Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
2012 Visioning Study
CITY OF ALBERTVILLE, MINNESOTA
2030 VISIONING STUDY
Prepared For: City of Albertville, Minnesota
5959 Main Avenue NE P.O. Box 9
Albertville, MN 55301
Prepared By: Northwest Associated Consultants, Inc.
4800 Olson Memorial Highway, Suite 202 Golden Valley, MN 55422
______________________________________________________________________ Albertville 2030 Visioning Study
ACKNOWLEDGEMENTS The City of Albertville would like to acknowledge and thank the following individuals for their time and dedication to completing the Albertville 2030 Vision Study. The courtesy, cooperation and contribution is greatly valued and appreciated.
Mayor Mark Meehan
City Council
Jillian Hendrickson Larry Sorensen
John Vetsch Dan Wagner
Planning Commission
Frank Kocon Dale Edgren
Natalya Lindberg Robert Olson Brian Totman
City Staff Larry Kruse Tina Lannes Tim Guimont
John Middendorf Adam Nafstad Michael Couri
Jon Sutherland
Property Owners John Darkenwald Casey Darkenwald
Mike Leuer Mike Potter
______________________________________________________________________ Albertville 2030 Visioning Study
TABLE OF CONTENTS Page Introduction ……………………………………………………………………………………….. 1 Small Town Atmosphere ………………………………………………………………………. 3 Pace of Growth ……………………………………………………………………………………. 4 Land Use ……………………………………………………………………………………………. 9 Residential Land Use ……………………………………………………………………………. 9 Household Types …………………………………………………………………………………. 16 Age Characteristics ………………………………………………………………………………. 17 Commercial Land Uses …………………………………………………………………………. 19 Industrial Land Uses ……………………………………………………………………………. 30 Economic Development ……………………………………………………………………….. 32 Public Facilities ……………………………………………………………………………………. 33 Finance ………………………………………………………………………………………………. 38 Goals and Policies ……………………………………………………………………………….. 39 Ten Year Projects ………………………………………………………………………………… 47 Project Priorities ………………………………………………………………………………….. 48 Land Use Plan ……………………………………………………………………………………… 49 List of Maps: Issues ………………………………………………………………………………………………… 2 Five Year Improvement Plan ………………………………………………………………… 8 Existing Land Use 1995 ……………………………………………………………………….. 11 Existing Land Use 2012 – DRAFT ………………………………………………………….. 12 Proposed Land Use ……………………………………………………………………………… 13 Concepts 1 through 5 ………………………………………………………………………….. 22-26 Parks and Trails …………………………………………………………………………………… 36 2011 Park and Trail Plan ………………………………………………………………………. 37 Proposed Land Use ……………………………………………………………………………… 50 List of Tables: Table 1 – Population, Household, Household Size 1990-2010 ………………….. 4 Table 2 – Housing by Age 2010 ……………………………………………………………. 5 Table 3 – Developed Land Use Comparison 1995 – 2012 ………………………… 9 Table 4 – Housing Units by Type 2000, 2010 …………………………………………. 9 Table 5 – Household Types 1990, 2000, 2010 ……………………………………….. 16 Table 6 – Age Characteristics 1990, 2000, 2010 …………………………………….. 17 Table 7 – Median Age 1990, 2000, 2010 ………………………………………………. 18
______________________________________________________________________ Albertville 2030 Visioning Study 1
INTRODUCTION The City of Albertville has commissioned this study to define the vision, goals, and priorities of the community for the next 20 to 30 years. Through a series of interviews with the City Council, Planning Commission, property owners, and City staff, the following issues and opportunities were identified. The issues were presented for further discussion by the City to establish goals, priorities, and strategies to address each issue. This will provide direction for the City in its future planning, administration, and investment efforts.
!
!
94
70TH
LAB
EAU
X
37
JASON
60TH
MA
IN
65TH
57TH
61ST
MA
CIV
ER
67TH
50TH
KALI
KAH
L
49TH
51ST
62ND
KALD
ER
KALL
AND
KAR
STO
N
63RD
58TH
52ND
MA
SO
N
LAN
DE
R
69TH
55TH
LAN
SIN
G
KAH
LER
64TH
LAM
BER
T
MA
RLO
WE
BARTHEL INDUSTRIAL
KALE
ND
A
MAY
ELIN
54TH
MAY
ER
KASS
EL
KAM
A
KAD
LER
JANSEN
56TH
MA
RX
LIN
WO
OD
47TH
53RD
LAK
E
LAC
HM
AN
48TH
68TH
71S
T
KYLE
R
KAIS
ER
54 1/2
MA
CK
ENZI
E
MA
RS
HAL
L
LAKETOWNE
LAS
ALLE
66TH
MACKENZE
KAG
AN
MA
RTI
N
LAN
GE
LAKEW
OOD
LABEAUX AVE NE TO WB I94
60TH ST NE TO WB I94
LAC
EN
TRE
KAITLIN
TERRACE
KAR
MEN
WEST LAKETO
WN
E
LAN
NO
N
60TH ST NE TO EB I94
LAKE
VIEW
LAR
GE
59TH
LYD
IA
EB I94 TO 60TH ST NE
LAM
ON
T
WB I94 TO
60TH ST NE
LAN
E
LAMPLIG
HT
EB I94 TO LABEAUX AVE NE
1ST
MA
NC
HE
STE
R
KAEL
IN
EAST
LAK
ESHORE
LANCAST
ER
LILA
C
LOCUST
SUMERLIN
LARABEE
LAR
KLI
NDEN
KAH
LER
BAY
IVORY
MA
RTI
N F
AR
MS
54TH
MA
RLO
WE
TERRACE
48TH
KALE
ND
A
67TH
KASS
EL
LAN
DE
R
56TH
60TH
54TH
64TH
69TH
58TH
58TH
61ST
LAR
GE
KALI
LASALLE
61ST
51ST
48TH
62ND
KALI
LAR
GE
KAISER
52ND
MASON
50TH
53RD
KALLAN
D
KALI
LAM
BER
T
49TH
47TH
67TH
47TH
JASON
LINW
OOD
63RD
KALE
NDA
65TH
47TH
48TH
KAH
LER
47TH
LAR
GE
57TH
JANSEN
59TH
56TH
LAC
HM
AN
94
KALI
JASON
53RD
LAS
ALLE
60TH
MA
CIV
ER
LAN
NO
N
66TH
49TH
KAH
L
KAG
AN
63RD
55TH53RD
51ST
65TH
LANSING
64TH
37
MASON
KAISER
50TH
62ND
52ND
KALE
ND
A
49TH
51ST
KALE
NDA
63RD
69TH
53RD
67TH
LAK
E
LANNON
Infill Development
Ditch Improvement Needed
Infill Development
Infill Development
More Senior Housing Needed
Physical Barrier
Physical Barrier
Physical BarrierAccess Issue
Improve CR 19
Infill Commercial Infill Commercial
Infill Commercial
Access Issues
Access Issues
Strong Schools
Strong Schools
Physical Barrier
Future Plant Capacity
Physical Barrier
Infill Industrial
Infill Industrial
Need Utility Expansion
50th StreetCounty Improvements
Golf Courseis an Asset
Future Land Use
Residential Infill
Ditch Improvements
Access Issues
Access Issues
CR-19/I-94Ramp
Future CommercialIndustrial Development Future Commercial
Industrial Development
Physical Barrier
Existing Land Use Draft 2012
Draft: April 11, 2012Source: Wright County Parcel Data
0 0.40.2 Miles
City Limit Boundary
Railroad
Wetland Overlay
Medium Density Residential
Low Density Residential
High Density Residential
Commercial
Industrial
Semi Public/Public
Park/Open Space
Agriculture/Vacant
Issues
Scattered & PoorHousing Conditions
Street Connection
Drainage Problem!
