45
8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 1/45 Department of Finance Office of the Mississippi Manage Workshop Presentation  – Pool  V 01/05/2 1/9/2012

20120105 PRO40 Fleet Management - Pool Vehicles

Embed Size (px)

Citation preview

Page 1: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 1/45

Department of FinanceOffice of the Mississippi Manage

Workshop Presentation  –

Pool V

01/05/2

1/9/2012

Page 2: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 2/45

1. Workshop Ground Rules

2. Workshop Guiding Principles

3. Workshop Objectives

4. Workshop Agenda in Detail5. Workshop Roles

6. Workshop Content

7. Workshop Wrap-up

1/9/2012

 AGENDA

Page 3: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 3/45

1/9/2012

• All participants should be familiar with the requirementtopics to be covered;

• The workshop scribe is responsible for documenting the

issues and

 follow

 up

 questions;

• The workshop facilitators are responsible for keeping thcentered on the topic being discussed.  If  an issue is dethat cannot be resolved during the workshop, the facilitnote the issue for future resolution and enter it into theoutput document; and

• Parking of  discussion item if  the required knowledge is room.

Workshop Ground Rule

Page 4: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 4/45

Workshop Guiding Princi

1/9/2012

Workshop Participant

– Demonstrate how requirements are met 

using Standard SAP functionality

– Utilize 

standard 

SAP 

functionality 

(80/20 

rule)

– Avoid the “what won’t work” mindset

– Be attentive and ope

– Explore questions an

– Encourage input

 from

– Refrain from absolut

– Focus on current issu

– Avoid “war stories”

– Manage cell

 phone,

 

interruptions

– Keep the conversatio

Essential  to dos:• Review Business Process Model

• Update/Create process Flow 

Diagrams

• WS Output

 Documents

• Identify RICEFW Objects

• Document process 

changes/implications

• Solution Manager: 

•Create Business Blueprint 

documents

• Identify Issues and Risks

Page 5: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 5/45

Workshop Objectives

1/9/2012

M6 Notification

Pool Creation & Editing

Reservation Process

Issuing Process

Return Process

Financial Process  – TBD?

Page 6: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 6/45

Workshop Agenda

1/9/2012

Date

Topics

Deliverables

Team Logistics  – Fleet Management

[01/05/2012

Pool Vehicle Request

Pool Vehicle

 Assignment

Pool Vehicle Reserved

Pool Vehicle Issued

Pool Vehicle Returned

Financial Process  – TBD?

Workshop Minutes

Parking Lot 

Page 7: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 7/45

Blueprint Workshop - Ro

1/9/2012

SAP Facilitator Terry Heinze

Customer Facilitator Logan Litchliter

Sharetha Batts

Scribe Jon Sanford

OCM  Dorothy Preston

A successful workshop is the result of  interaction and participation!

Page 8: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 8/45

Business Area, Fund, Functional

11/03/2011

 Fund 

The Fund has the same meaning as the SAAS Fund 

 New fund numbers will be assigned by funding source

The field is 10 digits and the appropriation number will be

 Functional Area

The Functional Area may be used for program budgetin

The field length is a maximum of 16 digits

 Business Area

The Business Area will be used for the Agency Numbe

The field is 4 digits and new numbers will be assigned

Page 9: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 9/45

General Ledger Account, Cost C

11/03/2011

General Ledger Account

General Ledger (G/L) accounts will include Assets, Liabilities, Fund

Revenue and Expenditure

The field is 8 digits and the Major Object Code will be built into the n

Cost Center

The Cost Center represents a division or area within an agency for rec

reporting budgets, revenues and expenditures

The field is 10 digits and may be set up as Agency/Bureau/Location/Agency D

Page 10: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 10/45

Project & WBS Element, Internal O

11/03/2011

 Projects

Projects are made up of Work Breakdown Structure (WBS) Elements- 24

Funded Program – Could be used to control budget at the project or WBS

WBS Elements will be used for:

Capital Projects

ITS Services

MDOT Projects

State Aid Road Maintenance

 Internal Order

A flexible cost collector that can be defined by the agency to meet a variet

10 digits

Internal Orders may be used for:

• Internal Services

• Events

• Activities

• Locations

Page 11: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 11/45

1/9/2012

State of Mississippi MAGIC Pro

Fleet Management

[content]

Page 12: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 12/45

1/9/2012

SAP Glossary

Equipment records  – Vehicle (cars, pick‐up trucks

into a functional location.

