  • 2017 IRP Supply-Side Resource Advisory Committee - Thermal

    July 25, 2016

  • 2

    Why are we here?

    July 25, 2016

    To gather technical information from subject matter experts Costs (capital, operating, etc) Performance characteristics

    This technical meeting is dedicated to natural gas fired generation

    Future meetings for:

    Demand-Side Resources on July 27, 2016 Renewable resources & energy storage on August 22, 2016

    All supply-side resources finalized by end of September 2016.

    Includes gas-fired generation, renewables and energy storage.

  • 3

    Agenda

    July 2015, 2016

    Overview

    Reciprocating Engine Technology overview John Robbins, Wrtsil

    Gas Turbine Technology overview

    Peter Stroganow, GE Power

    Black & Veatch Report Keith Cummer and Brian Reinhart, B&V

    Draft 2017 IRP thermal plant costs and

    operating characteristics

  • 4

    Overview

    July 25, 2016

    Natural Gas Fired Generation that will be modeled in 2017 IRP: Combined Cycle Combustion Turbine (CCCT)

    Also known as: Combined Cycle Gas Turbine (CCGT) Natural Gas Combined Cycle (NGCC)

    Frame Peaker Also known as:

    Simple Cycle Combustion Turbine (SCCT) Combustion Turbine (CT) Industrial or Heavy Frame Gas Turbine

    Aeroderivative Peaker (Aero Peaker) Reciprocating Engine (Recip Peaker)

    Also known as: Reciprocating Internal Combustion Engine (RICE)

  • 5

    Clarification

    July 25, 2016

    Resources used in IRP are for generalized analysis and do not reflect an acquisition level analysis

    The purpose of the IRP is to evaluate different types of resources and set up the analysis process for an acquisition

    This does not reflect preference to certain manufacturers, we just needed a baseline to establish operating characteristics.

  • 6

    Wrtsil Presentation

  • 7

    GE Presentation

  • 8

    Variable Operations and Maintenance

    July 25, 2016

    Variable Operations: Chemicals Water Consumables Station Power

    Major Maintenance Adder (MMA):

    Includes long term service agreements (LTSA) and other scheduled maintenance

  • 9

    Consistent with CAISO

    July 25, 2016

    The treatment of variable operations and maintenance is consistent with CAISO Business Practice Manual (BPM) for Market Instruments version 39, November 2015

    http://www.caiso.com/rules/Pages/BusinessPracticeManuals/Default.aspx

  • 10

    Fixed Operations and Maintenance

    July 25, 2016

    Fixed costs: Labor Annual cost of facilities and offices

  • 11

    B&V Presentation

  • 12

    Agenda

    July 2015, 2016

    Overview

    Reciprocating Engine Technology overview John Robbins, Wrtsil

    Gas Turbine Technology overview

    Peter Stroganow, GE Power

    Black & Veatch Report Keith Cummer and Brian Reinhart, B&V

    Draft 2017 IRP thermal plant costs and

    operating characteristics

  • 13

    Oil Back-Up

    July 25, 2016

    Oil back-up for all peakers cost estimate includes fuel oil storage tank, initial inventory,

    demineralized water production and storage system and additional balance of plant facilities such as roads, electrical supply and distribution, foundations, excavation, diesel truck unloading pads and pumps, truck hookups, etc.

    Draft 2017 IRP 2016 $ Frame Peaker

    Aero Peaker

    Recip Peaker

    Total Incremental cost Added to EPC $15 Million $14 Million $15 Million

    Total Incremental Cost ($/kw) $63 $62 $68 FOM ($/kw-yr added to FOM for plant) $4.60 $4.22 $4.12 Price of Distillate Fuel Oil ($/gallon) $1.55 $1.55 $1.55 Days of Oil 2 days 2 days 2 days

  • 14

    Duct Fire on CCCT

    July 25, 2016

    What is it? Some Heat Recovery Steam Generators (HRSGs) include

    supplemental, or duct firing. These additional burners provide additional energy to the HRSG, which produces more steam and hence increases the output of the steam turbine. Generally, duct firing provides electrical output at lower capital cost. It is therefore often utilized for peaking operations.

  • 15

    Duct Fire costs

    July 25, 2016

    Duct Fire (DF) can increase capacity up to 25% PSE will use 15% increase in capacity

    Costs around $300-$400/kW PSE will use $350/kW

    Heat rate of DF is around 8,000 9,000 PSE will use 8,500

    Size (MW)

    EPC Cost ($000)

    Owners Costs ($000)

    Overnight Cost ($000)

    Total Cost ($/kw)

    CCCT 359 $388,000 $116,400 $504,400 $1,405 DF 54 $18,853 CCCT w/ DF 413 $406,853 $116,400 $523,253 $1,267

  • 16

    Draft 2017 vs. 2015 IRP Capital Costs

    July 25, 2016

    Capital Cost ($/kW) 2017 IRP (2016 $)

    2015 IRP (2014 $)*

    CCCT $1,267 $1,256

    Frame Peaker w/ Oil $634 $896 Frame Peaker w/o Oil $537 $830 Aero Peaker w/ Oil $947 $1,342 Aero Peaker w/o Oil $881 $1,273 Recip Peaker w/ Oil $1,477 Recip Peaker w/o Oil $1,277 $1,599

    *2015 IRP Chapter 4, Figure 4-15 on page 4-25

  • 17

    Resource Assumptions Matrix

    July 25, 2016

  • 18

    Next Steps

    July 25, 2016

    Gas transport costs will be presented at the gas resource advisory committee (GRAC) in September.