Traffic Volumes
Industrial/Residential Protection District
Downtown Redevelopment
______________________________________________________________________ Albertville 2030 Visioning Study 3
SMALL TOWN ATMOSPHERE Albertville is a community of four square miles in area with a current population of approximately 7,000. The people interviewed were complementary of the City’s small town atmosphere which was characterized by the following features: • Small, walkable community • Attractive, friendly residential
neighborhoods • Strong local school system • Trail system that allows residents
to walk or bike within neighborhoods or to local destinations
• Strong civic organizations, clubs and programs
• Friendly City Days • Local businesses that serve the community residents • Local golf course The following features work against the City’s small town atmosphere: • Physical barriers (I-94, County Road 19, County Road 18, Main Street) divide the
community and separate neighborhoods. The physical barriers limit locations for crossings and access.
• Traffic volumes on the City’s major streets present public safety concerns that
emphasize the streets as physical barriers.
______________________________________________________________________ Albertville 2030 Visioning Study 4
PACE OF GROWTH The following table illustrates Albertville’s dramatic growth over the past 20 years. During the housing boom in the 1990s and early 2000s, Albertville’s population grew from 1,251 people in 1990 to 7,044 people in 2010.
TABLE 1 POPULATION, HOUSEHOLD, HOUSEHOLD SIZE
1990 – 2010
1990 2000 % Change 1990-2000 2010 % Change
2000-2010 Population 1,251 3,621 189.4% 7,044 94.5% Household 410 1,287 213.9% 2,377 84.5% Household Size 3.05 2.81 - 7.9% 2.96 5.3% Source: U.S. Census
The rapid pace of residential growth has benefited the City in the following ways: • The City required developer-installed improvements that construct the City’s
street and utility infrastructure. • The new growth created new commercial markets that spurred the City’s
commercial development like Albertville Crossings. • The growth generated taxes, fees, and charges to pay for new community
facilities.
Albertville’s residential growth stalled in 2006 with the national collapse of the housing market. Additionally, the City’s residential vacant land supply has declined to approximately 199 acres. With a limited amount of vacant residentially zoned land, the City will be transitioning from a fast growth community to a maturing community. This change in growth pattern raises the following concerns:
______________________________________________________________________ Albertville 2030 Visioning Study 5
1. Infill development of remaining vacant residential land. The City will need to continue to demand creative neighborhood designs, quality home construction and interconnected neighborhoods. Interviewees indicated that the City should not rush infill development. The City should be selective to insure quality neighborhoods in the remaining vacant residential land. The City should promote home ownership.
2. As existing housing stock continues to age, the City will begin to see issues with
housing conditions. The following table indicates 80 percent of the City’s housing stock is less than 20 years old, however, the City has scattered sites and neighborhoods showing declining housing and site conditions. The declining housing conditions can negatively affect property values of neighboring properties and detract from quiet enjoyment of the neighborhood.
TABLE 2
HOUSING BY AGE 2010
Units Percent of Total
2000 or Later 1,182 47.5% 1990 – 1999 828 33.3% 1980 – 1989 253 10.2% 1970 – 1979 102 4.1% 1960 – 1969 18 0.7% 1950 – 1959 9 0.4% 1940 – 1949 18 0.7% 1939 and Earlier 78 3.1% TOTAL UNITS 2,488 100.0% Source: U.S. Census
______________________________________________________________________ Albertville 2030 Visioning Study 6
3. The City has benefited from property owner reinvestment of insurance claims following several hail storms during the past years. Property owners have replaced siding, roofs, and made other exterior improvements to their homes. This has gone a long way to keep Albertville’s housing stock in good condition. There are instances where property owners have not reinvested insurance payments back into their properties. These homes show signs of deterioration to roofs and siding.
4. Other housing condition issues raised through the interviews include:
• Excessive outdoor storage. This may include recreational vehicles, boats, trailers, junk, and trash cans parked in the yard or in the driveway.
• Broken or deteriorated
driveways.
______________________________________________________________________ Albertville 2030 Visioning Study 7
5. The City has adopted a vacant home ordinance that has assisted in protecting
the City’s housing stock from abandoned or foreclosed homes. This ordinance requires all abandoned or foreclosed homes to be registered with the City. The City then turns off utilities and inspects the property to insure that it is secured. The inspector also notifies the foreclosing bank of property and building issues that must be completed prior to re-occupancy of the building.
6. The vacant home ordinance and the rental ordinance assist in protecting the
City’s housing stock. The following programs may also be considered:
• Point of Sale Housing Inspection. This program would require a house inspection and Building Code improvements as a condition of sale or occupancy.
• Driveway Permits. This permit would insure proper repair of driveways
that are blended with City sidewalks, trails, street and curb. 7. As the City continues to age and the remaining vacant land becomes developed,
the City will face changing priorities. The replacement, maintenance, and upkeep of existing infrastructure will need to be conducted without the revenues from new growth. Some of these improvements include:
• Street and utility
reconstruction, repair and replacement must be coordinated with City budgeting to insure funds are earmarked for infrastructure replacement.
• Street overlay and seal coating program.
• Five year capital improvement planning.
• 57th Street storm sewer improvements.
• Storm sewer and ditch improvement at Barthel Drive and through the Barthel Industrial Park.
• Cleaning and re-grading County Ditch 9 through Albert Villas.
• Park improvements.
______________________________________________________________________ Albertville 2030 Visioning Study 9
LAND USE The following table illustrates a comparison of existing developed land by land use category between 1995 and 2012. The maps on the following pages illustrate community growth between 1995 and 2012.
TABLE 3 DEVELOPED LAND USE COMPARISON FOR
ALBERTVILLE 1995 - 2012
1995 Acreage
2012 Acreage
Low Density Residential 237 759 Medium Density Residential 1 77 High Density Residential 16 16 Commercial 9 165 Industrial 46 89 Public / Semi-Public 140 167 Park and Recreation 28 299 Public Right-of-Way 302 469 TOTAL 779 2,041 Source: Northwest Associated Consultants, Inc.
RESIDENTIAL LAND USE Albertville’s growth between 1990 and 2010 was predominantly low density single family residential. The following table illustrates Albertville’s housing units by type.
TABLE 4 HOUSING UNITS BY TYPE 2000, 2010
Unit Type 1990 % of Total 2000 % of
Total 2010 % of Total
1 unit detached 311 74.5% 932 69.7% 1,854 75.6% 1 unit attached 43 10.0% 165 12.2% 405 16.6% 2 units 6 1.5% 20 1.5% 0 0% 3 – 4 units 7 1.5% 25 1.9% 18 0.7% 5 – 9 units
49
11.5% 9 0.7% 21 0.9%
10 – 19 units 32 2.4% 44 1.7% 20 or more units 147 11.0% 111 4.5% Mobile Homes 2 1.0% 8 0.6% 0 0% TOTALS 418 100.0% 1,338 100.0% 2,453 100.0% Households 410 1,287 2,377 Vacant Units 8 51 75 Vacancy Rate 1.9% 3.8% 3.1% Source: U.S. Census
______________________________________________________________________ Albertville 2030 Visioning Study 10
Albertville’s housing stock consists of 76 percent single family, 16 percent townhomes, and 8 percent multiple family dwelling units. In looking to the future, the following comments were offered: 1. The majority of the interviewees thought that the City has enough multiple
family housing and the City should not change zoning to accommodate more multiple family housing. The remaining residential zoned property should infill with low density single family developments.
