Upload
kmkhizir-ahmed
View
216
Download
0
Embed Size (px)
Citation preview
7/29/2019 2012 EEI Global Results Executive Summary
1/14
2012 EErgy EffEydaor: gLoBaL rEsLs
June 2012
Executive summ
7/29/2019 2012 EEI Global Results Executive Summary
2/14
introduction
he 2012 lbl Ene Ecienc nict (EE) uve hihliht ten npvie new iniht int the ttitue n pctice lbl executive
n builin wne epnible ene mnement n invetmenteciin in inutil, cmmecil n public-ect builin. hi ixthnnul uve tck thei piitie, invetment pln, n nncil evlutincitei w t unetn wht pject the e implementin, wht iivin thei ctin, n wht bie the ce.
he 2012 EE uve w pne b the ntitute Builin Ecienc in ptnehip with the ntentinl
fcilit Mnement acitin, the bn Ln ntitute, n 16 in-cunt tteic ptne. he uve,
cuin n ix ein n itibute in u lnue, ew 3,479 epnent (fiue 1).
Figure 1. 2012 Energy Efciency Indicator Survey Scope
rEsodEs rErEsE arEd JoB fos,MarE sEors ad orgazao szEs
he uve w cnucte nnmul, n-line, uin ve week in Mch n apil 2012. quli,
uve epnent mut meet tw citei:
he mut hve buet epnibilit thei nitin cilitie.
hei jb utie mut inclue eviewin mnitin ene ue n/ ppin ppvin
inititive t mke thei nitin cilitie me ecient.
ntitute Builin Ecienc www.ntituteBE.cm
253
369
396
944
230
1,139
7/29/2019 2012 EEI Global Results Executive Summary
3/14
he 2012 uve epnent cme m viet jb le n mket ect n m nitin
viu ie:
Job function: Builin wne cmpie 16 pecent, -level 22 pecent, vice peient 22 pecent,
cilit mne 19 pecent, n the 21 pecent.
Market sector: suve epnent wee cteie int 3 clute epnent: cmmecil
builin uch nncil intitutin, etil, n ce builin cntinue t be the let ptin
the uve epnent t 55 pecent; executive m inutil cilitie cmpie 21 pecent
the epnent, n public intitutin uch venment, hpitl n chl wee 24 pecent
the uve epnent in 2012.
Facility space: Le thn 50,000 que eet, 21 pecent (mll ce builin); 50,000 t 500,000
que eet, 31 pecent; me thn 500,000 que eet, 48 pecent (le univeit cmpu).
ErEs EErgy MaagEME ad EsMEs EErgy EffEy oEs o rsE
n ll ein uvee, inteet in ene mnement incee ve peviu e. glbll in 2012, 85
pecent epnent i ene mnement w extemel ve imptnt t thei nitin,
veu 70 pecent in 2011 n 60 pecent in 2010.
Past years investments in clean energy
ove ixt pecent lbl epnent i thei nitin wee invetin in ene ecienc n
ve thi them epte invetin in enewble ene pject. (fiue 2). amn ein, the nite
stte n n hwe bth the let pptin nitin invetin in ene ecienc
n the mllet pptin invetin in enewble. Eupe, autli n Bil hwe the mt even
iviin between the tw tpe pject.
Figure 2. Investments in energy efciency and renewables in past year
www.ntituteBE.cm ntitute Builin Ecienc
80%
70%
60%
50%
40%
30%
20%
10%
0%Global
Invested inenergy efficiency
Invested in
renewable energy
36
Europe
53
42
US/Canada
74
25
China
72
45
India
61
43
Australia
52
35
Brazil
47
40
63
7/29/2019 2012 EEI Global Results Executive Summary
4/14
Planned uture investments in clean energy
repnent in hin (81 pecent) n ni (74 pecent) inicte tht the wee in t incee ene
ecienc enewble ene invetment in the next 12 mnth. glbll, jut ve hl epnent
i the plnne t incee uch invetment (fiue 3).
Figure 3. Plans to invest in energy efciency and renewables in the next year
E raE sEor oEs o sE EErgy ad arBorEdo goaLs, ad rEors rEasEd EsMEs
LaEd LEa EErgy E E ELE Mosonitin in the inutil n cmmecil ect cntinue t et intenl n public euctin l
ene n cbn. Eiht pecent inutil n 72 pecent cmmecil nitin et uch
l ene; 72 n 63 pecent et l cbn.
ivte-ect nitin (61 pecent inutil, 52 pecent cmmecil) wee me incline thn
intitutinl (46 pecent) t be plnnin n incee in ene ecienc n enewble ene invetment
in the next e (fiue 4).
