14
Rain Control for Walls: Venting, Ventilation and Drainage Dr John Straube, P.Eng. www.BuildingScience.com Overview Rain Control basics review Role of ven8la8on and drainage What makes them work? When do we need them? Controlling Rain Penetra8on Deflec%on reduce water on building redirect water away slope surfaces, use flashing Drainage / Exclusion / Storage enclosure design choice provide drainage, barrier or storage Drying allow any remaining water to dry Better Buildings by Design Rain Control for Walls: Venting, Ventilation and Drainage February 6-7, 2013 Straube © buildingscience.com 1 of 14

2013 Straube Rain Vermont BBBD - Building Science Corporation

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 2013 Straube Rain Vermont BBBD - Building Science Corporation

Rain Control for Walls: Venting, Ventilation and Drainage

Dr John Straube, P.Eng.

www.BuildingScience.com

Overview&

•  Rain&Control&basics&review&•  Role&of&ven8la8on&and&drainage&•  What&makes&them&work?&•  When&do&we&need&them?&

Controlling&Rain&Penetra8on&•  Deflec%on(

–  reduce&water&on&building&–  redirect&water&away&&–  slope&surfaces,&use&flashing&

•  Drainage(/(Exclusion(/(Storage(–  enclosure&design&choice&–  provide&drainage,&barrier&or&storage&

•  Drying(–  allow&any&remaining&water&to&dry&

Better Buildings by Design Rain Control for Walls: Venting, Ventilation and Drainage February 6-7, 2013

Straube © buildingscience.com 1 of 14

Page 2: 2013 Straube Rain Vermont BBBD - Building Science Corporation

Deflec8on&Overhang

Drips at OpeningHeads & Sills

200minSplash Height

!  Surface(&(site(features(are(also(important(

7&

Deflec8on&

8&

Durable(Wooden(Buildings(

Lake&Baikal&

Forbidden&City&

Southern&Germany&

New&Zealand&

Rain&penetra8on&test&

Building&Science&2008&

&&Joseph&Ls8burek&–&Rain&Control&9&

Better Buildings by Design Rain Control for Walls: Venting, Ventilation and Drainage February 6-7, 2013

Straube © buildingscience.com 2 of 14

Page 3: 2013 Straube Rain Vermont BBBD - Building Science Corporation

Building&Science&

&Rain&Control&10&

Many&claddings&leak&

•  Brick&•  Wood,&vinyl,&fiber%cement&siding&•  Stucco&•  Metal&panels&

•  Joints&leak:&window,&precast,&curtainwall&

Drained&Walls&

Building&Science&&

&&Rain&Control&12&

Requirements(for(a(Drained(Enclosure(

Better Buildings by Design Rain Control for Walls: Venting, Ventilation and Drainage February 6-7, 2013

Straube © buildingscience.com 3 of 14

Page 4: 2013 Straube Rain Vermont BBBD - Building Science Corporation

DRAINAGE(PLANE(

Drainage&Plane&

Building&Science&

&&Rain&Control&15&

Lapped(Housewrap,(paper,(membrane(

Building&Science&&

&&Rain&Control&16&

17&

Laps(are(the(most(reliable(

Better Buildings by Design Rain Control for Walls: Venting, Ventilation and Drainage February 6-7, 2013

Straube © buildingscience.com 4 of 14

Page 5: 2013 Straube Rain Vermont BBBD - Building Science Corporation

HighEperformance:(thick,(selfEsealing(adhered(

Building&Science&&

&&Rain&Control&19&

Laps&

•  &&

DRAINAGE(GAP(

Better Buildings by Design Rain Control for Walls: Venting, Ventilation and Drainage February 6-7, 2013

Straube © buildingscience.com 5 of 14

Page 6: 2013 Straube Rain Vermont BBBD - Building Science Corporation

2013%02%11& John&Straube& 22&

Drainage&Gaps &&

•  We&have&long&built&gaps&in&walls/roofs&•  Why?&Both&drainage&and&ven8la8on&use&gaps&

•  What&is&the&proper&gap&size&for:&– Drainage?&– Ven8la8on?&

•  When&do&I&need&drainage?&Ven8la8on?&

23&

Drainage&Gaps&&•  Gap&avoids&hydrosta8c&pressure&

– drains&away&water&

•  Reduces&8me&of&wetness&on&housewrap,&membrane,&cladding&

•  Requires&only&small&gap,&e.g.&<1/16”&

2013%02%11& John&Straube& 24&

Leaks&&•  If&obstruc8on,&head&builds&up&and&small&nail/staple&holes&leak&

•  Some&housewraps&come&with&pre%manufactured&holes&

Drained&gap&&behind&brick&

Building&Science&

&Rain&Control&25&

Better Buildings by Design Rain Control for Walls: Venting, Ventilation and Drainage February 6-7, 2013

Straube © buildingscience.com 6 of 14

Page 7: 2013 Straube Rain Vermont BBBD - Building Science Corporation

26&

•  Vinyl&drains&well&with&no&strapping&

2013%02%11& John&Straube&27&

Lap&Siding&•  Water&ran&out&the&front&of&wall&–  Good&design&for&drainage&

1&2&3&4&5&6&7&8&9&10&11&12&13&14&15&16&17&18&

“Adhered&Veneer”&

www.BuildingScience.com& 29&

JJAC(Test(house(2001(

Better Buildings by Design Rain Control for Walls: Venting, Ventilation and Drainage February 6-7, 2013