2. The City does want expanded
senior (age restricted) housing with services as a means of providing a full range of life cycle housing within the community. The City is willing to consider a land use and zoning change to accommodate a high density senior housing project.
3. The City has expressed concern
over the number of single family and townhome rentals that have been established within owner occupied neighborhoods. Absentee landlords and poor tenant selections have created property maintenance issues and nuisance issues.
94
70TH
37
LAB
EA
UX
60TH
JASON
MA
IN
57TH
65TH
61ST
MA
CIV
ER
67TH
50TH
KALI
KA
HL
49TH
51ST
62ND
KA
LDE
R
KARSTON
63RD
KA
LLA
ND
58TH
52ND
MA
SO
N
LAN
DE
R
69TH
KAH
LER
64TH
LAN
SIN
G
LAM
BE
RT
MA
RLO
WE
BARTHEL INDUSTRIAL
KALE
ND
A
54TH
KASSEL
KAM
A
MAY
ELIN
56TH
MA
RX
LIN
WO
OD
KA
DLE
R
53RD
LAK
E
JAN
SEN
LAC
HM
AN
48TH
MAY
ER
68TH
KY
LER
47TH
KAISER
54 1/2
MA
CK
EN
ZIE
MA
RS
HA
LL
LAKETOWNE
LASA
LLE
66TH
MACKENZE
KAGAN
55TH
MA
RTI
N
LAKE
WOOD
LABEAUX AVE NE TO WB I94
60TH ST NE TO WB I94
LAC
EN
TRE
KAITLIN
EAST LAKETOWNE
KARM
EN
WEST LAKETO
WN
E
LAN
NO
N
60TH ST NE TO EB I94
LAKE
VIEW
LAR
GE
59TH
LYD
IA
LAN
GE
LAM
ON
T
LAMPLIG
HT
MA
NC
HE
STE
R
LANC
ASTE
R
WES
T LA
KESH
ORE
LOCUST
LARABEE
LIND
EN
KA
HLE
R B
AY
LAM
BE
RT
54TH
63RD
64TH
62ND
65TH
94
KASS
EL
63RD
69TH
KA
LI
KAISER
LAR
GE
JASON
LAN
SIN
G
JASON
LINW
OOD
58TH
67TH
61ST
67TH
47TH
52ND
49TH
JANS
EN
53RD
MA
RLO
WE
54TH
53RD
KAHLE
R
52ND
62ND
53RD
KA
HL
KALE
NDA
51ST
53RD
47TH
KALI
LAR
GE
48TH
56TH56TH
48TH
LANNON
KALI
60TH
LAC
HM
AN
LAN
DE
R
MA
CIV
ER
LAN
NO
N
66TH
KA
LLAN
D
57TH
KA
GA
N
69TH
60TH
49TH
65TH
50TH
61ST 37
MASON
50TH
51ST
58TH
KALE
ND
A
64TH
48TH
49TH
51ST
KALE
ND
A
LAK
E
67TH
55TH
Existing Land Use 2012
Draft: March 20, 2012Source: Wright County Parcel Data
0 0.50.25 Miles
City Limit Boundary
Railroad
Wetland Overlay
Medium Density Residential
Low Density Residential
High Density Residential
Commercial
Industrial
Semi Public/Public
Park/Open Space
Agriculture/Vacant
-0 4,000 8,0002,000 Feet
Sources: Northwest Associated Consultants, DNR, Wright County, City of Albertville.
Note: For planning purposes only. January 18, 2010.
City of AlbertvilleProposed Land Use Plan
Proposed Land Use PlanAgriculture/Rural
Low Density Residential
Medium Density Residential
High Density Residential
Commercial
Business Park
Industrial
Public/Semi-Public
Park/Open Space
Golf Course
parcels
Albertville City Limits
Water
MUDLAKE
SCHOOLLAKE
SWAMPLAKE
______________________________________________________________________ Albertville 2030 Visioning Study 14
Throughout the interviews, most people were complimentary of the City’s residential neighborhoods, citing attractive neighborhood design and quality housing construction. The following features were identified as adding to the residential quality: 1. Generous lot sizes of most
newer single family lots. 2. Quality housing
construction. 3. Sidewalk and trail system. 4. Proximity to neighborhood
parks. 5. Access to a variety of local
businesses. 6. Golf course neighborhoods.
Negative aspects cited with regard to residential development are: 1. Scattered sites and neighborhoods of poorer housing conditions. 2. Excessive outdoor storage of boats, recreational vehicles, and trailers. 3. Parks that are predominantly wetlands. 4. Physical barriers that isolate neighborhoods.
______________________________________________________________________ Albertville 2030 Visioning Study 15
In discussions within the interviews, the following residential designs should be implemented: • Install sidewalks within all new plats. • Provide sidewalks or trail connections between neighborhoods and City
destinations. • Replace front yard bituminous trails with concrete sidewalks.
• Avoid future private streets and street eyebrows, or center islands in cul-de-sacs. • Avoid water stand pipes within driveways. • Address deteriorated housing conditions. • Limit outdoor storage in residential neighborhoods. • Provide opportunities for larger garages/accessory buildings.
______________________________________________________________________ Albertville 2030 Visioning Study 16
HOUSEHOLD TYPES The predominance of single family housing has attracted young families with children to the City. Table 5 illustrates that the City’s predominant household type is married couples. The percentage of single parent households has dropped between 2000 and 2010, but the actual numbers have not seen significant change. The proportional change in single parent households may be due to the predominance of single family housing built during the 2000s. The City has experienced a significant increase in unrelated households primarily between 2000 and 2010.
TABLE 5 HOUSEHOLD TYPES 1990, 2000, 2010
Household Type 1990 % of Total 2000 % of
Total 2010 % of Total
Male Householder 50 12.2% 184 14.3% 113 4.7% Female Householder 47 11.5% 228 17.7% 207 8.7% Married 288 70.2% 790 61.4% 1,479 62.2% Unrelated 25 6.1% 85 6.6% 578 24.4% TOTAL 410 100.0% 1,287 100.0% 2,377 100.0% Source: U.S. Census
______________________________________________________________________ Albertville 2030 Visioning Study 17
AGE CHARACTERISTICS The following table illustrates Albertville’s population by age groups for years 1990, 2000, and 2010. Proportionally, Albertville’s age groups have remained fairly consistent between 1990 and 2010.
TABLE 6 AGE CHARACTERISTICS 1990, 2000, 2010
Age 1990 2000 2010 SCHOOL AGE
Under 5 years 175 417 754 5 – 9 years 140 337 761 10 – 14 years 79 343 601 15 – 19 years 59 200 452 Total School Age 453 1,297 2,568 Percent of Total 36.2% 35.8% 36.4%
WORK FORCE
20 – 24 years 126 245 309 25 – 29 years 195 389 525 30 – 34 years 153 456 691 35 – 39 years 75 396 738 40 – 44 years 68 263 623 45 – 49 years 39 134 499 50 – 54 years 41 96 338 55 – 59 years 29 91 227 60 – 64 years 23 69 156 Total Work Force 749 2,139 4,106 Percent of Total 59.9% 59.1% 58.3%
RETIRED
65 – 69 years 19 52 121 70 – 74 years 13 78 94 75 – 79 years 8 31 76 80 – 84 years 6 13 47 85+ years 3 11 32 Total Retired 49 185 370 Percent of Total 3.9% 5.1% 5.3%
GRAND TOTAL 1,251 3,621 7,044
Source: U.S. Census
______________________________________________________________________ Albertville 2030 Visioning Study 18
• In 2010, 36 percent of Albertville’s population fell within the school age category. This large percentage of school age children reflects the significant number of young families within Albertville. This young age group and their parents place demands on City resources including education, recreation, parks and trails.
