Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
Mt. Pilgrim Public Forum
2016 City of Smithville Budget / Project Overview
Tuesday, November 10, 2015 Mt. Pilgrim Baptist Church Public Forum
Mt. Pilgrim Public Forum
2016 City of Smithville Budget / Project Overview
Tuesday, November 10, 2015 Agenda:
• Purpose • Current Situation • 2016 Budget Highlights • 2016 Adopted Tax Rate • 2016 Focus / Projects • Summary / Next Steps • Smart Meter Discussion
Mt. Pilgrim Public Forum
2016 City of Smithville Budget / Project Overview
Tuesday, November 10, 2015
Ground Rules: • Sign up sheet / Hand-outs • Turn cell phone off or place on vibrate. • Minimize side conversations. • Use Microphone to ask questions. • State your name / address before asking
question. Questions limited to Smithville citizens and/or business owners only.
• Fill out Public Forum comment card. • Be respectful.
Mt. Pilgrim Public Forum
City of Smithville Budget / Project Overview Tuesday, November 10, 2015
Purpose: • Discuss current situation and provide overview of 2016 fiscal
budget and planned projects.
Current Situation: • Contingency expenditures in 2015 exceeded $300k. • Unassigned Fund balances (reserves) are recovering. • Property Tax value significantly up / Sales Tax revenue up 3%. • Multiple infrastructure improvement projects underway. • Improved response time / customer satisfaction. • Improved communications among and between City staff,
council, and community. • City is better positioned for growth but still much to do.
Mt. Pilgrim Public Forum
Budget Highlights: • Property Tax value is $198M. Up from
$180M. $93k additional revenue to GF
• Added 3% Merit and Longevity Increase
• Added Credit Card Use Fee of $4.00 • Film Permit Increase ($25 to $100) • Facility Use / Park Rental Fee Increase
• Electric distribution rate increase from 0.0388 to 0.0450 cent/Kwh. (rate has not increased in the past 13 years).
• Approved Additional Headcount: - 1 Dispatcher / 1 Parks Laborer
• Approved Capital Expenditures – Jet Machine, PD Firearms, Security System for City Hall, Library, and Rec Center.
Delta = $440k
General Utility Debt Total3,756,378 7,040,188 387,848 11,184,414
FY2014/15
City of Smithville Budget / Project Overview Tuesday, November 10, 2015
General Utility Debt Total3,955,153 7,281,540 387,806 11,624,499
FY2015/16
Mt. Pilgrim Public Forum
• 3% Merit w/ Benefits = $75k • Longevity Increase = $11k • Additional Headcount = $67k • Property Acquisition = $120-150k • Drainage Improvements = $65k • ADA Ramp @ City Hall = $15k • Video Surveillance System = $15k • Jet Machine (Lease/Purchase) = $15k • Smithville PD Firearms = $10k • Grant Match for MLK Pavilion = $20k • Historic District Survey = $15k
COST JUSTIFICATION
$440k
City of Smithville Budget / Project Overview Tuesday, November 10, 2015
Mt. Pilgrim Public Forum
2016 City of Smithville Tax Rate Tuesday, November 10, 2015
Tax Rate: • 2015 Certified Assessed Valuation = $198,375,435. • 2015/16 Adopted Tax Rate = $0.553438 (no increase)
Average Impact to Homeowners: • $41.46 Increase over 2014-15 Payment $599.00 (Avg. HH=$115k)
ADOPTED TAX RATE
PRECEDING YEAR’S RATE
EFFECTIVE TAX RATE
ROLLBACK TAX RATE
PROJECTED REVENUE
$0.553438 $0.553438 $0.514227 $0.555478 $93,382
The ad valorem property tax rate helps the City of Smithville maintain parks, expand public services, repair
streets, improve drainage, and increase public safety.
Bastrop = $0.57 / Elgin = $0.65 How Do We Compare?
2016 Areas of Focus :
Mt. Pilgrim Public Forum
• Infrastructure Improvement • Economic Development • Fiscal Performance • Public Safety / Security • Customer Service / Satisfaction • Communication • Community Services
- Parks & Rec - Recycling - Library - Leaf & Limb ⁻ Airport - Cemetery
• Organizational Development
City of Smithville Budget / Project Overview Tuesday, November 10, 2015
Mt. Pilgrim Public Forum
2015/16 City of Smithville - Current Projects • Street Repairs - $125k – WIP* • Washington / Hill Street Drainage Improvement - $90k – WIP • 8th Street Drainage Improvement -$70k - WIP • Hwy 71 Sewer and Water Project – ($1.5M COS / $1.0M EDA) - WIP • Industrial Park Annexation and CCN Transfer - $25k – WIP • Nichols Water Well / Tank Upgrade ($325k COS / $275k TDA) – WIP • Hwy 95 Expansion Engineering Study – ($375k / $6.2M TXDOT) – WIP • Airport Master Plan ($10k COS / $90k TXDOT) – WIP • Rec Center “Shelter-in-Place” Expansion – ($1.5M GLO-HUD) – WIP • Ameresco Electric / Water Meter Replacement – $3.4M Budget Neutral – WIP • FEMA Public Assistance Flood Damage Assessment / Reimbursement (DD-4223) – WIP • CDBG Disaster Relief Fund (DRF) and Community Enhancement Fund (CEF) Grant for MLK Pavilion – WIP • Halff Associates City-wide Drainage Study - Bastrop County TWDB Grant ($100k In-Kind) – WIP • HOME Program Grant Participation Renewal ($2.5k) - WIP • Loop 230 Sidewalk Improvement Project - Transportation Alternative Program ($1.5M TXDOT) • TXDOT Loop 230 ADA Accessibility Ramp Project (No Cost) – WIP • National Disaster Resiliency Competition Grant for New Fire Station ($3M HUD) - WIP • On-line conversion of City Ordinances – Complete / Update City Ordinances - WIP • FEMA Hazard Mitigation Grant Program (HMGP) / Fire Mitigation Assistance Grant (FMAG) • TCRFC Hazard Mitigation Plan Update ($2k) – WIP
*WIP = Work In Progress
Summary:
Mt. Pilgrim Public Forum
• FY15 budget performance was $200k better than forecast. • Electric Distribution rate increase is necessary to improve
infrastructure and provide expected level of service. • Any residual “profit” will be used to replenish fund balance. • Improved communications among and between City staff, council,
and community. • Smithville in a better position to support growth but still much to do. • Infrastructure improvement, economic development, fiscal
performance, communication, and effective management of growth are key to future success.
