Table of Contents - Distribution of Quantities
Project Name - 2018 Roadway Departure Mitigation - Contract 1Estimate Name - Addendum 1
R.I. Contract No. - 2018-CT-058FAP Nos: STPG-HSIP(051)
ItemCode Description
Page
201.0401 REMOVE AND DISPOSE GRANITE CURB 1201.0409 REMOVE AND DISPOSE FLEXIBLE PAVEMENT 1201.0411 REMOVE AND DISPOSE CATCH BASIN AND GUTTER INLETS 1201.0415 REMOVE AND DISPOSE GUARDRAIL AND POST ALL TYPES 1201.0428 REMOVE AND DISPOSE FRAME AND GRATE OR FRAME AND COVER 1201.9901 REMOVE AND DISPOSE OVERHEAD STRUCTURE AND SIGNS 1201.9902 REMOVE AND DISPOSE SIGNS AND POST 2202.0100 EARTH EXCAVATION 3202.0201 ROCK EXCAVATION MECHANICAL 3202.0800 GRAVEL BORROW 3204.0100 TRIMMING AND FINE GRADING 4206.0301 COMPOST FILTER SOCK 4206.9901 CATCH BASIN SEDIMENTATION CONTROL 4212.2000 CLEANING AND MAINTENANCE OF EROSION CONTROLS 5213.0100 PLACEMENT OF MILLINGS BENEATH GUARDRAIL 5401.1003 CLASS 19.0 HMA FOR PATCHING 6401.2003 CLASS 12.5 HMA FOR PATCHING 6401.3003 CLASS 9.5 HMA FOR PATCHING 6403.0300 ASPHALT EMULSION TACK COAT 6702.0512 ** ITEM DELETED ** 6702.0605 ** ITEM DELETED ** 7708.9041 CLEANING CATCH BASINS ALL TYPES AND SIZES 7901.0101 GUARDRAIL STEEL BEAM SINGLE FACE EARTH AND ASPHALT 8901.0163 GUARDRAIL STEEL BEAM POST IN LEDGE STANDARD 34.1.2 8901.0165 STEEL BEAM GUARDRAIL SECTION (12.5 FT. BY 12.0 INCHES) 8901.0175 STEEL THRIE BEAM GUARDRAIL SINGLE FACE STANDARD 34.5.3 9901.0177 STEEL THRIE BEAM GUARDRAIL TRANSITION 9901.0199 GUARDRAIL END TREATMENT, ENERGY ABSORBING TERMINAL 9901.9901 MGS COMPATIBLE GUARDRAIL CONNECTION TO CONCRETE BARRIER 10901.9902 STEEL W-BEAM GUARDRAIL - TRAILING ANCHORAGE (MASH TL-3) 10901.9903 LONG-SPAN GUARDRAIL 11901.9904 NCHRP TL-4 W-BEAM GUARDRAIL 11901.9905 GUARDRAIL CONNECTION TO BARRIER - APPROACH END SECTION
STD. 34.3.7 - MODIFIED11
901.9906 8-FOOT LONG GUARDRAIL POST 11909.9901 MGS COMPATIBLE CONCRETE BARRIER 12914.5010 FLAGPERSONS 12914.5020 FLAGPERSONS - OVERTIME 12919.0101 TEST PITS 12922.0100 TEMPORARY CONSTRUCTION SIGNS STANDARD 29.1.0 AND 27.1.1 12923.0105 DRUM BARRICADE STANDARD 26.2.0 13923.0200 FLUORESCENT TRAFFIC CONES STANDARD 26.1.0 13926.0121 UNANCHORED PRECAST CONCRETE BARRIER FOR TEMPORARY TRAFFIC
CONTROL STANDARD 40.5.013
926.0140 REFLECTIVE DELINEATORS FOR TEMPORARY CONCRETE BARRIERS 13928.9901 TRUCK MOUNTED ATTENUATOR WITH TRUCK MOUNTED FLASHING ARROW
BOARD13
929.0110 FIELD OFFICE 13932.0200 FULL-DEPTH SAWCUT OF BITUMINOUS PAVEMENT 14936.0100 MOBILIZATION AND DEMOBILIZATION 14937.0200 MAINTENANCE AND MOVEMENT TRAFFIC PROTECTION 14L01.0102 LOAM BORROW 4 INCHES DEEP 14L02.0101 GENERAL HIGHWAY SEEDING (TYPE 1) 14T15.0100 DIRECTIONAL REGULATORY AND WARNING SIGNS 15