• The work force age group (20-64 years) shows a slight decline in a portion of
Albertville’s population between 2000 and 2010. • The City’s retirement age population has grown both in number and as a
proportion of the population. This can be attributed to the aging of the City’s in- place population and the development of housing geared toward senior citizens (i.e., The Cottages of Albertville and townhomes). It is anticipated that the City’s senior population will continue to grow, placing demands on services such as senior programming, housing and medical care.
Reflective of the trends illustrated in Table 6, Albertville’s median age has gradually increased over the past 20 years. Table 7 illustrates Albertville’s median age.
TABLE 7 MEDIAN AGE 1990, 2000, 2010
Year Median Age 1990 28.2 years 2000 28.8 years 2010 30.9 years
Source: U.S. Census
______________________________________________________________________ Albertville 2030 Visioning Study 19
COMMERCIAL LAND USES The interviews pertaining to commercial land uses were expanded to include a number of the City’s larger landowners. 1. In review of the City’s Proposed Land Use Plan, a number of people raised
questions with regard to the amount and location of Albertville’s commercial land uses.
• Some are concerned with the quantity and location in regard to the time it
will take to develop. Property owners with B-2 zoning would like a greater range of uses to spur development. These property owners would like the City to consider alternative land uses such as fast food and gas stations in the B-2 District or a change in zoning to multiple family.
• Others expressed the opinion that the City should stand pat on its
commercial land use areas. This position is based on growing residential markets in Otsego and St. Michael, County travel patterns that lead to Albertville, Albertville’s direct access to I-94, and the Albertville Outlet Mall.
2. Most interviewed expressed satisfaction with the quality and design of the City’s
newer commercial developments (i.e., Shoppes at Towne Lakes, Outlet Mall, Albertville Crossings). However, most expressed a need to establish a plan or vision for the Main Street businesses and the commercial land uses along County Road 37. These gateway locations were identified as being visually unappealing and detrimental to the City’s identify. The City will need to consider renovation or redevelopment options when planning for these areas.
______________________________________________________________________ Albertville 2030 Visioning Study 20
3. A number of older, vacant buildings that were originally constructed for
industries but are now zoned commercial have presented difficulties for maintaining tenant occupancy. These buildings do not meet current Building and Fire Codes (sprinkling) for commercial occupancy, but the sites are no longer suited for the original industrial land uses. Ultimately, these buildings may be redeveloped, however in the interim, the property owners have a difficult time finding tenants for these buildings. While some buildings have found occupants, the difficult sites include:
6737 County Road 19 6575 County Road 19 5670 MacIver Avenue 5354 59th Street 5720 Barthel Drive
4. Site access will drive future commercial areas. The following locations have
difficult access issues: • Northwest Albertville. Property owners in this area seek to have a street
connection with the Outlet Mall. • 6575 and 6551 County Road 19. These sites will be limited to right-in,
right-out access to County Road 19 when County Road 19 is improved as a divided highway. A backage road is needed to provide secondary access to 67th Street.
• 6793 County Road 19 will require access from 67th Street to accomplish
commercial development.
______________________________________________________________________ Albertville 2030 Visioning Study 21
• 5933 County Road 19 will require access through the private street through Albert Plaza Addition.
• The area at the northeast corner of County Road 19 and 50th Street will
need to obtain street access from future 53rd Street extension , County Road 19 and 50th Street. The City will need to work with Wright County to secure a workable 50th Street access if this area is to be developed as commercial land use.
• The Zachman parcel in northeastern Albertville is land locked within
Albertville. A future street will be needed to connect this site with MacKenzie Avenue.
NW Commercial Park
1.0
2500 Feet
© Bolton & Menk, Inc - Web GIS Figure
Mall Access
2.0
2500 Feet
© Bolton & Menk, Inc - Web GIS Figure
North East Area
3.0
4500 Feet
© Bolton & Menk, Inc - Web GIS Figure
CSAH 19 East
4.0
4500 Feet
© Bolton & Menk, Inc - Web GIS Figure
EICHER
5.0
2500 Feet
© Bolton & Menk, Inc - Web GIS Figure
______________________________________________________________________ Albertville 2030 Visioning Study 27
5. The Outlet Mall is a major draw to the community – 4 million shoppers into
Albertville per year. Past relationships with the mall have been at times contentious. However, generally the mall is viewed as a positive local attraction, provides a strong tax base, provides employment opportunities, and some spin off businesses. In looking to the future, the City will want to take advantage of this attraction and try to promote complementary commercial growth that may attract spin off businesses from the mall. To implement this strategy, the following suggestions were offered:
• Market to recreational/entertainment and hospitality businesses that may
appeal to the Outlet Mall shoppers and inspire longer stays in the community.
• Provide a vehicular connection between the Outlet Mall and 67th Street to
allow business interchange without having to re-enter County Road 19. • Consider a larger area identification sign (i.e. dynamic billboard) that
would advertise businesses, events, or specials in northwest Albertville. • Complete the I-94/County Road 19 C-D road and ramp. • Improve County Road 19 north to a four lane highway and provide
necessary backage road to access the commercial areas from 67th Street. • Establish regional stormwater ponds and drainage system to economize
on the buildable land in northwest Albertville. • Investigate means to reduce or subsidize SAC/WAC charges for hospitality
businesses as an incentive to attract these businesses.
______________________________________________________________________ Albertville 2030 Visioning Study 28
6. The Albertville Downtown was a target of criticisms for its appearance. Those interviewed stated that the City must establish a vision for this commercial area of the City. Suggestions for improvements include:
• Bury the overhead utilities. • Improved sidewalks for pedestrian friendliness. • Enhance the entrance to Central Park. • Building face lifts. • Redevelop the old City shop building along with the pizza restaurant to
create an attractive entrance to the Downtown from County Road 37.
______________________________________________________________________ Albertville 2030 Visioning Study 29
7. Properties along County Road 37 and 60th Street are guided and zoned for
commercial uses. This area contains a mix of residential, industrial and commercial land uses. The City should look at this area again and confirm its long range land use intentions. Under the current zoning, the residential properties are legal non-conforming uses which complicate any desired home expansions by the property owners.
8. The interviewees identified the following commercial businesses as being
desirable for the community:
• Businesses that may be complementary to the Outlet Mall including: • Hospitality businesses, hotels, conference centers, restaurants. • Entertainment and recreational businesses. • Retailers that may appeal to men (i.e., Bass Pro Shop).
• Big box general merchandise retailers. • Lumber yard or home improvement store.
The following businesses are seen as being overly abundant in Albertville:
• Pizza restaurants. • Gas stations.
______________________________________________________________________ Albertville 2030 Visioning Study 30
INDUSTRIAL LAND USES The following perspectives include comments from Albertville’s local industries: 1. Most interviewed thought that the existing industrial park is an asset to the City
that should be promoted and grown. The proposed industrial land use pattern east of Barthel Drive is appropriate and compatible with St. Michael’s land use planning.
2. Interviewees expressed the following concerns with the existing industrial park:
• Future industrial development along Barthel Drive must be designed (both site and building) to avoid nuisance issues (glare, noise, odors, etc.) from being directed toward residential neighborhoods to the west.
