City of Folsom Community Development/Building Division 50 Natoma Street, Folsom, CA 95630 Phone: (916) 351-3555 Fax: (916) 351-3363 www.folsom.ca.us RESIDENTIAL PHOTOVOLTAIC (PV) PACKET Project Name and Address: _________________________________________ Plan Check # ________________ _________________________________________ YES NO The following must be submitted at time of permit application: 3 Complete sets of plans (18” x 24”) (plot plan, structural roof framing, arrays layout, etc.) Photovoltaic Checklist shall be submitted with plan submittal Sample One-Line Diagram for PV System Sample Site Diagram Certified Letter from the California Registered Civil or Structural Engineer Verification of Wire Size for PV System Calculation form (complete and submit with permit) CEC Table 310.16 (included for reference) City of Folsom Signage Requirements Note on plans: When the valuation of an addition, alteration or repair to Group R Occupancy exceeds $1000.00, approved smoke alarms shall be installed at the following locations: (1) all bedrooms; (2) centrally located in corridor and hallways leading to bedrooms; (3) above tops of stairs; (4) at least one at every level when the lower level contains a sleeping area; (5) a story or basement is split into two or more levels, the smoke alarm shall be installed on the upper level; (6) and in a dwelling unit where the ceiling height of a room open to the hallway serving the bedrooms exceeds that of the hallway by 24” inches or more smoke alarms shall be installed in the hallway and the adjacent room as per 2013 C.R.C. Section R314 and carbon monoxide detectors shall be installed per Section R315. I understand an application missing any item will be deemed incomplete and the plan check will not be scheduled until the Building Division receives all items that are marked above. This may affect applicable fees and codes since the operative date of the application will be the date on which a complete application is received. All the items required on this checklist are present and complete on plans. Print Name:________________________________________ Signature:_________________________________________ Date:_________________________ I am the: Owner Contractor Agent of the owner/contractor If you have any questions regarding your PV system, please call the City of Folsom Building Division at (916) 351-3555. Thank you. Intake by: _______ (Initials) PPV Packet – 11-05-13

2013 Residential Photovoltaic Packet

Embed Size (px)

DESCRIPTION

ggdfsg

Citation preview

  • City of Folsom Community Development/Building Division

    50 Natoma Street, Folsom, CA 95630 Phone: (916) 351-3555 Fax: (916) 351-3363 www.folsom.ca.us

    RESIDENTIAL PHOTOVOLTAIC (PV) PACKET

    Project Name and Address: _________________________________________ Plan Check # ________________

    _________________________________________

    YES NO The following must be submitted at time of permit application:

    3 Complete sets of plans (18 x 24) (plot plan, structural roof framing, arrays layout, etc.) Photovoltaic Checklist shall be submitted with plan submittal Sample One-Line Diagram for PV System Sample Site Diagram Certified Letter from the California Registered Civil or Structural Engineer Verification of Wire Size for PV System Calculation form (complete and submit with permit) CEC Table 310.16 (included for reference) City of Folsom Signage Requirements

    Note on plans: When the valuation of an addition, alteration or repair to Group R Occupancy exceeds $1000.00, approved smoke alarms shall be installed at the following locations: (1) all bedrooms; (2) centrally located in corridor and hallways leading to bedrooms; (3) above tops of stairs; (4) at least one at every level when the lower level contains a sleeping area; (5) a story or basement is split into two or more levels, the smoke alarm shall be installed on the upper level; (6) and in a dwelling unit where the ceiling height of a room open to the hallway serving the bedrooms exceeds that of the hallway by 24 inches or more smoke alarms shall be installed in the hallway and the adjacent room as per 2013 C.R.C. Section R314 and carbon monoxide detectors shall be installed per Section R315. I understand an application missing any item will be deemed incomplete and the plan check will not be scheduled until the Building Division receives all items that are marked above. This may affect applicable fees and codes since the operative date of the application will be the date on which a complete application is received. All the items required on this checklis t a re present and comple te on plans. Print Name:________________________________________ Signature:_________________________________________ Date:_________________________ I am the: Owner Contractor Agent of the owner/contractor

    If you have any questions regarding your PV system, please call the City of Folsom Building Division at (916) 351-3555. Thank you.

    Intake by: _______ (Initials)

    PPV Packet 11-05-13

  • Residential Photovoltaic - Required on plans Based on the 2013 California Electrical Code (CEC) Article 690

    Residential PV system shall be installed in accordance with the current adopted edition of the 2013 C.E.C. Article 690 California State Fire Marshall Photovoltaic installation guidelines and any other applicable articles or codes adopted by the jurisdiction.

    Simple plot plan showing: ______________ Main service panel location and existing ampere ______________ PV module array configuration shown on a roof layout (or lot if ground mounted system) ______________ Distance from ridge to array(s) - (minimum of 3 required by Fire) ______________ Distance from valley/ hip to array(s) - (minimum of 1.5 by Fire) ______________ Provide 3 wide access path on each slope ______________ PV equipment locations

    PV Equip. Manufacturers Specifications: Provide cut sheets on all components including but not limited to those shown below; including make, model, listing, size, weight, etc. Highlight project specific information on the cut sheets ____ Inverter:

    _______ Model number _______ Integrated disconnect - Per 2013 CEC 690.15

    Mounting System for Panel Installation: Highlight project specific information on the cut sheets ________ Indicate the style, diameter, length of embedment of bolts into framing members and

    location of attachments ________ Indicate number of bolts per panel ________ Provide mounting details and certified engineering for listed mounting installation