Pool  – Grouping of  vehicles in a Functional Locatio

M6 Notification

 (Pool

 Request)

  – Creates

 

the 

initia vehicle.

Pool Asset Management (PAM)  – Graphical tool u

manage vehicles in a pool. Has the ability to:

CREATE (YELLOW) a demand for a vehicle (dat

characteristics, 

etc). Actual vehicle not determined at this time

ASSIGN (YELLOW) demand to a specific vehicl

Select by availability and preference.

Page 13: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 13/45

1/9/2012

SAP Glossary

RESERVE ( RED) vehicle.

Requestor receives SAP express mail.

ISSUE (GREEN) vehicle.

Mileage

 

recorded RETURN (BLUE) vehicle.

Mileage recorded

Page 14: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 14/45

Contents

1/9/2012

Process

Technical informati

Integration

Page 15: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 15/45

Requesting Vehicle

1/9/2012

1. Creation of requirement

2.

3. Reser

confir

4. Vehicle issue

+

5. Vehicle return

+

6. Cost allocation

Vehicle usage costs are calculated and allocated 

to the account assignment object. TBD!

Requester receiv

Vehicle is returned.

Mileage and time of  return

are entered. 

Mileage and time

of  issue are entered.

Vehicle is issued.

Page 16: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 16/45

Entry of Requirement

1/9/2012

• Features:

• Users enter vehicle requirement on a user‐friendly interface

into the system .

• They specify the time and duration of  the trip and have the 

vehicle class and desired equipment.

Page 17: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 17/45

Online Entry of Requiremen

1/9/2012

Page 18: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 18/45

Booking Overview

1/9/2012

• Features:

• In the

 overview

 of 

 bookings,

 Requestors

 can

 display

 all

 ve

they have made.

• These are listed in Vehicle Requests.

• The 

vehicle 

requirement 

history 

can 

also 

be 

displayed.

Page 19: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 19/45

Booking Overview (ERP)

1/9/2012

This example shows a possible 

layout in the ERP environment

Page 20: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 20/45

 Assigning Vehicle

1/9/2012

1. Creation of requirement

2.

3. Reserv

confirm

4. Vehicle issue

+

5. Vehicle return

+

6. Cost allocation

Vehicle usage costs are calculated and allocated 

to the account assignment object. TBD!

Rr

Fr

Requester receive

Vehicle is returned.

Mileage and time of  return

are entered. 

Mileage and time

of  issue are entered.

Vehicle is issued.

Page 21: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 21/45

Vehicle Planning – Requirement Sch

1/9/2012

• Features:

• The pool is represented as an OrgUnit (an Agency) in the 

• Planning board

 for

 vehicle

 requirement

 scheduling.

• Vehicle requirements are dragged and dropped to the po

• An overall display gives a clear overview of  the vehicle po

Page 22: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 22/45

1/9/2012

Vehicle Planning – Requirements Sc

Schedule by

drag & drop

Page 23: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 23/45

Process Overview of Vehicle Fleet Ma

1/9/2012

1. Creation of requirement

2.

3. Reser

confir

4. Vehicle issue

+

5. Vehicle return

+

6. Cost allocation

Vehicle usage costs are calculated and allocated 

to the account assignment object. TBD!

Requester receiv

Vehicle is returned.

Mileage and time of  return

are entered. 

Mileage and time

of  issue are entered.

Vehicle is issued.

Page 24: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 24/45

Confirmation of Booking

1/9/2012

• Features:

• Vehicle requestors utilize M6 Notification  – Pooled Asset 

post vehicle requests in SAP.

• The Individual requesting a vehicle automatically receives

the vehicle requirement has been scheduled by the Fleet 

Manager/Custodian.

• The vehicle requirement is given the status ‘RESERVED’.

Page 25: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 25/45

Confirmation of Booking

1/9/2012

Double‐click

Page 26: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 26/45

Vehicle Handling

1/9/2012

1. Creation of requirement

2.

3. Reser

confir

4. Vehicle issue

+

5. Vehicle return

+

6. Cost allocation

Vehicle usage costs are calculated and allocated 

to the account assignment object. TBD!

Requester receiv

Vehicle is returned.

Mileage and time of  return

are entered. 

Mileage and time

of  issue are entered.

Vehicle is issued.

Page 27: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 27/45

Vehicle Issue

1/9/2012

• Features:

• The issue

 time

 and

 mileage

 is

 entered.

