29 April 2011
QUARTERLYACTIVITIES
REPORT
March2011
HighlightsIronOreFurtherdrillingunderwaytotargetMineralResourceandOreReserveupgradeforMt
Webber
CoalRevised
Coal
Resource
Estimate
(JORC
compliant)
of
13.4
million
tonnes
of
high
grade
thermalcoalatTabalongCoalProject
MiningapprovalsprocesscontinuesatTabalongCoalProjecttotargetproductioninlate
2011
LithiumDrillholeassaysfromthePilgangooraLithiumprojectintersectedfurtherwidezonesof
nearsurfacemineralisedspodumenepegmatite.
DrillingprogramcommencedinJanuary2011toestablishtheextentandtheresource
potentialofthishighlymineralisedspodumenepegmatite.
AlturaMiningLimited AustralianProjectLocations
8/3/2019 2011 04 29 Quarterly Activities Report Mar Qtr 2011 FINAL Circ
2/14
AlturaMiningLimitedQuarterlyActivitiesReportMarch2011
Page2of14
IRONOREMTWEBBER(PilbaraWesternAustralia)30%AlturaMiningLimited,70%AtlasIronLimitedTheMtWebberIronOreProjectislocated150kilometressouthsoutheastofPortHedlandinthe
worlds
premier
iron
ore
province,
the
Pilbara.
It
is
approximately
40
kilometres
east
of
the
FortescueMetalsGrouprailway lineand immediatelynorthofWoodstockRoad,whichconnects
MarbleBartotheGreatNorthernHighway(seeFigure1).
Altura has a 30% interest in the Mt Webber Iron Ore DSO project (and five other Pilbara
tenementsthatformpartofthejointventureagreement)inthePilbara. AtlasIronisAlturasjoint
venturepartnerforthisproject. Underthetermsoftheagreement,Alturaremainstheownerof
theMtWebberandothertenements,totalling333squarekilometres.
Figure1MtWebberDSOProjectLocation
8/3/2019 2011 04 29 Quarterly Activities Report Mar Qtr 2011 FINAL Circ
3/14
AlturaMiningLimitedQuarterlyActivitiesReportMarch2011
Page3of14
During the quarter drilling recommenced on the Fender and Gibson deposits under the
supervisionofjointventuremanagingpartnerAtlas Iron.Mobilisationof therigwasdelayedby
weather and mechanical problems which were exacerbated by the bad weather interrupting
supplyofspareparts.DrillingwastheninterruptedinmidMarchbyfurthermechanicalproblems,
andareplacementrighassincebeenmobilisedtositetocontinuetheprogram.
Prior to mid March a total of 822 metres of Reverse Circulation (RC) was completed. The
remainingprogramconsistsof40holes totallingapproximately2,000metres.The remaining40
drillholeswillcomplete the40metreby40metre infilldrillingatFenderandGibsonandbring
thosetwodepositstothesamelevelofresourceconfidenceasIbanez.
Provisionremainsforathirdroundofinfilldrillingatallthreeareas(Ibanez,FenderandGibson
seeFigure2)toclosethedrillspacingto40metresby20metresbutthatprogramisexpectedto
becompletedinthenextfinancialyear.Currentplansalsoincludecompletionofpitoptimisation
alternatives to feed into the overall development strategy including Atlas Turner River Hub
feasibilityprocess.
The results from thisprogramwillbecompiledand reviewedbyAtlasand reportedas soonas
practicableuponcompletionofthedrilling,assayingandtesting. Theprogramisalsoexpectedto
deliverahighrateofresourcetoreserveconversionaspertheearlierdrillprogramcompletedin
mid2010.
Figure2Reserve,ResourceandProspectLocation,MtWebberDSOProject
8/3/2019 2011 04 29 Quarterly Activities Report Mar Qtr 2011 FINAL Circ
4/14
AlturaMiningLimitedQuarterlyActivitiesReportMarch2011
Page4of14
COALTABALONG(SouthKalimantanIndonesia)ThermalCoal(100%AJM)The Tabalong Coal Project consists of two (2) Mining Licences (IUPs) in the province of South
Kalimantan
on
the
island
of
Borneo
(see
Figure
3).