City of Smithville Budget / Project Overview Tuesday, November 10, 2015
Next Steps:
Mt. Pilgrim Public Forum
• Finalize 2016 Staff Goals / Objectives.
• Hold Public Forum(s) to communicate Status.
• Develop Key Process Indicators (KPI) to track and measure performance against goals.
• Communicate results and identify opportunities for improvement.
Make a Difference
Get Involved
Stay Informed
City of Smithville Budget / Project Overview Tuesday, November 10, 2015
Ameresco Utility Infrastructure Project
Mt. Pilgrim Public Forum
Mt. Pilgrim Public Forum
City of Smithville Budget / Project Overview Tuesday, November 10, 2015
Ameresco Utility Upgrade: • $3.4M project to upgrade street
lights, utility meters, and billing system. • Budget “Neutral” per Texas Local
Government Code 302. • Benefits:
- Operational efficiency - Billing accuracy / cost savings - Outage / leak detection - Customer Service / Satisfaction
• 18-month evaluation by Council. • Advanced Metering Infrastructure:
- Safe / Reliable / Efficient
The World Health
Organization (WHO) and many other health
agencies confirm that there is no pervasive
evidence that low level RF exposure (such as those on which SmartMeters™ rely) cause any adverse
health effects.
Mt. Pilgrim Public Forum
City of Smithville Budget / Project Overview Tuesday, November 10, 2015
Electric Meter Specifications: • Landis & Gyr E130 Focus AL Meter • Complies with NEMA / ANSI C12 • Operating Frequency = 902-928 MHz • Transmission Power = 0.5 to 1.0 Watts • Duration of Pulse = < 20 milliseconds • Transmit data once every 24-hours • Meter Life = 20-yrs
Concerns: • Health & Safety • Increase in Utility Bills • Time of Use Billing • No Opt out program
City of Smithville will evaluate a Smart Meter opt-out program.
Mt. Pilgrim Public Forum
City of Smithville Installation Zones
Installation Start Date: January 11, 2016
Mt. Pilgrim Public Forum
City of Smithville Budget / Project Overview Tuesday, November 10, 2015
Mt. Pilgrim Public Forum
THANK YOU!
2012 2013 2014 2015JAN $26,238 $29,109 $27,047 $30,001FEB $50,343 $52,942 $52,159 $56,657MAR $26,259 $26,220 $28,706 $30,535APR $27,967 $29,148 $32,314 $28,243MAY $47,133 $51,522 $48,997 $51,774JUN $29,535 $29,598 $32,290 $33,405JUL $32,215 $29,537 $31,719 $30,426AUG $48,589 $48,273 $47,060 $50,911SEP $26,647 $28,356 $33,732 $32,731OCT $28,650 $27,166 $32,686 $33,983NOV $45,274 $45,448 $47,728 $0DEC $31,517 $32,644 $31,500 $0
2012 2013 2014 2015$420,366 $429,962 $445,938 $378,666
Data Source: https://mycpa.cpa.state.tx.us/allocation/AllocHistResults.jsp
Sales Tax Revenue
Smithville Sales Tax Revenue (2012-2015)
$33,983
$0
$10,000
$20,000
$30,000
$40,000
$50,000
$60,000
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
2012
2013
2014
2015
Trend
$420,366$429,962
$445,938
$378,666
$300,000
$400,000
$500,000
2012 2013 2014 2015
Smithville Sales Tax Revenue 2012-2015
Year-To-Date
SHOP LOCAL
It makes a difference!!!
Back Up
Mt. Pilgrim Public Forum
• Transmission • Generation • Services • Line Loss
• Distribution Rate
Impact to Customers: • 16% R / 15% SC / 18% LC per month • $6.43 R / $8.74 SC / $123.00 LC per month • Based Upon Average Monthly Consumption
LCRA F&PCRF* City of Smithville
LCRA F&PCRF COS KWh Sold
Mt. Pilgrim Public Forum
City of Smithville Budget Workshop Tuesday, November 10, 2015
Electric Rate Calculation
Current Rate: Residential = $0.0388 Small Commercial = $0.0528 Large Commercial = $0.0297
Current Rate: $0.06590
= Fuel Cost
Fuel Cost + Dist. Rate
Electric Rate X KWh Used =
1
2
3
Electric Bill
*Fuel & Power Cost Recovery Factor (Variable) = Electric Rate
Proposed Rate: Residential = $0.0450 Small Commercial = $0.0450 Large Commercial = $0.0350
Back Up
Mt. Pilgrim Public Forum