• A checklist can be created when the vehicle is collected (p

feature).

Page 28: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 28/45

Vehicle Issue

1/9/2012

Change

to “coll

If  requi

Enter t•Milea• Time

Double‐click

Page 29: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 29/45

Vehicle Handling

1/9/2012

1. Creation of requirement

2.

3. Reser

confir

4. Vehicle issue

+

5. Vehicle return

+

6. Cost allocation

Vehicle usage costs are calculated and allocated 

to the account assignment object. TBD!

Requester receiv

Vehicle is returned.

Mileage and time of  return

are entered. 

Mileage and time

of  issue are entered.

Vehicle is issued.

Page 30: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 30/45

Vehicle Return

1/9/2012

• Features:

• Time of  vehicle return and mileage are entered in the syste

as the basis for cost allocation. TBD?

• Checklist is

 handed

 in

 when

 the

 vehicle

 is

 returned,

 comple

signature.

Page 31: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 31/45

Vehicle Return

1/9/2012

Change n

“returned

Update di

equipmen

Double‐click

Enter th•Mileag• Time o

Double‐click

Page 32: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 32/45

 Allocating Costs – TBD!

1/9/2012

1. Creation of requirement

2.

3. Reserv

confirm

4. Vehicle issue

+

5. Vehicle return

+

6. Cost allocation

Vehicle usage costs are calculated and allocated 

to 

the 

account 

assignment 

object. 

TBD!

r

Fr

Requester receiv

Vehicle is returned.Mileage and time of  return

are entered. 

Mileage and time

of  issue are entered.

Vehicle is issued.

Page 33: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 33/45

Cost Allocation – TBD

1/9/2012

• Features:

• Cost allocation is based on the difference between collect

time and the mileage.

• Different charge rates can be assigned to different vehicle

Page 34: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 34/45

Cost Allocation – TBD!

1/9/2012

Cost al

Notific

data is 

Double‐click

Double‐click

Page 35: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 35/45

Integration

1/9/2012

• Mapping of  vehicles:

• Car pools are mapped as organizational unit.

• Vehicles are mapped as equipment.

• Mileage are entered as a measurement document for th

• Vehicle 

request:• The vehicle request is mapped as a notification.

• The vehicle requester’s details are taken from user data a

• It is possible to choose vehicle category and desired equi

• Status tracking.

Page 36: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 36/45

Main Benefits

1/9/2012

• Fully integrates into SAP environment:

• No interfaces required with controlling, accounting, o

maintenance.

• User-friendly.

Page 37: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 37/45

Pool Asset Managemen

1/9/2012

Pool 

Vehicle Is 

Required

Create Pool 

Vehicle 

Request 

Cancel Pool 

Vehicle 

Request 

Assign 

Request To 

Schedule

Cancel

Scheduli

Demand

Financial Process??

•YES…Deletes Vehicle 

Demand•NO…Continue 

Processing Request

•YES…Dele

On Plannin

•NO…Cont

Processing 

•Mileage recorded

Cancel 

Reservation CloseNotifica

Requested 

Vehicle 

Issued

Pool Vehicle

 Returned

•YES…SAP Express 

Mail to Requestor

•NO…Continue 

Processing Request

•M6 Notification

•Vehicle Type 

•Date &

 Time

•Scheduled To

Demand

•Vehicle Availability

 

& Preference

•Email

•Phone 

•Walk‐up

•Mileage recorded •Financial Impact??

Page 38: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 38/45

Workshop Objectives

1/9/2012

M6 Notification

Pool Creation & Editing

Reservation Process

Issuing Process

Return Process

Financial Process

Page 39: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 39/45

Let’s verify  that  we are on the same  pa¾Clarify any Strange Jargon

¾Validate Parking Lot Items

¾Record Key Decisions

Wrap-up

Page 40: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 40/45

Questions

1/9/2012

Page 41: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 41/45

1/9/2012

+’s

What worked well today?

• ∆’s

What can

 we

 improve

 for

 future

 meetings

 and

 pr

Plus/Delta

Page 42: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 42/45

Thank you!