Currently
both
IUPs
are
granted
for
exploration
purposes and Altura is seeking the necessary approvals to have them granted for operation
productionstatus.
During thequarterareviewoftheTabalongCoalProjectwasconductedaspartof internaldue
diligenceandmineplanningprocesses.ThereviewestimatedarevisedtotalJORCcompliantCoal
Resourceof13.4milliontonnesofhighgradethermalcoal.Thepreviousresourceassessmentwas
completed inMay2008and containedanestimated total resourceof11.3million tonnes.The
resultantvarianceisduetoupdatedseamcorrelationswithinthegeologicalmodelandtreatment
ofcoalpartingswithinthecoalseams.
Figure3TabalongCoalProjectLocation
8/3/2019 2011 04 29 Quarterly Activities Report Mar Qtr 2011 FINAL Circ
5/14
AlturaMiningLimitedQuarterlyActivitiesReportMarch2011
Page5of14
ApprovalsProcessThe IndonesianCentralGovernment introduced anewMining Law inDecember2008. Existing
mining permit holders such asAlturawere required to continue themining approvals process
under the new law. The new law was not invoked until a specific set of regulations were
introducedtoapplythelaw,andthisprocesswascompletedinmid2010.
AlturahassuccessfullyconvertedtheoriginalTabalongExplorationPermits intothenewformof
tenure(IUPexploration)andcontinuedtoseekapprovalofthe2xIUPstoOperationProduction
status. The prerequisite documentation required for approval, consists of an Environmental
ImpactStatementandtheGovernmentFeasibilityStudy.BothhavebeenacceptedbytheRegency
Councillorand theMinesDepartment.Currently theMineRehabilitationandReclamationplans
awaitapprovalinordertoprocesstheapplicationfurther,andthisisexpectedearlyinQ22011.
Subsequent toOperationProductionapproval theCompanywillbe required toobtainaPinjam
Pakai(Permittouseforestryland)fromtheMinisterofForestrypriortocommencementhowever
theproject
does
not
cover
any
protected
forestry
areas.
The
issue
of
these
permits
has
been
quite
slowandassuchnocompletiontimelinecanbeconfirmed.
UnderthenewMiningLawnonewminingpermitscanbeappliedfor,astheyaretobeofferedon
atenderbasisfromthegovernment,andtodatenonehavebeenissued.Alturahascontinuedto
seek out and review further coal opportunities to support the existing tenement holding in
Indonesia.
CoalResourcesThe
Tabalong
Project
is
comprised
of
2xIUPs
held
by
Suryaraya
Permata
Khatulistiwa
(SPK)
the
northernmost tenement and Suryaraya Cahaya Cemerlang (SCC) the southernmost tenement
whichissplitintoBlocks1and2(seeFigure4).BothIUPswereissuedon31December2009and
arevalid foraperiodof6years(exploration).SCCBlock1hasnotbeen fullyexplored,although
coal isknown toexist in thisblock.Currentlyanexplorationprogram isbeingplanned forSCC
Block1andexpectedtobecompletedinQ42011.
ExplorationtodatehasbeenconductedinhousebyPTAlturaIndonesia(whollyownedsubsidiary
ofAlturaMiningLimited).ThefollowingtabledetailsthecompleteddrillingattheTabalongCoal
Project.