Efciency actions taken
repnent epte thei nitin tk wie viet ene ecienc ctin in the lt12 mnth. n ll, 96 pecent epte unetkin t let ne impvement ctin. he mt cmmn
ctin tken wee lihtin upe (69 pecent), a cntl impvement (61 pecent) n wte
ecienc ctin (50 pecent).
ntitute Builin Ecienc www.ntituteBE.cm
Global
Dont know
Decrease
Stay the same
Increase
Europe US/Canada China India Australia Brazil
52%
31%
9%
39%
36%
15%
46%
39%
4%
81%
15%
4%
74%
13%
7%
46%
33%
9%
57%
23%
13%
100%
90%
80%
70%
60%
50%
40%
30%20%
10%
0%
7/29/2019 2012 EEI Global Results Executive Summary
5/14
Figure 4. Plans to invest in clean energy by building market sector
Technology expectations over the next decade
dieent lbl ein h ieent expecttin but the n-ite technlie tht will hw the
etet incee in mket ptin ve the next ten e. glbll, the tp thee technlie wee:
lihtin technlie (37%), mt builin technl (29%) n vnce builin mteil (26%). sl
l theml ppee in the tp thee eve ein utie the nite stte n n.
Figure 5. On-site technology expectations by region
www.ntituteBE.cm ntitute Builin Ecienc
Dont know
Decrease
Stay the same
Increase
Industrial Commercial Institutional
61%
24%
7%
52%
31%
10%
46%
34%
8%
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
Lighting technologies
Smart building technology(integrated systems)
Advanced building materials(windows, roofing)
Solar thermal
Solar PV
7/29/2019 2012 EEI Global Results Executive Summary
6/14
EErgy os sags ad goErME ad LyEEs raEd as E o Moaors of EErgyEffEy dEsos
ac the b in the ein uvee, ene ct vin emine the tp mtivt ene
ecienc eciin-mkin. gvenment n utilit incentive n ebte nke ecn in the .s. nn, autli n Bil. Ene ecuit nke ecn in Eupe n hin, n enhnce bn
public ime nke ecn in ni. nteetinl, autlin epnent ve thi-plce nkin t
the pwe ene ecienc enhncement t incee builin et vlue n hin nke exitin
venment plic it thi mt inicnt ive (fiue 6).
Figure 6. Drivers o energy efciency decisions by region
Impact o energy policies on improving building energy efciency
a new EE uve quetin exple epnent peceptin ene plicie tht wul hve the
mt impct n impvin ene ecienc in builin. ee (fiue 7), the epne iee between
evelpe ein (.s. n n, Eupe, autli) n emein ein (Bil, hin, ni).
n ll ein, tx incentive n ebte ene ecienc meue wee the mt ve plic,
lthuh the in evelpe ein uppte uch meue me tnl thn the in emein
ein (37 pecent v. 22 pecent). repnent in emein ein elt tht tx incentive, ticte
builin ce n equipment tn, n ptin een ppil tn wul hve nel
equl likelih n impvin ene ecienc in builin.
ntitute Builin Ecienc www.ntituteBE.cm
Drivers of
efficiency
Europe India ChinaUS/
Canada Australia Brazil
Energy cost savings
Government/utilityincentives/rebates
Enhanced brand orpublic image
Increasing energysecurity
Greenhouse gasreduction
Existing policy
Increasing assetvalue
1
3
2
1
2
3
1
2
3
1 1 1
2 2 2
3
3
3
7/29/2019 2012 EEI Global Results Executive Summary
7/14
Figure 7. Energy policies and their impact: Developed vs. emerging regions
fag ssEs dELEd sLgLy as BarrErso EErgy EffEy, LE oEr oEr sagsad ErforMaE rEasEd
hile qute epnent cite lck unin thei tp bie t ene ecienc pject, lck
unin ecline lihtl in pminence, m 30 pecent in 2011 t 26 pecent in 2012. Menwhile,
uncetint but vin n pemnce in ene ecienc pject incee in imptnce, m
12 pecent t 15 pecent (fiue 8).
