 - - - - - $88CON DEVELOPER FEES - - - $496 - - - - $496

Total Construction - - - $496 - - - - $496Total Programmed - - $88 $496 - - - - $584

5/12/2020 Public Project Listings

Page 5: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTAL… 4/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 200207 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-03

ConformCategory

NON-EXEMPT

TotalProject Cost$24,940

LeadAgency CHINO Modeling YES

County SanBernadino Primary Program Code CAX66 - NEW CONNECTNS/CROSS

TRAFFIC IMP: RS Air Basin SCAB RTP ID 200207

System LocalHwy

ProjectLimits From El PRADO to EUCLID, Begin: 0 End:

DescriptionPine Ave extension (0-4 lanes) from Route 71 to Euclid Avenue in the City of Chino, CA

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $306 - - - - - - $306PE DEMO-SAFETEA-LU $2,560 $1,226 - - - - - - $3,786PE DEVELOPER FEES $1,440 - - - - - - - $1,440

Total Preliminary Engineering $4,000 $1,532 - - - - - - $5,532CON DEMO-SAFETEA-LU - - - $3,014 - - - - $3,014CON DEVELOPER FEES - - - $16,394 - - - - $16,394

Total Construction - - - $19,408 - - - - $19,408Total Programmed $4,000 $1,532 - $19,408 - - - - $24,940

5/12/2020 Public Project Listings

Page 6: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTAL… 5/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID SBD031118 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$2,000

LeadAgency CHINO Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID SBD031118

System Local HwyProjectLimits From RAMONA AVENUE to CENTRAL AVENUE, Begin: 0 End:

DescriptionEDISON AVENUE RAMONA TO CENTRAL WIDEN FROM 4 LANES TO 6 LANES & REHABILITATION (SPOT WIDENING)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE DEVELOPER FEES - - $200 - - - - - $200

Total Preliminary Engineering - - $200 - - - - - $200CON DEVELOPER FEES - - - $1,800 - - - - $1,800

Total Construction - - - $1,800 - - - - $1,800Total Programmed - - $200 $1,800 - - - - $2,000

5/12/2020 Public Project Listings

Page 7: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTAL… 6/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID SBD031152 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$20,000

LeadAgency CHINO Modeling YES

County SanBernadino Primary Program Code CAX60 - BRIDGE RESTORATION &

REPLACEMENT- LN ADDITIONS: RS Air Basin SCAB RTP ID SBD031152

System Local HwyProjectLimits From AT SAN ANTONIO FLOOD CONTROL to AT SAN ANTOINIO FLOOD CONTROL, Begin: 0 End:

DescriptionRIVERSIDE DRIVE AT SAN ANTONIO FLOOD CONTROL CHANNEL WIDEN BRIDGE FROM 4 LANES TO 6 LANES (PA&EDOnly)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE DEVELOPER FEES $100 $2,000 - - - - - - $2,100

Total Preliminary Engineering $100 $2,000 - - - - - - $2,100Total Programmed $100 $2,000 - - - - - - $2,100

5/12/2020 Public Project Listings

Page 8: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTAL… 7/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 200401 FTIP Amendment San Bernardino County Transportation Authority(SBCTA) 19-00

ConformCategory TCM Total

Project Cost$4,530

LeadAgency

CHINOHILLS Modeling YES

County SanBernadino Primary Program Code CAXT5 - NEW CONNECTNS/CROSS TRAFFIC

IMP w/TCM: RS Air Basin SCAB RTP ID 200401

System Local HwyProjectLimits From ABOUT 0.40 MILES SOUTH OF STANFIELD CT (CURRENT NORTHERN ROAD CLOSURE) to PINE AVE, Begin: 0 End:

DescriptionFAIRFIELD RANCH RD: CONSTRUCT BOX CULVERT (approx. 0.40 miles south of Stanfield Ct.) TO RE-OPEN 0.76 MILES OFFAIRFIELD RANCH RD AT CURRENT CLOSURE SOUTH TO PINE AVE. CONSTRUCT RD IMPROVEMENTS AND ADDMARKED BIKE LANES IN BOTH DIRECTIONS.

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $387 - - - - - - - $387PE SBD CO MEASURE I $430 - - - - - - - $430

PE TRANS AND COMM AND SYS PRESRV PILOTPROG $175 - - - - - - - $175

Total Preliminary Engineering $992 - - - - - - - $992ROW CITY FUNDS - - - - - $70 - - $70ROW SBD CO MEASURE I - - - - - $430 - - $430

Total Right of Way - - - - - $500 - - $500CON CITY FUNDS - - - - - - $426 - $426CON SBD CO MEASURE I - - - - - - $2,612 - $2,612

Total Construction - - - - - - $3,038 - $3,038Total Programmed $992 - - - - $500 $3,038 - $4,530

5/12/2020 Public Project Listings

Page 9: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTAL… 8/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 200856 FTIP Amendment San Bernardino County Transportation Authority(SBCTA) 19-15

ConformCategory

NON-EXEMPT

TotalProject Cost$16,279

LeadAgency COLTON Modeling YES

County SanBernadino Primary Program Code CAY60 - BRIDGE RESTORATION &

REPLACEMENT- LN ADDITIONS: GM Air Basin SCAB RTP ID 200856

System LocalHwy

ProjectLimits From M ST. to I-10 ON RAMP, Begin: 0 End:

DescriptionMT. VERNON BRIDGE OVER UPRR(54C0101) -ON MT. VERNON AVE. FROM "M" ST. TO I-10 ON RAMP. WIDENINGBRIDGE FROM 2-4 LANES (CA338)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE BRIDGE - LOCAL $1,151 - - - - - - - $1,151PE CITY FUNDS $149 - - - - - - - $149

Total Preliminary Engineering $1,300 - - - - - - - $1,300ROW BRIDGE - LOCAL - $133 $291 - - - - - $424ROW CITY FUNDS - $17 $38 - - - - - $55

Total Right of Way - $150 $329 - - - - - $479CON BRIDGE - LOCAL - - - - - - - $12,837 $12,837CON CITY FUNDS - - - $1,663 - - - $-19 $1,644CON LOCAL - ADVANCED CONSTRUCTION - - - $12,837 - - - $-12,837 -CON LOCAL BRIDGE SEISMIC RETROFIT ACCOUNT - - - - - - - $19 $19

Total Construction - - - $14,500 - - - - $14,500Total Programmed $1,300 $150 $329 $14,500 - - - - $16,279

5/12/2020 Public Project Listings

Page 10: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTAL… 9/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 201158 FTIP Amendment San Bernardino County Transportation Authority(SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$6,652

LeadAgency COLTON Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A07226

System LocalHwy

ProjectLimits From RIALTO CHANNEL to RANCHO AVE., Begin: 0 End:

DescriptionAGUA MANSA FROM RIALTO CHANNEL TO RANCHO AVE. 2-4 LANE WIDENING

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $350 - - - - - - - $350

Total Preliminary Engineering $350 - - - - - - - $350ROW CITY FUNDS - $150 - - - - - - $150

Total Right of Way - $150 - - - - - - $150CON CITY FUNDS - - - $6,152 - - - - $6,152

Total Construction - - - $6,152 - - - - $6,152Total Programmed $350 $150 - $6,152 - - - - $6,652

5/12/2020 Public Project Listings

Page 11: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 10/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20170201 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-15

ConformCategory

EXEMPT -93.126

TotalProject Cost$27,535

LeadAgency COLTON Modeling NO

County SanBernadino Primary Program Code NCR36 - BRIDGE RESTORATION &

REPLC (NO LN ADD) Air Basin SCAB RTP ID 4A01069

System LocalHwy

ProjectLimits From to , Begin: 0 End:

DescriptionIn Colton: La Cadena Drive over Santa Ana River, 1.5 MI south of I-10; Replace existing 4 lane bridge with 4 lane bridge (54C0077)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE BRIDGE - LOCAL $2,457 - - - - - - - $2,457PE CITY FUNDS $318 - - - - - - - $318

Total Preliminary Engineering $2,775 - - - - - - - $2,775ROW BRIDGE - LOCAL - $753 $273 - - - - - $1,026ROW CITY FUNDS - $97 $36 - - - - - $133

Total Right of Way - $850 $309 - - - - - $1,159CON BRIDGE - LOCAL - - - - - - - $20,894 $20,894CON CITY FUNDS - - - $2,573 - - - - $2,573CON LOCAL - ADVANCED CONSTRUCTION - - - $20,894 - - - $-20,894 -CON LOCAL BRIDGE SEISMIC RETROFIT ACCOUNT - - - $134 - - - - $134

Total Construction - - - $23,601 - - - - $23,601Total Programmed $2,775 $850 $309 $23,601 - - - - $27,535

5/12/2020 Public Project Listings

Page 12: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 11/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20170805 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-07

ConformCategory

NON-EXEMPT

TotalProject Cost$450

LeadAgency COLTON Modeling NO

County SanBernadino Primary Program Code CAY66 - NEW CONNECTNS/CROSS

TRAFFIC IMP: GM Air Basin SCAB RTP ID 4120116

System LocalHwy

ProjectLimits From Existing Intersection at Washington St. to Four way intersection along Washington St. at Hunts Ln., Begin: 0 End:

DescriptionREALIGN RECHE CANYON ROAD TO HUNTS LANE/WASHINGTON STREET. CONSTRUCT NEW FOUR (4) LANE ROADWITH TOTAL LENGTH OF 0.30 MILE. Toll credits to match EARREPU. (PA&ED ONLY)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE 2016 EARMARK REPURPOSING - $360 - - - - - - $360PE CITY FUNDS - $90 - - - - - - $90

Total Preliminary Engineering - $450 - - - - - - $450Total Programmed - $450 - - - - - - $450

5/12/2020 Public Project Listings

Page 13: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 12/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 201107 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$3,375

LeadAgency FONTANA Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A04087

System Local HwyProjectLimits From SOUTH HIGHLAND to I-15, Begin: 0 End:

DescriptionCHERRY AVENUE FROM SOUTH HIGHLAND TO I-15 WIDEN (2-6 LANES)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - - $255 - - - - - $255PE SBD CO MEASURE I - - $545 - - - - - $545

Total Preliminary Engineering - - $800 - - - - - $800ROW CITY FUNDS - - - $32 - - - - $32ROW SBD CO MEASURE I - - - $68 - - - - $68

Total Right of Way - - - $100 - - - - $100CON CITY FUNDS - - - - $790 - - - $790CON SBD CO MEASURE I - - - - $1,685 - - - $1,685

Total Construction - - - - $2,475 - - - $2,475Total Programmed - - $800 $100 $2,475 - - - $3,375

5/12/2020 Public Project Listings

Page 14: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 13/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 201139 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$11,464

LeadAgency FONTANA Modeling YES

County SanBernadino Primary Program Code CAX67 - NEW HIGHWAY (NO HOV

LANE): RS Air Basin SCAB RTP ID 4A04084

System Local HwyProjectLimits From LYTLE CREEK ROAD to MANGO AVENUE, Begin: 0 End:

DescriptionCASA GRANDE AVENUE FROM LYTLE CREEK ROAD TO MANGO AVENUE CONSTRUCT 4 LANES

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $244 - - - - - - - $244PE SBD CO MEASURE I $516 - - - - - - - $516

Total Preliminary Engineering $760 - - - - - - - $760ROW CITY FUNDS - $1,570 - - - - - - $1,570ROW SBD CO MEASURE I - $3,335 - - - - - - $3,335

Total Right of Way - $4,905 - - - - - - $4,905CON CITY FUNDS - - $1,855 - - - - - $1,855CON SBD CO MEASURE I - - $3,944 - - - - - $3,944

Total Construction - - $5,799 - - - - - $5,799Total Programmed $760 $4,905 $5,799 - - - - - $11,464

5/12/2020 Public Project Listings

Page 15: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 14/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 201140 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$2,866

LeadAgency FONTANA Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A01093

System Local HwyProjectLimits From SUMMIT AVENUE to I-15, Begin: 0 End:

DescriptionCITRUS AVENUE FROM SUMMIT AVENUE TO I-15 WIDEN FROM 2 TO 4 LANES

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - - $132 - - - - - $132PE SBD CO MEASURE I - - $281 - - - - - $281

Total Preliminary Engineering - - $413 - - - - - $413ROW CITY FUNDS - - $35 - - - - - $35ROW SBD CO MEASURE I - - $74 - - - - - $74

Total Right of Way - - $109 - - - - - $109CON CITY FUNDS - - - $750 - - - - $750CON SBD CO MEASURE I - - - $1,594 - - - - $1,594

Total Construction - - - $2,344 - - - - $2,344Total Programmed - - $522 $2,344 - - - - $2,866

5/12/2020 Public Project Listings

Page 16: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 15/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 201141 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$2,727

LeadAgency FONTANA Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID REG0701

System Local HwyProjectLimits From SLOVER AVENUE to JURUPA AVENUE, Begin: 0 End:

DescriptionCYPRESS AVENUE FROM SLOVER TO JURUPA AVENUE WIDEN FROM 2-4 LANES

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - - $71 - - - - - $71PE SBD CO MEASURE I - - $148 - - - - - $148

Total Preliminary Engineering - - $219 - - - - - $219ROW CITY FUNDS - - - $175 - - - - $175ROW SBD CO MEASURE I - - - $371 - - - - $371

Total Right of Way - - - $546 - - - - $546CON CITY FUNDS - - - - - $627 - - $627CON SBD CO MEASURE I - - - - - $1,335 - - $1,335

Total Construction - - - - - $1,962 - - $1,962Total Programmed - - $219 $546 - $1,962 - - $2,727

5/12/2020 Public Project Listings

Page 17: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 16/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 201142 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$3,200

LeadAgency FONTANA Modeling YES

County SanBernadino Primary Program Code CAX67 - NEW HIGHWAY (NO HOV

LANE): RS Air Basin SCAB RTP ID 4A1005

System Local HwyProjectLimits From DUNCAN CANYON to FRONTAGE ROAD (I-15), Begin: 0 End:

DescriptionCYPRESS AVENUE FROM DUNCAN CANYON ROAD TO FRONTAGE ROAD (I-15)-CONSTRUCT NEW 2 LANE ROAD

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - - $128 - - - - - $128PE SBD CO MEASURE I - - $272 - - - - - $272

Total Preliminary Engineering - - $400 - - - - - $400ROW CITY FUNDS - - - $160 - - - - $160ROW SBD CO MEASURE I - - - $340 - - - - $340

Total Right of Way - - - $500 - - - - $500CON CITY FUNDS - - - $736 - - - - $736CON SBD CO MEASURE I - - - $1,564 - - - - $1,564

Total Construction - - - $2,300 - - - - $2,300Total Programmed - - $400 $2,800 - - - - $3,200

5/12/2020 Public Project Listings

Page 18: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 17/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 201143 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$5,251

LeadAgency FONTANA Modeling YES

County SanBernadino Primary Program Code CAX67 - NEW HIGHWAY (NO HOV

LANE): RS Air Basin SCAB RTP ID 4A01099

System Local HwyProjectLimits From CITRUS AVE to SIERRA AVE., Begin: 0 End:

DescriptionDUNCAN CANYON ROAD FROM CITRUS AVENUE TO SIERRA AVENUE CONSTRUCT 4 LANES.