Table 1 - Completed Drill Holes & Metres
No.ofHoles Totalm's No.ofHoles Totalm's No.ofHoles Totalm's
SPK 205 10,550.00 26 800.00 231 11,350.00
SCC 90 4,228.00 12 316.50 102 4,544.50
TOTAL 295 14,778.00 38 1,116.50 333 15,894.50
*PARTLYCOREDHOLES theseincludebothopenholeandcoremetres;seebelowforabreakdownonthesemetres
SPK
SCC
TOTAL
TOTALm's
11,246.27
4,511.41
15,757.68
103.73 11,350.00
33.09 4,544.50
136.82 15,894.50
OPENHOLES PARTLYCOREDHOLES* ALLHOLESLEASEAREA
LEASEAREA OPENHOLEm's COREm's
8/3/2019 2011 04 29 Quarterly Activities Report Mar Qtr 2011 FINAL Circ
6/14
AlturaMiningLimitedQuarterlyActivitiesReportMarch2011
Page6of14
Figure4TabalongCoalProjectIUPBlockLocations
8/3/2019 2011 04 29 Quarterly Activities Report Mar Qtr 2011 FINAL Circ
7/14
AlturaMiningLimitedQuarterlyActivitiesReportMarch2011
Page7of14
The JORC compliant Coal Resource estimate of 13.4 million tonnes comprises a Measured
Resource of 4.0 million tonnes, an Indicated Resource of 5.8 million tonnes and a further 3.6
milliontonnesof InferredResources.Thedepositcontainsa lowash(4.8%), lowsulphur(0.98%;
measured resource),highenergy (6,349kcal/kg; as receivedbasis) subbituminous coal. Table2
belowdetailsthebreakdownoftheCoalResourceestimatesandrelevantcategories.
Table2TabalongResourceEstimates
Note: TM=TotalMoisture%,IM=InherentMoisture%,VM=VolatileMatter%,FC=FixedCarbon%,TS=Total
Sulphur%,CV=CalorificValueinkilocaloriesperkilogram,RD=RelativeDensity.
ar=as
received
basis,
adb
=air
dried
basis,
daf
=dry
ash
free
basis
weightedaveragesnotprovidedforInferredResourcecategoryduetodatalimitations.
Table 3 (over) details the breakdown of the Measured Resources currently estimated for the
Tabalong Coal Project. Mining is planned to commence in the northernmost tenement (SPK)
wherethethicker(upto18metres)andhigherqualitycoalexistsmainlyconfinedtotheBseam
group.TheMeasuredResourcesofBseamseriescoals isestimatedat2.78milliontonnes.The
Bseriescoalshavesuperiorcoalqualityparameters (2.5%Ash,0.66%TotalSulphurand7,203
kilocalories/kilogramairdriedbasis).
TabalongCoal
Resources
indicate
ahighly
marketable
product
with
high
energy,
low
ash
and
low
tomedium sulphur characteristics. The larger proportion of theMeasured Resources (B series
seams)iscategorisedasIndonesianCoalIndex(ICI)Type1coal.Indexpricingforthiscoalasat15
April2011isUS$124.01pertonneFOBvesselwhichprovidesapromisingoutlookforTabalongas
itmovestoproduction.
Altura aims to develop Tabalong as a standalone operation initially at a planned annual
production rateof300,000 to400,000 tonnesperannumofpremium thermalgradecoal. The
locationoftheTabalongprojectalsolendsitselftosatellitedevelopmentofotherminingpermits.
The area consists of numerous other smaller resource areas that have the potential to be
operated
simultaneously
to
provide
increased
tonnages
and
blended
coal
products.
Altura
is
considering a number of potential adjacent projects that could be amalgamated into the
development.
COALIndonesiaandotherSouthEastAsiaDuring the quarter, Altura continued to source and review a number of other potential coal
acquisitions in Indonesia and other South East Asian targets. The Company will inform
shareholders and themarket if an agreement(s) can be reached and remains confident that a
suitablecoalproject(s)canbedeliveredin2011.