• The industrial traffic in Barthel Drive is not compatible with the on-street
trail. Families with small children are intimidated to share the street with large truck traffic.
______________________________________________________________________ Albertville 2030 Visioning Study 31
• The ditch and storm sewer through the industrial park requires some
redesign to reduce flooding at the corner of 55th Street and Barthel Drive. 3. In talking to the local industries, the following Albertville strengths were cited for
locating in Albertville:
• Small town atmosphere provides an attractive living environment for the employees.
• Access to I-94. The access to I-94 going both east and west via County
Road 37 is a critical consideration for Albertville industries. • Proximity to the Twin Cities Metropolitan Area provides ease of access to
company vendors and customers. • Albertville has proven to have excellent employee loyalty. Companies
value and reward employee loyalty. 4. Albertville has a strong and appealing industrial base. The companies are clean,
highly technical, and high paying industries. While struggling through the recession, a number of companies are currently experiencing potential record sales this year. A number of companies have expressed interest in expansion. This will provide immediate local opportunities for economic development.
______________________________________________________________________ Albertville 2030 Visioning Study 32
5. Local industries have expressed frustration in finding trained employees to fill
needed positions (i.e., die cast, tool and die, fabricators, etc.). Some companies have been working with the high school and Alexandria Vocational Technical School to provide scholarships to students that may fill their areas of need. Many were not aware of Wright County and State Department of Employment and Economic Development programs to pair qualified employees with employers.
ECONOMIC DEVELOPMENT Most of the interviewees identified economic development (expansion of the City’s commercial and industrial land uses) as a priority for the City. The following suggestions were made for economic development: 1. Define the City’s land use goals for commercial and industrial areas as related to:
• Location, land supply, variable lot sizes. • Access. • Zoning: types of use, site design, architectural quality. • Utility availability and capacity.
2. Economic development strategies:
• Advertise with professional media; market in professional magazines (retail, industrial, construction).
• Keep tax, fees, charges and SAC/WAC fees low. • Grow in-place industries. • Identify available financial incentives (i.e., tax abatement, tax increment,
DEED grants). 3. Identify and market to preferred commercial businesses and industries:
• Hospitality businesses. • Entertainment businesses. • Retailers that complement or benefit from the Outlet Mall.
4. Public improvements that will aid in improving economic development:
• Completion of I-94/County Road 19 interchange. • Completion of Phase II of the I-94/County Road 19 interchange. • County Road 19 improvements from Outlet Mall to 70th Street.
______________________________________________________________________ Albertville 2030 Visioning Study 33
• Outlet Mall street connection to 67th Street. • Local street extensions of 53rd Street, LaCenter Avenue. • Expansion of street and utilities along Marlowe Avenue to expand Barthel
Industrial Park. • Extension of utilities to Green Haven area.
PUBLIC FACILITIES 1. City Hall, Public Works and the Fire Hall are new facilities that are designed and
sized to meet the City’s needs well into the future.
2. There is a need for fiber optic links between the City Hall, Fire Hall, Public Works
and the Ice Arena to avoid communication breakdowns. 3. In looking to the future, Public Works values having the old Downtown
maintenance building for storage of equipment. If this area is lost to redevelopment, they will need additional cold storage at their site.
______________________________________________________________________ Albertville 2030 Visioning Study 34
4. Joint water system appears to be working adequately, serving each member
community. The City currently has no problems with supply, distribution, water quality, or pressure. In looking to the future, the five year capital improvement plan must be annually reviewed to include repairs or replacement of older, broken down water infrastructure.
5. The existing sanitary sewer treatment plant has the following issues:
• The plant is currently operating below MPCA permit allowances for liquids. • The plant is nearing capacity for solid waste treatment. To expand
capacity, the City will need to add a digestion tank and add reed beds. • The City is still using its ponds. The ponds were to be decommissioned
per MPCA permit with the last plant upgrade. • MPCA has sent a letter to all cities that have waste treatment plants that
discharge into shallow lakes requiring the plants to reduce their phosphorous discharge from 1 mg/million to .06 mg/million. MPCA has given 10 years to implement this phosphorous reduction. This is not an easy fix and may be quite expensive. The City will need to plan and budget for the required improvements to avoid having the plant become an obstacle for future development.
• The sewer collection system has no bottlenecks. Albertville’s sewer
collection system is reliant on six pass stations. Sewage from Albert Villas subdivision must pass through all six pumping stations to reach the plant.
• The City must address aging infrastructure with its five year capital
improvement plan so it can be prioritized, planned, and budgeted. Utility improvements must be coordinated with City street and storm sewer improvements to avoid duplication of costs.
6. The City is currently working with the School District, St. Michael, and the
Hockey Association to construct a second indoor sheet of ice at the Ice Arena. In consideration of this issue, the following opinions have been expressed:
• The Ice Arena is an important community asset. It is a priority to retain
and expand this regional facility in Albertville. • The Ice Arena expansion costs are to be shared with St. Michael, the
School District, and the Hockey Association. Building expansion on the current site presents land area issues due to the building size and required
______________________________________________________________________ Albertville 2030 Visioning Study 35
parking. To provide sufficient land, it is likely that Albertville will need to identify and pay for a solution.
• Recently, an opportunity for a public/private partnership has been
discussed for the expansion of the Ice Arena. This opportunity may require an alternative site for the Ice Arena. The City will need to investigate this opportunity further to determine:
• Is the project real and how it may be financed? • Is the alternative location acceptable to the City and its public
partners? • What is the timing of the project?
7. The Albertville park and trail system was identified as a positive asset for the
community. Most interviewees indicated that the City’s trail system is highly desirable. The 2011 Trail System Plan should be integrated with the City’s Five Year Street Improvement Plan to build incomplete trail or sidewalk segments.