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $138 - - - - - - $138PE SBD CO MEASURE I - $292 - - - - - - $292

Total Preliminary Engineering - $430 - - - - - - $430ROW CITY FUNDS - $96 - - - - - - $96ROW SBD CO MEASURE I - $204 - - - - - - $204

Total Right of Way - $300 - - - - - - $300CON CITY FUNDS - - $1,447 - - - - - $1,447CON SBD CO MEASURE I - - $3,074 - - - - - $3,074

Total Construction - - $4,521 - - - - - $4,521Total Programmed - $730 $4,521 - - - - - $5,251

5/12/2020 Public Project Listings

Page 19: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 18/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 201144 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$958

LeadAgency FONTANA Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A04108

System Local HwyProjectLimits From TAMARIND AVENUE to ALDER AVENUE, Begin: 0 End:

DescriptionJURUPA AVENUE FROM TAMARIND AVENUE TO ALDER AVENUE WIDEN FROM 2 TO 4 LANES

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $64 - - - - - - $64PE SBD CO MEASURE I - $136 - - - - - - $136

Total Preliminary Engineering - $200 - - - - - - $200ROW CITY FUNDS - $80 - - - - - - $80ROW SBD CO MEASURE I - $170 - - - - - - $170

Total Right of Way - $250 - - - - - - $250CON CITY FUNDS - - $172 - - - - - $172CON SBD CO MEASURE I - - $336 - - - - - $336

Total Construction - - $508 - - - - - $508Total Programmed - $450 $508 - - - - - $958

5/12/2020 Public Project Listings

Page 20: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 19/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 201146 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$4,290

LeadAgency FONTANA Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A04127

System Local HwyProjectLimits From BEECH AVENUE to CITRUS AVENUE, Begin: 0 End:

DescriptionSIERRA LAKES PARKWAY FROM BEECH AVENUE TO CITRUS AVENUE WIDEN FROM 2 TO 4 LANES.

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $128 - - - - - - $128PE SBD CO MEASURE I - $272 - - - - - - $272

Total Preliminary Engineering - $400 - - - - - - $400ROW CITY FUNDS - - $320 - - - - - $320ROW SBD CO MEASURE I - - $680 - - - - - $680

Total Right of Way - - $1,000 - - - - - $1,000CON CITY FUNDS - - - $925 - - - - $925CON SBD CO MEASURE I - - - $1,965 - - - - $1,965

Total Construction - - - $2,890 - - - - $2,890Total Programmed - $400 $1,000 $2,890 - - - - $4,290

5/12/2020 Public Project Listings

Page 21: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 20/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 201147 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$6,551

LeadAgency FONTANA Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A01132

System Local HwyProjectLimits From ETIWANDA AVENUE to 800 FT. EAST OF ETIWANDA AVENUE, Begin: 0 End:

DescriptionSLOVER AVENUE FROM ETIWANDA AVENUE TO 800 FEET EAST OF ETIWANDA AVENUE WIDEN FROM 2-4 LANES

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $100 - - - - - - - $100PE SBD CO MEASURE I $213 - - - - - - - $213

Total Preliminary Engineering $313 - - - - - - - $313ROW CITY FUNDS $101 - - - - - - - $101ROW SBD CO MEASURE I $213 - - - - - - - $213

Total Right of Way $314 - - - - - - - $314CON CITY FUNDS - $1,897 - - - - - - $1,897CON SBD CO MEASURE I - $4,027 - - - - - - $4,027

Total Construction - $5,924 - - - - - - $5,924Total Programmed $627 $5,924 - - - - - - $6,551

5/12/2020 Public Project Listings

Page 22: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 21/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 201148 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$5,250

LeadAgency FONTANA Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A07056

System Local HwyProjectLimits From CHERRY AVENUE to CITRUS AVENUE, Begin: 0 End:

DescriptionSOUTH HIGHLAND AVENUE FROM CHERRY AVENUE TO CITRUS AVENUE WIDEN FROM 2 TO 4 LANES

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $179 - - - - - - $179PE SBD CO MEASURE I - $381 - - - - - - $381

Total Preliminary Engineering - $560 - - - - - - $560ROW CITY FUNDS - - $160 - - - - - $160ROW SBD CO MEASURE I - - $340 - - - - - $340

Total Right of Way - - $500 - - - - - $500CON CITY FUNDS - - $1,341 - - - - - $1,341CON SBD CO MEASURE I - - $2,849 - - - - - $2,849

Total Construction - - $4,190 - - - - - $4,190Total Programmed - $560 $4,690 - - - - - $5,250

5/12/2020 Public Project Listings

Page 23: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 22/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 201149 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$2,418

LeadAgency FONTANA Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A07273

System Local HwyProjectLimits From CHERRY AVENUE to BEECH AVENUE, Begin: 0 End:

DescriptionVALLEY BOULEVARD FROM CHERRY AVENUE TO BEECH AVENUE WIDEN FROM 4-6 LANES

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $117 - - - - - - $117PE SBD CO MEASURE I - $246 - - - - - - $246

Total Preliminary Engineering - $363 - - - - - - $363ROW CITY FUNDS - - $116 - - - - - $116ROW SBD CO MEASURE I - - $247 - - - - - $247

Total Right of Way - - $363 - - - - - $363CON CITY FUNDS - - - $541 - - - - $541CON SBD CO MEASURE I - - - $1,151 - - - - $1,151

Total Construction - - - $1,692 - - - - $1,692Total Programmed - $363 $363 $1,692 - - - - $2,418

5/12/2020 Public Project Listings

Page 24: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 23/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 201162 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$2,418

LeadAgency FONTANA Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A07274

System Local HwyProjectLimits From BEECH AVENUE to CITRUS AVENUE, Begin: 0 End:

DescriptionVALLEY BOULEVARD FROM BEECH AVENUE TO CITRUS AVENUE WIDEN FROM 4-6 LANES

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $39 $78 - - - - - - $117PE SBD CO MEASURE I $82 $164 - - - - - - $246

Total Preliminary Engineering $121 $242 - - - - - - $363ROW CITY FUNDS - - $116 - - - - - $116ROW SBD CO MEASURE I - - $247 - - - - - $247

Total Right of Way - - $363 - - - - - $363CON CITY FUNDS - - - $541 - - - - $541CON SBD CO MEASURE I - - - $1,151 - - - - $1,151

Total Construction - - - $1,692 - - - - $1,692Total Programmed $121 $242 $363 $1,692 - - - - $2,418

5/12/2020 Public Project Listings

Page 25: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 24/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 201163 FTIP Amendment San Bernardino County Transportation Authority(SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$2,418

LeadAgency FONTANA Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A1007

System Local HwyProjectLimits From CITRUS AVENUE to SIERRA AVENUE, Begin: 0 End:

DescriptionVALLEY BOULEVARD FROM CITRUS AVENUE TO SIERRA AVENUE WIDEN FROM 4-6 LANES

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $117 - - - - - - - $117PE SBD CO MEASURE I $246 - - - - - - - $246

Total Preliminary Engineering $363 - - - - - - - $363ROW CITY FUNDS - $116 - - - - - - $116ROW SBD CO MEASURE I - $247 - - - - - - $247

Total Right of Way - $363 - - - - - - $363CON CITY FUNDS - - - $541 - - - - $541CON SBD CO MEASURE I - - - $1,151 - - - - $1,151

Total Construction - - - $1,692 - - - - $1,692Total Programmed $363 $363 - $1,692 - - - - $2,418

5/12/2020 Public Project Listings

Page 26: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 25/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 201164 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$2,416

LeadAgency FONTANA Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A07140

System Local HwyProjectLimits From SIERRA AVENUE to ALDER AVENUE, Begin: 0 End:

DescriptionVALLEY BOULEVARD FROM SIERRA AVENUE TO ALDER AVENUE WIDEN FROM 4-6 LANES

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $116 - - - - - - $116PE SBD CO MEASURE I - $246 - - - - - - $246

Total Preliminary Engineering - $362 - - - - - - $362ROW CITY FUNDS - - $116 - - - - - $116ROW SBD CO MEASURE I - - $246 - - - - - $246

Total Right of Way - - $362 - - - - - $362CON CITY FUNDS - - $541 - - - - - $541CON SBD CO MEASURE I - - $1,151 - - - - - $1,151

Total Construction - - $1,692 - - - - - $1,692Total Programmed - $362 $2,054 - - - - - $2,416

5/12/2020 Public Project Listings

Page 27: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 26/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 201166 FTIP Amendment San Bernardino County Transportation Authority(SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$1,312

LeadAgency FONTANA Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A1006

System Local HwyProjectLimits From I-15 to CITRUS AVENUE, Begin: 0 End:

DescriptionDUNCAN CANYON ROAD FROM I-15 TO CITRUS AVENUE-WIDEN FROM 2-4 LANES

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $394 - - - - - - - $394

Total Preliminary Engineering $394 - - - - - - - $394CON CITY FUNDS - $294 - - - - - - $294CON SBD CO MEASURE I - $624 - - - - - - $624

Total Construction - $918 - - - - - - $918Total Programmed $394 $918 - - - - - - $1,312

5/12/2020 Public Project Listings

Page 28: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 27/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20131506 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

TCMCommitted

TotalProject Cost$3,966

LeadAgency FONTANA Modeling NO

County SanBernadino Primary Program Code NCN25 - BICYCLE & PEDESTRAIN

FACILITIES-NEW Air Basin SCAB RTP ID 0A6410

System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionIN FONTANA: SAN SEVAINE TRAIL (PHASE 1, SEG 2) North/South 1.25 mile long, 12 ft wide paved multi-use trail from BanyanSt. to the Pacific Electric Trail in Fontana

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $20 - - - - - - - $20PE PARTNERSHIP PLANNING GRANT $150 - - - - - - - $150PE RECREATIONAL TRAILS $567 - - - - - - - $567

Total Preliminary Engineering $737 - - - - - - - $737CON AGENCY - $500 - - - - - - $500CON CITY FUNDS - $828 - - - - - - $828CON RECREATIONAL TRAILS - $1,901 - - - - - - $1,901

Total Construction - $3,229 - - - - - - $3,229Total Programmed $737 $3,229 - - - - - - $3,966

5/12/2020 Public Project Listings

Page 29: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 28/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20170804 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-08

ConformCategory

EXEMPT -93.126

TotalProject Cost$1,198

LeadAgency FONTANA Modeling NO

County SanBernadino Primary Program Code ITS08 - FIBER OPTIC

COMMUNICATIONS Air Basin SCAB RTP ID 4120193

System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionCITY OF FONTANA TO INSTALL FIBER OPTIC CABLE TO BRING BACK VIDEO AND COMMUNICATIONS TO THETRANSPORTATION MANAGEMENT CENTER. TOLL CREDIT TO MATCH EARREPU.

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $120 - - - - - - - $120

Total Preliminary Engineering $120 - - - - - - - $120CON 2016 EARMARK REPURPOSING - $1,078 - - - - - - $1,078

Total Construction - $1,078 - - - - - - $1,078Total Programmed $120 $1,078 - - - - - - $1,198

5/12/2020 Public Project Listings

Page 30: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 29/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20190006 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$2,858

LeadAgency FONTANA Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 2016A319

System Local HwyProjectLimits From Oleander Ave to Cypress Ave, Begin: 0 End:

DescriptionFoothill Boulevard: Oleander Ave to Cypress Ave; Widen 4-6 lanes

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $150 - - - - - - - $150

Total Preliminary Engineering $150 - - - - - - - $150ROW CITY FUNDS $655 - - - - - - - $655

Total Right of Way $655 - - - - - - - $655CON CITY FUNDS - $2,053 - - - - - - $2,053

Total Construction - $2,053 - - - - - - $2,053Total Programmed $805 $2,053 - - - - - - $2,858

5/12/2020 Public Project Listings

Page 31: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 30/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20190007 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$1,620

LeadAgency FONTANA Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 2016A319

System Local HwyProjectLimits From Sierra Ave to Mango Ave, Begin: 0 End:

DescriptionFoothill Boulevard: Sierra Ave to Mango Ave; Widen 4-6 lanes

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $120 - - - - - - - $120

Total Preliminary Engineering $120 - - - - - - - $120CON CITY FUNDS - $1,500 - - - - - - $1,500

Total Construction - $1,500 - - - - - - $1,500Total Programmed $120 $1,500 - - - - - - $1,620

5/12/2020 Public Project Listings

Page 32: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 31/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20190104 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-01

ConformCategory

NON-EXEMPT

TotalProject Cost$1,501

LeadAgency FONTANA Modeling YES

County SanBernadino Primary Program Code CAN76 - ADDING A LANE THROUGH A

BOTTLENECK: NRS Air Basin SCAB RTP ID 4A04102

System Local HwyProjectLimits From Hemlock Ave to Almeria Ave, Begin: 0 End:

DescriptionIn Fontana: Widen Foothill Blvd (4-6 lanes) from Hemlock Ave to Almeria Ave; includes class II bike lanes, raised median, andreplacement of historic Malaga Bridge to accommodate street widening. Existing Malaga bridge to be relocated. (PA&ED Only)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE LOCAL TRANS FUNDS - $1,500 - - - - - - $1,500PE STP LOCAL - $1 - - - - - - $1

Total Preliminary Engineering - $1,501 - - - - - - $1,501Total Programmed - $1,501 - - - - - - $1,501

5/12/2020 Public Project Listings

Page 33: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 32/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID SBD031217 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$5,055

LeadAgency FONTANA Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID SBD031217

System Local HwyProjectLimits From FOOTHILL to MILLER, Begin: 0 End:

DescriptionBEECH AVENUE FOOTHILL TO MILLER AVE WIDEN FROM 2 LANES TO 4 LANES

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $150 - - - - - - - $150PE SBD CO MEASURE I $317 - - - - - - - $317

Total Preliminary Engineering $467 - - - - - - - $467ROW CITY FUNDS $349 - - - - - - - $349ROW SBD CO MEASURE I $741 - - - - - - - $741

Total Right of Way $1,090 - - - - - - - $1,090CON CITY FUNDS - $1,120 - - - - - - $1,120CON SBD CO MEASURE I - $2,378 - - - - - - $2,378

Total Construction - $3,498 - - - - - - $3,498Total Programmed $1,557 $3,498 - - - - - - $5,055

5/12/2020 Public Project Listings

Page 34: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 33/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID SBD031218 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$2,624

LeadAgency FONTANA Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID SBD031218

System Local HwyProjectLimits From BASELINE to FOOTHILL, Begin: 0 End:

DescriptionALDER AVENUE BASELINE TO FOOTHILL BOULEVARD WIDEN 2 LANES TO 4 LANES W/TURN LANES

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE FEE - $210 - - - - - - $210PE SBD CO MEASURE I - $446 - - - - - - $446

Total Preliminary Engineering - $656 - - - - - - $656ROW FEE - $210 - - - - - - $210ROW SBD CO MEASURE I - $446 - - - - - - $446

Total Right of Way - $656 - - - - - - $656CON FEE - $420 - - - - - - $420CON SBD CO MEASURE I - $892 - - - - - - $892

Total Construction - $1,312 - - - - - - $1,312Total Programmed - $2,624 - - - - - - $2,624