RESOURCE TONNES TM IM Ash VM FC TS CV_ar CV_adb CV_daf RD
MEASURED 3,989,000 16.4 7.7 4.0 40.7 47.4 0.98 6432 7097 8018 1.29
INDICATED 5,796,000 16.6 8.2 5.4 40.2 46.3 1.34 6292 6924 7979 1.31
9,785,000 16.5 8.0 4.8 40.4 46.7 1.19 6349 6994 7995 1.30
INFERRED 3,600,000
TOTAL 13,385,000
8/3/2019 2011 04 29 Quarterly Activities Report Mar Qtr 2011 FINAL Circ
8/14
AlturaMiningLimitedQuarterlyActivitiesReportMarch2011
Page8of14
SEAM TONNES TM IM Ash VM FC TS CV_ar CV_adb CV_daf RD
F1
F2
E1 29,000 16.3 4.9 6.6 39.3 48.7 1.29 6324 7174 8075 1.33
E2 19,000 14.0 4.4 3.2 42.0 50.5 1.31 6809 7569 8187 1.28
48,000 15.4 4.7 5.2 40.4 49.4 1.30 6516 7331 8119 1.31
D11
D1
D12
D21
D2 2,000 14.5 7.6 7.4 40.5 44.5 1.99 6230 6735 7920 1.33
D22 149,000 13.6 6.5 4.3 41.7 47.5 2.01 6585 7132 7990 1.31
151,000 13.6 6.5 4.3 41.7 47.5 2.01 6581 7128 7990 1.31
C11 119,000 15.2 7.4 3.9 41.6 47.2 1.55 6581 7184 8094 1.29
C1 45,000 16.4 10.2 4.4 40.9 44.5 0.95 6300 6763 7908 1.30
C12 375,000 13.1 7.5 11.5 38.0 41.4 1.41 6106 6488 7877 1.38
539,000 13.9 7.7 9.1 39.0 43.0 1.40 6232 6672 7929 1.35
C21
C2 467,000 15.4 6.1 6.9 40.3 46.5 2.01 6231 6917 7953 1.33
C22
467,000 15.4 6.1 6.9 40.3 46.5 2.01 6231 6917 7953 1.33
C3
C41
C4
C42
B11 55,000 14.4 6.7 1.5 41.6 50.2 0.56 6822 7439 8105 1.26
B1 907,000 18.1 8.7 2.5 40.8 48.1 0.81 6412 7147 8034 1.28
B12 133,000 13.9 7.3 1.6 41.3 49.8 0.50 6867 7393 8114 1.27
B 354,000 15.4 6.1 3.4 41.1 49.5 0.48 6589 7314 8076 1.27
B21 95,000 17.0 7.7 2.1 41.5 48.7 0.62 6553 7282 8067 1.27
B2 1,101,000 17.7 8.6 2.4 41.0 48.0 0.64 6459 7162 8030 1.27
B22 139,000 17.0 7.7 2.1 41.5 48.7 0.62 6553 7282 8067 1.27
2,784,000 17.2 8.1 2.5 41.0 48.4 0.66 6495 7203 8046 1.27
A1
A2
A3
AA
BB
3,989,000 16.4 7.7 4.0 40.7 47.4 0.98 6432 7097 8018 1.29
Subtotal
Subtotal
Subtotal
Subtotal
GrandTotal
Subtotal
Subtotal
Subtotal
Subtotal
Subtotal
Subtotal
Subtotal
Subtotal
Table3TabalongCoalProjectMeasuredResources
Note:TM
=Total
Moisture
%,
IM
=Inherent
Moisture
%,
VM
=Volatile
Matter
%,
FC
=Fixed
Carbon
%,
TS
=Total
Sulphur%,CV=CalorificValueinkilocaloriesperkilogram,RD=RelativeDensity.
ar=asreceivedbasis,adb=airdriedbasis,daf=dryashfreebasis
MeasuredResourceslimitedto150metredepthcutoff
AboutThermalCoalThermal coalforms the backbone ofworldwide energy supplieswith Indonesia now theworlds largest
exporterofthermalcoalproducts. Recentinnovationsincoalbeneficiationandcleancoaltechnologypoint
towardastrongfutureforcoaltoremainareliableenergygenerationcommodity.
8/3/2019 2011 04 29 Quarterly Activities Report Mar Qtr 2011 FINAL Circ
9/14
AlturaMiningLimitedQuarterlyActivitiesReportMarch2011
Page9of14
LITHIUMPILGANGOORA(WesternAustralia)Lithium,Tantalum(100%AJM)Drillingon thePilgangoora tenementsrecommenced in January2011withAlturausing itsown
Maxdrill
2000
drill
rig
and
in
house
crew
to
undertake
the
work.
