17
2019 Esri Petroleum GIS Conference.

2019 Esri Petroleum GIS Conference.€¦ · ASME B31.8s 2007 “Gas Transmission and Distribution Piping System” ASME B31.8s 2004 “Managing System Integrity of Gas Pipeline”

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 2019 Esri Petroleum GIS Conference.€¦ · ASME B31.8s 2007 “Gas Transmission and Distribution Piping System” ASME B31.8s 2004 “Managing System Integrity of Gas Pipeline”

2019 Esri Petroleum GIS Conference.

Page 2: 2019 Esri Petroleum GIS Conference.€¦ · ASME B31.8s 2007 “Gas Transmission and Distribution Piping System” ASME B31.8s 2004 “Managing System Integrity of Gas Pipeline”
Page 3: 2019 Esri Petroleum GIS Conference.€¦ · ASME B31.8s 2007 “Gas Transmission and Distribution Piping System” ASME B31.8s 2004 “Managing System Integrity of Gas Pipeline”

HCA’s Analysis in PIDT for ArcGIS Pro – PIDT Ductos

MBA Eng. Alejandro Padilla V

Page 4: 2019 Esri Petroleum GIS Conference.€¦ · ASME B31.8s 2007 “Gas Transmission and Distribution Piping System” ASME B31.8s 2004 “Managing System Integrity of Gas Pipeline”

❖ Speaker…

MBA Eng. Alejandro Padilla V

• Developer Leader and Support for Tecna ICE.• .NET Developer.• Computer Science and Industrial Engineer.• 5+ years of experience in Pipeline Industry,

Specifically in Integrity Analysis, Semiquantitative Risk Management Analysis.

Page 5: 2019 Esri Petroleum GIS Conference.€¦ · ASME B31.8s 2007 “Gas Transmission and Distribution Piping System” ASME B31.8s 2004 “Managing System Integrity of Gas Pipeline”

Content..

❖ Methodology of HCA’s Analysis.

❖ Workflow

❖ Information Sources – Available Information

❖ Demo

❖ Conclusions and Considerations

Page 6: 2019 Esri Petroleum GIS Conference.€¦ · ASME B31.8s 2007 “Gas Transmission and Distribution Piping System” ASME B31.8s 2004 “Managing System Integrity of Gas Pipeline”

Code Of Federal Regulations (Title 49,

Part 192) – Transportation of Natural

and Other Gas by Pipeline.

ASME B31.8s 2007 “Gas Transmission

and Distribution Piping System”

ASME B31.8s 2004 “Managing

System Integrity of Gas Pipeline”

Pipeline Integrity basics, Dr John

F Kiefner, 2011

Pipeline Risk Management

Manual, Kent Muhlbauer,

Methology of HCA’s gas (References)

Page 7: 2019 Esri Petroleum GIS Conference.€¦ · ASME B31.8s 2007 “Gas Transmission and Distribution Piping System” ASME B31.8s 2004 “Managing System Integrity of Gas Pipeline”

Potential Impact

Determine the potential area of failure in the pipeline to assess the potential consequences of such an event. The impacted area is a function of the pipe diameter and pressure

Page 8: 2019 Esri Petroleum GIS Conference.€¦ · ASME B31.8s 2007 “Gas Transmission and Distribution Piping System” ASME B31.8s 2004 “Managing System Integrity of Gas Pipeline”

Class Locations

Classify the pipeline into segments according to information of local inhabitants, high buildings and areas of importance to the community (schools, Churches, Parks, etc.).

Page 9: 2019 Esri Petroleum GIS Conference.€¦ · ASME B31.8s 2007 “Gas Transmission and Distribution Piping System” ASME B31.8s 2004 “Managing System Integrity of Gas Pipeline”

HCA Gas

Segments of High Consequence Areas, considering the results of Class Locations, Potential Impact and other areas of high consequence. (HCA)

Page 10: 2019 Esri Petroleum GIS Conference.€¦ · ASME B31.8s 2007 “Gas Transmission and Distribution Piping System” ASME B31.8s 2004 “Managing System Integrity of Gas Pipeline”

Workflow - About Software Development…

❖ Create a suite of models for simulation, risk calculation and more ...

❖ Stability

❖ Reliability

❖ Usability

❖ Available on ArcGIS Pro❖ End users

❖ Reports

❖ Integration

Apps

Desktop

APIs

Online Enterprise

Page 11: 2019 Esri Petroleum GIS Conference.€¦ · ASME B31.8s 2007 “Gas Transmission and Distribution Piping System” ASME B31.8s 2004 “Managing System Integrity of Gas Pipeline”

Workflow - How to integrate ... Hybrid solution

❖ .NET (C #) for integration with ArcGIS Pro❖ Interface and User Experience

❖ Development in Microsoft Visual Studio

❖ Almost unlimited customization with different toolkits

❖ Python❖ Stable

❖ Flexible

❖ Easy integration with scientific libraries (Numpy, Scipy, Pandas, Arcpy, etc.)

Page 12: 2019 Esri Petroleum GIS Conference.€¦ · ASME B31.8s 2007 “Gas Transmission and Distribution Piping System” ASME B31.8s 2004 “Managing System Integrity of Gas Pipeline”

Workflow - Integrity Methodology…

ArcGIS

Pro

Page 13: 2019 Esri Petroleum GIS Conference.€¦ · ASME B31.8s 2007 “Gas Transmission and Distribution Piping System” ASME B31.8s 2004 “Managing System Integrity of Gas Pipeline”

Information availableIniciar sesión desde la cinta de ArcGIS Maps para desbloquear el mapa

Page 14: 2019 Esri Petroleum GIS Conference.€¦ · ASME B31.8s 2007 “Gas Transmission and Distribution Piping System” ASME B31.8s 2004 “Managing System Integrity of Gas Pipeline”

Demonstration According to Workflow

ClassLocations

Potential Impact

HCA Analysis

Page 15: 2019 Esri Petroleum GIS Conference.€¦ · ASME B31.8s 2007 “Gas Transmission and Distribution Piping System” ASME B31.8s 2004 “Managing System Integrity of Gas Pipeline”

Conclusions and Considerations…

Flexibility: It is easy to customize forclients with different requirements

Simple implementation: Rapid implementation in the Customer’senvironment

Python and ESRI: Automation ofprocesses for users

Page 16: 2019 Esri Petroleum GIS Conference.€¦ · ASME B31.8s 2007 “Gas Transmission and Distribution Piping System” ASME B31.8s 2004 “Managing System Integrity of Gas Pipeline”

What’s next (Upcoming)

Cloud Services Integration

ArcGIS Enterprise

Mobile App

Page 17: 2019 Esri Petroleum GIS Conference.€¦ · ASME B31.8s 2007 “Gas Transmission and Distribution Piping System” ASME B31.8s 2004 “Managing System Integrity of Gas Pipeline”

Thanks!¿Questions?

Please contact directly to:

[email protected]

[email protected]

Mobile: +57 320 409 6036 - 315 361 4216

Tel: +57 368 4311

Address: Carrera 32 # 22 B 60/66

BOGOTÁ – COLOMBIA