R - 1Addendum - 1
Index: 1
Table of Contents - Distribution of Quantities
Project Name - 2018 Roadway Departure Mitigation - Contract 1Estimate Name - Addendum 1
R.I. Contract No. - 2018-CT-058FAP Nos: STPG-HSIP(051)
ItemCode Description
Page
T15.0200 REMOVE AND RELOCATE DIRECTIONAL REGULATORY AND WARNING SIGN
15
T16.0100 GROUND MOUNTED PRIMARY DIRECTIONAL SIGN PANELS EXTRUDED ALUMINUM
15
T16.9901 GROUND MOUNTED PRIMARY DIRECTIONAL SIGN POST-STEEL BREAKAWAY
15
T18.0336 36 INCH HAZARD MARKER 16T18.9901 REFLECTORIZED DELINEATORS - GREEN 16T18.9902 REFLECTORIZED DELINEATORS - RED 16702.0517 FRAME AND GRATE, STANDARD 6.3.2 17702.0850 CONCRETE COVER SHALLOW TYPE "F" SQUARE CATCH BASINS
STANDARD 4.8.017
702.9901 SOLID BLOCK SHALLOW TYPE "F" SQUARE CATCH BASIN STANDARD 3.5.0 - MODIFIED
17
704.0300 RECONSTRUCT CATCH BASIN/VERTICAL WALLS 17
R - 1Addendum - 1
Index: 2
Page 1 of 17
Distribution of Quantities
Project Name - 2018 Roadway Departure Mitigation - Contract 1Estimate Name - Addendum 1
R.I. Contract No. - 2018-CT-058FAP Nos: STPG-HSIP(051)
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
001 201.0401 REMOVE AND DISPOSE GRANITE CURB LF
ROUTE 146
AS REQUIRED 500.00 0021 01
Item 201.0401 Total: 500.00
002 201.0409 REMOVE AND DISPOSE FLEXIBLE SY
PAVEMENT
ROUTE 146
AS REQUIRED 75.00 0021 01
Item 201.0409 Total: 75.00
003 201.0411 REMOVE AND DISPOSE CATCH BASIN AND EACH
GUTTER INLETS
ROUTE 146
280+00 RT 1.00 0021 01
Item 201.0411 Total: 1.00
004 201.0415 REMOVE AND DISPOSE GUARDRAIL AND LF
POST ALL TYPES
ROUTE 146
266+54 TO 267+79 RT 215.00 0021 01
285+39 TO 285+90 RT 55.00 0021 01
Item 201.0415 Total: 270.00
005 201.0428 REMOVE AND DISPOSE FRAME AND GRATE EACH
OR FRAME AND COVER
ROUTE 146
280+00 RT 2.00 0021 01
AS REQUIRED 1.00 0021 01
Item 201.0428 Total: 3.00
006 201.9901 REMOVE AND DISPOSE OVERHEAD LS
STRUCTURE AND SIGNS
R - 1Addendum - 1
Page 1a of 17
Distribution of Quantities
Project Name - 2018 Roadway Departure Mitigation - Contract 1Estimate Name - Addendum 1
R.I. Contract No. - 2018-CT-058FAP Nos: STPG-HSIP(051)
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
006 201.9901 Cont. ROUTE 2
Addendum - 1
Page 2 of 17
Distribution of Quantities
Project Name - 2018 Roadway Departure Mitigation - Contract 1Estimate Name - Addendum 1
R.I. Contract No. - 2018-CT-058FAP Nos: STPG-HSIP(051)
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
006 201.9901 Cont. 403+68 1.00 0021 01
Item 201.9901 Total: 1.00