Despite
wet
ground
conditions
in
Februaryduetorainassociatedwithcyclonicweather,Alturahasbeenabletocompleteeighteen
(18)ReverseCirculation(RC)holesfor1,286metresbytheendoftheMarchquarter.
Figure5DrillholeandCrossSectionLocations
Theresultsforthirteen(13)oftheseholeshavebeenpreviouslyreported(seeASXreleasesdated
2March 2011 and 15March 2011) and the significant results from these holes and the initial
drillingprogramaresetoutinTable4overleaf.
The thickness of the mineralised pegmatites and the attractive grades being returned at such
shallowdepthsisverypromising.Potentiallytheprojectcoulddeliververylowwastetooreratios
should a resource of sufficient size be identified. The favourable result from the initial
metallurgicaltestworkcertainlyranksthisprojecthighly incomparisontocurrentandemerging
hardrocklithiumproducers.
AlturawillcontinueitsexplorationdrillingprogramthroughQ22011utilisingtheinhouseAltura
drillandcrew.Oncethebroadoutlineandgeometryofthepegmatiteshavebeenidentifiedinfill
drillingwillbeundertakentoincreasethelevelofconfidenceinbothinthepotentialresourceand
thelithium
grades.
8/3/2019 2011 04 29 Quarterly Activities Report Mar Qtr 2011 FINAL Circ
10/14
AlturaMiningLimitedQuarterlyActivitiesReportMarch2011
Page10of14
Table4PilgangooraDrillingResultstoDateAssaysgreaterthan0.3%Li2OHoleNo. EastGDA94
(m)North
GDA94(m)
Dip/Az(Deg.) From(m) To(m) Thickness(m) Li2O%
PRC026 697,368 7,668,677 60/340 0 5 5 1.17%6
23
17 1.45%[email protected]%(6mto13m)
PRC027 697,380 7,668,675 60/042 0 60 60 1.65%[email protected]%(11mto25m)
[email protected]%(43mto54m)PRC028 697,401 7,668,679 60/360 5 56 51 1.77%
[email protected]%(5mto9m)[email protected]%(29mto34m)[email protected]%(43mto52m)
PRC029 697,403 7,668,757 60/355 5 25 20 1.62%[email protected]%(11mto24m)
PRC030 697,399 7,668,724 60/358 2 34 32 1.31%[email protected]%(2mto4m)
[email protected]%(7mto11m)[email protected]%(25mto32m)
PRC031 697,405 7,668,791 60/358 7 16 9 1.23%PRC032* 697,394 7,668,676 60/357 0 55 55 1.63%
[email protected]%(26mto30m)[email protected]%(32mto37m)
[email protected]%(43mto54m)PRC033 697,440 7,668,758 60/358 28 54 26 1.65%
[email protected]%(29mto41m)[email protected]%(50mto54m)
PRC034 697,441 7,668,722 60/354 46 70 24 1.41%[email protected]%(49mto56m)
PRC038 697,479 7,668,684 60/360 4 12 8 1.06%31 34 3 0.69%
PRC039 697,520 7,668,764 60/360 22 31 9 1.20%42 44 2 0.89%
PRC040 697,516 7,668,714 60/360 30 35 5 1.07%PRC041 697,523 7,668,683 60/360 2 13 11 0.69%
31
51
20 1.19%[email protected]%(32mto38m)
8/3/2019 2011 04 29 Quarterly Activities Report Mar Qtr 2011 FINAL Circ
11/14
AlturaMiningLimitedQuarterlyActivitiesReportMarch2011
Page11of14
*Note:HolePRC032islocatedabout8mtothesouthandwestofPRC028andwasdrilledasatwinholetoverifyand
validate the assay data recorded in PRC028 inparticular the lithium values. The variance over the 55metre
intersectionforLi2Owas
8/3/2019 2011 04 29 Quarterly Activities Report Mar Qtr 2011 FINAL Circ
12/14
AlturaMiningLimitedQuarterlyActivitiesReportMarch2011
Page12of14
FINNISSRANGE(NorthernTerritory)Lithium,Tantalum(100%AJM)As previously reported, Altura has undertaken regional and prospect geochemical evaluation
studies and a number of areas have been identified formore detailed follow upwith drilling.
