RAG Framework Contract Drilling of Wells – Well Engineering Services – Well Services V01 Appendix F – Obligations & Responsibilities 19. Feb. 2015

RAG.AUSTRIA.ENERGIE 2015 02 19 Appendix F - Obligations and Responsibilities_final.docx | 1 / 6

FRAMEWORK CONTRACT

APPENDIX F

OBLIGATIONS AND RESPONSIBILITIES Following is a summary of facilities, equipment, supplies and personnel to be furnished by each Party and a summary of each Party’s obligations for payment.

This checklist is included for convenience only.

In cases of conflict between other Contractor provisions and this checklist, the other contract provisions shall govern.

The Parties indicated shall provide the supplies and installations, perform the supporting activities, and make the payments as indicated below.

The categories indicated in the right-hand column shall have the following meanings:

Definition Category

Provided by Contractor, paid by Company and included in rates as per Appendix E – Schedule of Rates and Fees

A

Provided by Company, paid by Company B

Provided by Contractor, paid by Company at Contractor net direct cost (5% handling charge or 5% cost plus shall apply)

C

Provided by Company, paid by Contractor D

1. Equipment and Materials

# Description Category

1.1 Drilling unit complete with all related equipment as specified in Appendix B – Equipment List

A

1.2 Wire Line and Slick Line Trucks and Well Test Unit complete with all related equipment as specified in Appendix B – Equipment List

A

1.3 Stake and prepare drilling location including foundation, cellar, stove pipe up to ground level as well as prepare and maintain access road

B

1.4 Mouse hole and rat hole casing and installation B

1.5 Personnel and supervision listed in Appendix C – Contractor's Personnel to operate the drilling unit, the wireline and slickline trucks and to perform work as required around the well site

A

Page 2: 2015 02 19 Appendix F - Obligations and Responsibilities · PDF fileRAG.AUSTRIA.ENERGIE 2015 02 19 Appendix F - Obligations and Responsibilities ... casing and casing hardware

RAG Framework Contract Drilling of Wells – Well Engineering Services – Well Services V01 Appendix F – Obligations & Responsibilities 19. Feb. 2015

RAG.AUSTRIA.ENERGIE 2015 02 19 Appendix F - Obligations and Responsibilities_final.docx | 2 / 6

# Description Category

1.6 Personal Protection Equipment (PPE) according min. EN531 (EN 11612) and EN 1149 for Contractor personnel in accordance with local requirements and good oilfield practice and as per Appendix D. To include but not be limited to steel toed working shoes, hard hats, safety glasses, and hearing protection

A

1.7 Maintenance, repair and replacement work including spare parts and consumables of all items provided by Contractor for the specified drilling unit, wireline and slickline trucks, well test unit and maintenance and repair of Company items in accordance with the framework contract

A

1.8 Spare parts for Company's items under item 1.6 B

1.9 Spare parts for Contractor provided by Company D

1.10 Installation, maintenance and spare parts for all required mud, water, air, fuel, cementing lines for Contractor’s drilling unit

A

1.11 All casing and casing hardware in excess of those listed in Appendix B – Equipment List

B

1.12 All necessary adapters and spools to connect Contractor BOP equipment to Company wellheads and flanges (in excess of those listed in Appendix B) :

13 5/8” 5M 7 1/16”” 5M

A

1.13 Wellhead and associated running tools in excess of those listed in Appendix B – Equipment List

B

1.14 Adapter flanges and Ring gaskets connecting Contractor BOP equipment to Company wellheads (ref. to 1.11).

A

1.15 Wear bushings B

1.16 Bits, centralizers, underreamers, and hole openers including maintenance and repair thereof, in excess of those listed in Appendix B – Equipment List

B

1.17 Diesel fuel or Gas for Contractor’s drilling unit and for Company and other Company, third party service or contractor’s equipment at rig site

C

1.18 Annular & ram type preventer packing element to replace the initially accepted packing

a) for normal operations b) for stripping operations

a) A b) B

1.19 Lubricants and greases, including hydraulic oil for Contractor equipment A

1.20 Thread dope for Contractor drill string A

1.21 Thread compound for Company casing and tubing B

1.22 Water:

a) Water Well b) Water line and water pump c) Drilling water d) Potable water e) Bottled drinking water for contractor personnel

a) B b) B c) B d) C e) A

1.23 Water storage tanks for drilling unit and camp A

Page 3: 2015 02 19 Appendix F - Obligations and Responsibilities · PDF fileRAG.AUSTRIA.ENERGIE 2015 02 19 Appendix F - Obligations and Responsibilities ... casing and casing hardware