007 201.9902 REMOVE AND DISPOSE SIGNS AND POST EACH
INTERSTATE 195
161+39 LT 1.00 0021 01
162+10 RT 1.00 0021 01
163+15 RT 1.00 0021 01
163+98 LT 1.00 0021 01
INTERSTATE 295
228+31 RT 1.00 0021 01
229+01 RT 1.00 0021 01
229+54 RT 1.00 0021 01
229+76 RT 1.00 0021 01
230+69 RT 1.00 0021 01
231+79 RT 1.00 0021 01
232+47 LT 1.00 0021 01
233+17 RT 1.00 0021 01
233+49 LT 1.00 0021 01
233+55 LT 1.00 0021 01
233+61 LT 1.00 0021 01
234+46 LT 1.00 0021 01
234+73 LT 1.00 0021 01
235+51 LT 1.00 0021 01
237+39 LT 1.00 0021 01
INTERSTATE 95
540+96 LT 1.00 0021 01
541+96 LT 1.00 0021 01
542+99 LT 1.00 0021 01
ROUTE 138
692+47 RT 1.00 0021 01
693+70 RT 1.00 0021 01
ROUTE 146
Page 3 of 17
Distribution of Quantities
Project Name - 2018 Roadway Departure Mitigation - Contract 1Estimate Name - Addendum 1
R.I. Contract No. - 2018-CT-058FAP Nos: STPG-HSIP(051)
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
007 201.9902 Cont. 266+80 RT 1.00 0021 01
266+95 RT 1.00 0021 01
267+14 RT 1.00 0021 01
267+32 RT 1.00 0021 01
267+51 RT 1.00 0021 01
267+80 RT 1.00 0021 01
268+97 RT 1.00 0021 01
271+62 RT 1.00 0021 01
276+86 RT 1.00 0021 01
279+46 RT 1.00 0021 01
282+08 RT 1.00 0021 01
284+70 RT 1.00 0021 01
285+40 RT 1.00 0021 01
285+90 RT 1.00 0021 01
ROUTE 4
140+40 LT 1.00 0021 01
142+68 LT 1.00 0021 01
Item 201.9902 Total: 40.00
008 202.0100 EARTH EXCAVATION CY
ROUTE 146
AS REQUIRED 150.00 0021 01
Item 202.0100 Total: 150.00
009 202.0201 ROCK EXCAVATION MECHANICAL CY
ROUTE 146
AS REQUIRED 5.00 0021 01
Item 202.0201 Total: 5.00
010 202.0800 GRAVEL BORROW CY
ROUTE 146
AS REQUIRED 100.00 0021 01
Item 202.0800 Total: 100.00
Page 4 of 17
Distribution of Quantities
Project Name - 2018 Roadway Departure Mitigation - Contract 1Estimate Name - Addendum 1
R.I. Contract No. - 2018-CT-058FAP Nos: STPG-HSIP(051)
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
011 204.0100 TRIMMING AND FINE GRADING SY
ROUTE 146
AS REQUIRED 225.00 0021 01
Item 204.0100 Total: 225.00
012 206.0301 COMPOST FILTER SOCK LF
INTERSTATE 195
160+30 TO 165+00 LT 470.00 0021 01
160+61 TO 164+43 RT 390.00 0021 01
INTERSTATE 95
539+81 TO 543+57 LT 370.00 0021 01
ROUTE 138
691+64 TO 694+31 RT 270.00 0021 01
ROUTE 146
266+56 TO 286+00 RT 2,050.00 0021 01
ROUTE 2
403+75 TO 403+95 LT 20.00 0021 01
ROUTE 4
139+77 TO 142+79 LT 310.00 0021 01
Item 206.0301 Total: 3,880.00
013 206.9901 CATCH BASIN SEDIMENTATION CONTROL EACH
INTERSTATE 195
161+88 LT 1.00 0021 01
161+91 LT 1.00 0021 01
164+34 LT 1.00 0021 01
164+51 LT 1.00 0021 01
INTERSTATE 295
228+01 RT 1.00 0021 01
