Upload
trinhdung
View
217
Download
2
Embed Size (px)
Citation preview
2018 Exploration & Production Winter Standards Meeting January 22-26, 2018 | Hyatt Regency San Antonio | San Antonio, Texas | www.api.org Current as of November 29, 2017 | Subject to change | Final program distributed onsite.
Sunday, January 21, 2018
General
Sponsor and Exhibitor Displays (Setup)
1:00 pm – 4:00 pm
Registration 1:00 pm – 5:00 pm
Subcommittee and Task Group Chairs Training 4:00 pm – 6:00 pm
Subcommittee on Tubular Goods (SC 5)
SC 5 Steering Committee (Steering Committee Members Only) 6:00 pm – 7:00 pm
Monday, January 22, 2018
General
Welcome Breakfast and General Session 7:00 am – 8:30 am
Registration 7:00 am – 4:00 pm
Sponsor and Exhibitor Displays 7:00 am – 5:00 pm
Spouse’s Breakfast 8:00 am – 10:00 am (Tentative, time subject to change slightly)
Morning Coffee Service 8:30 am – 9:00 am
Orientation for New Committee Members and First-Time Attendees 9:00 am – 10:00 am
Mid-Morning Coffee Service 10:00 am – 10:30 am
Afternoon Coffee Service 2:00 pm – 2:30 pm
Special Networking Break 2:30 pm – 3:00 pm
Subcommittee and Task Group Chairs Training 3:30 pm – 5:30 pm
Subcommittee on Tubular Goods (SC 5)
SC 5 Opening – Welcome and General Announcements 8:30 am – 9:00 am
Manufacturers Advisory Group (SC 5/MAG) 9:00 am – 11:00 am
WI 4212, RP 5L8 3rd Edition Development (SC 5/TGLP) 11:00 am – 12:00 pm
Monday, January 22, 2018 (Continued)
Subcommittee on Tubular Goods (SC 5)
(Continued)
WI 7038, Double-Shoulder Connections (Spec 7-2) (SC 5/TGDSE)) 11:00 am – 12:00 pm
WI’s 2360 & 2395, Stress Relief of Cold-Worked Ends & Re-Evaluation of PLSs for Spec 5CT (SC 5/TGOCTG) 11:00 am – 12:00 pm
Users Advisory Group (SC 5/UAG) 1:00 pm – 3:00 pm
WI 4235, Bearing Piece Location for Spec 5L (SC 5/TGLP) 3:00 pm – 4:00 pm
Cancelled
WI 4232, Moderate Sour Service for Spec 5L (SC 5/TGOCTG/RGPP) 3:00 pm – 4:30 pm
WI 2351 & 2398, Elevated Temperature (Spec 5CT) (SC 5/TGOCTG/RGPP) 3:00 pm – 4:30 pm
WI 2345, Coiled Tubing Performance Properties (SC 5/TGOCTG/RGCT) 3:00 pm – 5:00 pm
WI 3083, Connection FEA Workflow for RP 5C5 (SC 5/TGTGC) 3:00 pm – 5:00 pm
Moved to Tuesday
WI 4239, Mechanical Interference Fit (Spec 5L) (SC 5/TGLP) 4:00 pm – 5:00 pm
Monday, January 22, 2018 (Continued)
Subcommittee on Tubular Goods (SC 5)
(Continued)
WI 2390, Add C125 to Spec 5CT (SC 5/TGOCTG/RGSSP) 4:00 pm – 5:00 pm
WI 2353, Dimensional Mapping for Performance Properties (Spec 5CT) (SC 5/TGOCTG/RGPP) 4:30 pm – 5:30 pm
Subcommittee on Valves and Wellhead Equipment
(SC 6)
API 6D Task Group, Pipeline Valves (SC 6) 1:00 pm – 5:00 pm
Subcommittee on Field Operating Equipment
(SC 11)
SC 11 Task Group Meetings 8:30 am – 5:00 pm
Subcommittee on Drilling Well Control Equipment
(SC 16)
API 16AS Task Group, BOP Systems (SC 16) 8:30 am – 12:00 pm
API Task Group on S53 – Blowout Prevention Equipment Systems for Drilling Wells (SC 16) 1:00 pm – 5:00 pm