AlturahasinaMineManagementPlan(MMP)approvedbytheNorthernTerritoryDepartmentof
Resourcesfortheproposeddrillingofthe7Upprospect,anditisplannedthatthisdrillingwillbe
undertakenaspartofthe2011fieldseason.
AboutLithiumLithium (Li) is recoveredfrom themineral spodumene and lithiumrich brines. It is used in a range of
productssuchasceramics,glass,batteriesandpharmaceuticals.Lithiumusehasexpandedsignificantly in
recentyearsdueto increasinguse inrechargeablebatteries inportableelectronicdevicesand inbatteries
andelectricmotorsforhybridandelectriccars.
GARNETBALLINE(WesternAustralia)AlluvialGarnetMineralSands(100%AJM)DuringtheMarchquartertheCompanyreceivedstatutoryapprovalsfortheMiningProposalfrom
theDepartmentofMinesandPetroleum(DMP)andthe5Clicenseapplicationforwaterextraction
fromtheDepartmentofWater.
Furthercapitalandoperatingexpenditure studieswerecompletedduring thequarter,however
the ongoing appreciation of theAustralian dollar continues to have an adverse impact on the
economicsoftheproject,andnodecisiontoproceedwiththeminehasbeenmadeatthisstage.
AboutGarnetGarnetisanaturallyoccurringmaterialthatisminedinasimilarmethodtomineralsands. Garnetsandisa
goodabrasiveandacommonreplacementforsilicasand insandblasting.Mixedwithveryhighpressure
water,garnetisusedtocutsteelandothermaterialsinwaterjets.
URANIUMLONGISLAND(MtShoobridgeNorthernTerritory)Uranium(100%AJM)Due
to
the
wet
season
no
field
work
has
been
undertaken,
however
further
desktop
studies
have
beenconducted. Subjecttothereceiptofstatutoryapproval,drillingwillresumelaterinQ22011.
BASEANDPRECIOUSMETALSSHOOBRIDGE(MtShoobridgeNorthernTerritory)Lead,Copper,Zinc,Silver,Gold(AJM100%)Asnotedabove,nofurtherfieldworkhasbeenundertakenbecauseofthewetseason. Desktop
studieshavebeenconductedandsubjecttothereceiptofstatutoryapproval,drillingwillresume
laterintheJunequarter.
8/3/2019 2011 04 29 Quarterly Activities Report Mar Qtr 2011 FINAL Circ
13/14
AlturaMiningLimitedQuarterlyActivitiesReportMarch2011
Page13of14
MININGSERVICESINDONESIA(PTAsiadrillBaraUtama)(100%AJM)TheminingservicegroupofAsiadrillBaraUtama (Asiadrill)andVelseis Indonesia (Velseis50%
Altura)
continued
exploration
support
services
during
the
quarter.
The
drilling
operations
were
confinedtoIndonesiawithaprimaryfocusincoalexplorationanddevelopment.
Drill rig deployment remained steady during the quarter. Asiadrill operated up to twenty (20)
individual drill units consisting of track and skid mounted and man portable units during the
quarter.
Asiadrill has equipment deployed in South and East Kalimantan on the island of Borneo with
officesinJakarta(WestJava),Balikpapan(EastKalimantan)andTanjung(SouthKalimantan).
AboutPTAsiadrillBaraUtamaAsiadrilloperatesavariedfleetoftruckandtrackmounteddrills;supplementedbyafleetofheliliftand
manportableunitsforenvironmentallysensitiveareas. Thecurrentfleettotalssixteen(16)largerunitsand
fifteen(15)manportabledrills. AsiadrillspredominantlyIndonesianworkforcetotals48permanentandup
to150contractstaff.