230+98 RT 1.00 0021 01
234+00 LT 1.00 0021 01
236+03 LT 1.00 0021 01
PROJECTWIDE
Page 5 of 17
Distribution of Quantities
Project Name - 2018 Roadway Departure Mitigation - Contract 1Estimate Name - Addendum 1
R.I. Contract No. - 2018-CT-058FAP Nos: STPG-HSIP(051)
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
013 206.9901 Cont. AS DIRECTED 2.00 0021 01
ROUTE 146
268+50 RT 1.00 0021 01
270+90 RT 1.00 0021 01
274+65 RT 1.00 0021 01
277+49 RT 1.00 0021 01
280+00 RT 1.00 0021 01
282+50 RT 1.00 0021 01
284+99 RT 1.00 0021 01
708+74 RT 1.00 0021 01
ROUTE 4
142+50 RT 1.00 0021 01
Item 206.9901 Total: 19.00
014 212.2000 CLEANING AND MAINTENANCE OF LS
EROSION CONTROLS
PROJECTWIDE
AS REQUIRED 1.00 0021 01
Item 212.2000 Total: 1.00
015 213.0100 PLACEMENT OF MILLINGS BENEATH LF
GUARDRAIL
INTERSTATE 195
160+39 TO 164+90 LT 450.00 0021 01
160+71 TO 164+33 RT 365.00 0021 01
INTERSTATE 295
228+08 TO 233+26 RT 525.00 0021 01
228+16TO 233+39 RT 525.00 0021 01
232+32 TO 237+50 LT 515.00 0021 01
232+44 TO 235+89 LT 340.00 0021 01
INTERSTATE 95
539+91 TO 543+46 LT 350.00 0021 01
ROUTE 138
Page 6 of 17
Distribution of Quantities
Project Name - 2018 Roadway Departure Mitigation - Contract 1Estimate Name - Addendum 1
R.I. Contract No. - 2018-CT-058FAP Nos: STPG-HSIP(051)
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
015 213.0100 Cont. 691+74 TO 694+21 RT 250.00 0021 01
ROUTE 146
266+54 TO 267+75 RT 215.00 0021 01
269+50 TO 279+25 RT 975.00 0021 01
281+50 TO 285+90 RT 440.00 0021 01
707+15 TO 711+58 RT 450.00 0021 01
ROUTE 4
139+87 TO 142+69 LT 290.00 0021 01
Item 213.0100 Total: 5,690.00
016 401.1003 CLASS 19.0 HMA FOR PATCHING TON
ROUTE 146
AS REQUIRED 15.00 0021 01
Item 401.1003 Total: 15.00
017 401.2003 CLASS 12.5 HMA FOR PATCHING TON
ROUTE 146
AS REQUIRED 9.00 0021 01
Item 401.2003 Total: 9.00
018 401.3003 CLASS 9.5 HMA FOR PATCHING TON
ROUTE 146
AS REQUIRED 6.00 0021 01
Item 401.3003 Total: 6.00
019 403.0300 ASPHALT EMULSION TACK COAT SY
ROUTE 146
AS REQUIRED 150.00 0021 01
Item 403.0300 Total: 150.00
020 702.0512 FRAME AND GRATE STANDARD 6.3.0 EACH
ROUTE 146
280+00 RT 0021 01
R - 1Addendum - 1
Page 7 of 17
Distribution of Quantities
Project Name - 2018 Roadway Departure Mitigation - Contract 1Estimate Name - Addendum 1
R.I. Contract No. - 2018-CT-058FAP Nos: STPG-HSIP(051)
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
020 702.0512 Cont. Item 702.0512 Total: **DELETED**
021 702.0605 PRECAST CATCH BASIN 4' DIAMETER EACH
STANDARD 4.4.0
ROUTE 146
280+00 RT 0021 01
Item 702.0605 Total: **DELETED**