5/12/2020 Public Project Listings

Page 35: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 34/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID SBD031228 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$2,635

LeadAgency FONTANA Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID SBD031228

System Local HwyProjectLimits From RIVERSIDE COUNTY LINE to I-10, Begin: 0 End:

DescriptionETIWANDA AVENUE RIVERSIDE COUNTY LINE TO INTERSTATE 10 WIDEN FROM 4 TO 6 LANES

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $58 - - - - - - $58PE SBD CO MEASURE I - $122 - - - - - - $122

Total Preliminary Engineering - $180 - - - - - - $180ROW CITY FUNDS - $160 - - - - - - $160ROW SBD CO MEASURE I - $340 - - - - - - $340

Total Right of Way - $500 - - - - - - $500CON CITY FUNDS - - $626 - - - - - $626CON SBD CO MEASURE I - - $1,329 - - - - - $1,329

Total Construction - - $1,955 - - - - - $1,955Total Programmed - $680 $1,955 - - - - - $2,635

5/12/2020 Public Project Listings

Page 36: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 35/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID SBD031233 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$5,830

LeadAgency FONTANA Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID SBD031233

System Local HwyProjectLimits From ALDER AVE to MAPLE AVE, Begin: 0 End:

DescriptionARROW BOULEVARD ALDER TO MAPLE AVENUE WIDEN 2 LANES TO 4 LANES

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $466 - - - - - - - $466PE SBD CO MEASURE I $991 - - - - - - - $991

Total Preliminary Engineering $1,457 - - - - - - - $1,457ROW CITY FUNDS - $467 - - - - - - $467ROW SBD CO MEASURE I - $991 - - - - - - $991

Total Right of Way - $1,458 - - - - - - $1,458CON CITY FUNDS - $933 - - - - - - $933CON SBD CO MEASURE I - $1,982 - - - - - - $1,982

Total Construction - $2,915 - - - - - - $2,915Total Programmed $1,457 $4,373 - - - - - - $5,830

5/12/2020 Public Project Listings

Page 37: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 36/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID SBD031235 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$1,265

LeadAgency FONTANA Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID SBD031235

System Local HwyProjectLimits From ALMERIA to CITRUS AVE, Begin: 0 End:

DescriptionARROW HIGHWAY ALMERIA TO CITRUS AVENUE WIDEN 2 LANES TO 4 LANES

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE FEE - - - - $101 - - - $101PE SBD CO MEASURE I - - - - $215 - - - $215

Total Preliminary Engineering - - - - $316 - - - $316ROW FEE - - - - $102 - - - $102ROW SBD CO MEASURE I - - - - $215 - - - $215

Total Right of Way - - - - $317 - - - $317CON FEE - - - - $202 - - - $202CON SBD CO MEASURE I - - - - $430 - - - $430

Total Construction - - - - $632 - - - $632Total Programmed - - - - $1,265 - - - $1,265

5/12/2020 Public Project Listings

Page 38: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 37/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID SBD031254 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$2,065

LeadAgency FONTANA Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID SBD031254

System Local HwyProjectLimits From ALDER AVENUE to MAPLE AVENUE, Begin: 0 End:

DescriptionMERRILL AVENUE ALDER TO MAPLE AVENUE WIDEN FROM 2 TO 4 LANES

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $38 - - - - - - - $38PE SBD CO MEASURE I $82 - - - - - - - $82

Total Preliminary Engineering $120 - - - - - - - $120ROW CITY FUNDS - - - $96 - - - - $96ROW SBD CO MEASURE I - - - $204 - - - - $204

Total Right of Way - - - $300 - - - - $300CON CITY FUNDS - - - - $526 - - - $526CON SBD CO MEASURE I - - - - $1,119 - - - $1,119

Total Construction - - - - $1,645 - - - $1,645Total Programmed $120 - - $300 $1,645 - - - $2,065

5/12/2020 Public Project Listings

Page 39: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 38/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID SBD031266 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$8,129

LeadAgency FONTANA Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID SBD031266

System Local HwyProjectLimits From FOOTHILL BOULEVARD to BASELINE AVENUE, Begin: 0 End:

DescriptionSIERRA AVENUE FOOTHILL BOULEVARD TO BASELINE AVENUE- WIDEN FROM 4 TO 6 LANES

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $10 $48 - - - - - - $58PE SBD CO MEASURE I $20 $102 - - - - - - $122

Total Preliminary Engineering $30 $150 - - - - - - $180ROW CITY FUNDS - $1,760 - - - - - - $1,760ROW SBD CO MEASURE I - $3,740 - - - - - - $3,740

Total Right of Way - $5,500 - - - - - - $5,500CON CITY FUNDS - - $784 - - - - - $784CON SBD CO MEASURE I - - $1,665 - - - - - $1,665

Total Construction - - $2,449 - - - - - $2,449Total Programmed $30 $5,650 $2,449 - - - - - $8,129

5/12/2020 Public Project Listings

Page 40: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 39/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 201105 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$1,800

LeadAgency

GRANDTERRACE Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A07268

System Local HwyProjectLimits From COMMERCE WAY to MAIN ST., Begin: 0 End:

DescriptionMICHIGAN AVENUE WIDENING (2-4 LANES) FROM COMMERCE WAY TO MAIN STREET

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - - $300 - - - - - $300

Total Preliminary Engineering - - $300 - - - - - $300CON CITY FUNDS - - - $1,500 - - - - $1,500

Total Construction - - - $1,500 - - - - $1,500Total Programmed - - $300 $1,500 - - - - $1,800

5/12/2020 Public Project Listings

Page 41: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 40/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 201106 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$3,500

LeadAgency

GRANDTERRACE Modeling YES

County SanBernadino Primary Program Code CAX67 - NEW HIGHWAY (NO HOV

LANE): RS Air Basin SCAB RTP ID 4A01008

System Local HwyProjectLimits From MICHIGAN AVENUE to BARTON ROADVIVIENDA, Begin: 0 End:

DescriptionCOMMERCE WAY FROM MICHIGAN AVENUE TO BARTON ROAD AT VIVIENDA AVENUE. NEW ROAD - 4 LANE ROADEXTENSION

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalCON CITY FUNDS - $1,400 - - - - - - $1,400CON SBD CO MEASURE I - $2,100 - - - - - - $2,100

Total Construction - $3,500 - - - - - - $3,500Total Programmed - $3,500 - - - - - - $3,500

5/12/2020 Public Project Listings

Page 42: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 41/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20084104 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$743

LeadAgency HESPERIA Modeling YES

County SanBernadino Primary Program Code TDR64 - PARK & RIDE LOT

MODIFICATIONS/UPGRADE Air Basin RTP ID 20084104

System Local HwyProjectLimits From W OF US 395 to I-15, Begin: 0 End:

DescriptionJOSHUA STREET PARK & RIDE EXPANSION - ON JOSHUA STREET WEST OF US 395,C ITY OF HESPERIA, EXISTING PNRHAS 188 SPACES AND NEEDS TO ADD 200 SPACES, TO INCLUDE LANDSCAPING, LIGHTING AND VARIOUS NON-CAPACITY STREET IMPROVEMENTS TO FACILITATE ADDITIONAL SPACES (M003). Toll credits to match CMAQ.

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $25 - - - - - - - $25

Total Preliminary Engineering $25 - - - - - - - $25CON CITY FUNDS - $26 - - - - - - $26CON CMAQ - $508 - - - - - - $508CON STATE AB2766 - $184 - - - - - - $184

Total Construction - $718 - - - - - - $718Total Programmed $25 $718 - - - - - - $743

5/12/2020 Public Project Listings

Page 43: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 42/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20150008 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-02

ConformCategory

NON-EXEMPT

TotalProject Cost$30,136

LeadAgency HESPERIA Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin RTP ID SBD55025

System Local HwyProjectLimits From I-15 to MAPLE, Begin: 0 End:

DescriptionIN HESPERIA: MAIN ST FROM I-15 TO MAPLE (PHASE 1) / MAPLE TO 11TH (PHASE 2) / I-15 TO SR 395 (PHASE 3); WIDENAND RECONSTRUCT FROM 4-6 LANES, INCLUDING WIDENING OF BRIDGE OVER CALIFORNIA AQUEDUCT (2.75MILES)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE AGENCY $72 - - - - - - - $72PE DEVELOPER FEES $7 - - - - - - - $7PE LOCAL TRANS FUNDS $456 $270 - - - - - - $726PE SBD CO MEASURE I - $1,200 - - - - - - $1,200

Total Preliminary Engineering $535 $1,470 - - - - - - $2,005ROW DEVELOPER FEES - - - - $2,647 - - - $2,647ROW SBD CO MEASURE I - - - - $1,846 - - - $1,846

Total Right of Way - - - - $4,493 - - - $4,493CON DEVELOPER FEES - - - - - $13,923 - - $13,923CON SBD CO MEASURE I - - - - - $9,715 - - $9,715

Total Construction - - - - - $23,638 - - $23,638Total Programmed $535 $1,470 - - $4,493 $23,638 - - $30,136

5/12/2020 Public Project Listings

Page 44: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 43/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID SBD55030 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-07

ConformCategory

NON-EXEMPT

TotalProject Cost$27,622

LeadAgency HESPERIA Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin RTP ID SBD55030

System Local HwyProjectLimits From TOPAZ AVE to 7TH STREET, Begin: 0 End:

DescriptionRANCHERO RD. FROM TOPAZ AVE TO 7TH ST. - WIDEN FROM 2 TO 5 LANES (6 MILES)(includes bridge over CaliforniaAqueduct)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE DEVELOPER FEES $2,064 - - - - - - - $2,064

Total Preliminary Engineering $2,064 - - - - - - - $2,064ROW DEVELOPER FEES $1,606 - - - - - - - $1,606ROW SBD CO MEASURE I $1,120 - - - - - - - $1,120

Total Right of Way $2,726 - - - - - - - $2,726CON AGENCY - - $6,339 - - - - - $6,339CON DEVELOPER FEES - - $9,548 - - - - - $9,548CON SB1 LOCAL PARTNERSHIP COMPETITIVE FUNDS - $3,900 - - - - - - $3,900CON SBD CO MEASURE I - - $3,045 - - - - - $3,045

Total Construction - $3,900 $18,932 - - - - - $22,832Total Programmed $4,790 $3,900 $18,932 - - - - - $27,622

5/12/2020 Public Project Listings

Page 45: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 44/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 200019 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-15

ConformCategory

EXEMPT -93.126

TotalProject Cost$38,776

LeadAgency HIGHLAND Modeling NO

County SanBernadino Primary Program Code NCR36 - BRIDGE RESTORATION &

REPLC (NO LN ADD) Air Basin SCAB RTP ID 200019

System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionBRIDGE NO. 54C0035 (previously shown as 00L0028), BASE LINE, OVER CITY CREEK. REPLACE 4 LANE BRIDGE WITH 4LANE BRIDGE.

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE BRIDGE - LOCAL $531 $2,517 - - - - - - $3,048PE DEVELOPER FEES $69 $326 - - - - - - $395

Total Preliminary Engineering $600 $2,843 - - - - - - $3,443ROW BRIDGE - LOCAL - - $536 - - $3,098 - - $3,634ROW DEVELOPER FEES - - $471 - - - - - $471ROW LOCAL - ADVANCED CONSTRUCTION - - $3,098 - - $-3,098 - - -

Total Right of Way - - $4,105 - - - - - $4,105CON BRIDGE - LOCAL - - - - - - - $55,292 $55,292CON DEVELOPER FEES - - - $3,582 - - - - $3,582CON LOCAL - ADVANCED CONSTRUCTION - - - $27,646 - - - $-55,292 $-27,646

Total Construction - - - $31,228 - - - - $31,228Total Programmed $600 $2,843 $4,105 $31,228 - - - - $38,776

5/12/2020 Public Project Listings

Page 46: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 45/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20082402 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$20,958

LeadAgency HIGHLAND Modeling YES

County SanBernadino Primary Program Code CAY76 - ADDING A LANE THROUGH A

BOTTLENECK: GM Air Basin SCAB RTP ID 4A07308

System Local HwyProjectLimits From CHURCH to BUCKEYE ST., Begin: 0 End:

DescriptionWIDEN BASE LINE BETWEEN CHURCH AVE AND BUCKEYE ST FROM 4-6 LANES

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $438 $632 - - - - - $1,070PE SBD CO MEASURE I - $728 $876 - - - - - $1,604

Total Preliminary Engineering - $1,166 $1,508 - - - - - $2,674ROW CITY FUNDS - - - $1,257 - - - - $1,257ROW SBD CO MEASURE I - - - $1,743 - - - - $1,743

Total Right of Way - - - $3,000 - - - - $3,000CON CITY FUNDS - - - - $525 - - - $525CON SBD CO MEASURE I - - - - $14,759 - - - $14,759

Total Construction - - - - $15,284 - - - $15,284Total Programmed - $1,166 $1,508 $3,000 $15,284 - - - $20,958

5/12/2020 Public Project Listings

Page 47: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 46/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 2011104 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

EXEMPT -93.126

TotalProject Cost$8,325

LeadAgency HIGHLAND Modeling NO

County SanBernadino Primary Program Code NCR31 - ROAD REPLC & REHAB (NO

LN ADD) Air Basin SCAB RTP ID 4OM0701

System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionIn Highland: Victoria Ave from 3rd St to 6th St including reconstruction of the 5th St/Victoria ave intersection, additional turn lanes,shoulder improvements, traffic signal mod, no add'l thru lanes; Storm drain improvements from 3rd St to 9th St w/connection to theexisting drainage channel on the south side of 3rd St.

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $775 - - - - - - - $775

Total Preliminary Engineering $775 - - - - - - - $775CON CITY FUNDS - - $7,550 - - - - - $7,550

Total Construction - - $7,550 - - - - - $7,550Total Programmed $775 - $7,550 - - - - - $8,325

5/12/2020 Public Project Listings

Page 48: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 47/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 201153 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$5,070

LeadAgency HIGHLAND Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4120141

System Local HwyProjectLimits

From ABOUT 0.36 MILES SOUTH OF 5TH STREET ALONG SR 210 to ABOUT 0.38 MILES SOUTH OF 5TH STREET ALONGSR 210, Begin: 0 End:

DescriptionWIDEN 5TH ST FROM CITY CRK TO SR210; RESTRIPE 5TH ST FROM 4-6LNS BTW CHURCH AVE & SR210; WIDEN ANDRESTRIPE 210 UNDERCROSSING 4-5LNS BTW RAMPS AND ADDITIONAL TURN LN.