1/9/2012

Page 43: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 43/45

 

MAGIC Project

WORKSHOP MINUTES/OUTPUT DOCUMENT

PROJECT IDENTIFICATION 

Project Name CPI/Project Number  Project Type(CBI, Implementation, CSS, Upgrade, Internal, other) 

MAGIC Implementation

Customer Name Customer Number Planned Start/Finish

State of Mississippi 600260

SAP Customer Partner Project Sponsor Program Manager 

SAP Project Director Customer Project Director Partner Project Manager 

Bill Bevil Becky Thompson

GENERAL INFORMATION 

Workshop Title PRO-40 Fleet Management – Pool Vehicles

Workshop Facilitators Terry Heinze, Logan Litchliter, Sharetha Batts

Scribe J on Sanford, J ack Ladhur

 ATTENDEES 

Name (including Role/Organization)

Logan Litchliter (DFA/MMRS) Retha Gregory (MDOT) Preston Ware (MSH)

Sharetha Batts (DFA/MMRS) J ulie Ethridge (MDOT) Bettye Rimmer (DFA/MMRS)

 J ackie Robinson (EMSH) Leah Chittom (DFA/MMRS) Aaron Stein (SAP)

Lena Patterson (EMSH) Tammy Rankin (DFA/MMRS)

 Terrence J ones (DFA/MMRS) Kenya Gardner (MDE)

 J ack Ladhur (STA Consulting) Michael Swofford (MDE)

Brenda Benson (DFA/MMRS) Kelvin McClee (MDWFP)

Shelley Walker (DFA/MMRS) J on Sanford (SAP)

Mark Hayden (MDOT) Mark Taylor (MDOT)

Darren Crotchett (MDOT) Marilyn Cox (ITS)

Susan Thames (MDOT) Yolanda Tillman (DFA/MMRS)

Steve Tucker (MDOT) Kenneth Dixon (MSH)

Page 44: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 44/45

 

KEY DECISIONS ANSWERED REFERENCE DOCUMENTS

FOR DETAILS REFER TO THE FOLLOWINGKEY DECISION DOCUMENT

Require Odometer reading

Require financial billing functionality for the Feds (MDOT)

Use Work Center’s to capture rate per mile, per class off vehicle

State Hospital requires LSMW for Mileage, Fuel Consumption and Cost

ID GAPS IDENTIFIED OWNER DUE DATE

0102

03

04

05

ID ACTION/PARKING LOT ITEM OWNER DUE DATE

01 AI – Determine if the Asset#can be used on PAM Planning Board Terry Heinze 1/12/2012

02 AI – Mileage Report for Specific Date Range(s) Terry Heinze 1/12/2012

03 AI – Verify the system can allow for going back to correct an odometerreading (reading entered is less than last reading)

 Terry Heinze 1/12/2012

04 AI – On the M6 notification, a one-step approval to the supervisor maybe needed 

 Terry Heinze 1/12/2012

05 AI – When billing back usage of the vehicles for the Feds (MDOT),

Daily Rates are associated with vehicles classesI. Need to check if this is feasible as we may not want to turn it on 

 Terry Heinze 1/12/2012

06 AI – May potentially add M6 Notification (Vehicle Request) to the portaltransaction (ESS)

 Terry Heinze 1/12/2012

07 AI - Odometer readings need to be captured on return of a vehicle –Need to ensure that this is a measuring document on all of the fleetvehicles

 Terry Heinze 1/12/2012

08 AI - OPTFM Meeting Request

I. Discuss Mapping VIN Intelligence to SAP

II. Discuss Characteristics

 Terry Heinze 1/12/2012

09

10

Page 45: 20120105 PRO40 Fleet Management - Pool Vehicles

8/22/2019 20120105 PRO40 Fleet Management - Pool Vehicles

http://slidepdf.com/reader/full/20120105-pro40-fleet-management-pool-vehicles 45/45

 

ID ORG CHANGE MANAGEMENT (OCM) IMPACT IDENTIFIED CROSS TEAM IMPACT

01 SOM current system(s) are driven by Asset#, since SAP is not drivenby Asset#- this could potentially be a large impact to the Pool Vehicle

process

02

03

04

05

ID MISC NOTES

01 MDOT currently uses TPS (internal system to manage pool vehicles)

02 SOM tracks pool vehicles by asset number (not License PL#) 11 characters(first 3 are agency#)03 MDOT – has need to assign mileage to a project (Federal Billing)

04 MDOT – Federal Billing=Rental Rate x Mileage, not limited to Pool Vehicles – Dummy Work Center’s can be

used to accommodate that functionality

05 MDOT – has multiple activity rates – not just a flat rates