    Will discuss operating parameters for flexibility analysis at the flexibility technical advisory committee (Flex-Tac) meeting in October. This can include ramping times, min up/min down, etc.

  • 19 July 25, 2016

    Proposed 2017 IRP Meeting Schedule--July 11, 2016

    2016 2017

    Fri, June 171

    IRPAG

    July 25: 1-4 pm2

    Thermal RACForum

    July 27: 9 am - 3 pm3

    DSR-AC IRPAG

    Auditorium

    Work Plan Filed July 15

    Monday, Aug 224

    Renew RAC: 9-12Auditorium

    Monday, Sept 266

    GRAC: 9-12IRPAG: 12:30-3

    Auditorium

    Thurs, Oct 277

    Flex Tac: 9-12DSR-AC: 12:30-3:30

    Forum

    Monday, Nov 148

    IRPAG: 9-3Auditorium

    Wed, Jan 119

    IRPAG: 9-3Forum

    Thurs, March 1610

    IRPAG: 9-3Forum

    Tues, Apr 1811

    IRPAG: 9-3Forum

    Mon, May 2212

    IRPAG:9-3Forum

    Draft IRP April 28

    IRP FiledJuly 14

    June July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June July

    5

    IRPAG: 12:30-3

  • 20

    THANK YOU

    July 25, 2016

  • 25 Ju

    ly 2

    016

    CHARACTERIZATION OF GAS-FIRED SUPPLY-SIDE OPTIONS (SSOs)

  • BLACK & VEATCH WERE BUILDING A WORLD OF DIFFERENCE. TOGETHER. Founded in 1915 Global workforce of more than 10,000 Employee-owned corporation

    $3 billion in annual revenues in 2015 More than 110 offices worldwide

    Completed projects in more than 100 countries

    Black & Veatch conducts 7,000+ active projects globally at any one time

    25 July 2016

    2

  • CHARACTERIZATION OF GAS-FIRED SUPPLY-SIDE OPTIONS

    3

  • Provide general overview of commercially available baseload and peaking gas-fired Supply-Side Options (SSOs)

    Preliminary estimates: Thermal performance Capital cost Operations and maintenance (O&M) cost Dispatch characteristics

    Preliminary, screening-level characteristics suitable for the initial evaluation of multiple SSOs

    OBJECTIVE OF B&V CHARACTERIZATION

    25 July 2016

    4

  • Based on B&V experience with similar generation options Recent studies and recent project installations

    executed by B&V Performance and cost data provided by major

    equipment Original Equipment Manufacturers (OEMs)

    Adjusted to provide representative values for projects implemented within PSEs service territory

    APPROACH OF B&V CHARACTERIZATION

    25 July 2016

    5

  • 8 gas-fired options characterized for study: 2 baseload/intermediate load: combined cycle 6 peaking load: simple cycle

    Options include gas turbines and reciprocating internal combustion engines (RICE) GE gas turbines: representative of commercial

    aeroderivative and large frame gas turbines Wrtsil engines: representative of commercial RICEs

    SSOs CONSIDERED

    25 July 2016

    6

  • SSO

    Nominal Net Output

    (MW)

    Annual Capacity

    Factor

    Annual Number of

    Starts

    Combined Cycle Options

    1x1 GE 7F.05 359 80% 70

    1x1 GE 7HA.01 405 80% 70

    Simple Cycle Options

    3X0 Wrtsil 18V50SG 55 5% 100

    6x0 Wrtsil 18V50SG 111 5% 100

    12x0 Wrtsil 18V50SG 222 5% 100

    1x0 GE LMS100PA+ 114 6% 100

    2x0 GE LMS100PA+ 227 6% 100

    1x0 GE 7F.05 239 2% 100

    SSOs CONSIDERED (CONT.)

    25 July 2016

    7

  • B&V developed performance models to estimate unit performance and emissions, considering: OEM gas turbine/RICE performance Various load points (100%, 75%, and minimum load) All options with SCR/oxidation catalyst controls

    Selected operational parameters defined to support production modeling by PSE, including: Ramp rates Minimum run/down times Start fuel/energy/times

    CHARACTERIZATION OF PERFORMANCE, EMISSIONS AND OPERATIONAL PARAMETERS

    25 July 2016

    8

  • SSO

    Nominal Net Output

    (MW)

    Net Plant Heat Rate

    (Btu/kWh) (1)

    Com