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE PRIVATE FUNDS $507 - - - - - - - $507

Total Preliminary Engineering $507 - - - - - - - $507CON PRIVATE FUNDS - $4,563 - - - - - - $4,563

Total Construction - $4,563 - - - - - - $4,563Total Programmed $507 $4,563 - - - - - - $5,070

5/12/2020 Public Project Listings

Page 49: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 48/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 201156 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$22,530

LeadAgency HIGHLAND Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 20061014

System Local HwyProjectLimits From SANTA PAULA to 2,600' S/O SANTA ANA RIVER, Begin: 0 End:

DescriptionGREENSPOT RD. FROM SANTA PAULA ST. TO SOUTH CITY LIMIT - WIDEN FROM 2-4 LANES WITH MEDIAN (2.2 MILES)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE DEVELOPER FEES - $787 - - - - - - $787PE SBD CO MEASURE I - $925 - - - - - - $925

Total Preliminary Engineering - $1,712 - - - - - - $1,712ROW DEVELOPER FEES - $520 - - - - - - $520ROW SBD CO MEASURE I - $600 - - - - - - $600

Total Right of Way - $1,120 - - - - - - $1,120CON DEVELOPER FEES - - - - $9,056 - - - $9,056CON SBD CO MEASURE I - - - - $10,642 - - - $10,642

Total Construction - - - - $19,698 - - - $19,698Total Programmed - $2,832 - - $19,698 - - - $22,530

5/12/2020 Public Project Listings

Page 50: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 49/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 201180 FTIP Amendment San Bernardino County Transportation Authority(SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$673

LeadAgency HIGHLAND Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 200852

System Local HwyProjectLimits From 5TH STREET to 6TH STREET, Begin: 0 End:

DescriptionDEL ROSA DRIVE FROM 5TH STREET TO 6TH STREET-WIDEN FROM 2 TO 4 LANES (0.2 MILES)FORMERLY PART OFPROJECT ID 200852

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $63 - - - - - - $63

Total Preliminary Engineering - $63 - - - - - - $63ROW CITY FUNDS - - $42 - - - - - $42

Total Right of Way - - $42 - - - - - $42CON CITY FUNDS - - - $568 - - - - $568

Total Construction - - - $568 - - - - $568Total Programmed - $63 $42 $568 - - - - $673

5/12/2020 Public Project Listings

Page 51: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 50/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 201182 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$798

LeadAgency HIGHLAND Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A07142

System Local HwyProjectLimits From 3RD STREET to 5TH STREET, Begin: 0 End:

DescriptionTIPPECANOE AVENUE FROM 3RD STREET TO 5TH STREET - WIDEN FROM 2-4 LANES (0.3 MILES)FORMERLY PART OFPROJECT ID 200852

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $61 - - - - - - $61

Total Preliminary Engineering - $61 - - - - - - $61ROW CITY FUNDS - - $30 - - - - - $30

Total Right of Way - - $30 - - - - - $30CON CITY FUNDS - - - $707 - - - - $707

Total Construction - - - $707 - - - - $707Total Programmed - $61 $30 $707 - - - - $798

5/12/2020 Public Project Listings

Page 52: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 51/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 201183 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$5,255

LeadAgency HIGHLAND Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A01368

System Local HwyProjectLimits From TIPPECANOE AVENUE to VICTORIA AVENUE, Begin: 0 End:

Description5TH ST FROM TIPPECANOE AVENUE TO DEL ROSA DR.-WIDEN FROM 2-4 LANES

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $441 - - - - - - $441

Total Preliminary Engineering - $441 - - - - - - $441ROW CITY FUNDS - - $732 - - - - - $732

Total Right of Way - - $732 - - - - - $732CON CITY FUNDS - - - $4,082 - - - - $4,082

Total Construction - - - $4,082 - - - - $4,082Total Programmed - $441 $732 $4,082 - - - - $5,255

5/12/2020 Public Project Listings

Page 53: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 52/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 201191 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$683

LeadAgency HIGHLAND Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4OM0701

System Local HwyProjectLimits From SEINE AVENUE to STONEY CREEK DRIVE, Begin: 0 End:

DescriptionBASE LINE FROM SEINE AVENUE TO STONEY CREEK DRIVE - WIDEN FROM 4-6 LANES (0.2 MILES)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $143 - - - - - - $143

Total Preliminary Engineering - $143 - - - - - - $143ROW CITY FUNDS - - - $47 - - - - $47

Total Right of Way - - - $47 - - - - $47CON CITY FUNDS - - - - $493 - - - $493

Total Construction - - - - $493 - - - $493Total Programmed - $143 - $47 $493 - - - $683

5/12/2020 Public Project Listings

Page 54: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 53/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20130306 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-01

ConformCategory

EXEMPT -93.126

TotalProject Cost$42

LeadAgency HIGHLAND Modeling NO

County SanBernadino Primary Program Code RECREATION TRAIL PROJECTS Air Basin SCAB RTP ID REG0704

System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionCITY CREEK LEVEE TRAILS - CONSTRUCT NON-MOTORIZED TRAILS ALONG THE EASTERLY AND WESTERLY CITYCREEK FLOOD CONTROL LEVEES BETWEEN HIGHLAND AVE AND BASE LINE

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE RECREATIONAL TRAILS $11 - - - - - - - $11

Total Preliminary Engineering $11 - - - - - - - $11CON CITY FUNDS - $5 - - - - - - $5CON RECREATIONAL TRAILS - $26 - - - - - - $26

Total Construction - $31 - - - - - - $31Total Programmed $11 $31 - - - - - - $42

5/12/2020 Public Project Listings

Page 55: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 54/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20130401 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-16

ConformCategory

EXEMPT -93.126

TotalProject Cost$10,530

LeadAgency HIGHLAND Modeling NO

County SanBernadino Primary Program Code NCR36 - BRIDGE RESTORATION &

REPLC (NO LN ADD) Air Basin SCAB RTP ID 20130401

System Local HwyProjectLimits From N/O Pioneer Ave-Bridge to N/O Pioneer Ave-Bridge, Begin: 0 End:

DescriptionBRIDGE NO. 54C0592, ORANGE ST OVER PLUNGE CREEK OVERFLOW, 1.5 MI N OF PIONEER AVE. Replace existing twolane bridge structure with four lane bridge structure. (Non-Capacity: bridge will remain striped for two lanes)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE BRIDGE - LOCAL $469 - - - $655 - - - $1,124PE DEVELOPER FEES $61 - - - $85 - - - $146

Total Preliminary Engineering $530 - - - $740 - - - $1,270ROW BRIDGE - LOCAL - - - - - $1,006 - - $1,006ROW DEVELOPER FEES - - - - - $130 - - $130

Total Right of Way - - - - - $1,136 - - $1,136CON BRIDGE - LOCAL - - - - - - - $14,384 $14,384CON DEVELOPER FEES - - - - - - - $1,864 $1,864

Total Construction - - - - - - - $16,248 $16,248Total Programmed $530 - - - $740 $1,136 - $16,248 $18,654

5/12/2020 Public Project Listings

Page 56: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 55/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20131501 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-19

ConformCategory

EXEMPT -93.126

TotalProject Cost$4,064

LeadAgency HIGHLAND Modeling NO

County SanBernadino Primary Program Code NCN46 - PLANTING/LANDSCAPING Air Basin SCAB RTP ID 200018

System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionIN HIGHLAND: ON BOULDER AVE FROM SAN MANUEL VILLAGE ENTRANCE TO GREENSPOT ROAD; STREET ANDLANDSCAPING IMPROVEMENTS (non-capacity enhancements)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE AGENCY $41 - - - - - - - $41PE CITY FUNDS $200 - - - - - - - $200

PE PROJECTS OF NATIONAL AND REGIONALSIGNIFICANCE $164 - - - - - - - $164

Total Preliminary Engineering $405 - - - - - - - $405CON AGENCY - - $223 - - - - - $223CON CITY FUNDS - - $1,600 - - - - - $1,600

CON PROJECTS OF NATIONAL AND REGIONALSIGNIFICANCE - - $1,045 - - - - - $1,045

CON STP LOCAL - - $791 - - - - - $791Total Construction - - $3,659 - - - - - $3,659Total Programmed $405 - $3,659 - - - - - $4,064

5/12/2020 Public Project Listings

Page 57: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 56/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20131502 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

EXEMPT -93.126

TotalProject Cost$2,000

LeadAgency HIGHLAND Modeling NO

County SanBernadino Primary Program Code NCR22 - SHOULDER WIDENING Air Basin SCAB RTP ID 4A01387

System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionIN HIGHLAND: ALONG NORTH SIDE OF 5TH STREET FROM VICTORIA AVE TO PALM AVE; SHOULDERIMPROVEMENTS (no additional lanes)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $250 - - - - - - - $250

Total Preliminary Engineering $250 - - - - - - - $250ROW CITY FUNDS - $500 - - - - - - $500

Total Right of Way - $500 - - - - - - $500CON CITY FUNDS - - $1,250 - - - - - $1,250

Total Construction - - $1,250 - - - - - $1,250Total Programmed $250 $500 $1,250 - - - - - $2,000

5/12/2020 Public Project Listings

Page 58: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 57/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20131503 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

EXEMPT -93.126

TotalProject Cost$2,733

LeadAgency HIGHLAND Modeling NO

County SanBernadino Primary Program Code NCR22 - SHOULDER WIDENING Air Basin SCAB RTP ID 0A6410

System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionIN HIGHLAND: PALM AVE HISTORIC DISTRICT IMPROVEMENTS; PALM AVE (BASE LINE TO HIGHLAND AVE) &PACIFIC ST (CHURCH AVE TO 350FT WEST OF PALM) SHOULDER IMPROVEMENTS (curb, gutter and sidewalkimprovements), NEW ROUNDABOUT AT PALM/PACIFIC INT., BIKE LANES (Intersection improvements - no new lanes)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $600 - - - - - - $600

Total Preliminary Engineering - $600 - - - - - - $600ROW CITY FUNDS - - - $100 - - - - $100

Total Right of Way - - - $100 - - - - $100CON CITY FUNDS - - - - - $2,033 - - $2,033

Total Construction - - - - - $2,033 - - $2,033Total Programmed - $600 - $100 - $2,033 - - $2,733

5/12/2020 Public Project Listings

Page 59: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 58/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20150401 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

EXEMPT -93.126

TotalProject Cost$680

LeadAgency HIGHLAND Modeling NO

County SanBernadino Primary Program Code NCR22 - SHOULDER WIDENING Air Basin SCAB RTP ID REG0703

System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionHIGHLAND: DEL ROSA DR SHOULDER IMPROVEMENTS; FROM 3RD ST TO 5TH ST (curb, gutter & sidewalk improvements)(non-capacity)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalCON CITY FUNDS - - - $680 - - - - $680

Total Construction - - - $680 - - - - $680Total Programmed - - - $680 - - - - $680

5/12/2020 Public Project Listings

Page 60: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 59/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20171101 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

EXEMPT -93.126

TotalProject Cost$1,316

LeadAgency HIGHLAND Modeling NO

County SanBernadino Primary Program Code NCN26 - BICYCLE FACILITY-NEW Air Basin SCAB RTP ID 4A07275

System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionPACIFIC ST. RECONFIGURATION FROM 2 LANES TO 2 LANES WITH CONTINUOUS CENTER 2-WAY LEFT-TURN LANEAND BIKE LANES (VICTORIA AVE TO APPROXIMATELY 350' WEST OF PALM AVENUE). 1 CENTERLINE MILE OF BIKELANE.

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $130 - - - - - - - $130

Total Preliminary Engineering $130 - - - - - - - $130CON CITY FUNDS - - - - $1,186 - - - $1,186

Total Construction - - - - $1,186 - - - $1,186Total Programmed $130 - - - $1,186 - - - $1,316

5/12/2020 Public Project Listings

Page 61: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 60/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20190001 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-02

ConformCategory

NON-EXEMPT

TotalProject Cost$9,661

LeadAgency HIGHLAND Modeling YES

County SanBernadino Primary Program Code CAX75 - OVERCROSS OR

UNDERCROSS IMP(LN ADD'S) : RS Air Basin SCAB RTP ID 4M01003

System Local HwyProjectLimits From East edge of City Creek Bridge to EB SR210 ramps, Begin: 0 End:

Description

SR-210/5th St IC Improvements: Widen & restripe 5th St (4-6 lanes) from east edge of City Creek Brdg to the EB SR-210 ramps w/add?lturn pockets plus 2 truck access lanes; Widen & restripe 5th St (6-8 lanes) under SR-210 b/w EB & WB ramps, incl. add?l thru & turnlanes; Widen the EB & WB on-ramps 2-3 lanes, widen the EB & WB off-ramps 1-2 lanes, all ramps remain 1 ln at the mainline.(Combines prior projs 2011153 & 2011154)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $818 - - - - - - $818

Total Preliminary Engineering - $818 - - - - - - $818ROW CITY FUNDS - - - $1,000 - - - - $1,000

Total Right of Way - - - $1,000 - - - - $1,000CON CITY FUNDS - - - - $7,843 - - - $7,843

Total Construction - - - - $7,843 - - - $7,843Total Programmed - $818 - $1,000 $7,843 - - - $9,661

5/12/2020 Public Project Listings

Page 62: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 61/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20190003 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-02

ConformCategory

NON-EXEMPT

TotalProject Cost$7,058

LeadAgency HIGHLAND Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 2016A319

System Local HwyProjectLimits From Palm Ave to 5th Street, Begin: 0 End:

Description

In Highland: 3rd & 5th St Corridor Improvements: Widen 0.4 miles of 3rd St b/w Palm Ave & 5th St 2-4 lns; Extend 3rd St NE toconnect to/at 5th St/Church Ave Intersection; Restripe 0.1 mile of 5th St b/w Church Ave & East edge of City Creek Brdg 4-6 lns;Shoulder improvements along 5th St, Central Ave & Palm Ave; Add?l turn lanes at 3rd/Palm & 5th/Palm Intersections. (Comb 2017FTIP ID 2011105)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $483 - - - - - - $483PE EDA GRANT - $350 - - - - - - $350

Total Preliminary Engineering - $833 - - - - - - $833ROW CITY FUNDS - - $261 - - - - - $261ROW EDA GRANT - - $189 - - - - - $189

Total Right of Way - - $450 - - - - - $450CON CITY FUNDS - - - $1,650 - - - - $1,650CON EDA GRANT - - - $2,425 - - - - $2,425CON SB1 LOCAL PARTNERSHIP COMPETITIVE FUNDS - - - $1,700 - - - - $1,700

Total Construction - - - $5,775 - - - - $5,775Total Programmed - $833 $450 $5,775 - - - - $7,058

5/12/2020 Public Project Listings

Page 63: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 62/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20190302 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-13

ConformCategory

EXEMPT -93.126

TotalProject Cost$285

LeadAgency HIGHLAND Modeling NO

County SanBernadino Primary Program Code NCN29 - SIDEWALKS/CURB CUTS-NEW Air Basin SCAB RTP ID 0A6410

System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionHighland 2017 Repurposing Funds for SCAG016: This project captures repurposing earmarks for Highland SRTS projects SRTS3-08-008 (McKinley) & SRTS3-08-009 (9th St) not included in FTIP ID SCAG016; Construct sidewalks, curb and gutter, and curb ramps;install in-pavement crosswalk lights and flashing beacons

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalROW 2017 EARMARK REPURPOSING - - $225 - - - - - $225

Total Right of Way - - $225 - - - - - $225CON 2017 EARMARK REPURPOSING - - - $60 - - - - $60

Total Construction - - - $60 - - - - $60Total Programmed - - $225 $60 - - - - $285

5/12/2020 Public Project Listings

Page 64: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 63/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID SBD55031 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$1,078

LeadAgency HIGHLAND Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID SBD55031