INTERSTATE 94
LAB
EAUX
AVE
NE (C
SAH
19)
70TH ST
57TH ST NE
70TH ST NE
JASON AVE NE (CSAH 18)
KAR
STON
AVE N
E
49TH ST NE
61ST ST NE
65TH ST NE
67TH ST NE
50TH ST NE (CSAH 18)
KAH
L AVE
NE
62ND ST NE
51ST ST NE
KAL
LAND
AVE
NE BARTHEL INDUSTRIAL DR NE
55TH ST NE
63RD ST NE
KAL
I AVE
NE
52ND ST NE
KAL
DER
AVE N
E
60TH ST NE
58TH ST NE
LAN
DER
AVE N
E
KAH
LER
DR N
E
LAM
BERT
AVE
NE
LAC
HMAN
AVE
NE
64TH LN NE
KAL
ENDA
DR
NE
69TH ST NE
64TH ST NE
COUNTY ROAD 37
LABEAUX AVE NE TO WB I94
KAL
LAND
DR
NE 60TH ST NE TO WB I94
LIN
WOOD
DR
NE
KAS
SEL A
VE N
E
MAR
LOW
E AVE
NE
KAM
A LN N
E
MAC
KENZ
IE AV
E NE
60TH ST NE TO EB I94
54TH ST NE
JASON LN NE
64TH WAY NE
68TH ST NE
53RD ST NE
56TH ST NE
KAD
LER
AVE N
E
KYL
ER AV
E NE
LASALLE CIR NE
KAI
SER
AVE
NE
48TH ST NE
KARSTON CT NE
EB I94 TO 60TH ST NE
WB I94 TO 60TH ST NE
LAK
EWOO
D DR
NE
KAL
ENDA
AVE
NE
54 1/2 ST NE
WEST LAKETOWNE DR NE
LAK
E AVE
NE
EB I94 TO LABEAUX AVE NE E
LAC
ENTR
E AVE
NE
MAR
LOW
E N
E
MAI
N AV
E NE
KAGAN AVE NE
KARSTON DR NE
LAK
EVIEW
CIR N
E
KARMEN AVE NE
KAITLIN AVE NE
LANSING AVE NE
LAN
NON
AVE N
E
KAL
LAND
CIR
NE
EAST LAKESHORE DR NE
LAMPLIGHT DR NE
KAL
ENDA
LN N
E
69TH CIR NE
LAR
GE AV
E NE
WEST LAKETOWNE DR NE
LAM
ONT A
VE N
E
LAN
CAST
ER W
AY NE
59TH ST NE
LYD
IA C
IR N
E
51ST CT NE
KAHLER CT NE
KAL
I CT N
E
49TH CT NE
64TH LN NE
63RD ST NE
53RD CT NE
LARABEE CIR NE
KAH
LER
BAY
NE
55TH ST NE 55TH ST NE
MACI
VER
AVE
NE
MACIVER AVE NE
LILA
C GRN
NE
KAL
ENDA
CT NE
KAS
SEL A
VE
53R
D CI
R NE
KALLAND CT NE
KAISER CIR NE
54T
H CI
R NE
LIND
EN ST
NE
54T
H PL
NE
KAHLER CIR NE
55T
H CI
R NE
56TH ST NE
KAL
I AVE
NE
53RD ST NE
LAC
HMAN
AVE
NE
60TH ST NE
61ST ST NE
KAISER LN NE
MAI
N AV
E NE
KAL
ENDA
CT NE
INTERSTATE 94
KAH
L AVE
NE
50TH ST NE
LAR
GE AV
E NE
58TH ST NE
62ND ST NE
LAR
GE AV
E NE
KAH
LER
DR N
E
52ND ST NE
COUNTY ROAD 37
52ND ST NE
53RD ST NE 53RD ST NE
MAI
N AV
E NE
KAG
AN AV
E NE
60TH ST NE
51ST ST NE
LAC
HMAN
AVE
NE
51ST ST NE
54TH ST NE
LAK
E AVE
NE
67T
H ST
NE
60TH ST NE
53RD ST NE
58TH ST NE
LAM
BERT
AVE
NE
56TH ST NE
LASALLE CIR NE
LANNON AVE NE
61ST PL NE
LINWOOD DR NE LAKETOWNE VIEW NE
LOCUST CT NE
EAST LAKETOWNE DR NE
KEYS
TONE
AVE
57TH ST NE
59TH PLACE NE
59TH CIR NE
WEST LAKETOWNE DR NE
50TH CT NE
LANSING CIR NE
JASON CT NE
64T
H ST
NE
LAN
NON
CIR
NE
KANTAR CT NE
KARSTON COVE NE
LARKSPUR GRN NE
LACHMAN CIR NE
LYNNMERE LN NE
54 1/2 ST NE
LAB
EAUX
AVE
NE (C
SAH
19)
57TH ST NE
KALL
AND
AVE N
EKALE
NDA A
VE N
E
KARS
TON A
VE N
E
KALI AVE NE
54TH ST NE
LAN
DER
AVE N
E
51ST ST NE
49TH ST
KARSTON CIR NE
51ST CT
KAHLER DR NE
KALE
NDA
DR
KARSTON AVE NE
KARS
TON A
VE N
E
LYMO
N AV
E NE
62ND ST
NE
KALLAND AVE NE
KAR
STON
CT
!"b$)p
G©WX
G©WX
!"b$)p
GrWXGsWX
GrWX
GsWX
LINWOOD PARK11260 WEST LAKETOWNE DR.
PARK6450 WEST LAKETOWNE DR.
WASTEWATERTREATMENT
PLANT MAINTENANCECENTER
COMPOSTSITE
ALBERTVILLE CITY HALL5959 MAIN AVE. NE
CITYHALL
HOCKEYFREE
SKATE
STMAICE ARENA
FIRESTATION
CENTRAL PARK5801 LANDER AVENUE NE
12
3
WINTER PARK10381 64TH STREET NE
WESTWIND PARK10687 KALLAND DRIVE NE
OAKSIDE PARK10820 KANTAR CT. NE
VILLAS PARK10365 KALI AVENUE NE
ST. MICHAEL-ALBERTVILLEAREA HIGH SCHOOL11343 50TH STREET NE
TRACK
FOOTBALL
FOUR SEASONS PARK11830 - 51st STREET NE
ALBERTVILLE PRIMARY SCHOOL5386 MAIN AVE. NE
JOINT POWERSWATER
TREATMENT PLANT
CEDAR CREEK GOLF COURSE
SHADYOAK PARK6832 LAKEWOOD DR.
HUNTERS PARK7040 69TH CIRCLE NE
OUTLET MALL
OUTLET MALL OUTLET MALL
HuntersLake
SchoolLake
SwampLake
71
10
32
9
5
12
181116
1413
6
8
17
15
4
PLAY
PLAY
PLAY
PLAY
PLAY
PLAY
PLAY
PLAY
PLAY
PLAY
PLAY
PLAY
S
S
S
S
S
S
S
SPLAY
Map D
ocume
nt: (\\
Arcser
ver1\g
is\ALBT
\_Base
map\E
SRI\M
aps\20
11\Alb
t-Park
s & Tra
ils 11x
17.mx
d)2/2
1/2011
-- 3:3
4:43 P
M
2011
I0 1,200Feet
Source: Wright County, MNDNR
Parks & TrailsFigure 4
CLIENTLOGO
Legend
Bunker
Ponds
Boundary
Clubhouse
ParkingLot
City Hall
Compost Site
Fire Station
Maintenance Facilities/Treatment Plant
Play Structures
Schools
Shelters
Parks
Sidewalks
Trails
Street Centerlines
Albertville Parcel Lines
City Limits
Protected Waters
Baseball Fields
Football Field
Soccer Fields
Tennis Courts
Hockey Rinks
Fairways & Greens
COMPOST SITE
CITY PARK
ST MICHAEL-ALBERTVILLE AREA MIDDLE SCHOOL
WESTWIND PARK
WINTER PARK
ALBERTVILLE PRIMARY
VILLAS PARK
SHADYOAK PARKLINWOOD PARK
OAKSIDE PARK
FOUR SEASON'S PARK
CITY HALL
TOWNE LAKE PARKS
HUNTERS PARK
Proposed Sidewalk/TrailsSidewalkTrail
Existing Sidewalk/TrailsSidewalksTrails
ExistingParksGolf CourseCommercial AreasRoadsWetlandsWaterParcelsAlbertville City Limits
SCHOOLLAKE
SWAMPLAKE
HUNTERSLAKE
Sources: Northwest Associated Consultants, Bolton-Menk,DNR, Wright County, City of Albertville.
Note: For planning purposes only. May 5, 2011.
0 5,100 10,2002,550 Feet-
2011 Park & Trail PlanDRAFT
Existing & ProposedParks & Trails
ST MICHAEL-ALBERTVILLEHIGH SCHOOL & PRIMARY SCHOOL
ICE ARENA
TextStripe Traffic Lanes
TextStripe Traffic
Lanes
TextStripe Traffic Lanes
______________________________________________________________________ Albertville 2030 Visioning Study 38
FINANCE The City is changing from a fast growth community to a maturing community. In this light, the City revenues move away from development fees and toward taxes and assessments for infrastructure replacement. Albertville has a number of large projects identified for the next 10 years (see page 48). In planning for these improvements, programs and services, the City must be cognizant of the changing revenues. The following issues have been identified related to City finance: 1. State assistance to the cities will likely continue to decline, requiring cities to
fund operations and projects locally. The loss of these State funds will be reflected in increased local tax rates.
