2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

OrganizationDateAWV Stakeholder GroupJan. 12, 2016

Page 2: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

• North and south portal construction

• Update on tunneling machine• Schedule and next steps• Upcoming closures

Alaskan Way Viaduct Replacement Program Update

Page 3: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

Envisioning the 

NORTH PORTAL

Page 4: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

Building the 

NORTH PORTAL

North Portal December 29, 2015

Page 5: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

North operations building

December 4, 2015

NORTH OPERATIONSBuilding

Page 6: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

Building the 

NORTH PORTAL

North portal January 6, 2016

Page 7: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

Building the northbound lanes coming out of the 

SR 99 tunnelJanuary 6, 2016

Building the 

NORTH PORTAL

Page 8: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

Envisioning the 

SOUTH PORTAL

Page 9: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

The south portal work zone in December 2015

Building the 

SOUTH PORTAL

Page 10: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

Rendering of the south portal operations building

Building the 

SOUTH PORTAL

Page 11: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

Building the 

SOUTH PORTAL

The tunnel operations buildingJanuary 6, 2016

Page 12: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

Filling the 

ACCESS PIT

Page 13: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

Repairing 

BERTHA

Getting ready to resume tunneling

December 15, 2015

Page 14: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

Repairing 

BERTHA

Recent activities• Access pit backfilling• Performing load tests• Building tunnel rings• Removing tunnel soil with a

barge• Tunneling through the

access pit wallBackfilling access pit

Building rings

Page 15: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

Repairing 

BERTHA

Page 16: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

STP’s next steps• Late January 2016: Reach planned maintenance site (Safe

Haven 3)

• March 2016: Tunnel under viaduct

• January 2017: Complete tunneling

• June 2017: Final concrete pour

• April 2018: Complete testing and commissioning

• April 2018: Tunnel ready for traffic

Repairing 

BERTHA

Page 17: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

2016 lane closures on

Aurora Avenue North

Page 18: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

2016 lane closures on

Aurora Avenue North

Page 19: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

How to REACH US

Website: www.AlaskanWayViaduct.org

Twitter: @BerthaDigsSR99

Email:[email protected]

Hotline:1-888-AWV-LINE

Our information center, Milepost 31, is located at 211 First Ave. S. in Seattle’s Pioneer Square neighborhood.

Page 20: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

OFFICE OF THE WATERFRONTJanuary 12, 2016

ALASKAN WAY VIADUCT REPLACEMENT PROGRAM STAKEHOLDER GROUP

Page 21: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

2015 WORK PLAN:KEY ACCOMPLISHMENTS• Completed MarketFront (PC‐1 North) Development Agreement (May)

• Completed Draft Environmental Impact Statement (EIS) for Alaskan Way, Promenade and Overlook Walk (June)

• Aquarium Master Plan approved by Council (August)

• Maintenance Report completed (November)

• Design progress on critical utilities, including telecommunications, Seattle City Light and Seattle Public Utilities and Puget Sound Energy coordination (30% designs completed, continues in 2016)

• Continued stakeholder engagement (ongoing)

Page 22: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

NEXT STEPS IN 2016

• Supplement Draft EIS for Alaskan Way, Promenade and Overlook Walk (spring)

• Develop MOU with Aquarium regarding next steps for expansion (summer)

• Complete updated 60% design of Main Corridor (summer)

• Final EIS for Alaskan Way, Promenade and Overlook Walk (fall)

• Cost Estimate and Validation Process (CEVP) workshop with WSDOT (fall)

• Complete City/WSDOT funding agreement (end of year)

Page 23: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

SUPPLEMENTAL DRAFT EIS• OW will complete a Supplemental Draft EIS in spring 2016

• Final EIS is anticipated in fall 2016

• In addition to the action and no action alternatives evaluated in the Draft EIS, the Supplemental Draft EIS will evaluate two new alternatives:  

A narrower Alaskan Way that does not include dedicated bus lanes between Yesler and King streets (transit would operate in the general purpose lanes)

A revised Overlook Walk to accommodate a potential Aquarium expansion project in that location

Page 24: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

SCHEDULE

Page 25: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

QUESTIONS? 

Page 26: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

26

ELLIOTT BAY SEAWALL PROJECT

Alaskan Way Viaduct Stakeholder Group

January 12, 2016

Page 27: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

27

WINTER 2016: CONSTRUCTION CONTINUES

– Work continues between University street and Yesler Way.

– Work begins between Pine and Pike streets

– Business will be open and accessible

– Some businesses will not have access for certain construction activities and for a limited duration

– Access to Colman Dock remains the same

Page 28: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

28

CONSTRUCTION CONTINUESUNIVERSITY STREET TO YESLER WAY

Page 29: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

29

RECENT CONSTRUCTION HIGHLIGHTS

Page 30: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

30

THE WATERFRONT IS OPEN!

Page 31: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

31

JANUARY 2016 CONSTRUCTION STARTSPINE TO PIKE STREETS

Page 32: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

32

QUESTIONS?

Email: [email protected]

Website: waterfrontseattle.org/seawall

24‐hour hotline: 206‐618‐8584

Page 33: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

Stakeholder Group Feedback

Page 34: 2016 0112 AWV Stakeholder Group DRAFT...SUPPLEMENTAL DRAFT EIS • OW will complete a Supplemental Draft EIS in spring 2016 • Final EIS is anticipated in fall 2016 • In addition

How to REACH US

Website: www.AlaskanWayViaduct.org

Twitter: @BerthaDigsSR99

Email:[email protected]

Hotline:1-888-AWV-LINE

Our information center, Milepost 31, is located at 211 First Ave. S. in Seattle’s Pioneer Square neighborhood.