System Local HwyProjectLimits From 3RD STREET to SOUTH CITY LIMITS, Begin: 0 End:

DescriptionALABAMA STREET FROM 3RD STREET TO SOUTH CITY LIMITS - WIDEN FROM 2 TO 3 NB LANES (0.25 MILES)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE PRIVATE FUNDS - $68 - - - - - - $68

Total Preliminary Engineering - $68 - - - - - - $68ROW PRIVATE FUNDS - - $40 - - - - - $40

Total Right of Way - - $40 - - - - - $40CON PRIVATE FUNDS - - - $970 - - - - $970

Total Construction - - - $970 - - - - $970Total Programmed - $68 $40 $970 - - - - $1,078

5/12/2020 Public Project Listings

Page 65: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 64/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID SBD55033 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$2,350

LeadAgency HIGHLAND Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID SBD55033

System Local HwyProjectLimits From GREENSPOT ROAD/5TH ST to SOUTH CITY LIMITS, Begin: 0 End:

DescriptionBOULDER AVE. FROM GREENSPOT TO SOUTH CITY LIMITS - WIDEN FROM 2-4 LANES (0.70 MILES)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $235 - - - - - - - $235

Total Preliminary Engineering $235 - - - - - - - $235CON CITY FUNDS - - $2,115 - - - - - $2,115

Total Construction - - $2,115 - - - - - $2,115Total Programmed $235 - $2,115 - - - - - $2,350

5/12/2020 Public Project Listings

Page 66: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 65/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20190301 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-03

ConformCategory

EXEMPT -93.126

TotalProject Cost$375

LeadAgency

LOMALINDA Modeling NO

County SanBernadino Primary Program Code NCR91 - UPGRADED FACILITI (NO LN

ADD) Air Basin SCAB RTP ID REG0703

System LocalHwy

ProjectLimits From to , Begin: 0 End:

DescriptionIn Loma Linda: Construct a round-a-bout along Andersen Street at the joint intersection of Mound Street and Hill Drive. (non-capacityincreasing, conversion from typical intersection to round-a-bout)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE DEVELOPER FEES - $50 - - - - - - $50

Total Preliminary Engineering - $50 - - - - - - $50ROW DEVELOPER FEES - $25 - - - - - - $25

Total Right of Way - $25 - - - - - - $25CON SBD CO MEASURE I - - $300 - - - - - $300

Total Construction - - $300 - - - - - $300Total Programmed - $75 $300 - - - - - $375

5/12/2020 Public Project Listings

Page 67: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 66/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID SBD31876 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$1,090

LeadAgency

LOMALINDA Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID SBD31876

System Local HwyProjectLimits From REDLANDS BOULEVARD to BARTON ROAD, Begin: 0 End:

DescriptionCALIFORNIA STREET BARTON ROAD TO REDLANDS BOULEVARD WIDEN FROM 2 TO 4 LANES

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - - $20 - - - - - $20

Total Preliminary Engineering - - $20 - - - - - $20ROW CITY FUNDS - - - $70 - - - - $70

Total Right of Way - - - $70 - - - - $70CON CITY FUNDS - - - - $1,000 - - - $1,000

Total Construction - - - - $1,000 - - - $1,000Total Programmed - - $20 $70 $1,000 - - - $1,090

5/12/2020 Public Project Listings

Page 68: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 67/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20150001 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-15

ConformCategory

NON-EXEMPT

TotalProject Cost$14,585

LeadAgency MONTCLAIR Modeling YES

County San Bernadino Primary Program Code CAX60 - BRIDGE RESTORATION &REPLACEMENT- LN ADDITIONS: RS Air Basin SCAB RTP ID 4G07421

System Local HwyProjectLimits From About 0.25 miles north of Mission Blvd. to About 0.15 miles south of Holt Blvd., Begin: 0 End:

DescriptionBRIDGE NO. 54C0112, CENTRAL AVE OVER UP RR AMTRAK METROLINK, 0.2 MI S HOLT AVENUE. Bridge rehabilitate.Rehabilitate existing four lane bridge with six lane bridge with sidewalks. Toll credits to match EARREPU.

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE 2016 EARMARK REPURPOSING - $1,440 - - - - - - $1,440PE BRIDGE - LOCAL $531 - - - $548 - - - $1,079PE CITY FUNDS $69 - - - $71 - - - $140

Total Preliminary Engineering $600 $1,440 - - $619 - - - $2,659ROW BRIDGE - LOCAL - - - - - $483 - - $483ROW CITY FUNDS - - - - - $63 - - $63

Total Right of Way - - - - - $546 - - $546CON BRIDGE - LOCAL - - - - - - - $10,075 $10,075CON CITY FUNDS - - - - $1,305 - - - $1,305CON LOCAL - ADVANCED CONSTRUCTION - - - - $10,075 - - $-10,075 -

Total Construction - - - - $11,380 - - - $11,380Total Programmed $600 $1,440 - - $11,999 $546 - - $14,585

5/12/2020 Public Project Listings

Page 69: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 68/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20150109 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-11

ConformCategory

TCMCommitted

TotalProject Cost$3,500

LeadAgency OMNITRANS Modeling NO

County San Bernadino Primary Program Code NCR25 - BICYCLE & PEDESTRAINFACILITIES-UPGRADE Air Basin SCAB RTP ID 7120004

System Local HwyProjectLimits From to , Begin: 0 End:

Description

PEDESTRIAN & BICYCLE ACCESS IMPROVEMENTS WITHIN 1/2 MILE OF RAPID TRANSIT STATIONS, INCLUDINGSIDEWALK AND CURB RAMP REPLACEMENT & BIKE PARKING AT STATIONS (Termini at Pomona Downtown MetrolinkStation & Kaiser Medical Center Fontana, following Holt Ave/Blvd, Archibald Ave, Milliken Ave, Foothill Blvd, & Sierra Ave).(TDC:FY18/19, ATP $402)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE ACTIVE TRANSPORTATION PROGRAM - $525 - - - - - - $525

Total Preliminary Engineering - $525 - - - - - - $525CON ACTIVE TRANSPORTATION PROGRAM - $2,975 - - - - - - $2,975

Total Construction - $2,975 - - - - - - $2,975Total Programmed - $3,500 - - - - - - $3,500

5/12/2020 Public Project Listings

Page 70: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 69/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20150201 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-07

ConformCategory

NON-EXEMPT

TotalProject Cost$45,028

LeadAgency ONTARIO Modeling YES

County SanBernadino Primary Program Code CAX76 - ADDING A LANE THROUGH A

BOTTLENECK: RS Air Basin SCAB RTP ID 2002160

System LocalHwy

ProjectLimits From FOURTH ST to AIRPORT DRIVE, Begin: 0 End:

DescriptionGROVE AVE CORRIDOR: WIDEN GROVE BETWEEN FOURTH ST AND STATE ST / AIRPORT DR (4-6 LNS); ANDIMPROVEMENTS TO GROVE AVE / HOLT BLVD INTERSECTION. Toll Credit to match EARREPU.

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE 2016 EARMARK REPURPOSING - $3,335 - - - - - - $3,335PE DEMO-SAFETEA-LU $1,834 - - - - - - - $1,834PE DEVELOPER FEES $204 - - - - - - - $204PE SBD CO MEASURE I $255 - - - - - - - $255

Total Preliminary Engineering $2,293 $3,335 - - - - - - $5,628ROW DEVELOPER FEES $5,916 - - - - - - - $5,916ROW SBD CO MEASURE I $7,409 - - - - - - - $7,409

Total Right of Way $13,325 - - - - - - - $13,325CON DEVELOPER FEES - $11,577 - - - - - - $11,577CON SBD CO MEASURE I - $14,498 - - - - - - $14,498

Total Construction - $26,075 - - - - - - $26,075Total Programmed $15,618 $29,410 - - - - - - $45,028

5/12/2020 Public Project Listings

Page 71: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 70/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20150004 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-05

ConformCategory

EXEMPT -93.126

TotalProject Cost$2,250

LeadAgency

RANCHOCUCAMONGA Modeling NO

County San Bernadino Primary Program Code NCN26 - BICYCLE FACILITY-NEW Air Basin SCAB RTP ID 20010133System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionIMPROVE FOOTHILL BOULEVARD (OLD STATE ROUTE 66) BETWEEN GROVE AVENUE AND SAN BERNARDINO RD:INCLUDES BIKE LANES, SIDEWALKS, STREET LIGHTS, TRAFFIC SIGNAL, PAVEMENT REHABILITATION, ANDSTRIPING.

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $50 $250 - - - - - $300

Total Preliminary Engineering - $50 $250 - - - - - $300CON CITY FUNDS - - - $1,950 - - - - $1,950

Total Construction - - - $1,950 - - - - $1,950Total Programmed - $50 $250 $1,950 - - - - $2,250

5/12/2020 Public Project Listings

Page 72: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 71/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20190004 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-01

ConformCategory

EXEMPT- 93.126

TotalProject Cost$60,000

LeadAgency

RANCHOCUCAMONGA Modeling NO

County San Bernadino Primary Program CodeNCN31 - GRADE SEPARATION;RAIL/HWY CROSSING-NONCAPACITY

Air Basin SCAB RTP ID 2016A319

System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionIn Rancho Cucamonga: Etiwanda Ave & SCRRA Grade Separation; Project replaces an at grade railroad crossing with an overheadroadway at the SCRRA/BNSF railroad corridor.

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE SB1TRADE CORRIDOR ENHANCEMENT - $2,850 - - - - - - $2,850

Total Preliminary Engineering - $2,850 - - - - - - $2,850ROW SB1TRADE CORRIDOR ENHANCEMENT - $5,000 - - - - - - $5,000

Total Right of Way - $5,000 - - - - - - $5,000CON SB1TRADE CORRIDOR ENHANCEMENT - - $52,150 - - - - - $52,150

Total Construction - - $52,150 - - - - - $52,150Total Programmed - $7,850 $52,150 - - - - - $60,000

5/12/2020 Public Project Listings

Page 73: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 72/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 200035 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$950

LeadAgency REDLANDS Modeling YES

County SanBernadino Primary Program Code CAX66 - NEW CONNECTNS/CROSS

TRAFFIC IMP: RS Air Basin SCAB RTP ID 200035

System Local HwyProjectLimits From 5TH AVE to I-10 FREEWAY, Begin: 0 End:

DescriptionWABASH AV FROM 5TH ST TO I-10 - CONSTRUCT NEW 2 LANE STREET TO I-10 TO MATCH ON AND OFF RAMPS-CONSTRUCT MISSING LINK (2 LANE IN EACH DIRECTION)-1 MILE

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalROW PRIVATE FUNDS - - $100 - - - - - $100

Total Right of Way - - $100 - - - - - $100CON PRIVATE FUNDS - - - $850 - - - - $850

Total Construction - - - $850 - - - - $850Total Programmed - - $100 $850 - - - - $950

5/12/2020 Public Project Listings

Page 74: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 73/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 200419 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$7,200

LeadAgency REDLANDS Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE

ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 200419

System Local HwyProjectLimits From NORTH CITY LIMITS to 3,00' N/O PALMETTO, Begin: 0 End:

DescriptionALABAMA STREET WIDENING - WIDEN FROM 2-4 LANES FROM NORTH CITY LIMITS TO 3,000 FT. NORTH PALMETTO

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $700 - - - - - - $700

Total Preliminary Engineering - $700 - - - - - - $700ROW CITY FUNDS - - $500 - - - - - $500

Total Right of Way - - $500 - - - - - $500CON CITY FUNDS - - - $6,000 - - - - $6,000

Total Construction - - - $6,000 - - - - $6,000Total Programmed - $700 $500 $6,000 - - - - $7,200

5/12/2020 Public Project Listings

Page 75: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 74/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 201113 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

EXEMPT -93.126

TotalProject Cost$540

LeadAgency REDLANDS Modeling NO

County SanBernadino Primary Program Code NCR81 - CURB AND GUTTER

IMPROVEMENTS Air Basin SCAB RTP ID 4GL04

System Local HwyProjectLimits From LUGONIA to SAN BERNARDINO AVE., Begin: 0 End:

Description

ORANGE STREET FROM LUGONIA TO SAN BERNARDINO AVE. -WIDEN THE EAST SIDE OF THE STREET TO REMOVE ARESTRICTION IN THE ROADWAY TRAVEL AREA. PROJECT INCLUDES ROAD PAVING, CURB AND GUTTER, SIDEWALK,STREET LIGHTING, STRIPING AND MARKING, AND LANDSCAPE IMPROVEMENTS. THE PROJECT WILL IMPROVEPEDESTRIAN AND VEHICULAR SAFE TRAVEL AND CIRCULATION.

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE DEVELOPER FEES - - $60 - - - - - $60

Total Preliminary Engineering - - $60 - - - - - $60CON DEVELOPER FEES - - - $87 - - - - $87CON SBD CO MEASURE I - - - $393 - - - - $393

Total Construction - - - $480 - - - - $480Total Programmed - - $60 $480 - - - - $540

5/12/2020 Public Project Listings

Page 76: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 75/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20190012 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$13,206

LeadAgency RIALTO Modeling YES

County SanBernadino Primary Program Code CAX76 - ADDING A LANE THROUGH A

BOTTLENECK: RS Air Basin SCAB RTP ID 2016A319

System LocalHwy

ProjectLimits From South City Limits (Santa Ana River) to Slover Ave, Begin: 0 End:

DescriptionRialto: Widen Riverside Ave; from South City Limits to Slover Ave 4-6 lanes.