Tuesday, January 23, 2018
General
Early Morning Coffee Service 7:00 am – 8:30 am
Registration 7:00 am – 4:00 pm
Sponsor and Exhibitor Displays 7:00 am – 5:00 pm
Spouse/Guest Breakfast 8:00 am – 10:00 am (Tentative, time subject to change slightly)
Technical Session 9:30 am – 11:30 am
Mid-Morning Coffee Service 10:00 am – 10:30 am
Afternoon Coffee Service 2:00 pm – 2:30 pm
Special Networking Break 2:30 pm – 3:00 pm
Subcommittee and Task Group Chairs Training 3:00 pm – 5:00 pm
Subcommittee on Tubular Goods (SC 5)
WI 2397, Spec 5CT Hardness and NACE MR0175 Ballot (SC 5/TGOCTG/RGSSP) 8:00 am – 9:00 am
WI 2380, Spec 5CT 10th Edition Development (SC 5/TGOCTG) 8:00 am – 10:00 am
Tuesday, January 23, 2018 (Continued)
Subcommittee on Tubular Goods (SC 5)
(Continued)
WI 3083, Connection FEA Workflow for RP 5C5 (SC 5/TGTGC) 8:00 am – 10:00 pm
WI’s 1064, 3066, 3078, and 3079 for Thread Compounds (RP 5A3) (SC 5/TGTGC/TGOCTG/TGDSE) 8:00 am – 10:00 am
WI 4223, Fatigue Equation Development (RP’s 5L1 and 5LW) (SC 5/TGLP) 8:00 am – 10:00 am
Resource Group on Coiled Tubulars (SC 5/RGCT) 8:00 am – 12:00 pm
WI's 2384 & 2391, Spec 5CT Annex I Requirements and Thread Protector Impact Test Methodology (SC 5/TGOCGT/TGTGC) 10:00 am – 12:00 pm
WI 4240, Chemistry Changes to HTP for Spec 5L (SC 5/TGLP) 10:00 am – 12:00 pm
WI’s 1066, 2284, 2366, and 2411 for Spec 5CRA, Addition of Ni-Based Alloys (SC 5/TGOCTG/TGLP/RGSSP) 10:00 am – 12:00 pm
WI 2389, Review TR 5C3 Annex G – Analysis for Evaluating Small Data Sets (Spec 5CT) (SC 5/TGTGC) 10:00 am – 12:00 pm
WI 7040, Spec 5DP 2nd Edition Development (SC 5/TGDSE) 10:00 am – 12:00 pm
Tuesday, January 23, 2018 (Continued)
Subcommittee on Tubular Goods (SC 5)
(Continued)
WI 2419, Pre-Cracking Requirements for 5CT SR39 for C110 (and potential other grades) (SC 5/TGOCTG/RGPP). 11:00 am – 12:00 pm
WI 2408, Update Annex D for TR 5C3, Technical Report-Out on PRAC III Project (Includes WI’s 2315, 2318A, 2352, 2386) (SC 5/TGOCTG/RGSSP) 1:00 pm – 3:00 pm
WI 2381, Charpy Energy Requirements (Spec 5CT) (SC 5/TGOCTG) 1:00 pm – 3:00 pm
WI 7001, RP 7G-1 (7G Revision) (SC 5/TGDSE) 1:00 pm – 3:00 pm
Resource Group on NDT (SC 5/RGNDT) 1:00 pm – 3:00 pm
WI 2413, DCB Side Grooves for Spec 5CT (SC 5/TGOCTG) 3:00 pm – 4:00 pm
WI 7030, RP 7G-2 Second Edition Maintenance (SC 5/TGDSE) 3:00 pm – 5:00 pm
WI 4234, Coiled Line Pipe (Spec 5LCP) Maintenance (SC 5/TGLP/RGCT) 3:00 pm – 5:00 pm
Tuesday, January 23, 2018 (Continued)
Subcommittee on Tubular Goods (SC 5)
(Continued)
WI 3081, Connection Testing Methods for MFHW Low-Cycle Fatigue (SC 5/TGTGC) 3:00 pm – 5:00 pm
WI 1069, Harmonize NDE Personnel Certification in Spec’s 5CT, SCRA, and 5L (SC 5/TGOCTG/TGLP/RGNDT) 3:00 pm – 5:00 pm
WI 2400, Acceptance Criteria for C110 for Method D (Spec 5CT) (SC 5/TGOCTG/RGSSP) 4:00 pm – 5:00 pm
WI 2405, Hydrotesting Heavy Wall Tubulars (Spec 5CT) (SC 5/TGOCTG) 4:00 pm – 5:00 pm
