Upload
buidang
View
215
Download
0
Embed Size (px)
Citation preview
1/22/2015
1
WelcomeWelcome
AgendaAgenda
Project Overview
Project Development
Preliminary Design
Next Steps
Public Meeting #2January 22, 2015
Public Meeting #2January 22, 2015
1/22/2015
2
Public ParticipationPublic Participation
Tonight is for You!
Project Presentation
Preliminary Design Exhibits
Interactive Discussions
Comment/Feedback Forms
PROJECT OVERVIEWPROJECT OVERVIEW
1/22/2015
3
Project OverviewProject Overview
Goals and Objectives:
Enhance and Beautify the Green Street Corridor
Promote Economic Development
Increase Connectivity within Campustown and to City Districts
Public Meeting #1 - March 12, 2014
Introduction of the Green Street Project
Summary of the Existing Conditions
Gather Public Comments and Identify Concerns
Project OverviewProject Overview
1/22/2015
4
Enter text
PHASE 2 2003
PHASE 1 2002
Project OverviewProject Overview
Project Study Area
PHASE 3A 2016PHASE 3B TBD
Enter text
PHASE 3 2016
PHASE 2 2003
PHASE 1 2002
Project OverviewProject Overview
Project Study Area
1/22/2015
5
Enter text
LEGEND
21,70020,300
XX 2001 ADTXX 2014 ADT
19,90022,600
17,40010,500
1,950325
12,2008,000
7,4006,700
750600
800350
1,4501,450
6,2005,000
9,1005,100
17,40010,500
3,0503,0501,200
1,200
12,2008,100
Project OverviewProject Overview
Existing Traffic (Average Daily Traffic)
101 Total Reported Accidents during 2009-2013
5%pedestrian crashes bicycle crashes
6%Crashes resulted in injuries16%
crashes resulted in property damage only
69%
X
LEGEND
MIDBLOCK ACCIDENTS
INTERSECTION ACCIDENTS
PEDESTRIAN ACCIDENT
BICYCLE ACCIDENT
X
X
NEIL
ST.
LOCU
ST S
T.
FIRS
T ST
.
SECO
ND S
T.
THIR
D ST
.
FOUR
TH S
T.
GREEN ST.
22 3 1 4 2
7 55 7 17 3
Project OverviewProject Overview
Accident History
1/22/2015
6
Project Related Concerns A better connection needed to the Boneyard Creek, including way-finding Retailers slow to develop west of Fourth Street (lack of pedestrian traffic) Lack of bike lanes and sidewalks
Comments about the Green Street Corridor− “Finding a way to safely get pedestrians & bikes thru the viaduct is huge”− “Look for new concepts from recent projects in other urban areas”− “The viaduct should be an aesthetic priority”
When you think about Green Street, what comes to mind?− “The have’s and have not’s (Green Street east of Fourth vs. west of Fourth)”− “Too much traffic, still”− “Heavy pedestrian traffic”
Project OverviewProject Overview
What We Heard From You…
PROJECT DEVELOPMENTPROJECT DEVELOPMENT
1/22/2015
7
The PLANNING of Green Street
Create exciting and safe spaces for pedestrians
Foster multiple modes of transportation
Embrace changing development models and programs
Reflect ecology, traditions, and culture of the region
Employ sustainable, cost-effective and sensible solutions
Project DevelopmentProject Development
The ENGINEERING of Green Street
Complete Street Approach
− Typology and Modal Hierarchy
− Local Policy & Procedures
Implementing Best Practices with Previous Experiences
− Storm Water Drainage
− ADA Compliance
Project Development Process
− Funding Source = Design Criteria
− Collaborative Effort with Engineers, Planners and Landscape Architects
Project DevelopmentProject Development
1/22/2015
8
Green Street Proximities
Approx. 15 Minute Walking Time
Approx. 15 Minute Walking Time
Project DevelopmentProject Development
Building Heights and Road Connections
NEILSTREET
LOCUSTSTREET
FIRSTSTREET
WRIGHTSTREET
FOURTHSTREET
SECONDSTREET
THIRDSTREET
FIFTHSTREET
SIXTHSTREET
GREENSTREET
GREENSTREET
Project DevelopmentProject Development
1/22/2015
9
Outdoor Café Spaces
Project DevelopmentProject Development
PRELIMINARY DESIGNPRELIMINARY DESIGN
1/22/2015
10
Preliminary DesignPreliminary Design
Urban Design Approach
Preliminary DesignPreliminary Design
Urban Design Approach
66 Feet
Right-Of-Way
35 Feet
Curb to Curb
1/22/2015
11
Preliminary DesignPreliminary Design
Urban Design Approach
Preliminary DesignPreliminary Design
Urban Design Approach
Green St.
Firs
t S
t.
1/22/2015
12
Preliminary DesignPreliminary Design
Street Planter Detail
Preliminary DesignPreliminary Design
Street Planter Detail
1/22/2015
13
Preliminary DesignPreliminary Design
Street Tree Palette
Preliminary DesignPreliminary Design
Green Street Sidewalk Experience
1/22/2015
14
Preliminary DesignPreliminary Design
Gateway Scheme
Preliminary DesignPreliminary Design
Sustainable Stormwater Management – Third Street
1/22/2015
15
NEXT STEPSNEXT STEPS
Next StepsNext Steps
P U B L I C I N V O L V E M E N T
PRELIMINARY DESIGN BEGINS
EVALUATE EXISTING
CONDITIONS
COMPLETE PRELIMINARY DESIGN AND BEGIN
FINAL DESIGN
BID AND AWARD
CONTRACT
BEGIN CONSTRUCTION
STA
RT
COMPLETE FINAL
DESIGN
PUBLIC MEETING
PROJECT MILESTONE
IDENTIFY AND EVALUATE TYPICAL
SECTION ALTERNATIVES
2014 2015 2016
Project Development ProcessPreliminary Engineering &
Environmental StudiesContract Plan Preparations &
Land AcquisitionConstruction
WE ARE HERE
UTILITYCOORDINATION