Straube © buildingscience.com 7 of 14

Page 8: 2013 Straube Rain Vermont BBBD - Building Science Corporation

30&

Stucco&s8cks&to&paper/housewraps&

•  leaks&

31&

Water(drained(astonishingly(well(between(sheets(of(building(paper(

32&

FLASHING(+(WEEPHOLES(

Better Buildings by Design Rain Control for Walls: Venting, Ventilation and Drainage February 6-7, 2013

Straube © buildingscience.com 8 of 14

Page 9: 2013 Straube Rain Vermont BBBD - Building Science Corporation

J.&Straube&2002& 34&

Water(can(build(up(here(EE(we(need(a(waterproof(barrier(

Note(standing(water((

Building&Science&&

&&Rain&Control&35&

Flashing&

•  Need&to&direct&water&outward&

Building&Science&&

&&Rain&Control&36&

Leaky&windows&

•  Leaks&around&windows&occur&•  Collect&and&dump&onto&drainage&plane&w/&flashing&

Better Buildings by Design Rain Control for Walls: Venting, Ventilation and Drainage February 6-7, 2013

Straube © buildingscience.com 9 of 14

Page 10: 2013 Straube Rain Vermont BBBD - Building Science Corporation

Building&Science.com& 38& Building&Science&2008&&

&&Joseph&Ls8burek&–&Rain&Control&39&

Building&Science&2008&&

&&Joseph&Ls8burek&–&Rain&Control&40&

Building&Science&&

&&–&Rain&Control&41&

Better Buildings by Design Rain Control for Walls: Venting, Ventilation and Drainage February 6-7, 2013

Straube © buildingscience.com 10 of 14

Page 11: 2013 Straube Rain Vermont BBBD - Building Science Corporation

VENTILATION(

www.BuildingScience.com&

Requirements(for(a(VenSlated(Enclosure(

2013%02%11& John&Straube& 44&

Ven8la8on&Drying&

Clear Air Spaces

Vent Holes Above& Below Window

Vent Holes at Top& Bottom of Wall

• VenSlaSon:(design(to(allow(some(exterior(air(to(flow(between(cladding(and(sheathing(in(an(air(gap(• Usually(driven(by(solar(heaSng,(someSmes(by(wind(&

How&much&Ven8la8on&do&you&need&

•  Are&materials&adjoining&the&gap&moisture&sensi8ve,&e.g.?&– Are&you&drying&the&cladding&back?&

• Wood&siding,&fiber%cement&

– Are&you&drying&the&wall&sheathing?&•  OSB&exposed&to&wet&cladding&like&stucco,&brick,&etc&

•  Are&you&controlling&inward&vapor&drives?&– Moisture&storing&claddings,&with&vapor&permeable&sheathing&

Better Buildings by Design Rain Control for Walls: Venting, Ventilation and Drainage February 6-7, 2013

Straube © buildingscience.com 11 of 14

Page 12: 2013 Straube Rain Vermont BBBD - Building Science Corporation

Building&Science&

&&–&Rain&Control&46&

VenSlaSon(helps(drying.((But(not(always(needed.(

47&

Previous&Ven8la8on&Research&•  Fraunhofer&Ins8tut&

–  Cladding&on&wet&AAC&–  Test&hut&–  Ven8la8on&allowed&

faster&drying&

•  Hansen&(2002)&–  Ini8ally&dry&test&hut&–  No&effect&of&

ven8la8on&found&–  No&weker/drier&

48&

Lab&test:&Drying&vs&flow&

-200

0

200

400

600

800

1000

1200

1400

1600

0 24 48 72 96 120 144 168 192 216 240 264 288 312 336

Time (h)

Wei

ght C

hang

e fr

om S

tart

(g)

No Flow

0.2 L/s

0.4 L/s0.8 L/s1.6 L/s

ASHRAE&RP%1091&PSU& 2013%02%11& John&Straube&49&

Ven8la8on&Research:&ASHRAE&1091&

Ven8la8on&drying&study&Wood&frame&walls&

!  Brick,(boYom(vents(only(w/(Tyvek(!  Brick,(venSlated(w/(Tyvek(!  Brick,(venSlated(w/(#15(Felt(paper(!  Vinyl(w/(Tyvek(!  Vinyl(w/(#15(Felt(

Better Buildings by Design Rain Control for Walls: Venting, Ventilation and Drainage February 6-7, 2013

Straube © buildingscience.com 12 of 14

Page 13: 2013 Straube Rain Vermont BBBD - Building Science Corporation

2013%02%11& John&Straube& 50&

Example&Field&Results:&ASHRAE&RP1091&

Induced(we]ng(event(

Brick(w/Tyvek(venSlated(Brick(w/#15(felt(venSlated(

Brick(w/Tyvek(nonEvenSlated(

Building&Science&&

&&Rain&Control&51&

Specified(1”(gap(Actual(….(

Drained(gap(behind(wood(

•  Taped&Foam&

Building&Science&&

&&Rain&Control&53&

Better Buildings by Design Rain Control for Walls: Venting, Ventilation and Drainage February 6-7, 2013

Straube © buildingscience.com 13 of 14

Page 14: 2013 Straube Rain Vermont BBBD - Building Science Corporation

www.BuildingScience.com& 2013%02%11& John&Straube& 55&

Summary(

•  We&need&gaps&to&provide&drainage&– flashing,&esp&at&penetra8ons,&cri8cal&

•  The&required&size&of&the&drainage&gap&is&very&small&(in&the&1/16�+)&

•  Larger&gaps&can&be&useful&for&ven8la8on&drying&(1/4”-&¾��clear)&– We&don�t&always&need&ven8la8on&drying&

Better Buildings by Design Rain Control for Walls: Venting, Ventilation and Drainage February 6-7, 2013

Straube © buildingscience.com 14 of 14