2012 South Peace Invasive Plant Management Area (SP IPMA)

Contractor Summary

11/22/2012

3810 – 18th AVENUE • PRINCE GEORGE, BC • V2N 4V5 • PH: 250.564-0383 • FX: 250.562-4885www.srgi.ca

Presented by: Mike Deliman & Eric Nijboer, B.I.T.

Page 2: 2012 South Peace Invasive Plant Management Area (SP IPMA) Contractor Summary 11/22/20121 3810 – 18 th AVENUE PRINCE GEORGE, BC V2N 4V5 PH: 250.564-0383

2

Became active in the Invasive Plant Council of BC in 2004.

Began managing invasive plants in 2005 beginning with the Northern Interior Forest Region (NIFR).

Began managing IPMAs in 2006 for the NWIPC and NEIPC.

For the NWIPC, Spectrum now manages the Prince George IPMA.

Spectrum currently manages the South Peace IPMA for the Northeast Invasive Plant Committee (Peace River Regional District).

Besides working with the Invasive Plant Councils of our area we also manage noxious weeds for Municipalities, Oil and Gas & Forestry Companies.

11/22/2012

Brief History of Spectrum’s Invasive Plant Projects:

Figure 1 Claudius deadheading a giant common tansy plant down the

Murray FSR (10/17/2012).

3810 – 18th AVENUE • PRINCE GEORGE, BC • V2N 4V5 • PH: 250.564-0383 • FX: 250.562-4885www.srgi.ca

Page 3: 2012 South Peace Invasive Plant Management Area (SP IPMA) Contractor Summary 11/22/20121 3810 – 18 th AVENUE PRINCE GEORGE, BC V2N 4V5 PH: 250.564-0383

3

Challenges Faced in 2011

Crassiar Creek FSR

Sukunka FSR

Heritage Highway 52

Heritage Highway 52

11/22/2012

Page 4: 2012 South Peace Invasive Plant Management Area (SP IPMA) Contractor Summary 11/22/20121 3810 – 18 th AVENUE PRINCE GEORGE, BC V2N 4V5 PH: 250.564-0383

4

Extremely dry and warm growing season.

Long summer and late fall meant several IP species underwent multiple late germinations.

Began field work on June 11th and completed field work on October 19th.

11/22/2012

3810 – 18th AVENUE • PRINCE GEORGE, BC • V2N 4V5 • PH: 250.564-0383 • FX: 250.562-4885www.srgi.ca

2012: Another Extreme Season in the Peace..

Figure 2 Claudius disposing of bagged invasive plants at the Chetwynd

landfill (10/19/2012).

Page 5: 2012 South Peace Invasive Plant Management Area (SP IPMA) Contractor Summary 11/22/20121 3810 – 18 th AVENUE PRINCE GEORGE, BC V2N 4V5 PH: 250.564-0383

511/22/2012

3810 – 18th AVENUE • PRINCE GEORGE, BC • V2N 4V5 • PH: 250.564-0383 • FX: 250.562-4885www.srgi.ca

3% 5%

92%

Data Entry

Administration

Inventory & Treatment

Figure 2 Funding distribution by activity for the South Peace IPMA in 2012.

Page 6: 2012 South Peace Invasive Plant Management Area (SP IPMA) Contractor Summary 11/22/20121 3810 – 18 th AVENUE PRINCE GEORGE, BC V2N 4V5 PH: 250.564-0383

611/22/2012

3810 – 18th AVENUE • PRINCE GEORGE, BC • V2N 4V5 • PH: 250.564-0383 • FX: 250.562-4885www.srgi.ca

MoTI57%MoFLNRO

17%

MoFLNRO Monkman Park14%

PRRD10%

Bear Mountain Windfarm, CN Rail, etc.1%

BC Hydro0.01%

District of Tumbler Ridge2%

Figure 3 Funding allocation by partner for the South Peace IPMA in 2012.

Data Entry34%

Administration50%

Inventory5%

Treatment11%

Figure 4 Funding allocation for the PRRD by activity in 2012.

Page 7: 2012 South Peace Invasive Plant Management Area (SP IPMA) Contractor Summary 11/22/20121 3810 – 18 th AVENUE PRINCE GEORGE, BC V2N 4V5 PH: 250.564-0383

7

3810 – 18th AVENUE • PRINCE GEORGE, BC • V2N 4V5 • PH: 250.564-0383 • FX: 250.562-4885www.srgi.ca

11/22/2012

Where the Weeds Were..

Dalmatian toadflax at East Pine Hill.

Common tansy along Highway 52 and down the Murray FSR.

Scentless chamomile along Highway R.O.W.

Spotted knapweed in the Peace River Hill MoTI Gravel Pit.

Marsh plume thistle along railway tracks on Elevator Road in Pouce

Coupe.

Page 8: 2012 South Peace Invasive Plant Management Area (SP IPMA) Contractor Summary 11/22/20121 3810 – 18 th AVENUE PRINCE GEORGE, BC V2N 4V5 PH: 250.564-0383

811/22/2012

3810 – 18th AVENUE • PRINCE GEORGE, BC • V2N 4V5 • PH: 250.564-0383 • FX: 250.562-4885www.srgi.ca

02468

1012141618

0

0.005

0.01

0.015

0.02

0.025

0.14

4

0.16

17.0

216

0.84

0000

0000

0000

1

0.18

5

10.8

61

0.11

2.73

35 5.28

84

4.03

67

2.62

0.01

93

0.00

61

0.00

01

0.00

0900

0000

0000

000

2

0.00

45

0.01

26

0.00

01

0.60

25

10.5

103

0.01

5

0.01

25

Area Chemically Treated (Left Y-Axis) Area Mechanically Treated (Left Y-Axis)Area Chemically Treated (Right Y-Axis) Area Mechanically Treated (Right Y-Axis)

Invasive Plant Species

Hec

tare

s (h

a)

Hectares (ha)

Figure 5 Total areas chemically and mechanically treated in hectares by species in the South Peace IPMA in 2012.

Page 9: 2012 South Peace Invasive Plant Management Area (SP IPMA) Contractor Summary 11/22/20121 3810 – 18 th AVENUE PRINCE GEORGE, BC V2N 4V5 PH: 250.564-0383

911/22/2012

3810 – 18th AVENUE • PRINCE GEORGE, BC • V2N 4V5 • PH: 250.564-0383 • FX: 250.562-4885www.srgi.ca

Areas of Concern for 2013:1) Priority of IP species (e.g. not all category B IPs created equal).

Creation of a standard operating procedure for each IP species (e.g. when to retire an IP site, preferable IP management strategies, etc.).

2) Communication between MoTI maintenance contractors and the IPMA contractor in regards to mowing and brushing activities.

3) Hawkweed infestations down the Murray and OJ Main FSRs, within Monkman Provincial Park and along Highway 52.

4) Scentless chamomile along highway and FSR right-of-ways.5) Dalmatian toadflax at East Pine Hill and the misidentification of

toadflax species by previous surveyors.6) Emergence of common tansy along Highway 52 east of Tumbler Ridge

and down the Murray FSR.7) The Peace River Hill gravel pit spotted knapweed infestation.8) Elevator Road marsh plume thistle in Pouce Coupe.

Page 10: 2012 South Peace Invasive Plant Management Area (SP IPMA) Contractor Summary 11/22/20121 3810 – 18 th AVENUE PRINCE GEORGE, BC V2N 4V5 PH: 250.564-0383

10

Questions?Email: [email protected] / [email protected]