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $1,314 - - - - - - $1,314PE DEVELOPER FEES - $900 - - - - - - $900

Total Preliminary Engineering - $2,214 - - - - - - $2,214ROW CITY FUNDS - - $1,200 - - - - - $1,200ROW DEVELOPER FEES - - $800 - - - - - $800

Total Right of Way - - $2,000 - - - - - $2,000CON CITY FUNDS - - - - $5,300 - - - $5,300CON DEVELOPER FEES - - - - $3,692 - - - $3,692

Total Construction - - - - $8,992 - - - $8,992Total Programmed - $2,214 $2,000 - $8,992 - - - $13,206

5/12/2020 Public Project Listings

Page 77: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 76/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20190013 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-01

ConformCategory

EXEMPT -93.126

TotalProject Cost$11,643

LeadAgency RIALTO Modeling NO

County SanBernadino Primary Program Code NCR36 - BRIDGE RESTORATION &

REPLC (NO LN ADD) Air Basin SCAB RTP ID 2016A319

System LocalHwy

ProjectLimits From to , Begin: 0 End:

DescriptionRialto: Reconfigure/widen Alder Ave over SR-210, and widen Locust Ave from Renaissance Pkwy to Casmalia St. Alder Ave bridgewidening will accommodate additional left and right turn lanes for on and off ramps from N&S bound Alder, provide for full standardlanes. Locust Ave widening will accommodate class II bike lanes, and ADA compliant sidewalks. (Non-Capacity)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE AGENCY - $909 - - - - - - $909PE CITY FUNDS - $250 - - - - - - $250PE DEVELOPER FEES - $511 - - - - - - $511

Total Preliminary Engineering - $1,670 - - - - - - $1,670CON AGENCY - - - $1,135 - - - - $1,135CON CITY FUNDS - - - $8,838 - - - - $8,838

Total Construction - - - $9,973 - - - - $9,973Total Programmed - $1,670 - $9,973 - - - - $11,643

5/12/2020 Public Project Listings

Page 78: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 77/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20190103 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-01

ConformCategory

NON-EXEMPT

TotalProject Cost$4,582

LeadAgency RIALTO Modeling NO

County SanBernadino Primary Program Code CAX76 - ADDING A LANE THROUGH A

BOTTLENECK: RS Air Basin SCAB RTP ID 4120181

System LocalHwy

ProjectLimits From Baseline Road to Renaissance Parkway, Begin: 0 End:

DescriptionIn Rialto: Widen Alder Ave 2-4 lns from Baseline Rd to Renaissance Pkwy; Widen Randall Ave 2-4 lns from Riverside Ave to CactusAve; Project includes various improvements such as, added turn lanes, bike lanes, eliminate bottlenecks, new landscaped medians, andimproved traffic signal operations. (RTP IDs 4120181 & 4120231 respectfully)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalCON CITY FUNDS - $2,291 - - - - - - $2,291CON SB1 LOCAL PARTNERSHIP COMPETITIVE FUNDS - $2,291 - - - - - - $2,291

Total Construction - $4,582 - - - - - - $4,582Total Programmed - $4,582 - - - - - - $4,582

5/12/2020 Public Project Listings

Page 79: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 78/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 200619 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-03

ConformCategory

NON-EXEMPT

TotalProject Cost$32,669

LeadAgency

SANBERNARDINOCOUNTY

Modeling YES

County San Bernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANEADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 200619

System Local HwyProjectLimits From 0.2 MILES EAST OF CAJON CREEK to 0.2 MILES WEST 0F CAJON CREEK, Begin: 0 End:

DescriptionGLEN HELEN PARKWAY - FROM 0.2 MILES WEST OF CAJON CREEK TO 0.2 MILES EAST OF CAJON CREEK-REPLACE 36FT WIDE 48 FT LONG 2 LN BRIDGE OVER CAJON CREEK W/ 102 FT, 526 FT LONG 4 LN BRIDGE (54C0025)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE BRIDGE - LOCAL $2,081 - - - - - - - $2,081PE COUNTY $269 - - - - - - - $269

Total Preliminary Engineering $2,350 - - - - - - - $2,350ROW BRIDGE - LOCAL $1,195 $266 - - - - - - $1,461ROW COUNTY $155 $34 - - - - - - $189

Total Right of Way $1,350 $300 - - - - - - $1,650CON BRIDGE - LOCAL - - - - - $25,381 - - $25,381CON COUNTY - - - $3,288 - - - - $3,288CON LOCAL ADVANCE CONSTRUCTION - - - $25,381 - $-25,381 - - -

Total Construction - - - $28,669 - - - - $28,669Total Programmed $3,700 $300 - $28,669 - - - - $32,669

5/12/2020 Public Project Listings

Page 80: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 79/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 200810 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-14

ConformCategory

NON-EXEMPT

TotalProject Cost$13,300

LeadAgency

SANBERNARDINOCOUNTY

Modeling YES

County San Bernadino Primary Program Code CAY60 - BRIDGE RESTORATION &REPLACEMENT- LN ADDITIONS: GM Air Basin MDAB RTP ID 200810

System Local HwyProjectLimits From 150' E/O MOJAVE FLOOD CHANNEL to BRIDGE SPAN, Begin: 0 End:

DescriptionBAKER BLVD. BRIDGE - OVER MOJAVE RIVER, 0.2 MI SW OF DEATH VALLEY RD REPLACE 2 LANE BRIDGE W 4 LANEBRIDGE (BRIDGE NO 54C0127)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE COUNTY - - $264 - - - - - $264

Total Preliminary Engineering - - $264 - - - - - $264CON COUNTY - - - - - $1,262 - - $1,262

Total Construction - - - - - $1,262 - - $1,262Total Programmed - - $264 - - $1,262 - - $1,526

5/12/2020 Public Project Listings

Page 81: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 80/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 200816 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-09

ConformCategory

EXEMPT -93.126

TotalProject Cost$32,876

LeadAgency

SANBERNARDINOCOUNTY

Modeling NO

County San Bernadino Primary Program Code NCR36 - BRIDGE RESTORATION &REPLC (NO LN ADD) Air Basin RTP ID 200816

System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionROCK SPRINGS RD.: 0.9 Miles east of Arrowhead Lake Rd.; Replace 2 lane bridge with 2 lane bridge.

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE AGENCY $540 - - - - - - - $540PE COUNTY $3,103 - - - - - - - $3,103

Total Preliminary Engineering $3,643 - - - - - - - $3,643ROW CITY FUNDS $230 - - - - - - - $230

Total Right of Way $230 - - - - - - - $230CON AGENCY - $21,328 - - - - - - $21,328CON COUNTY - $7,675 - - - - - - $7,675

Total Construction - $29,003 - - - - - - $29,003Total Programmed $3,873 $29,003 - - - - - - $32,876

5/12/2020 Public Project Listings

Page 82: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 81/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 200835 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$3,866

LeadAgency

SANBERNARDINOCOUNTY

Modeling YES

County San Bernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANEADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 200835

System Local HwyProjectLimits From CHERRY AVE. to FONTANA CITY LIMITS (ELM AVE), Begin: 0 End:

DescriptionSAN BERNARDINO AVE. FROM CHERRY AVE. TO FONTANA CITY LIMITS (ELM AVE.) (1.27 MILES)-WIDEN 2-4 LANES(North side only)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE COUNTY $425 - - - - - - - $425

Total Preliminary Engineering $425 - - - - - - - $425ROW COUNTY $350 - - - - - - - $350

Total Right of Way $350 - - - - - - - $350CON COUNTY - $3,091 - - - - - - $3,091

Total Construction - $3,091 - - - - - - $3,091Total Programmed $775 $3,091 - - - - - - $3,866

5/12/2020 Public Project Listings

Page 83: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 82/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 200843 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$5,650

LeadAgency

SANBERNARDINOCOUNTY

Modeling YES

County San Bernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANEADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 200843

System Local HwyProjectLimits From 1.20 MILES OF S. BARTON ROAD to 0.42 MILES SOUTH OF BARTON RD, Begin: 0 End:

DescriptionRECHE CANYON RD. FROM 1.20 MILES OF S. BARTON ROAD TO 0.42 MILES SOUTH OF BARTON RD (0.78 MILES)-WIDEN FROM 2-4 LANES

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE DEVELOPER FEES - - $250 $800 - - - - $1,050

Total Preliminary Engineering - - $250 $800 - - - - $1,050ROW DEVELOPER FEES - - - $1,500 - - - - $1,500

Total Right of Way - - - $1,500 - - - - $1,500CON DEVELOPER FEES - - - - $3,100 - - - $3,100

Total Construction - - - - $3,100 - - - $3,100Total Programmed - - $250 $2,300 $3,100 - - - $5,650

5/12/2020 Public Project Listings

Page 84: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 83/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20130402 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$25

LeadAgency

SANBERNARDINOCOUNTY

Modeling YES

County San Bernadino Primary Program Code CAX76 - ADDING A LANETHROUGH A BOTTLENECK: RS Air Basin RTP ID 20130402

System Local HwyProjectLimits From West I-15 Ramps to SH 127, Begin: 0 End:

DescriptionRestripe existing structural section of Baker Blvd between I-15 ramps and SH 127 from 2 - 4 lane configuration in conjunction withproject to replace existing 2 lane bridge 54CO127 with 4 lane bridge

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalCON COUNTY - - - - $25 - - - $25

Total Construction - - - - $25 - - - $25Total Programmed - - - - $25 - - - $25

5/12/2020 Public Project Listings

Page 85: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 84/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20150002 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$6,600

LeadAgency

SANBERNARDINOCOUNTY

Modeling YES

County San Bernadino Primary Program Code CAY66 - NEW CONNECTNS/CROSSTRAFFIC IMP: GM Air Basin RTP ID 200414

System Local HwyProjectLimits From WILSON RANCH ROAD to BALDY MESA, Begin: 0 End:

DescriptionON DUNCAN ROAD FROM WILSON RANCH ROAD TO BALDY MESA PAVE DIRT ROAD IN 4 ONE MILE SEGMENTS 1LANE IN EACH DIRECTION

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE FEE $600 - - - - - - - $600

Total Preliminary Engineering $600 - - - - - - - $600CON FEE - $6,000 - - - - - - $6,000

Total Construction - $6,000 - - - - - - $6,000Total Programmed $600 $6,000 - - - - - - $6,600

5/12/2020 Public Project Listings

Page 86: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 85/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20151302 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

EXEMPT -93.126

TotalProject Cost$39,001

LeadAgency

SANBERNARDINOCOUNTY

Modeling NO

County San Bernadino Primary Program Code NCR36 - BRIDGE RESTORATION &REPLC (NO LN ADD) Air Basin RTP ID 4AL04

System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionREPLACE OR REHABILITATE MULTIPLE BRIDGES ALONG NATIONAL TRAILS HIGHWAY BETWEEN DAGGETT TO THEWEST AND INTERSTATE 40 TO THE EAST.

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE COUNTY $7,000 - - - - - - - $7,000PE STP LOCAL $1 - - - - - - - $1

Total Preliminary Engineering $7,001 - - - - - - - $7,001CON AGENCY - - $32,000 - - - - - $32,000

Total Construction - - $32,000 - - - - - $32,000Total Programmed $7,001 - $32,000 - - - - - $39,001

5/12/2020 Public Project Listings

Page 87: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 86/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20152202 FTIP AmendmentSan Bernardino CountyTransportation Authority (SBCTA)19-00

ConformCategory

EXEMPT -93.126

TotalProject Cost$1,782

LeadAgency

SANBERNARDINOCOUNTY

Modeling NO

County San Bernadino Primary Program Code NCR31 - ROAD REPLC & REHAB(NO LN ADD) Air Basin RTP ID SBD031426

System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionSegment 1B: Needles Highway from 500 ft south of Park Road north to David Drive; Overlay existing roadway, L-5373' (1.01 MI)(Parent project SBD031426).

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalCON PUBLIC LAND HWYS - $1,782 - - - - - - $1,782

Total Construction - $1,782 - - - - - - $1,782Total Programmed - $1,782 - - - - - - $1,782

5/12/2020 Public Project Listings

Page 88: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 87/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20190014 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-07

ConformCategory

NON-EXEMPT

TotalProject Cost$15,439

LeadAgency

SANBERNARDINOCOUNTY

Modeling YES

County San Bernadino Primary Program Code CAN76 - ADDING A LANETHROUGH A BOTTLENECK: NRS Air Basin RTP ID 200815

System Local HwyProjectLimits From 0.3 Miles E/O Mariposa to Hesperia CL, Begin: 0 End:

DescriptionSan Bernardino County: Widen Ranchero St. 2-4 lanes - From 0.3 M E/O Mariposa to Hesperia CL (3 miles)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE DEVELOPER FEES - $1,625 - - - - - - $1,625

Total Preliminary Engineering - $1,625 - - - - - - $1,625ROW DEVELOPER FEES - $1,033 - - - - - - $1,033ROW SBD CO MEASURE I - $1,457 - - - - - - $1,457

Total Right of Way - $2,490 - - - - - - $2,490CON DEVELOPER FEES - - $4,700 - - - - - $4,700CON SBD CO MEASURE I - - $6,624 - - - - - $6,624

Total Construction - - $11,324 - - - - - $11,324Total Programmed - $4,115 $11,324 - - - - - $15,439

5/12/2020 Public Project Listings

Page 89: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 88/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 2011150 FTIP AmendmentSan Bernardino CountyTransportation Authority(SBCTA) 19-11

ConformCategory

TCMCommitted

TotalProject Cost$13,021

LeadAgency

SAN BERNARDINO COUNTYTRANSPORTATIONAUTHORITY

ModelingNO

County San Bernadino Primary Program Code TDM20 - RIDESHARING Air Basin SCAB RTP ID 4RL04System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionSOUTH COAST AIR BASIN RIDESHARE PROGRAM (Ongoing)(Toll Credits are being used as match for CMAQ)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CMAQ $4,070 - - - - - - - $4,070PE SBD CO MEASURE I $466 - - - - - - - $466

Total Preliminary Engineering $4,536 - - - - - - - $4,536CON CMAQ $3,985 $1,950 - $1,950 - - - - $7,885CON SBD CO MEASURE I $150 $150 $150 $150 - - - - $600

Total Construction $4,135 $2,100 $150 $2,100 - - - - $8,485Total Programmed $8,671 $2,100 $150 $2,100 - - - - $13,021

5/12/2020 Public Project Listings

Page 90: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 89/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 2011151 FTIP AmendmentSan Bernardino CountyTransportation Authority(SBCTA) 19-15

ConformCategory

EXEMPT- 93.126

TotalProject Cost$5,896

LeadAgency

SAN BERNARDINO COUNTYTRANSPORTATIONAUTHORITY

ModelingNO

County San Bernadino Primary Program Code TDM20 - RIDESHARING Air Basin MDAB RTP ID 4RL04System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionMOJAVE DESERT AIR BASIN RIDESHARE PROGRAM (Toll Credits to match: CMAQ)(Ongoing)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CMAQ $2,320 - - - - - - - $2,320PE SBD CO MEASURE I $266 - - - - - - - $266

Total Preliminary Engineering $2,586 - - - - - - - $2,586CON CMAQ $1,810 $650 - $650 - - - - $3,110CON SBD CO MEASURE I $50 $50 $50 $50 - - - - $200

Total Construction $1,860 $700 $50 $700 - - - - $3,310Total Programmed $4,446 $700 $50 $700 - - - - $5,896

5/12/2020 Public Project Listings

Page 91: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 90/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20159907 FTIP AmendmentSan Bernardino CountyTransportation Authority(SBCTA) 19-03

ConformCategory

EXEMPT- 93.127

TotalProject Cost$10,968

LeadAgency

SAN BERNARDINOCOUNTYTRANSPORTATIONAUTHORITY

ModelingNO

County San Bernadino Primary Program CodeNCR87 -OVERCROSS/UNDERCROSSIMP (NO LN ADD)

Air Basin SCAB RTP ID 4M01025

System Local HwyProjectLimits From NORTH OF I-10 OVERCROSSING to SOUTH OF I-10 OVERCROSSING, Begin: 0 End:

DescriptionI-10 @ Alabama St IC: Intersection improvements w/ ramp widening (No Capacity Enhancements)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE DEVELOPER FEES $874 - - - - - - - $874PE SBD CO MEASURE I $857 - - - - - - - $857

Total Preliminary Engineering $1,731 - - - - - - - $1,731ROW DEVELOPER FEES $18 - - - - - - - $18ROW SBD CO MEASURE I $18 - - - - - - - $18

Total Right of Way $36 - - - - - - - $36CON DEVELOPER FEES - - - $4,646 - - - - $4,646CON SBD CO MEASURE I - - - $4,555 - - - - $4,555

Total Construction - - - $9,201 - - - - $9,201Total Programmed $1,767 - - $9,201 - - - - $10,968