WI 2416, Collapse Equations in TR 5C3 for 5L Pipe (SC 5/TGOCTG/RGPP 5:00 pm – 6:00 pm
Tuesday, January 23, 2018 (Continued)
Subcommittee on Valves and Wellhead Equipment
(SC 6)
API 6A Task Group, Wellhead and Christmas Tree Equipment 8:00 am – 12:00 pm
Subcommittee on Oil Well Cements
(SC 10)
Oil Well Cements (SC 10) 8:00 am – 5:00 pm
Subcommittee on Field Operating Equipment
(SC 11)
SC 11 Task Group Meetings 8:30 am – 5:00 pm
Subcommittee on Drilling, Completion, and Fracturing Fluids
(SC 13)
Drilling, Completion, and Fracturing Fluids (SC 13) 8:00 am – 5:00 pm
Tuesday, January 23, 2018 (Continued)
Subcommittee on Drilling Well Control Equipment
(SC 16)
API 16FR Task Group, Repair & Remanufacture of Marine Drilling Riser Equipment (SC 16) 8:00 am – 12:00 pm
API 16B Task Group, Coiled Tubing, Snubbing, and Wireline Well Control Stack Equipment (SC 16) 8:00 am – 12:00 pm
API 16C Task Group, Choke and Kill Systems (SC 16) 1:00 pm – 5:00 pm
API 16ST Task Group, Coiled Tubing Well Control Equipment Sysytems (SC 16) 1:00 pm – 5:00 pm
Subcommittee on Completion Equipment
(SC 19)
Subcommittee on Completion Equipment (SC 19) 9:00 am – 5:30 pm
Subcommittee on Materials (SC 21)
Pipeline Flange and Fitting Work Group (SC 21) 1:00 pm – 3:00 pm
Task Group on Bolting Issues (SC 21) 1:30 pm – 3:30 pm
Wednesday, January 24, 2018
General
Early Morning Coffee Service 7:00 am – 8:30 am
Registration 7:00 am – 3:00 pm
Sponsor and Exhibitor Displays 7:00 am – 5:00 pm
Mid-Morning Coffee Service 10:00 am – 10:30 am
Afternoon Coffee Service 2:00 pm – 3:00 pm
API Reception 6:00 pm – 7:30 pm
Committee on Standardization of Oilfield Equipment and Materials
(CSOEM)
CSOEM Research & Budget Meeting (Committee Members and Invited Guests Only) 9:00 am – 12:00 pm
Subcommittee on Tubular Goods (SC 5)
WI 4228, RP 5L3 Working Group (SC 5/TGLP) 8:00 am – 10:00 am
WI 3065, RP 5B1 6th Edition Development (SC 5/TGTGC) 8:00 am – 10:00 pm
Wednesday, January 24, 2018 (Continued)
Subcommittee on Tubular Goods (SC 5)
(Continued)
WI 7022, Spec 7-1 Revision (SC 5/TGDSE) 8:00 am – 10:00 am
Resource Group on Sour Service Products (SC 5/RGSSP) 8:00 am – 10:30 am
WI 7041, Working Gauge Calibration for Spec 7-2 (SC 5/TGDSE/TGTGC) 10:00 am – 11:00 am
Line Pipe Global Industry Standards Liaison Group (SC 5/TGLP) 10:00 am – 11:00 am
Spec 5B Maintenance (SC 5/TGTGC) 10:00 am – 11:00 am
WI 2403, Simulated PWHT Requirements (RP 5C6) (SC 5/TGOCTG) 10:00 am – 11:00 am
Resource Group on Performance Properties (SC 5/RGPP) 10:30 am – 12:00 pm
WI 2407 Positive Material Identification for Spec 5CRA (SC 5/TGOCTG/RGSSP) 11:00 am – 12:00 pm
Wednesday, January 24, 2018 (Continued)
Subcommittee on Tubular Goods (SC 5)
(Continued)
WI 4232, Moderate Sour Service for Spec 5L Pipe (SC 5/TGLP/RGSSP) 11:00 am – 12:00 pm
Cancelled
WI 4235, Bearing Piece Location for Spec 5L (SC 5/TGLP) 11:00 am – 12:00 pm
WI 2414, Oblique Angle Requirement in Spec 5CT (SC 5/TGOCTG/RGNDT) 1:00 pm – 3:00 pm