2. Albertville has used its enterprise funds to finance projects with the expectation
of repayment. Anticipated payments have not always occurred on schedule, placing the enterprise fund in the hole.
3. The past tax increases were capped by the Council at 3 percent. These tax rates
are not sufficient to cover all expenses, debt service, and repayment of enterprise funds.
4. The City needs to balance taxes with debt, services, personnel and capital
improvements. The enterprise funds need to be replenished. 5. The City needs to prioritize projects based on community needs and its ability to
finance the specific improvements.
______________________________________________________________________ Albertville 2030 Visioning Study 39
GOALS AND POLICIES Through the vision process, the City Council, Planning Commission and staff worked together to outline issues and opportunities that the City will need to address over the next 20 years. The City Council and Planning Commission, through a series of workshop meetings, then outlined the City’s future goals. This chapter identifies the general community goals and policies for their implementation. In the sections which follow, the terms “goals” and “policies” are frequently used. These terms are defined as follows: Goals: The generalized end products which will ultimately result in achieving the
kinds of living, working and recreational environments that are desired. Policies: Definite courses of action which lead to goal achievement. They serve as
guides to help make present and future decisions consistent with the stated goals.
Small Town Atmosphere Goal 1: Maintain and protect Albertville’s small town atmosphere and identity through long range planning. Policies: 1. Enhance the areas surrounding the Albertville interchange ramps, which serve as
the gateway to the community, through planning, development and/or redevelopment of marginal and under-utilized properties.
2. Maintain and develop attractive residential neighborhoods through the
application of high development standards. 3. Maintain and develop high quality commercial areas through the application of
quality architectural standards and site design elements such as parking, landscaping, and lighting that promote an attractive shopping environments.
4. As opportunities present themselves, investigate the redevelopment of the Main
Avenue streetscape to create an attractive historical downtown. Efforts may include:
a. Burying the overhead utility lines. b. Pedestrian friendly sidewalk design.
______________________________________________________________________ Albertville 2030 Visioning Study 40
c. Redevelopment of marginal or under-utilized properties. d. Improvement and enhancement of Central/Lions Park as a community
amenity. e. Redevelopment of single family homes along Main Avenue to a
commercial land use. f. Improve available public/private parking to enhance the appearance of
the downtown area. g. Attractive streetscape, landscaping, lighting and sidewalk amenities. h. Promote private reinvestment in downtown buildings.
5. Maintain and improve the City’s comprehensive sidewalk and trail system
through the implementation of the City’s 2011 Trail System Plan recommendations.
6. Investigate opportunities to maintain and enhance the Cedar Creek Golf Course
as a community amenity. 7. Continue to promote neighborliness and citizen involvement in community
activities and organizations, and program activities like:
a. Friendly City Days. b. FYCC Recreational Programs. c. Civic organizations. d. School activities. e. City newsletter.
Pace of Growth Goal 1: Manage growth that provides quality development and does not fiscally burden the community. Policies: 1. Infill development of existing platted residential lots with homes that share the
same quality and value of adjoining homes. 2. The City will be patient with the development of the remaining larger
undeveloped tracts of residentially zoned land. With a limited supply of residential zoned land, the City can wait for a preferred development.
______________________________________________________________________ Albertville 2030 Visioning Study 41
3. The cost of extending utilities for residential development will be the burden of
the developer. 4. Maintain its current planned commercial and industrial land use patterns and
zoning. 5. Examine redevelopment as opportunities for public/private projects present
themselves. City involvement will be determined on a case-by-case basis based on City priorities and return on investment.
6. Annually update the City’s five year capital improvement plan to maintain,
renovate, or replace deteriorating public infrastructure. Long range improvement projects will be annually identified, reviewed, scheduled, and budgeted to plan for these needed project expenditures.
Residential Goal 1: Maintain and build attractive residential neighborhoods. Policies: 1. Promote infill development within existing neighborhoods with homes that share
the same quality and value as adjoining homes. 2. The City is very concerned with the amount of residential rental properties in the
City. There is specific concern for the conversion of owner-occupied single family and townhome units to rental. The City will continue to enforce its rental ordinance and property maintenance regulations on all rental properties to insure the properties stay in proper repair.
3. The Visioning Study has indicated that the majority of Albertville’s housing is less
than 20 years old and is in very good condition. However, the study has also identified scattered sites where housing is showing its age or deterioration. While it is not an immediate priority, the City may consider the following programs to address sites of poor housing condition:
a. Vacant Building Ordinance (existing). b. Rental Ordinance (existing). c. Point of Sale Ordinance.
4. Excessive outdoor storage on scattered sites through the City was identified as a
detriment to the adjoining neighbors. Promotion of yard cleaning and regulation
______________________________________________________________________ Albertville 2030 Visioning Study 42
of outdoor storage were recommended through code enforcement on a complaint basis.
5. Through the five year capital improvement programming, the City will include the
replacement of bituminous trails located in residential front yards with concrete sidewalks.
6. Examine City subdivision and zoning performance standards to establish the
performance standards that accomplish the City’s residential goals. Goal 2: Provide a variety of housing options to meet the life cycle needs of Albertville residents. Policies: 1. The City has identified senior housing with services as a priority need within the
community. The City will work with senior housing providers to address this local need.
2. Albertville has a fair balance of housing densities as well as a large supply of
medium and high density residential land use near its borders within other communities. Albertville will limit future multiple family development to locations currently zoned for multiple family land uses. Except for senior housing, no new locations have been identified for multiple family land use.
3. Encourage the rehabilitation of substandard multiple family properties that
display deteriorated building conditions, no site amenities, or poor site design through the enforcement of the City’s Rental Ordinance.
4. Adhere to the highest community design and construction standards for new
construction and redevelopment projects. 5. Accompany medium and high density development with adequate accessory
amenities such as garages, parking, open space, landscaping, and recreational facilities to insure a safe, functional, and desirable living environment.
Commercial Goal 1: The City will continue to promote commercial development by the City taking advantage of its access to Interchange 94 and the growing population of Albertville and its adjoining communities.
______________________________________________________________________ Albertville 2030 Visioning Study 43
Policies: 1. The City will promote commercial development within locations of the City’s
commercial areas as guided in the Albertville Proposed Land Use Plan. 2. The City should be patient with infill commercial development to insure proper
access, quality site design, and quality architecture. Maintaining high design and construction standards related to architecture, site design, and landscaping was recommended.
3. With regard to older buildings, the City will be supportive of the reuse of these
buildings, but will enforce the fire sprinkler requirements of Regulation 1306. 4. Site access will drive the timing and quality of commercial development. The
Visioning Study identified a number of locations where improved street access is needed to facilitate commercial development, as illustrated on Figures 1.0-4.0 of this Vision Study. The City will promote private interest to cooperate in providing this street access. The City’s role in these street connections will be as a facilitator.
5. Downtown Albertville has been a target of criticisms for its appearance, however,
in the scope of the entire community, it has been identified as a low priority project. The City will pursue downtown improvement projects when opportunities become available and financially practical.
6. The following commercial uses have been identified as desired in Albertville:
a. Additional hospitality businesses, hotels, sit down restaurants, conference centers.
b. Big box retailer. c. Lumber yard.