5/12/2020 Public Project Listings

Page 92: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 91/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20190702 FTIP AmendmentSan Bernardino CountyTransportation Authority(SBCTA) 19-07

ConformCategory TCM Total

Project Cost$6,983

LeadAgency

SAN BERNARDINO COUNTYTRANSPORTATIONAUTHORITY

Modeling NO

County San Bernadino Primary Program CodeNCN25 - BICYCLE &PEDESTRAIN FACILITIES-NEW

Air Basin SCAB RTP ID 7120004

System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionSBCTA Metrolink Station Accessibility Improvement Project - Phase II: Bicycle and pedestrian accessibility improvements near fiveMetrolink transit stations (Montclair, Upland, Rancho Cucamonga, Fontana, and San Bernardino). Toll Credit to match ATP

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE LOCAL TRANS FUNDS - - - $559 - - - - $559

Total Preliminary Engineering - - - $559 - - - - $559CON ACTIVE TRANSPORTATION PROGRAM - - - - $6,132 - - - $6,132CON LOCAL TRANS FUNDS - - - - $292 - - - $292

Total Construction - - - - $6,424 - - - $6,424Total Programmed - - - $559 $6,424 - - - $6,983

5/12/2020 Public Project Listings

Page 93: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 92/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 200609 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$7,500

LeadAgency

SANBERNARDINO,CITY OF

Modeling YES

County San Bernadino Primary Program Code CAX66 - NEW CONNECTNS/CROSSTRAFFIC IMP: RS Air Basin SCAB RTP ID 200609

System Local HwyProjectLimits From Coulston to Riverview, Begin: 0 End:

DescriptionMT.VIEW WIDENING/EXTENSION PROJECT- WIDEN S/B FROM 2-4LNS- FROM COULSTON TO RIVERVIEW (SOUTH OFSANTA ANA RIVER) (PROJECT IS SPLIT INTO 2 SEPARATE PROJECTS AS OF THE 2011 ENTRY)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $500 - - - - - - - $500

Total Preliminary Engineering $500 - - - - - - - $500ROW CITY FUNDS $1,000 - - - - - - - $1,000

Total Right of Way $1,000 - - - - - - - $1,000CON CITY FUNDS - $6,000 - - - - - - $6,000

Total Construction - $6,000 - - - - - - $6,000Total Programmed $1,500 $6,000 - - - - - - $7,500

5/12/2020 Public Project Listings

Page 94: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 93/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 201169 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$1,060

LeadAgency

SANBERNARDINO,CITY OF

Modeling YES

County San Bernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANEADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A07263

System Local HwyProjectLimits From KENDALL DR. to 4OTH STREET, Begin: 0 End:

DescriptionH STREET FROM KENDALL DRIVE TO 40TH STREET WIDENING FROM 2-4 LANES

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE DEVELOPER FEES $150 - - - - - - - $150

Total Preliminary Engineering $150 - - - - - - - $150ROW CITY FUNDS - $128 - - - - - - $128ROW DEVELOPER FEES - $120 - - - - - - $120

Total Right of Way - $248 - - - - - - $248CON CITY FUNDS - - $496 - - - - - $496CON DEVELOPER FEES - - $166 - - - - - $166

Total Construction - - $662 - - - - - $662Total Programmed $150 $248 $662 - - - - - $1,060

5/12/2020 Public Project Listings

Page 95: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 94/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 201170 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$5,800

LeadAgency

SANBERNARDINO,CITY OF

Modeling YES

County San Bernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANEADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A07119

System Local HwyProjectLimits From STERLING AVE to VICTORIA, Begin: 0 End:

Description5TH STREET FROM STERLING AVE TO VICTORIA AVE WIDEN FROM 2-4 LANES.

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $441 - - - - - - - $441

Total Preliminary Engineering $441 - - - - - - - $441ROW CITY FUNDS - $290 - - - - - - $290

Total Right of Way - $290 - - - - - - $290CON CITY FUNDS - - $5,069 - - - - - $5,069

Total Construction - - $5,069 - - - - - $5,069Total Programmed $441 $290 $5,069 - - - - - $5,800

5/12/2020 Public Project Listings

Page 96: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 95/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 201181 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

EXEMPT -93.126

TotalProject Cost$3,200

LeadAgency

SANBERNARDINO,CITY OF

Modeling NO

County San Bernadino Primary Program Code NCR22 - SHOULDER WIDENING Air Basin SCAB RTP ID 4OM0701System Local HwyProjectLimits From to , Begin: 0 End:

Description3RD STREET FROM TIPPECANOE AVENUE TO LELAND/NORTON WAY AND FROM LELAND/NORTON WAY TOVICTORIA AVENUE SHOULDER WIDENING AND MEDIANS- 1.25 MILES)(NO THROUGH LANE WIDENING)TOTALLENGTH 1.95 MILESFORMERLY PART OF PROJECT ID 200852

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $243 - - - - - - - $243

Total Preliminary Engineering $243 - - - - - - - $243ROW CITY FUNDS $160 - - - - - - - $160

Total Right of Way $160 - - - - - - - $160CON CITY FUNDS - $2,797 - - - - - - $2,797

Total Construction - $2,797 - - - - - - $2,797Total Programmed $403 $2,797 - - - - - - $3,200

5/12/2020 Public Project Listings

Page 97: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 96/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20150012 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

EXEMPT- 93.127

TotalProject Cost$1,137

LeadAgency

SANBERNARDINO,CITY OF

Modeling NO

County San Bernadino Primary Program Code NCRH1 - INTERSECTIONIMPROVEMENTS/CHANNELIZATION Air Basin SCAB RTP ID SBD31903

System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionFOOTHILL BOULEVARD (STATE ROUTE 66) AT FOURTH MODIFY SIGNALS, CHANNELIZE TRAFFIC SIGNAL,INTERSECTION IMPROVEMENTS/REALIGN INTERSECTION (0.11 MILE)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE SBD CO MEASURE I $12 - - - - - - - $12

Total Preliminary Engineering $12 - - - - - - - $12CON SBD CO MEASURE I - $1,125 - - - - - - $1,125

Total Construction - $1,125 - - - - - - $1,125Total Programmed $12 $1,125 - - - - - - $1,137

5/12/2020 Public Project Listings

Page 98: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 97/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID SBD41316 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$2,288

LeadAgency

SANBERNARDINO,CITY OF

Modeling YES

County San Bernadino Primary Program Code CAN76 - ADDING A LANETHROUGH A BOTTLENECK: NRS Air Basin SCAB RTP ID SBD41316

System Local HwyProjectLimits From I10 to 1 MILE NORTH AND SOUTH, Begin: 0 End:

DescriptionMT. VIEW AVE. RAILWAY GRADE CROSSING, 1500 FT. NORTH OF I-10 WIDEN RAILWAY GRADE CROSSING FROM 1LANE NORTH & SOUTH TO 2 LANES NORTH & SOUTH & UPGRADE GATES (0.75 MILES)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE SBD CO MEASURE I - $200 - - - - - - $200

Total Preliminary Engineering - $200 - - - - - - $200ROW SBD CO MEASURE I - - - - $500 - - - $500

Total Right of Way - - - - $500 - - - $500CON CITY FUNDS - - - - - $1,574 - - $1,574CON SBD CO MEASURE I - - - - - $14 - - $14

Total Construction - - - - - $1,588 - - $1,588Total Programmed - $200 - - $500 $1,588 - - $2,288

5/12/2020 Public Project Listings

Page 99: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 98/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID SBD41317 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$1,655

LeadAgency

SANBERNARDINO,CITY OF

Modeling YES

County San Bernadino Primary Program Code CAX60 - BRIDGE RESTORATION &REPLACEMENT- LN ADDITIONS: RS Air Basin SCAB RTP ID SBD41317

System Local HwyProjectLimits From MISSION CREEK to MT. VIEW, Begin: 0 End:

DescriptionMT. VIEW AVE. BRIDGE AT MISSION CREEK CHANNEL WIDEN ROADWAY & SHOULDER WORK AND EXISTINGBRIDGE AT MT. VIEW -1 LN. NO. & SO. TO 2 LNS N/S & LFT_TURNS TO MAKE A TOTAL OF 4 LANES ( 2 IN EACHDIRECTION)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $248 - - - - - - $248

Total Preliminary Engineering - $248 - - - - - - $248ROW CITY FUNDS - - - - $200 - - - $200

Total Right of Way - - - - $200 - - - $200CON CITY FUNDS - - - - - $1,207 - - $1,207

Total Construction - - - - - $1,207 - - $1,207Total Programmed - $248 - - $200 $1,207 - - $1,655

5/12/2020 Public Project Listings

Page 100: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 99/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID SBD59019 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$3,264

LeadAgency

SANBERNARDINO,CITY OF

Modeling YES

County San Bernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP -LANE ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID SBD59019

System Local HwyProjectLimits From JOHNSON LANE to ELECTRIC AVE, Begin: 0 End:

Description40TH ST. FROM JOHNSON LANE TO ELECTRIC AVENUE; ACQUIRE ROW AND WIDEN ROAD FROM 2TO 4 LANES (1,200FT.)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE DEVELOPER FEES $200 - - - - - - - $200

Total Preliminary Engineering $200 - - - - - - - $200ROW DEVELOPER FEES - $370 - - - - - - $370ROW SBD CO MEASURE I - $710 - - - - - - $710

Total Right of Way - $1,080 - - - - - - $1,080CON AGENCY - - $1,984 - - - - - $1,984

Total Construction - - $1,984 - - - - - $1,984Total Programmed $200 $1,080 $1,984 - - - - - $3,264

5/12/2020 Public Project Listings

Page 101: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 100/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID SBD59021 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$17,628

LeadAgency

SANBERNARDINO,CITY OF

Modeling YES

County San Bernadino Primary Program CodeCAX66 - NEWCONNECTNS/CROSS TRAFFICIMP: RS

Air Basin SCAB RTP ID SBD59021

System Local HwyProjectLimits From HANFORD ST to FOOTHILL BLVD., Begin: 0 End:

DescriptionSTATE STREET FROM HANFORD ST TO FOOTHILL BLVD.; EXTEND AND CONSTRUCT (4) LANES OF ROADWAY (1.5MILES) TO CONNECT STATE STREET TO RANCHO AVENUE (NEW ROAD)4 PHASES TOTAL IN PROJECT

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE DEVELOPER FEES $830 - - - - - - - $830PE SBD CO MEASURE I $1,731 - - - - - - - $1,731

Total Preliminary Engineering $2,561 - - - - - - - $2,561ROW DEVELOPER FEES - $2,942 - - - - - - $2,942ROW SBD CO MEASURE I - $6,138 - - - - - - $6,138

Total Right of Way - $9,080 - - - - - - $9,080CON DEVELOPER FEES - - $1,940 - - - - - $1,940CON SBD CO MEASURE I - - $4,047 - - - - - $4,047

Total Construction - - $5,987 - - - - - $5,987Total Programmed $2,561 $9,080 $5,987 - - - - - $17,628

5/12/2020 Public Project Listings

Page 102: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 101/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID SBD59023 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$22,000

LeadAgency

SANBERNARDINO,CITY OF

Modeling YES

County San Bernadino Primary Program Code CAX67 - NEW HIGHWAY (NO HOVLANE): RS Air Basin SCAB RTP ID SBD59023

System Local HwyProjectLimits From KENDALL DR. to I-215, Begin: 0 End:

DescriptionCAMPUS PKWY-PEPPER/LINDEN DRIVE EXTENSION FROM KENDALL TO I-215 FWY - CONSTRUCT (4) LANE ROADWAY- BETWEEN KENDALL DRIVE AND I-215, PARTIAL DIAMOND INTERCHANGE FOR N/B (2,000 FT)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - - - - - $2,000 - - $2,000

Total Preliminary Engineering - - - - - $2,000 - - $2,000CON CITY FUNDS - - - - - - - $40,000 $40,000

Total Construction - - - - - - - $40,000 $40,000Total Programmed - - - - - $2,000 - $40,000 $42,000

5/12/2020 Public Project Listings

Page 103: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 102/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 201101 FTIP Amendment San Bernardino County Transportation Authority(SBCTA) 19-00

ConformCategory

NON-EXEMPT

TotalProject Cost$2,200

LeadAgency UPLAND Modeling YES

County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE ADD'S

( NO HOV LANES): RS Air Basin SCAB RTP ID 200630

System LocalHwy

ProjectLimits From Monte Vista to Benson, Begin: 0 End:

DescriptionARROW ROUTE WIDENING FROM 2 TO 4 LANES. BRIDGE AND STREET WIDENING FOR ARROW ROUTE, FROM MONTEVISTA AVENUE TO CENTRAL AVENUE

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalROW CITY FUNDS - - $200 - - - - - $200

Total Right of Way - - $200 - - - - - $200CON CITY FUNDS - - - $200 - - - - $200CON DEVELOPER FEES - - - $710 - - - - $710CON SBD CO MEASURE I - - - $1,090 - - - - $1,090

Total Construction - - - $2,000 - - - - $2,000Total Programmed - - $200 $2,000 - - - - $2,200

5/12/2020 Public Project Listings

Page 104: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 103/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 201103 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00

ConformCategory

EXEMPT -93.126

TotalProject Cost$5,300

LeadAgency UPLAND Modeling NO

County SanBernadino Primary Program Code NCN95 - LEFT TURN LANE(S) Air Basin SCAB RTP ID 4OM0701

System LocalHwy

ProjectLimits From to , Begin: 0 End:

DescriptionFOOTHILL BOULEVARD BOTTLENECK AND SAFETY IMPROVEMENTS- FROM CENTRAL TO GROVE AVE.INSTALLRIGHT TURN LANES AT MAJOR INTERSECTIONS, ELONGATE LEFT TURNS FOR SAFE TURNING, CURB, GUTTERDRAINAGE, ROADWAY REHAB.

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $300 - - - - - - $300

Total Preliminary Engineering - $300 - - - - - - $300ROW CITY FUNDS - - $5,000 - - - - - $5,000

Total Right of Way - - $5,000 - - - - - $5,000Total Programmed - $300 $5,000 - - - - - $5,300

5/12/2020 Public Project Listings

Page 105: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 104/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20151501 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-13

ConformCategory

EXEMPT -93.126

TotalProject Cost$850

LeadAgency

VARIOUSAGENCIES Modeling NO

County San Bernadino Primary Program Code NCR25 - BICYCLE & PEDESTRAINFACILITIES-UPGRADE Air Basin SCAB RTP ID 7120004

System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionGrouped Projects for Bicycle and pedestrian facilities funded with ATP Cycle 2 funds (State - Non SRTS): Projects are consistent with 40CFR Part 93.126 Exempt Tables 2 and Table 3 categories - Bicycle and pedestrian facilities (both motorized and Non-motorized). Tollcredits to match ATP.