RAG Framework Contract Drilling of Wells – Well Engineering Services – Well Services V01 Appendix F – Obligations & Responsibilities 19. Feb. 2015

RAG.AUSTRIA.ENERGIE 2015 02 19 Appendix F - Obligations and Responsibilities_final.docx | 3 / 6

# Description Category

1.24 Maintenance of water well equipment (including piping and power supply) during drilling operation

C

1.25 All cement and additives B

1.26 Drilling mud chemicals and additives B

1.27 Bit Breakers as per Appendix B

Other sizes

A

B

1.28 Screens for shale shakers and mud cleaner B or C

1.29 Core barrel including core heads, core catchers and spares.

Provided as auxiliary service as per Appendix E

B

A

1.30 Casing drift mandrels as per App B A

1.31 Cup type testers A

1.32 Plug type testers in excess of those listed in Appendix B – Equipment List B

1.33 Casing Scrapers B

1.34 Casing Spears B

1.35 Casing cutters B

1.36 Drilling jars and intensifiers B

1.37 All ropes, hand tools and general unit consumables A

1.38 Stabilizers, Reamers, etc., including sleeves and spare parts and maintenance as per Appendix B

A

1.39 Roller reamers including rollers and spares and maintenance B

1.40 Non-magnetic drill collars for well surveys B

1.41 Packers, bridge plugs, cement retainers and other equipment used for the purpose of drilling, testing and completion and cement operations

B

1.42 Well testing unit and associated equipment for production testing B

1.43 All completion and production equipment B

1.44 Telecommunications:

a) All telecommunication permits and license for Contractor telecommunication equipment

b) Telecommunications equipment for Contractor use other than items belonging to Company

a) A b) A

1.45 Gas protection equipment (including supervisor) other than specified in Appendix B – Equipment List

B

1.46 Wireline logging tools and maintenance as per Appendix B A

1.47 Slickline tools and maintenance as per Appendix B A

1.48 Any Redressing in excess as of Appendix E C

Page 4: 2015 02 19 Appendix F - Obligations and Responsibilities · PDF fileRAG.AUSTRIA.ENERGIE 2015 02 19 Appendix F - Obligations and Responsibilities ... casing and casing hardware

RAG Framework Contract Drilling of Wells – Well Engineering Services – Well Services V01 Appendix F – Obligations & Responsibilities 19. Feb. 2015

RAG.AUSTRIA.ENERGIE 2015 02 19 Appendix F - Obligations and Responsibilities_final.docx | 4 / 6

2. Services

# Description Category

2.1 Mobilization and Demobilization of the drilling unit in accordance with the contract.

A

2.2 Mobilization and Demobilization of the wireline unit in accordance with the contract

A

2.3 Mobilization and Demobilization of the slickline unit in accordance with the contract

A

2.4 Mobilization and Demobilization of the well test unit(s) in accordance with the contract

A

2.5 Drilling, testing, completing, repair, suspension and abandonment of wells, in accordance with Company’s program

A

2.6 Permits as required by local regulations A and B

2.7 Accommodation of Contractor personnel on well site A

2.9 Accommodation of Company personnel on well site as specified in Appendix B – Equipment List

A

2.10 Office for Contractor supervisory personnel on well site A

2.11 Office for Company personnel on well site as specified in Appendix B – Equipment List

A

2.12 Administrative center/supply base including offices, office furniture, equipment and supplies, warehousing and storage yard facilities for Contractor personnel, equipment and supplies

A

2.13 All medical services for Contractor personnel and their families, and first-aid medical attention for all persons at the well location

A

2.14 First aid service at work site A

2.15 Welding and cutting required for Company equipment as casing, wellhead, etc.

A

2.16 Assistance in all services performed by service companies used in the operations as can be reasonably done with Contracor's personnel at the drilling location during the regular working hours, except in case of emergencies, when the regular working hours will not necessarily be adhered to

A

2.17 Extra personnel in excess of normal complement of personnel provided by Contractor when requested in writing by Company, as per Appendix C –Contractor's Personnel

C

2.18 Electrical well logging equipment and services in excess of the Well Services as per Appendix B

B or C

2.19 Mud logging equipment and services B or C

2.20 Mud and solids control services as per Appendix B and Appendix C A

2.21 Any geological services B

Page 5: 2015 02 19 Appendix F - Obligations and Responsibilities · PDF fileRAG.AUSTRIA.ENERGIE 2015 02 19 Appendix F - Obligations and Responsibilities ... casing and casing hardware