Figure 8. Barriers to energy efciency investment: 2012 vs. 2011
www.ntituteBE.cm ntitute Builin Ecienc
22%
17%
20%
12%
11%
18%
0% 10%5% 20%15% 30%25% 40%35%
Mandatory energy-use disclosure9%
Adoption of greenappraisal standards
10%
Putting a price on carbon emissions 11%
Stricter building codes andequipment standards
16%
Low-interest financing
for energy updates
18%
Tax credits/incentives or rebates forimplementing EE measures
35%
Developed economies
Emerging economies
8%
0% 10% 20% 30% 40%
Landlord/tenantsplit incentives
9%
No organizational ownership 10%
Lack of awareness 10%9%
Lack of technical expertise 11%9%
Uncertainty regardingsavings/performance
15%
12%
Insufficient payback/ROI 17%19%
Lack of funding 26%30%
2012
2011
Average AllowablePayback
2011 2012
3.7 yrs 3.4 yrs
8%
7/29/2019 2012 EEI Global Results Executive Summary
8/14
ntitute Builin Ecienc www.ntituteBE.cm
Importance o barriers in dierent regions
eviu EE uve hve ientie ve ke bie t ene ecienc invetment (fiue 9):
Lck awareness pptunitie ene vin.
Lck technical expertise t ein n cmplete pject.
Lck certainty tht pmie vin will be chieve.
nbilit pject t meet the nitin nancial payback criteria.
Lck available capital invetment in pject.
Figure 9: Barriers to pursuing energy efciency projects
he 2012 EE uve un tht ieent ein cntinue t hw ieence in the bie the ce(fiue 10). n evelpe ein the .s. n n, autli n Eupe, lck unin w the
etet bie, while epnent in emein ein ce me tule with wene, technicl
expetie, n cetint vin.
Figure 10. Barriers to energy efciency by region
Awareness Technicalexpertise
Certaintyof savings
Financialcriteria
Availablecapital
11% 11% 16% 17% 17%
8% 23% 16% 14% 14%China
Brazil
17% 18% 15% 14% 15%India
11% 10% 18% 14% 23%Europe
13% 9% 18% 14% 29%Australia
7% 6% 12% 21% 37%US/Canada
7/29/2019 2012 EEI Global Results Executive Summary
9/14
orgazaos aLyg EErgy MaagEME BEs raEsoo E Mos aos o MroE BLdg EffEy
a new quetin exple the extent t which epnent wee pplin plnne t ppl et
ecnie ene mnement bet pctice. he pctice epnent mt ten cite bein
pplie plnne wee eull tckin n nlin ene t, meuin n veiin enevin m pject, n pemin ene uit (fiue 11). sinicntl, 31% t 41% the lbl
mket i plnnin t implement ech the ene mnement pctice lite uetin tht even
thuh me cmpnie hve implemente ene mnement pctice, thee i till inicnt wth
t chieve in ene mnement.
Figure 11. Energy management best practices implemented
Energy management best practices and actions
he uve un tht c the b, nitin tht h pplie n iven ene mnement
bet pctice h tken uhl thee time mn ene ecienc ctin the tht h nt
implemente tht pctice. he ieence in ctin tken wee the etet the bet pctice
tckin n nlin ene t, meuin n veiin ene vin, pemin ene uit, n
cetin ctin pln t implement pject.
futheme, epne inicte tht the me ene mnement bet pctice n nitin
pplie, the me ene ecienc ctin it tk, n the ete it plnne incee in invetment in
ene ecienc n enewble ene ve the next 12 mnth (fiue 12). weve, ix pctice eemt be the pint iminihin etun ben which thee i n hit in plnne invetment level.
www.ntituteBE.cm ntitute Builin Ecienc
Staffed energy management team
0% 20%10% 40%30% 60%50% 80% 90%70% 100%
Already implemented Planning to implement Neither
35%
Dedicated capital budget for energy projects 39%
Benchmarked facility energy performance 41%
Communicated energy policy & goals 43%
Created an action plan to implement projects 44%
Performed energy audit 48%
Measured and verified energy project savings 50%
Tracked and analyzed energy data 57% 12%
14%
32%
22%
21%
20%
15%
16%
33%
39%
38%
37%
41%
36%
36%
31%
7/29/2019 2012 EEI Global Results Executive Summary
10/140
Figure 12. Connecting management practices, investments and actions
Frequency o tracking and analysis o energy data
he 2012 uve hwe ntble incee ve 2011 in the numbe epnent wh epte meuin
n ecin ene t t let weekl (56 pecent veu 43 pecent) n eviewin n nlin tht
t t let weekl (20 pecent v. 15 pecent). hi i inicnt n pitive hit, ince equent t
nli i ne the ene mnement pctice cite with ete ene ecienc ctin.