Industrial Goal 1: Promote continued industrial development in order to expand local employment opportunities and the City’s tax base. Policies: 1. Pursue an industrial land use pattern consistent with Albertville’s Proposed Land
Use Plan.
______________________________________________________________________ Albertville 2030 Visioning Study 44
2. Aggressively market and promote the sale of its City-owned industrial lots. Primary focus shall be the retention and in-place expansion of Albertville’s existing industries.
3. Maintain open lines of communication with local industries to be aware of the
needs and to create a business-friendly and business-responsive community. 4. Periodically examine its industrial zoning standards to insure they address
industrial needs and accomplish the City’s industrial land use goals. Economic Development Goal 1: The Vision Committee identified commercial and industrial growth as a priority for the community. The City will become more aggressive in its economic development promotion efforts. Policies: 1. The City shall define its land use goals for commercial and industrial areas as
related to:
a. Location, land supply, variable lot sizes. b. Access. c. Zoning: types of use, site design, architectural quality. d. Utility availability and capacity.
2. Albertville’s economic development strategies shall include:
a. Advertise with professional media; market in professional magazines (retail, industrial, construction).
b. Keep tax, fees, charges and SAC/WAC fees low. c. Grow in-place industries. d. Identify available financial incentives (i.e., tax abatement, tax increment,
DEED grants). e. Communicate with local businesses to understand their needs and growth
opportunities. 3. Identify and market to preferred commercial businesses and industries:
a. Hospitality businesses. b. Entertainment businesses. c. Retailers that complement or benefit from the Outlet Mall.
______________________________________________________________________ Albertville 2030 Visioning Study 45
4. Public improvements that will aid in improving economic development:
a. Completion of I-94/County Road 19 interchange. b. Completion of Phase II of the I-94/County Road 19 interchange. c. County Road 19 improvements from Outlet Mall to 70th Street. d. Outlet Mall street connection to 67th Street. e. Local street extensions of 53rd Street, LaCenter Avenue. f. Expansion of street and utilities along Marlowe Avenue to expand Barthel
Industrial Park. g. Extension of utilities to Greenhaven area.
Public Facilities Goal 1: Ensure public facilities are designed and constructed to address the City’s long range needs, facilitate development, and contribute to the quality of life in Albertville. Policies: 1. The extension of municipal water to the golf course was identified as a top
priority for the City. This public improvement would allow for the golf course clubhouse expansion to accommodate larger events, banquet facilities, and community events. The water extension is necessary to provide proper fire protection.
2. The completion of Phase I C-D road and I-94/County Road 19 interchange has
been a longstanding priority for the City which will be completed in Fall 2012. The Vision Committee identified the completion of the Phase II ramp as a high priority.
3. With the completion of the C-D road and I-94, the City has also identified the
need to upgrade County Road 19 to a four-lane street from the Outlet Mall to 70th Street as a City priority.
4. The City will need to upgrade its wastewater treatment plan to address the
following:
a. Expanding the capacity to treat solids. b. Reduction of phosphorous to meet MPCA guidelines.
5. The City has identified retaining and expanding the Ice Arena in Albertville as a
priority. The City will work to identify options for the physical layout of the Ice Arena and financing that can be cooperatively pursued with other Ice Arena participants.
______________________________________________________________________ Albertville 2030 Visioning Study 46
6. The City will continue to investigate opportunities to share facilities, services and
programs with surrounding communities as a means of expanding services, avoid duplication, and reducing costs to Albertville residents.
Finance Goal 1: Maintain Albertville as a financially sound, self-sustaining community. Policies: 1. The City’s financial position and debt service shall be annually reviewed and
analyzed to ensure proper fiscal programming and management. City budgets must reflect all of its operational, capital, and debt expenses to ensure that they balance with available revenues.
2. Allocate, to the extent possible, administrative and improvement costs to those
generating the demand or utilizing the service. 3. An annual update shall be prepared of the capital improvement program for the
management, programming, and budgeting of needed improvement projects (see Ten Year Project List). In considering any new project, the Council will evaluate its priority based on project costs, available funds, and priorities of other community projects.
4. An application, fee, and processing procedure shall be continued which assigns
financial cost of any and all related project consideration to the applicant. 5. Special assessments and/or special taxing districts shall be concepts utilized in
assigning costs for public improvements to benefiting parties. 6. Federal and State programs shall be monitored for the possibility of assisting the
City with implementing the Comprehensive Plan and meeting the needs of the community.
7. The City will promote new growth consistent with its adopted Land Use Plan to
expand its employment base and to grow its commercial and industrial tax base.
______________________________________________________________________ Albertville 2030 Visioning Study 47
TEN YEAR PROJECTS I-94 / County Road 19 Interchange County Road 19 North 50th Street Improvements / Sewer and Water 2012 Overlay and Seal Coat Main Street Ice Arena Expansion Waste Treatment Plant (Phosphorous Reduction) Waste Treatment Plant (Pond Removal) Waste Treatment Plant (Digester/Reed Beds) Green Haven Utility Improvements 57th Street Storm Sewer Improvements Barthel Industrial Park Ditch County Ditch 9 Improvements / Clean Out Fiber Optic Connections Between City Hall, Public Works, Fire Hall, Ice Arena New Community Playfield North of Waste Treatment Plant Economic Development Incentives Sewer and Water Extension to Golf / Jason Redevelopment Trail Improvements along County Road 18 Stormwater Pond Cleaning
______________________________________________________________________ Albertville 2030 Visioning Study 48
PROJECT PRIORITIES The Vision Committee established the following project priorities. The City shall introduce these priorities into the City planning and budgeting efforts as a means of pursuing their implementation.
Project Priorities From May Visioning Workshop Votes 14 Complete I-94/County Road 19 freeway access Phases I and II 13 Extension of water under County Road 18 to the golf course 8 Develop senior housing with services 7 Maintain small town character of Albertville 6 Keep guided commercial and industrial land use patterns and zoning as is 4 Clean up yards and outdoor storage in residential neighborhoods 4 Redevelop Main Avenue homes north of 57th Street to commercial uses 3 Maintain high standards for commercial buildings through architecture, site
design, landscaping and screening 3 Upgrade County Road 19 between the Outlet Mall and 70th Street 3 Construct a trail along County Road 18 between Kahl Avenue and Janson
Avenue to provide access to the High School 2 Upgrade Albertville wastewater treatment facility to address phosphorous
removal 2 Investigate programs or ordinances to maintain aging housing stock 2 Investigate means to reduce SAC/WAC charges to promote economic
development of hospitality businesses
______________________________________________________________________ Albertville 2030 Visioning Study 49
LAND USE PLAN The Vision Committee reviewed the City’s Existing and Proposed Land Use Plan for the community to identify potential desired changes. The attached Proposed Land Use Map reflects the Vision Committee’s recommendations. With the adoption of the Vision Study, the Proposed Land Use Map will be the guide for all future community development. The Proposed Land Use Map illustrates street concepts for various locations within the City. These street layouts are conceptual only and may change in location and design upon site developments.
-0 4,000 8,0002,000 Feet
Sources: Northwest Associated Consultants, DNR, Wright County, City of Albertville.
Note: For planning purposes only. January 18, 2010.
City of AlbertvilleProposed Land Use Plan
Proposed Land Use PlanAgriculture/Rural
Low Density Residential
Medium Density Residential
High Density Residential
Commercial
Business Park
Industrial
Public/Semi-Public
Park/Open Space
Golf Course
parcels
Albertville City Limits
Water
MUDLAKE
SCHOOLLAKE
SWAMPLAKE