022 708.9041 CLEANING CATCH BASINS ALL TYPES EACH
AND SIZES
INTERSTATE 195
161+88 LT 1.00 0021 01
161+91 RT 1.00 0021 01
164+34 LT 1.00 0021 01
164+51 RT 1.00 0021 01
INTERSTATE 295
228+01 RT 1.00 0021 01
230+98 RT 1.00 0021 01
234+00 LT 1.00 0021 01
236+03 LT 1.00 0021 01
PROJECTWIDE
AS DIRECTED 2.00 0021 01
ROUTE 146
268+50 RT 1.00 0021 01
270+90 RT 1.00 0021 01
274+65 RT 1.00 0021 01
277+49 RT 1.00 0021 01
280+00 RT 1.00 0021 01
282+50 RT 1.00 0021 01
284+99 RT 1.00 0021 01
708+74 RT 1.00 0021 01
ROUTE 4
142+50 RT 1.00 0021 01
R - 1Addendum - 1
Page 8 of 17
Distribution of Quantities
Project Name - 2018 Roadway Departure Mitigation - Contract 1Estimate Name - Addendum 1
R.I. Contract No. - 2018-CT-058FAP Nos: STPG-HSIP(051)
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
022 708.9041 Cont. Item 708.9041 Total: 19.00
023 901.0101 GUARDRAIL STEEL BEAM SINGLE FACE LF
EARTH AND ASPHALT
INTERSTATE 195
160+47 TO 164+40 LT 395.00 0021 01
161+21 TO 164+27 RT 310.00 0021 01
INTERSTATE 295
228+58 TO 233+20 RT 470.00 0021 01
232+51 TO 235+38 LT 285.00 0021 01
INTERSTATE 95
540+00 TO 542+96 LT 295.00 0021 01
ROUTE 138
692+23 TO 694+15 RT 195.00 0021 01
ROUTE 146
266+54 TO 267+55 RT 195.00 0021 01
269+70 TO 279+05 RT 935.00 0021 01
281+70 TO 285+90 RT 420.00 0021 01
707+21 TO 707+39 RT 20.00 0021 01
ROUTE 4
139+93 TO 142+20 LT 235.00 0021 01
Item 901.0101 Total: 3,755.00
024 901.0163 GUARDRAIL STEEL BEAM POST IN LEDGE EACH
STANDARD 34.1.2
PROJECTWIDE
AS DIRECTED 40.00 0021 01
Item 901.0163 Total: 40.00
025 901.0165 STEEL BEAM GUARDRAIL SECTION (12.5 EACH
FT. BY 12.0 INCHES)
INTERSTATE 195
161+80 RT 4.00 0021 01
Page 9 of 17
Distribution of Quantities
Project Name - 2018 Roadway Departure Mitigation - Contract 1Estimate Name - Addendum 1
R.I. Contract No. - 2018-CT-058FAP Nos: STPG-HSIP(051)
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
025 901.0165 Cont. INTERSTATE 295
228+90 RT 2.00 0021 01
229+80 RT 2.00 0021 01
231+70 RT 2.00 0021 01
234+20 LT 4.00 0021 01
PROJECTWIDE
AS DIRECTED 8.00 0021 01
ROUTE 146
271+00 RT 4.00 0021 01
Item 901.0165 Total: 26.00
026 901.0175 STEEL THRIE BEAM GUARDRAIL SINGLE LF
FACE STANDARD 34.5.3
ROUTE 146
707+46 TO 711+26 RT 388.00 0021 01
Item 901.0175 Total: 388.00
027 901.0177 STEEL THRIE BEAM GUARDRAIL EACH
TRANSITION
ROUTE 146
707+45 RT 1.00 0021 01
711+30 RT 1.00 0021 01
Item 901.0177 Total: 2.00
028 901.0199 GUARDRAIL END TREATMENT, ENERGY EACH
ABSORBING TERMINAL
INTERSTATE 195
161+00 RT 1.00 0021 01
164+50 LT 1.00 0021 01
INTERSTATE 295
228+25 RT 1.00 0021 01
228+50 RT 1.00 0021 01
