2011 04 29 Quarterly Activities Report Mar Qtr 2011 FINAL Circ

Embed Size (px)

Citation preview

  • 8/3/2019 2011 04 29 Quarterly Activities Report Mar Qtr 2011 FINAL Circ

    1/14

    ]

    29 April 2011

    QUARTERLYACTIVITIES

    REPORT

    March2011

    HighlightsIronOreFurtherdrillingunderwaytotargetMineralResourceandOreReserveupgradeforMt

    Webber

    CoalRevised

    Coal

    Resource

    Estimate

    (JORC

    compliant)

    of

    13.4

    million

    tonnes

    of

    high

    grade

    thermalcoalatTabalongCoalProject

    MiningapprovalsprocesscontinuesatTabalongCoalProjecttotargetproductioninlate

    2011

    LithiumDrillholeassaysfromthePilgangooraLithiumprojectintersectedfurtherwidezonesof

    nearsurfacemineralisedspodumenepegmatite.

    DrillingprogramcommencedinJanuary2011toestablishtheextentandtheresource

    potentialofthishighlymineralisedspodumenepegmatite.

    AlturaMiningLimited AustralianProjectLocations

  • 8/3/2019 2011 04 29 Quarterly Activities Report Mar Qtr 2011 FINAL Circ

    2/14

    AlturaMiningLimitedQuarterlyActivitiesReportMarch2011

    Page2of14

    IRONOREMTWEBBER(PilbaraWesternAustralia)30%AlturaMiningLimited,70%AtlasIronLimitedTheMtWebberIronOreProjectislocated150kilometressouthsoutheastofPortHedlandinthe

    worlds

    premier

    iron

    ore

    province,

    the

    Pilbara.

    It

    is

    approximately

    40

    kilometres

    east

    of

    the

    FortescueMetalsGrouprailway lineand immediatelynorthofWoodstockRoad,whichconnects

    MarbleBartotheGreatNorthernHighway(seeFigure1).

    Altura has a 30% interest in the Mt Webber Iron Ore DSO project (and five other Pilbara

    tenementsthatformpartofthejointventureagreement)inthePilbara. AtlasIronisAlturasjoint

    venturepartnerforthisproject. Underthetermsoftheagreement,Alturaremainstheownerof

    theMtWebberandothertenements,totalling333squarekilometres.

    Figure1MtWebberDSOProjectLocation

  • 8/3/2019 2011 04 29 Quarterly Activities Report Mar Qtr 2011 FINAL Circ

    3/14

    AlturaMiningLimitedQuarterlyActivitiesReportMarch2011

    Page3of14

    During the quarter drilling recommenced on the Fender and Gibson deposits under the

    supervisionofjointventuremanagingpartnerAtlas Iron.Mobilisationof therigwasdelayedby

    weather and mechanical problems which were exacerbated by the bad weather interrupting

    supplyofspareparts.DrillingwastheninterruptedinmidMarchbyfurthermechanicalproblems,

    andareplacementrighassincebeenmobilisedtositetocontinuetheprogram.

    Prior to mid March a total of 822 metres of Reverse Circulation (RC) was completed. The

    remainingprogramconsistsof40holes totallingapproximately2,000metres.The remaining40

    drillholeswillcomplete the40metreby40metre infilldrillingatFenderandGibsonandbring

    thosetwodepositstothesamelevelofresourceconfidenceasIbanez.

    Provisionremainsforathirdroundofinfilldrillingatallthreeareas(Ibanez,FenderandGibson

    seeFigure2)toclosethedrillspacingto40metresby20metresbutthatprogramisexpectedto

    becompletedinthenextfinancialyear.Currentplansalsoincludecompletionofpitoptimisation

    alternatives to feed into the overall development strategy including Atlas Turner River Hub

    feasibilityprocess.

    The results from thisprogramwillbecompiledand reviewedbyAtlasand reportedas soonas

    practicableuponcompletionofthedrilling,assayingandtesting. Theprogramisalsoexpectedto

    deliverahighrateofresourcetoreserveconversionaspertheearlierdrillprogramcompletedin

    mid2010.

    Figure2Reserve,ResourceandProspectLocation,MtWebberDSOProject

  • 8/3/2019 2011 04 29 Quarterly Activities Report Mar Qtr 2011 FINAL Circ

    4/14

    AlturaMiningLimitedQuarterlyActivitiesReportMarch2011

    Page4of14

    COALTABALONG(SouthKalimantanIndonesia)ThermalCoal(100%AJM)The Tabalong Coal Project consists of two (2) Mining Licences (IUPs) in the province of South

    Kalimantan

    on

    the

    island

    of

    Borneo

    (see

    Figure

    3).