WI 4241, Spec 5L 46th Edition Development (SC 5/TGLP) 1:00 pm – 3:00 pm
Task Group on Oil Country Tubular Goods (SC 5/TGOCTG) 3:00 pm – 5:00 pm
Subcommittee on Valves and Wellhead Equipment
(SC 6)
Subcommittee 6 on Valves and Wellhead Equipment (SC 6) 8:00 am – 2:00 pm
Wednesday, January 24, 2018 (Continued)
Subcommittee on Oil Well Cements
(SC 10)
Oil Well Cements (SC 10) 8:00 am – 5:00 pm
Subcommittee on Field Operating Equipment
(SC 11)
Subcommittee on Field Operating Equipment (SC 11) 8:30 am – 12:00 pm
SC 11 Task Group Meetings 1:00 pm – 5:00 pm
Subcommittee on Drilling, Completion, and Fracturing Fluids
(SC 13)
Drilling Completion, and Fracturing Fluids (SC 13) 8:00 am – 5:00 pm
Subcommittee on Fiberglass and Plastic Tubulars
(SC 15)
Task Group on Fiberglass Line Pipe and Tubulars (SC 15/TG 1) 8:00 am – 5:00 pm
Thermoplastic Liners (SC 15/TG 3) 8:00 am – 5:00 pm
Wednesday, January 24, 2018 (Continued)
Subcommittee on Drilling Well Control Equipment
(SC 16)
API 16A Task Group, Drill-Through Equipment (SC 16) 8:00 am – 12:00 pm
API 16D Task Group, Control Systems for Drilling Control and Diverter Equipment (SC 16) 1:00 pm – 3:00 pm
API 16AR Task Group, Repair/Remanufacture of Drill-Through Equipment (SC 16) 3:00 pm – 5:00 pm
Subcommittee on Materials (SC 21)
Subcommittee on Materials 1:30 pm – 5:00 pm
Thursday, January 25, 2018
General
Early Morning Coffee Service 7:00 am – 8:30 am
Registration 7:00 am – 10:00 am
Mid-Morning Coffee Service 10:00 am – 10:30 am
Afternoon Coffee Service 2:00 pm – 3:00 pm
API Monogram / APIQR Forum 3:00 pm – 5:00 pm
Subcommittee on Tubular Goods (SC 5)
Task Group on Threading, Gauging, and Compounds 8:00 am – 10:00 am
Task Group on Line Pipe 8:00 am – 12:00 pm
Task Group on Drill Stem Elements (SC 5/TGDSE) 10:00 am – 12:00 pm
SC 5 Planning Meeting (Steering Committee Members Only) 1:00 pm – 2:00 pm
Subcommittee on Tubular Goods (SC 5) 2:00 pm – 4:00 pm
Thursday, January 25, 2018 (Continued)
Subcommittee on Oil Well Cements
(SC 10)
SC 10, Follow-Up Working Session 8:00 am – 5:00 pm
Subcommittee on (SC 11)
SC 11 Task Group Meetings 1:00 pm – 5:00 pm
Subcommittee on (SC 15)
Fiberglass and Plastic Tubulars (SC 15) 8:00 am – 5:00 pm
Subcommittee on (SC 16)
SC 16 Steering Committee (Subcommittee officers and Invited Guests Only) 8:00 am – 10:00 am
Subcommittee 16, Subcommittee on Drilling Well Control Systems (SC 16) 1:00 pm – 5:00 pm
Subcommittee on Quality Standards
(SC 18)
Subcommittee on Quality Standards 1:00 pm – 3:00 pm
Subcommittee on Supply Chain Management
(SC 20)
Subcommittee on Supply Chain Management (SC 20) 8:30 am – 12:00 pm
Friday, January 26, 2018
Committee on Standardization of Oilfield Equipment and Materials
(CSOEM)
CSOEM Governance Meeting (Budget and SC Reports) (Committee Members, Subcommittee Officers and Invited Guests Only) 8:00 am – 12:00 pm
CSOEM Executive Committee (Voting Members and Representatives Only) 1:00 pm – 5:00 pm