RAG Framework Contract Drilling of Wells – Well Engineering Services – Well Services V01 Appendix F – Obligations & Responsibilities 19. Feb. 2015

RAG.AUSTRIA.ENERGIE 2015 02 19 Appendix F - Obligations and Responsibilities_final.docx | 5 / 6

# Description Category

2.22 Well testing equipment and services in excess of Well Services as per Appendix B

B or C

2.23 Guns and perforating services B or C

2.24 Directional drilling services and special directional equipment B or C

2.25 Casing and tubing running services and equipment B or C

2.26 Cementing unit and equipment (including casing cementing heads) and cementing services

B or C

2.27 Services i.e. miscellaneous engineering (coring, wellhead, liner hanger, surveyor, etc.) not heretofore designated but required by company

B or C

2.28 Waste Disposal:

a) Contratcor & Company sewage disposal b) Drilling fluid and cuttings disposal if required c) Solid waste disposal during the well d) Contractor generated hazardous waste

a) C b) B or C

c) C d) A

2.29 Offloading and loading of casing, mud chemicals and other Company furnished items at the well location

A

2.30 Cleaning and drifting of casing with Contractor drifts A

2.31 Materials handling and storage of all Contractor items at Contractor warehouse and yard and at the drilling location

A

2.32 All transportation of Contractor equipment, materials, personnel and their families outside the country of operations

A

2.33 Air and other passage and all associated expenses for travel documents, health certificates, visa, work permits, etc., for Contractor personnel and their families from country of domicile to base of operation

A

2.34 All import and export taxes, custom duties, clearances, brokerage, storage fees and the like for Contractor's equipment and supplies.

A

2.35 All land transportation required for contractor personnel A

2.36 Land transport services to move Contractor equipment, materials and supplies, during drilling operations, between base of operations and drilling location

A

2.37 Land transport services to move Contractor and Company equipment, materials and supplies during well-to-well moves

A

2.38 Land transport service to move Company equipment materials and supplies between Company base and drilling location

B or C

2.39 Cost of licensing all Contractor vehicles A

2.40 Additional equipment and services (e. g. crane, extra forklift, etc) C

2.41 Final clean-up of well site:

a) Contracor's equipment and rubbish b) Well site removal and re-cultivation if required

a) A b) B

Page 6: 2015 02 19 Appendix F - Obligations and Responsibilities · PDF fileRAG.AUSTRIA.ENERGIE 2015 02 19 Appendix F - Obligations and Responsibilities ... casing and casing hardware

RAG Framework Contract Drilling of Wells – Well Engineering Services – Well Services V01 Appendix F – Obligations & Responsibilities 19. Feb. 2015

RAG.AUSTRIA.ENERGIE 2015 02 19 Appendix F - Obligations and Responsibilities_final.docx | 6 / 6

3. Inspections

# Description Category

3.1 (1) Contractor shall ensure that all drill pipe, other down hole equipment and related surface equipment are inspected by a reputable, Company recognized, inspection facility according to DS-1 Cat. 4 standards prior to start of operation and further agreed frequency during operation

A

3.2 (1)

a) All drill pipe, other down hole equipment and related surface equipment shall be inspected more often if frequent failures occur or when requested by Company in writing. Contractor shall furnish all inspection reports and certificates of inspection to Company if requested. (Frequency of inspection has to be agreed by Contractor & Company)

b) Inspection and De-Magnetizing of all DC and HWDP which are magnetic and create magnetic interference to MWD/LWD tools

a) C

b) A

3.3 All drill pipe not passing Premium Class shall be rejected and replaced, at Contractor's cost, by new or premium drill pipe. Other equipment found defective or nonconform (refer to 3.2 b) shall be repaired or replaced as appropriate.

A

3.4 Contractor shall visually inspect all equipment and materials furnished by Company before using the equipment and shall notify Company forthwith of any apparent defect in order to permit replacement or repair of the defective item at once

A

3.5 Contractor shall exercise the correct care, maintenance and repair of Company's equipment on well site. Company may however, provide spare parts and materials required to maintain or repair Company items

B or C

3.6 All payments to local governing bodies for services required to operate A

(1) Note: Contractor to provide definition of excessive wear and operation limits of drill string components