    _____ Photovoltaic Modules: ________ Open-circuit voltage (Voc) from listed cut sheet Maximum system voltage from listed cut sheet ________ Short-circuit current (Isc) from listed cut sheet Maximum fuse rating from listed cut sheet ________ Maximum power- panel wattage from listed cut sheet

    _____ Electrical Schematic: ________ System inter-tie with utility company or stand alone ________ Indicate the system KW rating ________ Indicate if the system has battery backup ________ Single line drawing of electrical installation which includes:

    Array PV power source short circuit rating Conductor size and type Conductor locations and runs Equipment bonding points and sizes Per 2013 CEC 250.122 Inverter location AC & DC disconnect locations Per 2013 CEC 690.14 (C) Batteries; number, size and locations (if applicable) Point of connect to existing electrical service panel Size and number of electrical service meters Per 2013 CEC 690.64 (705.12) Location of required signage (per City of Folsom)

    _______ Proper Signage and Labeling: Signage required per City of Folsom handout (see attached) Indicate system type below and show location of each required sign on one line diagram (see attached examples):

    SINGLE PV ARRAY SYSTEM

    PV ARRAY SYSTEM W/ BATTERY BACKUP

    MULTIPLE PV ARRAY SYSTEMS _______ Structural Plan Check Comments PV Roof Layout:

    ______________ Structural calculations (stamped and wet signed by a California Registered Civil or Structural ___________ Engineer) are required to justify the existing roof system components.

    PV Checklist Revised 11-06-13 Page 2 of 8

  • ______________ Structural calculations to justify the installation of PV railing or racking systems are adequate to

    resist wind up-lift minimum 85 mph (based on 3 seconds gust formula) and exposure C). ______________ Show existing slope of roof, type of roof materials, and existing rafter/engineered truss size. ______________ Show number of arrays layout ______________ Show weight of arrays (in pounds per square) ______________ Ensure that lag screws have adequate pullout strength and sheer capacity as installed. ______________ PV layout shall include access pathway for Fire Department

    a. _______ Residential Buildings with hip roof layouts: Modules should be located in a manner that provides one (1) three-foot (3) wide clear access pathway from the eave to the ridge on each roof slope where modules are located. The access pathway should be located at a structurally strong location on the building (such as a bearing wall).

    b. _______ Residential Buildings with a single ridge: Modules should be located in a manner that provides two (2) three-foot (3) wide access pathways from the eave to the ridge on each roof slope where modules are located.

    c. _______ Hips and Valleys: Modules should be located no closer than one and one half (1.5) feet to a hip or a valley if modules are to be placed on both sides of a hip or valley. If the modules are to be located on only one side of a hip or valley that is of equal length then the modules may be placed directly adjacent to the hip or valley.

    _______ Plan Review Information:

    ______________ Review time should be no greater than 5 days (depending on backlog, staffing, and completeness of submitted plans)

    NOTE THESE STATEMENTS ON PLAN:

    2013 CEC 690.17 - Switch or Circuit Breaker. The disconnecting means for ungrounded conductors shall consist of a manually operable switch(es) or circuit breaker(s) complying with all of the following requirements: 1. __________ Located where readily accessible 2. __________ Externally operable without exposing the operator to contact with live parts 3. __________ Plainly indicating whether in the open or closed position 4. __________ Having an interrupting rating sufficient for the nominal circuit voltage and the current that is

    available at the line terminals of the equipment. 2013 CEC 250.122 - Size of Equipment Grounding Conductors. Copper, aluminum, or copper-clad aluminum

    equipment grounding conductors of the wire type shall not be smaller than shown in Table 250.122 but shall not be required to be larger than the circuit conductors supplying the equipment.

    2013 CEC 690.14 (5) - Grouping. The photovoltaic system disconnecting means shall be grouped with other disconnecting means for the system to comply with 690.14(C)(4). A Photovoltaic disconnecting means shall not be required at the photovoltaic module or array location.

    2013 CEC 690.64 (705.12) - Load Side. A photovoltaic power source shall be permitted to be connected to the load side of the service disconnecting means of the other source(s) at any distribution equipment on the premises, provided that (exception) the sum of the ampere ratings of the overcurrent devices shall not exceed 120% of the rating of the busbar or conductor.

    This installation shall comply with the Solar Photovoltaic Installation Guideline developed by the Office of the State Fire Marshal.

    Location of Direct Current (DC) Conductors: Conduit, wiring systems, and raceways for photovoltaic circuits should be located as close as possible to the ridge

    or hip or valley. Conduit, wiring systems, and raceways for photovoltaic circuits should be located from the hip or valley as directly

    as possible to an outside wall to reduce trip hazards and maximize ventilation. Conduit runs between sub arrays and to DC combiner boxes should minimize the total amount of conduit on the

    roof by taking the shortest path from the array to the DC combiner box. DC combiner boxes are to be located such that conduit runs are minimized in the pathways between arrays. DC wiring should be run in metallic conduit or raceways. DC wiring should be run along the bottom of load-bearing members.

    PV Checklist Revised 11-06-13 Page 3 of 8

  • PV Checklist Revised 11-06-13 Page 4 of 8

  • PV Checklist Revised 11-06-13 Page 5 of 8

  • CITY OF FOLSOM

    EXAMPLE 3

    PV Checklist Revised 11-06-13 Page 6 of 8

  • CITY OF FOLSOM

    EXAMPLE 4

    PV Checklist Revised 11-06-13 Page 7 of 8

  • CITY OF FOLSOM

    EXAMPLE 5

    PV Checklist Revised 11-06-13 Page 8 of 8

    UResidential Photovoltaic - Required on plans Review time should be no greater than 5 days (depending on backlog, staffing, and completeness of submitted plans)