    Currently

    both

    IUPs

    are

    granted

    for

    exploration

    purposes and Altura is seeking the necessary approvals to have them granted for operation

    productionstatus.

    During thequarterareviewoftheTabalongCoalProjectwasconductedaspartof internaldue

    diligenceandmineplanningprocesses.ThereviewestimatedarevisedtotalJORCcompliantCoal

    Resourceof13.4milliontonnesofhighgradethermalcoal.Thepreviousresourceassessmentwas

    completed inMay2008and containedanestimated total resourceof11.3million tonnes.The

    resultantvarianceisduetoupdatedseamcorrelationswithinthegeologicalmodelandtreatment

    ofcoalpartingswithinthecoalseams.

    Figure3TabalongCoalProjectLocation

  • 8/3/2019 2011 04 29 Quarterly Activities Report Mar Qtr 2011 FINAL Circ

    5/14

    AlturaMiningLimitedQuarterlyActivitiesReportMarch2011

    Page5of14

    ApprovalsProcessThe IndonesianCentralGovernment introduced anewMining Law inDecember2008. Existing

    mining permit holders such asAlturawere required to continue themining approvals process

    under the new law. The new law was not invoked until a specific set of regulations were

    introducedtoapplythelaw,andthisprocesswascompletedinmid2010.

    AlturahassuccessfullyconvertedtheoriginalTabalongExplorationPermits intothenewformof

    tenure(IUPexploration)andcontinuedtoseekapprovalofthe2xIUPstoOperationProduction

    status. The prerequisite documentation required for approval, consists of an Environmental

    ImpactStatementandtheGovernmentFeasibilityStudy.BothhavebeenacceptedbytheRegency

    Councillorand theMinesDepartment.Currently theMineRehabilitationandReclamationplans

    awaitapprovalinordertoprocesstheapplicationfurther,andthisisexpectedearlyinQ22011.

    Subsequent toOperationProductionapproval theCompanywillbe required toobtainaPinjam

    Pakai(Permittouseforestryland)fromtheMinisterofForestrypriortocommencementhowever

    theproject

    does

    not

    cover

    any

    protected

    forestry

    areas.

    The

    issue

    of

    these

    permits

    has

    been

    quite

    slowandassuchnocompletiontimelinecanbeconfirmed.

    UnderthenewMiningLawnonewminingpermitscanbeappliedfor,astheyaretobeofferedon

    atenderbasisfromthegovernment,andtodatenonehavebeenissued.Alturahascontinuedto

    seek out and review further coal opportunities to support the existing tenement holding in

    Indonesia.

    CoalResourcesThe

    Tabalong

    Project

    is

    comprised

    of

    2xIUPs

    held

    by

    Suryaraya

    Permata

    Khatulistiwa

    (SPK)

    the

    northernmost tenement and Suryaraya Cahaya Cemerlang (SCC) the southernmost tenement

    whichissplitintoBlocks1and2(seeFigure4).BothIUPswereissuedon31December2009and

    arevalid foraperiodof6years(exploration).SCCBlock1hasnotbeen fullyexplored,although

    coal isknown toexist in thisblock.Currentlyanexplorationprogram isbeingplanned forSCC

    Block1andexpectedtobecompletedinQ42011.

    ExplorationtodatehasbeenconductedinhousebyPTAlturaIndonesia(whollyownedsubsidiary

    ofAlturaMiningLimited).ThefollowingtabledetailsthecompleteddrillingattheTabalongCoal

    Project.

    Table 1 - Completed Drill Holes & Metres

    No.ofHoles Totalm's No.ofHoles Totalm's No.ofHoles Totalm's

    SPK 205 10,550.00 26 800.00 231 11,350.00

    SCC 90 4,228.00 12 316.50 102 4,544.50

    TOTAL 295 14,778.00 38 1,116.50 333 15,894.50

    *PARTLYCOREDHOLES theseincludebothopenholeandcoremetres;seebelowforabreakdownonthesemetres