INDONESIA(PTVelseisIndonesia)(50%AJM)Velseis Indonesia (Velseis 50% Altura) operated up to eleven (11) wireline units during the
quartercomprisingtheentirefleetofunits,withafurthertwo(2)unitsplannedforpurchaseinQ2
2011.Velseis
has
operated
primarily
in
East
and
South
Kalimantan
provinces
on
the
island
of
Borneo. VelseiscontinuestopartnerAsiadrillonanumberofprojectstoprovideclientswithboth
drillingandgeophysicalservicesontheircoalexplorationprojects.
AboutPTVelseisIndonesiaVelseisIndonesiaisjointventurecompanybetweenAlturaandVelseisPtyLtd(Brisbanebasedwirelineand
seismic serviceprovider). Velseis operates afleet of eleven (11)portable and vehiclemountedwireline
loggingunitsinIndonesia. TheVelseisIndonesianworkforcetotals24permanentstaff.
AUSTRALIA(AlturaDrillingPtyLtd)(100%AJM)TheCompanysMaxdrill2000multipurposedrillrighasbeenutilisedat thePilgangooraLithium
Prospect inWesternAustraliasPilbararegionduringtheMarchquarter,andwillcontinueinthis
roleduringtheJunequarter.
8/3/2019 2011 04 29 Quarterly Activities Report Mar Qtr 2011 FINAL Circ
14/14
AlturaMiningLimitedQuarterlyActivitiesReportMarch2011
Page14of14
AboutAlturaMiningLimited(ASX:AJM)Alturahasadiversemineralportfolio inAustraliaand Indonesia coupledwith cashflowpositivemining
servicesunits in Indonesia. The company aims to systematicallyevaluateanddevelop the key resource
projectscommencingwithTabalongCoalandMtWebberIronOreJV(30%Altura/70%AtlasIronLimited).
KeyProjectsandProspects: IronOre:MtWebberDSOJointVenture(30%Altura). Coal:TabalongCoalProjectSouthKalimantan,Indonesiaminingapprovalprocesscommenced. Lithium: PilgangooraProjectWA,FinnissRangeProspectNTexplorationstage.
Garnet: BallineMineralSandsProjectWA,miningapprovalsprocess.
Uranium:MtShoobridgeNT,explorationstagewithkeyuraniumtargetsinHayesCreekregion. Base/PreciousMetals: MtShoobridgeNT, lead,copper,zinc,goldandsilverprospectatexploration
stage.ForadditionalinformationaboutAltura,pleasevisittheCompanyswebsitewww.alturamining.com
COMPETENTPERSONSSTATEMENTSTabalongCoalProject(Indonesia)
The information in this report that relates to theTabalongCoalResources isbasedon informationcompiledbyMr
StephenBarber,whoisamemberoftheMemberoftheAustralasianInstituteofMiningandMetallurgyandafulltime
employee ofAlturaMining Limited. Stephen Barber has sufficient experience, which is relevant to the style of
mineralisationandtypeofdepositunderconsiderationandtotheactivityheisundertaking,toqualifyasaCompetent
Person intermsofthe AustralasianCodeforReportingofExplorationResults,MineralResourcesandOreReserves
(JORCCode
2004
Edition).
Stephen
Barber
consents
to
the
inclusion
of
such
information
in
this
Report
in
the
form
and
contextinwhichitappears.
Pilgangoora(WA)
TheinformationinthisreportthatrelatestothePilgangooraexplorationresultsisbasedoninformationcompiledby
MrBryanBourke,who isamemberof theAustralian InstituteofGeoscientistsandafulltime employeeofAltura
MiningLimited. BryanBourkehassufficientexperience,which isrelevant to thestyleofmineralisationand typeof
depositunderconsiderationand to theactivityhe isundertaking, toqualifyasaCompetentPerson in termsof the
Australasian Code for Reporting of Exploration Results,Mineral Resources and Ore Reserves (JORC Code 2004
Edition). BryanBourkeconsentstotheinclusionofsuchinformationinthisReportintheformandcontextinwhichit
appears.
Forfurtherinformation,pleasecontact:
JamesBrown,ManagingDirector Ph:+61738146900
PaulMantell,ExecutiveDirector Ph:+61738146900