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalCON ACTIVE TRANSPORTATION PROGRAM $72 $557 - - - - - - $629CON CITY FUNDS - $221 - - - - - - $221

Total Construction $72 $778 - - - - - - $850Total Programmed $72 $778 - - - - - - $850

5/12/2020 Public Project Listings

Page 106: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 105/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20151502 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-15

ConformCategory

EXEMPT -93.126

TotalProject Cost$11,508

LeadAgency

VARIOUSAGENCIES Modeling NO

County San Bernadino Primary Program Code NCN25 - BICYCLE & PEDESTRAINFACILITIES-NEW Air Basin SCAB RTP ID 7120004

System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionGrouped Projects for Safety Imprvmnts - (State - SRTS): Projects consistent w/ 40 CFR Part 93.126 Exempt Tables 2&3 categories -Railroad/highway crossing, safer non-Fed-aid system roads, shoulder imprvmnts, traffic control devices and operating assistance otherthan signalization projects, intersection signalization projects at individual intersections, pvmnt marking. Toll Credits to match ATP

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE ACTIVE TRANSPORTATION PROGRAM $522 $343 - - - - - - $865

Total Preliminary Engineering $522 $343 - - - - - - $865ROW ACTIVE TRANSPORTATION PROGRAM $26 $60 - - - - - - $86

Total Right of Way $26 $60 - - - - - - $86CON ACTIVE TRANSPORTATION PROGRAM - $2,334 $2,613 $3,636 - - - - $8,583CON CITY FUNDS - $380 $685 $909 - - - - $1,974

Total Construction - $2,714 $3,298 $4,545 - - - - $10,557Total Programmed $548 $3,117 $3,298 $4,545 - - - - $11,508

5/12/2020 Public Project Listings

Page 107: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 106/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20151503 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-01

ConformCategory

EXEMPT -93.126

TotalProject Cost$376

LeadAgency

VARIOUSAGENCIES Modeling NO

County San Bernadino Primary Program Code NCR25 - BICYCLE & PEDESTRAINFACILITIES-UPGRADE Air Basin SCAB RTP ID 7120004

System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionGrouped Projects for Bicycle and pedestrian facilities funded with ATP Cycle 2 funds (MPO - Non SRTS): Projects are consistent with40 CFR Part 93.126 Exempt Tables 2 and Table 3 categories - Bicycle and pedestrian facilities (both motorized and Non-motorized). Tollcredits to match ATP.

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalCON ACTIVE TRANSPORTATION PROGRAM - $301 - - - - - - $301CON CITY FUNDS - $75 - - - - - - $75

Total Construction - $376 - - - - - - $376Total Programmed - $376 - - - - - - $376

5/12/2020 Public Project Listings

Page 108: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 107/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20151504 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-01

ConformCategory

EXEMPT -93.126

TotalProject Cost$4,980

LeadAgency

VARIOUSAGENCIES Modeling NO

County San Bernadino Primary Program Code NCR25 - BICYCLE & PEDESTRAINFACILITIES-UPGRADE Air Basin SCAB RTP ID 7120004

System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionGrouped Prjcts for Sfty Imprvmnts (MPO - SRTS): Projects consistent with 40 CFR Part 93.126 Exempt Tables 2/3 categories -railroad/highway crossing, safer non-Fed-aid system rds, shlder imprvmnts, traffic control devices and op. assistance other thansignalization projects, Intersection signalization projects at individual intersections, pavement marking demo. Tolls credit to match ATP.

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalCON ACTIVE TRANSPORTATION PROGRAM $1,222 $1,074 $2,420 - - - - - $4,716CON CITY FUNDS $264 - - - - - - - $264

Total Construction $1,486 $1,074 $2,420 - - - - - $4,980Total Programmed $1,486 $1,074 $2,420 - - - - - $4,980

5/12/2020 Public Project Listings

Page 109: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 108/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20170802 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-09

ConformCategory

EXEMPT -93.126

TotalProject Cost$10,955

LeadAgency

VARIOUSAGENCIES Modeling NO

County San Bernadino Primary Program Code NCR36 - BRIDGE RESTORATION &REPLC (NO LN ADD) Air Basin RTP ID SBDLS08

System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionIN BARSTOW: N. 1ST AVENUE OVER BNSF RAILWAY UP RR AMTRAK 0.2 MI N. MAIN STREET (BRIDGE NO 54C0088)REPLACE EXISTING 2 LANE BRIDGE WITH 2 LANE BRIDGE. EXISTING BRIDGE TO BE REMOVED. Toll Credits to matchEARREPU funds. HBP project no. 3834

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE SBD CO MEASURE I $794 - - - - - - - $794

Total Preliminary Engineering $794 - - - - - - - $794ROW 2016 EARMARK REPURPOSING - $2,591 - - - - - - $2,591ROW SBD CO MEASURE I - $1,835 - - - - - - $1,835

Total Right of Way - $4,426 - - - - - - $4,426CON SBD CO MEASURE I - - $5,735 - - - - - $5,735

Total Construction - - $5,735 - - - - - $5,735Total Programmed $794 $4,426 $5,735 - - - - - $10,955

5/12/2020 Public Project Listings

Page 110: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 109/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20171402 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-15

ConformCategory

EXEMPT -93.126

TotalProject Cost$23,006

LeadAgency

VARIOUSAGENCIES Modeling NO

County San Bernadino Primary Program Code NCN25 - BICYCLE & PEDESTRAINFACILITIES-NEW Air Basin SCAB RTP ID 4TL104

System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionGrouped Projects for Bicycle and pedestrian facilities - Non - Motorized (ATP Cycle 3 State/MPO): Projects are consistent with 40 CFRPart 93.126 Exempt Tables 2 and Table 3 categories - Bicycle and pedestrian facilities (Non-motorized)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE ACTIVE TRANSPORTATION PROGRAM $479 - $157 - - - - - $636PE ACTIVE TRANSPORTATION PROGRAM - MPO $15 - $52 - - - - - $67PE CITY FUNDS $103 - $13 - - - - - $116

Total Preliminary Engineering $597 - $222 - - - - - $819ROW ACTIVE TRANSPORTATION PROGRAM $42 - $191 - - - - - $233ROW ACTIVE TRANSPORTATION PROGRAM - MPO - - $978 - - - - - $978ROW CITY FUNDS $8 - $205 - - - - - $213

Total Right of Way $50 - $1,374 - - - - - $1,424CON ACTIVE TRANSPORTATION PROGRAM $792 $3,137 $1,888 $1,560 - - - - $7,377CON ACTIVE TRANSPORTATION PROGRAM - MPO - - $1,662 $7,461 - - - - $9,123CON CITY FUNDS $207 $943 $840 $2,273 - - - - $4,263

Total Construction $999 $4,080 $4,390 $11,294 - - - - $20,763Total Programmed $1,646 $4,080 $5,986 $11,294 - - - - $23,006

5/12/2020 Public Project Listings

Page 111: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 110/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20190701 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-09

ConformCategory

EXEMPT -93.126

TotalProject Cost$15,027

LeadAgency

VARIOUSAGENCIES Modeling NO

County San Bernadino Primary Program Code NCN25 - BICYCLE & PEDESTRAINFACILITIES-NEW Air Basin SCAB RTP ID 4TL104

System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionGrouped Projects for Bicycle and pedestrian facilities funded with ATP Cycle 4 (Statewide- Toll Credit to match ATP): Projects areconsistent with 40 CFR Part 93.126 Exempt Tables 2 and Table 3 categories - Bicycle and pedestrian facilities (both motorized and Non-motorized)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE ACTIVE TRANSPORTATION PROGRAM - - $504 $403 - - - - $907PE CITY FUNDS - - $7 $11 - - - - $18

Total Preliminary Engineering - - $511 $414 - - - - $925ROW ACTIVE TRANSPORTATION PROGRAM - - $928 $125 - - - - $1,053ROW CITY FUNDS - - $180 $5 - - - - $185

Total Right of Way - - $1,108 $130 - - - - $1,238CON ACTIVE TRANSPORTATION PROGRAM - - $1,049 $6,177 $1,846 $2,108 - - $11,180CON CITY FUNDS - - $553 $1,054 - $77 - - $1,684

Total Construction - - $1,602 $7,231 $1,846 $2,185 - - $12,864Total Programmed - - $3,221 $7,775 $1,846 $2,185 - - $15,027

5/12/2020 Public Project Listings

Page 112: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 111/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID SBD31905 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-07

ConformCategory

EXEMPT -93.126

TotalProject Cost$172,685

LeadAgency

VARIOUSAGENCIES Modeling NO

County San Bernadino Primary Program Code NCR36 - BRIDGE RESTORATION &REPLC (NO LN ADD) Air Basin SCAB RTP ID SBD31905

System Local HwyProjectLimits From n/a to n/a, Begin: 0 End:

DescriptionMT. VERNON AVENUE BRIDGE (OVERHEAD) AT BNSF REPLACE GRADE SEPARATION, REPLACE 4 LANE BRIDGE WITH4 LANE BRIDGE FROM RIALTO AVE TO 5TH STREETS (0.2 MILES SOUTH OF RTE. 66)(BRIDGE NO 54C0066)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE BRIDGE - LOCAL $6,157 - - - - - - - $6,157PE CITY FUNDS $797 - - - - - - - $797

Total Preliminary Engineering $6,954 - - - - - - - $6,954ROW BRIDGE - LOCAL - - - $10,000 $15,000 $46,173 - - $71,173ROW CITY FUNDS - $9,221 - - - - - - $9,221ROW LOCAL ADVANCE CONSTRUCTION - $71,173 - $-10,000$-15,000$-46,173 - - -

Total Right of Way - $80,394 - - - - - - $80,394CON BRIDGE - LOCAL - - - - - $75,549 - - $75,549CON CITY FUNDS - - $9,788 - - $-447 - - $9,341CON LOCAL ADVANCE CONSTRUCTION - - $75,549 - - $-75,549 - - -CON LOCAL BRIDGE SEISMIC RETROFIT ACCOUNT - - - - - $447 - - $447

Total Construction - - $85,337 - - - - - $85,337Total Programmed $6,954 $80,394 $85,337 - - - - - $172,685

5/12/2020 Public Project Listings

Page 113: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 112/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID SBDLS08 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-15

ConformCategory

EXEMPT -93.126

TotalProject Cost$289,886

LeadAgency

VARIOUSAGENCIES Modeling NO

County San Bernadino Primary Program Code NCR36 - BRIDGE RESTORATION &REPLC (NO LN ADD) Air Basin SCAB RTP ID SBDLS08

System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionGROUPED PROJECTS FOR BRIDGE REHABILITATION AND RECONSTRUCTION - HBP PROGRAM -PROJECTS ARECONSISTENT WITH 40 CFR PART 93.126, 127, 128 EXEMPT TABLES 2 & 3

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalCON AGENCY $3,006 $242 $7,823 $2,238 $2,001 $449 $1,410 $30,756 $47,925CON BRIDGE - LOCAL $23,203 $1,826 $1,900 $17,275 $15,443 $3,465 $11,372 $364,564$439,048CON LOCAL - ADVANCED CONSTRUCTION - $44 $58,480 - - - - $-117,048 $-58,524CON LOCAL BRIDGE SEISMIC RETROFIT ACCOUNT - - - - - - $63 $1,020 $1,083

Total Construction $26,209 $2,112 $68,203 $19,513 $17,444 $3,914 $12,845 $279,292$429,532Total Programmed $26,209 $2,112 $68,203 $19,513 $17,444 $3,914 $12,845 $279,292$429,532

5/12/2020 Public Project Listings

Page 114: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 113/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 200866 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-15

ConformCategory

EXEMPT -93.126

TotalProject Cost$11,298

LeadAgency VICTORVILLE Modeling NO

County San Bernadino Primary Program Code NCR78 - SEISMIC RETROFIT Air Basin MDAB RTP ID REG0701System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionBRIDGE NO. 54C0547, BEAR VALLEY ROAD, OVER BNSF RY, AMTRAK, & UP RR, 3.8 MI E OF ROUTE I-15. Widen 6 lanebridge to 7 lanes (median turn lane) and seismically retrofitting existing bridge.

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE BRIDGE - LOCAL $620 - - - - - - - $620PE CITY FUNDS $80 - - - - - - - $80

Total Preliminary Engineering $700 - - - - - - - $700ROW BRIDGE - LOCAL $133 - $168 - - - - - $301ROW CITY FUNDS $17 - $22 - - - - - $39

Total Right of Way $150 - $190 - - - - - $340CON BRIDGE - LOCAL - - - - $5,540 - - - $5,540CON CITY FUNDS - - - - $718 - - - $718CON STP LOCAL - - $4,000 - - - - - $4,000

Total Construction - - $4,000 - $6,258 - - - $10,258Total Programmed $850 - $4,190 - $6,258 - - - $11,298

5/12/2020 Public Project Listings

Page 115: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 114/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID SBD97147 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-07

ConformCategory

NON-EXEMPT

TotalProject Cost$48,513

LeadAgency VICTORVILLE Modeling YES

County San Bernadino Primary Program Code CAX66 - NEW CONNECTNS/CROSSTRAFFIC IMP: RS Air Basin RTP ID SBD97147

System Local HwyProjectLimits From HESPERIA RD to RIDGECREST ROAD, Begin: 0 End:

DescriptionGREEN TREE BLVD AT AT&SF RAILROAD CONSTRUCT 4-LANE BR & CONNECT TO HESPERIA & RIDGECREST RD (TollCredits used to match EARREPU, SEC112, HIP & STP)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE SECTION 112 $230 - - - - - - - $230PE SECTION 117 $2,958 - - - - - - - $2,958

Total Preliminary Engineering $3,188 - - - - - - - $3,188ROW 2016 EARMARK REPURPOSING - $4,219 - - - - - - $4,219ROW SBD CO MEASURE I - $500 - - - - - - $500ROW SECTION 112 $760 - - - - - - - $760

Total Right of Way $760 $4,719 - - - - - - $5,479CON AGENCY - - $4,219 - - - - - $4,219CON CITY FUNDS - - $16,818 - - - - - $16,818CON HIGHWAY INFRASTRUCTURE PROGRAM (HIP) - - $7,545 - - - - - $7,545CON STP LOCAL - - $11,264 - - - - - $11,264

Total Construction - - $39,846 - - - - - $39,846Total Programmed $3,948 $4,719 $39,846 - - - - - $48,513

5/12/2020 Public Project Listings

Page 116: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary

https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 115/116

2019 Federal Transportation Improvement ProgramSan Bernardino County

Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21

(In $000`s)

FTIP ID 20170502 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-02

ConformCategory

EXEMPT -93.126

TotalProject Cost$779

LeadAgency

YUCCAVALLEY Modeling NO

County SanBernadino Primary Program Code NCN27 - PEDESTRIAN FACILITIES-NEW Air Basin RTP ID 0A6410

System Local HwyProjectLimits From to , Begin: 0 End:

DescriptionYucca Valley: Little League Drive Pedestrian Improvements (ATP Cycle 3 - Statewide Component)

Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE ACTIVE TRANSPORTATION PROGRAM - - $68 - - - - - $68

Total Preliminary Engineering - - $68 - - - - - $68CON ACTIVE TRANSPORTATION PROGRAM - - - $554 - - - - $554CON AGENCY - - - $157 - - - - $157

Total Construction - - - $711 - - - - $711Total Programmed - - $68 $711 - - - - $779

5/12/2020 Public Project Listings

Page 117: 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/19FTIP_LocalAmend19_0111_1319_21SBD.pdf$560 Lead Agency ADELANTO Modeling NO County San Bernadino Primary