235+75 LT 1.00 0021 01
Page 10 of 17
Distribution of Quantities
Project Name - 2018 Roadway Departure Mitigation - Contract 1Estimate Name - Addendum 1
R.I. Contract No. - 2018-CT-058FAP Nos: STPG-HSIP(051)
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
028 901.0199 Cont. 237+25 LT 1.00 0021 01
INTERSTATE 95
543+25 LT 1.00 0021 01
ROUTE 138
692+00 RT 1.00 0021 01
ROUTE 4
142+50 LT 1.00 0021 01
Item 901.0199 Total: 9.00
029 901.9901 MGS COMPATIBLE GUARDRAIL EACH
CONNECTION TO CONCRETE BARRIER
ROUTE 146
267+75 RT 1.00 0021 01
269+50 RT 1.00 0021 01
279+25 RT 1.00 0021 01
281+50 RT 1.00 0021 01
AS DIRECTED 4.00 0021 01
Item 901.9901 Total: 8.00
030 901.9902 STEEL W-BEAM GUARDRAIL - TRAILING EACH
ANCHORAGE (MASH TL-3)
INTERSTATE 195
160+40 LT 1.00 0021 01
164+30 RT 1.00 0021 01
INTERSTATE 295
232+40 LT 1.00 0021 01
232+50 LT 1.00 0021 01
233+20 RT 1.00 0021 01
233+40 RT 1.00 0021 01
INTERSTATE 95
540+00 LT 1.00 0021 01
ROUTE 138
694+20 RT 1.00 0021 01
Page 11 of 17
Distribution of Quantities
Project Name - 2018 Roadway Departure Mitigation - Contract 1Estimate Name - Addendum 1
R.I. Contract No. - 2018-CT-058FAP Nos: STPG-HSIP(051)
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
030 901.9902 Cont. ROUTE 146
707+20 RT 1.00 0021 01
ROUTE 4
139+90 LT 1.00 0021 01
Item 901.9902 Total: 10.00
031 901.9903 LONG-SPAN GUARDRAIL EACH
INTERSTATE 295
228+90 RT 1.00 0021 01
PROJECTWIDE
AS DIRECTED 8.00 0021 01
ROUTE 138
692+80 RT 1.00 0021 01
Item 901.9903 Total: 10.00
032 901.9904 NCHRP TL-4 W-BEAM GUARDRAIL LF
INTERSTATE 295
228+66 TO 233+33 RT 470.00 0021 01
232+38 TO 236+99 LT 460.00 0021 01
Item 901.9904 Total: 930.00
033 901.9905 GUARDRAIL CONNECTION TO BARRIER - EACH
APPROACH END SECTION STD. 34.3.7 -
MODIFIED
ROUTE 146
711+50 RT 1.00 0021 01
Item 901.9905 Total: 1.00
034 901.9906 8-FOOT LONG GUARDRAIL POST EACH
PROJECTWIDE
AS DIRECTED 50.00 0021 01
Item 901.9906 Total: 50.00
Page 12 of 17
Distribution of Quantities
Project Name - 2018 Roadway Departure Mitigation - Contract 1Estimate Name - Addendum 1
R.I. Contract No. - 2018-CT-058FAP Nos: STPG-HSIP(051)
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
035 909.9901 MGS COMPATIBLE CONCRETE BARRIER LF
ROUTE 146
267+75 TO 269+50 RT 175.00 0021 01
279+25 TO 281+50 RT 225.00 0021 01
AS DIRECTED 100.00 0021 01
Item 909.9901 Total: 500.00
036 914.5010 FLAGPERSONS MHRS
PROJECTWIDE
AS REQUIRED 320.00 0021 01
Item 914.5010 Total: 320.00
037 914.5020 FLAGPERSONS - OVERTIME MHRS
PROJECTWIDE
AS REQUIRED 32.00 0021 01
Item 914.5020 Total: 32.00
038 919.0101 TEST PITS EACH