    SPK

    SCC

    TOTAL

    TOTALm's

    11,246.27

    4,511.41

    15,757.68

    103.73 11,350.00

    33.09 4,544.50

    136.82 15,894.50

    OPENHOLES PARTLYCOREDHOLES* ALLHOLESLEASEAREA

    LEASEAREA OPENHOLEm's COREm's

  • 8/3/2019 2011 04 29 Quarterly Activities Report Mar Qtr 2011 FINAL Circ

    6/14

    AlturaMiningLimitedQuarterlyActivitiesReportMarch2011

    Page6of14

    Figure4TabalongCoalProjectIUPBlockLocations

  • 8/3/2019 2011 04 29 Quarterly Activities Report Mar Qtr 2011 FINAL Circ

    7/14

    AlturaMiningLimitedQuarterlyActivitiesReportMarch2011

    Page7of14

    The JORC compliant Coal Resource estimate of 13.4 million tonnes comprises a Measured

    Resource of 4.0 million tonnes, an Indicated Resource of 5.8 million tonnes and a further 3.6

    milliontonnesof InferredResources.Thedepositcontainsa lowash(4.8%), lowsulphur(0.98%;

    measured resource),highenergy (6,349kcal/kg; as receivedbasis) subbituminous coal. Table2

    belowdetailsthebreakdownoftheCoalResourceestimatesandrelevantcategories.

    Table2TabalongResourceEstimates

    Note: TM=TotalMoisture%,IM=InherentMoisture%,VM=VolatileMatter%,FC=FixedCarbon%,TS=Total

    Sulphur%,CV=CalorificValueinkilocaloriesperkilogram,RD=RelativeDensity.

    ar=as

    received

    basis,

    adb

    =air

    dried

    basis,

    daf

    =dry

    ash

    free

    basis

    weightedaveragesnotprovidedforInferredResourcecategoryduetodatalimitations.

    Table 3 (over) details the breakdown of the Measured Resources currently estimated for the

    Tabalong Coal Project. Mining is planned to commence in the northernmost tenement (SPK)

    wherethethicker(upto18metres)andhigherqualitycoalexistsmainlyconfinedtotheBseam

    group.TheMeasuredResourcesofBseamseriescoals isestimatedat2.78milliontonnes.The

    Bseriescoalshavesuperiorcoalqualityparameters (2.5%Ash,0.66%TotalSulphurand7,203

    kilocalories/kilogramairdriedbasis).

    TabalongCoal

    Resources

    indicate

    ahighly

    marketable

    product

    with

    high

    energy,

    low

    ash

    and

    low

    tomedium sulphur characteristics. The larger proportion of theMeasured Resources (B series

    seams)iscategorisedasIndonesianCoalIndex(ICI)Type1coal.Indexpricingforthiscoalasat15

    April2011isUS$124.01pertonneFOBvesselwhichprovidesapromisingoutlookforTabalongas

    itmovestoproduction.

    Altura aims to develop Tabalong as a standalone operation initially at a planned annual

    production rateof300,000 to400,000 tonnesperannumofpremium thermalgradecoal. The

    locationoftheTabalongprojectalsolendsitselftosatellitedevelopmentofotherminingpermits.

    The area consists of numerous other smaller resource areas that have the potential to be

    operated

    simultaneously

    to

    provide

    increased

    tonnages

    and

    blended

    coal

    products.

    Altura

    is

    considering a number of potential adjacent projects that could be amalgamated into the

    development.

    COALIndonesiaandotherSouthEastAsiaDuring the quarter, Altura continued to source and review a number of other potential coal

    acquisitions in Indonesia and other South East Asian targets. The Company will inform

    shareholders and themarket if an agreement(s) can be reached and remains confident that a

    suitablecoalproject(s)canbedeliveredin2011.