ErEs grEE ad g ErforMaE BLdgsgrog arod E orLd
repnent inteet in een builin cntinue t w. glbll, 44 pecent (veu 35 pecent in 2011)
i thei nitin plnne t puue vlunt een builin cetictin exitin builin in
the next e. ft-thee pecent plnne t puue cetictin new cntuctin (veu 39 pecent
in 2011). ln t cetiin exitin builin e n p with cetiin new cntuctin. sixt pecent
epnent i the h t let ne cetie een builin.11 globally, some uncertaintystill exists about the
denition o certied
reen buildins and how
respondents understood
it. for example, some
may have equated reen
buildin certication with
compliance to national
enery eciency buildin
codes.
ntitute Builin Ecienc www.ntituteBE.cm
80%
70%
60%
50%
40%
30%
20%
10%
0
20
18
16
14
12
10
8
6
4
2
00 1
41%
4.85.7
7.4
9.4
12.6
14.3
16.317.0
48% 48%
57%
62%
68%66%
63%
18.068%
2 3 4 5 6 7 8
Percent planning to increaseefficiency and renewableinvestment in the next year
Average number ofmeasures implemented
Total number of energy management practices in place
Numberofmeasuresimplem
ented
7/29/2019 2012 EEI Global Results Executive Summary
11/14
Figure 13. Plans to pursue green building certifcation
Interest in leasing high perormance ofce space
nteetinl, nitin tht plnne t puue een builin cetictin in the next e wee inicntl
me likel t v thee pctice elte t lein een ( hih-pemnce) ce pce.
Figure 14. Leasing practices or green/high-perormance ofce space
www.ntituteBE.cm ntitute Builin Ecienc
2011
35%
39%
44% 43%
2012
50%
45%
40%
35%30%
25%
20%
15%
10%
5%
0%
Existing buildings
New construction
0% 10%5% 20%15% 30%25% 40%35%
Corporate policy to only leasespace in a certified green building
Enter into green leases that alignbuilding owners and tenant incentives
Build out tenant space to highperformance (above code) standards
Willing to pay a premium for spacein a certified green building
25%
7%
24%
13%
7/29/2019 2012 EEI Global Results Executive Summary
12/14
Institute or Building Efciency www.InstituteBE.com
oLsos
repnent in the 2012 lbl EE uve in enel hwe incein inteet in mnin ene, invetin
in ene ecienc n enewble ene, n puuin een builin. n pticul, the t inicte:
repnent lbll pln t incee invetment in ene ecienc; the utie the .s. n
n inicte me inteet in enewble ene thn .s. n nin executive. he cmmecil n inutil ect tk the le in ettin ene n cbn euctin l n
in plnnin incee ene ecienc n enewble ene invetment.
gvenment n utilit incentive wee the mt ve plicie wlwie encuin ene
ecienc; emein ecnmie ve cmpble weiht t incentive, builin ce n equipment
tn, n een ppil.
onitin utiliin ecnie ene mnement bet pctice tene t invet me in
ene ecienc n tke me ctin t impve ecienc.
ntitute Builin Ecienc www.ntituteBE.cm
7/29/2019 2012 EEI Global Results Executive Summary
13/14
www.ntituteBE.cm ntitute Builin Ecienc
a yo o or gLoBaL arErs
ad or -ory sraEg arErs
7/29/2019 2012 EEI Global Results Executive Summary
14/14
2012 Jhnn ntl, nc. 444 th pitl st., suite 729, hintn d 20001 inte in sa
he ntitute Builin Ecienc i n inititive Jhnn ntl pviin inmtin n
nli technlie, plicie, n pctice
ecient, hih pemnce builin n mt
ene tem un the wl. he ntitute
levee the cmpn 125 e lbl
expeience pviin ene ecient lutin
builin t uppt n cmplement the et
nnpt nitin n inut citin.
he ntitute cue n pcticl lutin tht e
innvtive, ct-eective n clble.
u e inteete in cntctin the uth,
enin with the ntitute Builin Ecienc,
plee emil u t: [email protected].
ntentinl fcilit Mnement acitin
(fMa) i the wl let n mt wiel ec-
nie intentinl citin peinl
cilit mne, upptin me thn 19,000
membe in 78 cuntie. f me inmtin, viit
the fMa pe m www.im..
bn Ln ntitute (L) i eech n euctin
nitin with membe in 95 cuntie, epe-
entin the entie pectum ln ue n el
ette evelpment icipline wkin in pivte
entepie n public evice. f me inmtin,
viit www.L..