PROJECTWIDE
AS DIRECTED 40.00 0021 01
Item 919.0101 Total: 40.00
039 922.0100 TEMPORARY CONSTRUCTION SIGNS SF
STANDARD 29.1.0 AND 27.1.1
RI STD
27.1.1 96.00 0021 01
ROLLING ROAD BLOCK
AS REQUIRED 39.00 0021 01
TYPICAL SETUPS
AS REQUIRED 233.50 0021 01
WILBUR ROAD ON-RAMP CLOSURE
AS REQUIRED 131.50 0021 01
Item 922.0100 Total: 500.00
Page 13 of 17
Distribution of Quantities
Project Name - 2018 Roadway Departure Mitigation - Contract 1Estimate Name - Addendum 1
R.I. Contract No. - 2018-CT-058FAP Nos: STPG-HSIP(051)
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
040 923.0105 DRUM BARRICADE STANDARD 26.2.0 BDAY
PROJECTWIDE
AS REQUIRED 2,400.00 0021 01
Item 923.0105 Total: 2,400.00
041 923.0200 FLUORESCENT TRAFFIC CONES STANDARD EACH
26.1.0
PROJECTWIDE
AS REQUIRED 240.00 0021 01
Item 923.0200 Total: 240.00
042 926.0121 UNANCHORED PRECAST CONCRETE LF
BARRIER FOR TEMPORARY TRAFFIC
CONTROL STANDARD 40.5.0
PROJECTWIDE
AS REQUIRED 1,000.00 0021 01
Item 926.0121 Total: 1,000.00
043 926.0140 REFLECTIVE DELINEATORS FOR EACH
TEMPORARY CONCRETE BARRIERS
PROJECTWIDE
AS REQUIRED 25.00 0021 01
Item 926.0140 Total: 25.00
044 928.9901 TRUCK MOUNTED ATTENUATOR WITH HRS
TRUCK MOUNTED FLASHING ARROW BOARD
PROJECTWIDE
AS REQUIRED 320.00 0021 01
Item 928.9901 Total: 320.00
045 929.0110 FIELD OFFICE PMO
PROJECTWIDE
AS REQUIRED 16.00 0021 01
Page 14 of 17
Distribution of Quantities
Project Name - 2018 Roadway Departure Mitigation - Contract 1Estimate Name - Addendum 1
R.I. Contract No. - 2018-CT-058FAP Nos: STPG-HSIP(051)
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
045 929.0110 Cont. Item 929.0110 Total: 16.00
046 932.0200 FULL-DEPTH SAWCUT OF BITUMINOUS LF
PAVEMENT
ROUTE 146
268+10 to 269+50 RT 140.00 0021 01
279+25 to 281+50 RT 230.00 0021 01
AS DIRECTED 130.00 0021 01
Item 932.0200 Total: 500.00
047 936.0100 MOBILIZATION AND DEMOBILIZATION LS
PROJECTWIDE
AS REQUIRED 1.00 0021 01
Item 936.0100 Total: 1.00
048 937.0200 MAINTENANCE AND MOVEMENT TRAFFIC LS
PROTECTION
PROJECTWIDE
AS REQUIRED 1.00 0021 01
Item 937.0200 Total: 1.00
049 L01.0102 LOAM BORROW 4 INCHES DEEP SY
ROUTE 146
AS REQUIRED 75.00 0021 01
Item L01.0102 Total: 75.00
S050 L02.0101 GENERAL HIGHWAY SEEDING (TYPE 1) SY
PROJECTWIDE
AFTER REMOVE COMPOST FILTER 860.00 0021 01
SOCK
ROUTE 146
AS REQUIRED 75.00 0021 01
Item L02.0101 Total: 935.00
Page 15 of 17
Distribution of Quantities
Project Name - 2018 Roadway Departure Mitigation - Contract 1Estimate Name - Addendum 1
R.I. Contract No. - 2018-CT-058FAP Nos: STPG-HSIP(051)
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