    RESOURCE TONNES TM IM Ash VM FC TS CV_ar CV_adb CV_daf RD

    MEASURED 3,989,000 16.4 7.7 4.0 40.7 47.4 0.98 6432 7097 8018 1.29

    INDICATED 5,796,000 16.6 8.2 5.4 40.2 46.3 1.34 6292 6924 7979 1.31

    9,785,000 16.5 8.0 4.8 40.4 46.7 1.19 6349 6994 7995 1.30

    INFERRED 3,600,000

    TOTAL 13,385,000

  • 8/3/2019 2011 04 29 Quarterly Activities Report Mar Qtr 2011 FINAL Circ

    8/14

    AlturaMiningLimitedQuarterlyActivitiesReportMarch2011

    Page8of14

    SEAM TONNES TM IM Ash VM FC TS CV_ar CV_adb CV_daf RD

    F1

    F2

    E1 29,000 16.3 4.9 6.6 39.3 48.7 1.29 6324 7174 8075 1.33

    E2 19,000 14.0 4.4 3.2 42.0 50.5 1.31 6809 7569 8187 1.28

    48,000 15.4 4.7 5.2 40.4 49.4 1.30 6516 7331 8119 1.31

    D11

    D1

    D12

    D21

    D2 2,000 14.5 7.6 7.4 40.5 44.5 1.99 6230 6735 7920 1.33

    D22 149,000 13.6 6.5 4.3 41.7 47.5 2.01 6585 7132 7990 1.31

    151,000 13.6 6.5 4.3 41.7 47.5 2.01 6581 7128 7990 1.31

    C11 119,000 15.2 7.4 3.9 41.6 47.2 1.55 6581 7184 8094 1.29

    C1 45,000 16.4 10.2 4.4 40.9 44.5 0.95 6300 6763 7908 1.30

    C12 375,000 13.1 7.5 11.5 38.0 41.4 1.41 6106 6488 7877 1.38

    539,000 13.9 7.7 9.1 39.0 43.0 1.40 6232 6672 7929 1.35

    C21

    C2 467,000 15.4 6.1 6.9 40.3 46.5 2.01 6231 6917 7953 1.33

    C22

    467,000 15.4 6.1 6.9 40.3 46.5 2.01 6231 6917 7953 1.33

    C3

    C41

    C4

    C42

    B11 55,000 14.4 6.7 1.5 41.6 50.2 0.56 6822 7439 8105 1.26

    B1 907,000 18.1 8.7 2.5 40.8 48.1 0.81 6412 7147 8034 1.28

    B12 133,000 13.9 7.3 1.6 41.3 49.8 0.50 6867 7393 8114 1.27

    B 354,000 15.4 6.1 3.4 41.1 49.5 0.48 6589 7314 8076 1.27

    B21 95,000 17.0 7.7 2.1 41.5 48.7 0.62 6553 7282 8067 1.27

    B2 1,101,000 17.7 8.6 2.4 41.0 48.0 0.64 6459 7162 8030 1.27

    B22 139,000 17.0 7.7 2.1 41.5 48.7 0.62 6553 7282 8067 1.27

    2,784,000 17.2 8.1 2.5 41.0 48.4 0.66 6495 7203 8046 1.27

    A1

    A2

    A3

    AA

    BB

    3,989,000 16.4 7.7 4.0 40.7 47.4 0.98 6432 7097 8018 1.29

    Subtotal

    Subtotal

    Subtotal

    Subtotal

    GrandTotal

    Subtotal

    Subtotal

    Subtotal

    Subtotal

    Subtotal

    Subtotal

    Subtotal

    Subtotal

    Table3TabalongCoalProjectMeasuredResources

    Note:TM

    =Total

    Moisture

    %,

    IM

    =Inherent

    Moisture

    %,

    VM

    =Volatile

    Matter

    %,

    FC

    =Fixed

    Carbon

    %,

    TS

    =Total

    Sulphur%,CV=CalorificValueinkilocaloriesperkilogram,RD=RelativeDensity.

    ar=asreceivedbasis,adb=airdriedbasis,daf=dryashfreebasis

    MeasuredResourceslimitedto150metredepthcutoff

    AboutThermalCoalThermal coalforms the backbone ofworldwide energy supplieswith Indonesia now theworlds largest

    exporterofthermalcoalproducts. Recentinnovationsincoalbeneficiationandcleancoaltechnologypoint

    towardastrongfutureforcoaltoremainareliableenergygenerationcommodity.

  • 8/3/2019 2011 04 29 Quarterly Activities Report Mar Qtr 2011 FINAL Circ

    9/14

    AlturaMiningLimitedQuarterlyActivitiesReportMarch2011

    Page9of14

    LITHIUMPILGANGOORA(WesternAustralia)Lithium,Tantalum(100%AJM)Drillingon thePilgangoora tenementsrecommenced in January2011withAlturausing itsown

    Maxdrill

    2000

    drill

    rig

    and

    in

    house

    crew

    to

    undertake

    the

    work.

    Despite

    wet

    ground

    conditions

    in

    Februaryduetorainassociatedwithcyclonicweather,Alturahasbeenabletocompleteeighteen

    (18)ReverseCirculation(RC)holesfor1,286metresbytheendoftheMarchquarter.

    Figure5DrillholeandCrossSectionLocations

    Theresultsforthirteen(13)oftheseholeshavebeenpreviouslyreported(seeASXreleasesdated

    2March 2011 and 15March 2011) and the significant results from these holes and the initial

    drillingprogramaresetoutinTable4overleaf.