051 T15.0100 DIRECTIONAL REGULATORY AND WARNING SF
SIGNS
ROUTE 146
13-1 16.00 0021 01
13-2 12.00 0021 01
13-3 12.00 0021 01
13-4 12.00 0021 01
13-5 13.00 0021 01
13-6 13.00 0021 01
8-1 9.00 0021 01
Item T15.0100 Total: 87.00
052 T15.0200 REMOVE AND RELOCATE DIRECTIONAL EACH
REGULATORY AND WARNING SIGN
INTERSTATE 295
231+35 RT 1.00 0021 01
ROUTE 146
268+02 RT 1.00 0021 01
268+72 RT 1.00 0021 01
Item T15.0200 Total: 3.00
053 T16.0100 GROUND MOUNTED PRIMARY DIRECTIONAL SF
SIGN PANELS EXTRUDED ALUMINUM
ROUTE 2
12-1 35.00 0021 01
12-2 30.00 0021 01
Item T16.0100 Total: 65.00
054 T16.9901 GROUND MOUNTED PRIMARY DIRECTIONAL EACH
SIGN POST-STEEL BREAKAWAY
ROUTE 2
12-1 2.00 0021 01
12-2 2.00 0021 01
Page 16 of 17
Distribution of Quantities
Project Name - 2018 Roadway Departure Mitigation - Contract 1Estimate Name - Addendum 1
R.I. Contract No. - 2018-CT-058FAP Nos: STPG-HSIP(051)
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
054 T16.9901 Cont. Item T16.9901 Total: 4.00
055 T18.0336 36 INCH HAZARD MARKER EACH
INTERSTATE 195
2-1 1.00 0021 01
INTERSTATE 295
3-1 1.00 0021 01
3-2 1.00 0021 01
4-1 1.00 0021 01
Item T18.0336 Total: 4.00
056 T18.9901 REFLECTORIZED DELINEATORS - GREEN EACH
INTERSTATE 195
AS REQUIRED 2.00 0021 01
INTERSTATE 295
AS REQUIRED 4.00 0021 01
INTERSTATE 95
AS REQUIRED 1.00 0021 01
ROUTE 138
AS REQUIRED 1.00 0021 01
ROUTE 146
AS REQUIRED 1.00 0021 01
ROUTE 4
AS REQUIRED 1.00 0021 01
Item T18.9901 Total: 10.00
057 T18.9902 REFLECTORIZED DELINEATORS - RED EACH
INTERSTATE 195
AS REQUIRED 2.00 0021 01
INTERSTATE 295
AS REQUIRED 4.00 0021 01
INTERSTATE 95
AS REQUIRED 1.00 0021 01
Page 17 of 17
Distribution of Quantities
Project Name - 2018 Roadway Departure Mitigation - Contract 1Estimate Name - Addendum 1
R.I. Contract No. - 2018-CT-058FAP Nos: STPG-HSIP(051)
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
057 T18.9902 Cont. ROUTE 138
AS REQUIRED 1.00 0021 01
ROUTE 4
AS REQUIRED 1.00 0021 01
Item T18.9902 Total: 9.00
058 702.0517 FRAME AND GRATE, STANDARD 6.3.2 EACH
ROUTE 146
280+80 RT 1.00 0021 01
AS REQUIRED 1.00 0021 01
Item 702.0517 Total: 2.00
059 702.0850 CONCRETE COVER SHALLOW TYPE "F" EACH
SQUARE CATCH BASINS STANDARD 4.8.0
ROUTE 146
280+00 RT 1.00 0021 01
Item 702.0850 Total: 1.00
060 702.9901 SOLID BLOCK SHALLOW TYPE "F" EACH
SQUARE CATCH BASIN STANDARD 3.5.0
- MODIFIED
ROUTE 146
280+00 RT 1.00 0021 01
Item 702.9901 Total: 1.00
061 704.0300 RECONSTRUCT CATCH BASIN/VERTICAL VLF
WALLS
ROUTE 146
268+50 RT 2.00 0021 01
Item 704.0300 Total: 2.00
R - 1Addendum - 1