    The thickness of the mineralised pegmatites and the attractive grades being returned at such

    shallowdepthsisverypromising.Potentiallytheprojectcoulddeliververylowwastetooreratios

    should a resource of sufficient size be identified. The favourable result from the initial

    metallurgicaltestworkcertainlyranksthisprojecthighly incomparisontocurrentandemerging

    hardrocklithiumproducers.

    AlturawillcontinueitsexplorationdrillingprogramthroughQ22011utilisingtheinhouseAltura

    drillandcrew.Oncethebroadoutlineandgeometryofthepegmatiteshavebeenidentifiedinfill

    drillingwillbeundertakentoincreasethelevelofconfidenceinbothinthepotentialresourceand

    thelithium

    grades.

  • 8/3/2019 2011 04 29 Quarterly Activities Report Mar Qtr 2011 FINAL Circ

    10/14

    AlturaMiningLimitedQuarterlyActivitiesReportMarch2011

    Page10of14

    Table4PilgangooraDrillingResultstoDateAssaysgreaterthan0.3%Li2OHoleNo. EastGDA94

    (m)North

    GDA94(m)

    Dip/Az(Deg.) From(m) To(m) Thickness(m) Li2O%

    PRC026 697,368 7,668,677 60/340 0 5 5 1.17%6

    23

    17 1.45%[email protected]%(6mto13m)

    PRC027 697,380 7,668,675 60/042 0 60 60 1.65%[email protected]%(11mto25m)

    [email protected]%(43mto54m)PRC028 697,401 7,668,679 60/360 5 56 51 1.77%

    [email protected]%(5mto9m)[email protected]%(29mto34m)[email protected]%(43mto52m)

    PRC029 697,403 7,668,757 60/355 5 25 20 1.62%[email protected]%(11mto24m)

    PRC030 697,399 7,668,724 60/358 2 34 32 1.31%[email protected]%(2mto4m)

    [email protected]%(7mto11m)[email protected]%(25mto32m)

    PRC031 697,405 7,668,791 60/358 7 16 9 1.23%PRC032* 697,394 7,668,676 60/357 0 55 55 1.63%

    [email protected]%(26mto30m)[email protected]%(32mto37m)

    [email protected]%(43mto54m)PRC033 697,440 7,668,758 60/358 28 54 26 1.65%

    [email protected]%(29mto41m)[email protected]%(50mto54m)

    PRC034 697,441 7,668,722 60/354 46 70 24 1.41%[email protected]%(49mto56m)

    PRC038 697,479 7,668,684 60/360 4 12 8 1.06%31 34 3 0.69%

    PRC039 697,520 7,668,764 60/360 22 31 9 1.20%42 44 2 0.89%

    PRC040 697,516 7,668,714 60/360 30 35 5 1.07%PRC041 697,523 7,668,683 60/360 2 13 11 0.69%

    31

    51

    20 1.19%[email protected]%(32mto38m)

  • 8/3/2019 2011 04 29 Quarterly Activities Report Mar Qtr 2011 FINAL Circ

    11/14

    AlturaMiningLimitedQuarterlyActivitiesReportMarch2011

    Page11of14

    *Note:HolePRC032islocatedabout8mtothesouthandwestofPRC028andwasdrilledasatwinholetoverifyand

    validate the assay data recorded in PRC028 inparticular the lithium values. The variance over the 55metre

    intersectionforLi2Owas

  • 8/3/2019 2011 04 29 Quarterly Activities Report Mar Qtr 2011 FINAL Circ

    12/14

    AlturaMiningLimitedQuarterlyActivitiesReportMarch2011

    Page12of14

    FINNISSRANGE(NorthernTerritory)Lithium,Tantalum(100%AJM)As previously reported, Altura has undertaken regional and prospect geochemical evaluation

    studies and a number of areas have been identified formore detailed follow upwith drilling.

    AlturahasinaMineManagementPlan(MMP)approvedbytheNorthernTerritoryDepartmentof

    Resourcesfortheproposeddrillingofthe7Upprospect,anditisplannedthatthisdrillingwillbe

    undertakenaspartofthe2011fieldseason.

    AboutLithiumLithium (Li) is recoveredfrom themineral spodumene and lithiumrich brines. It is used in a range of

    productssuchasceramics,glass,batteriesandpharmaceuticals.Lithiumusehasexpandedsignificantly in

    recentyearsdueto increasinguse inrechargeablebatteries inportableelectronicdevicesand inbatteries

    andelectricmotorsforhybridandelectriccars.

    GARNETBALLINE(WesternAustralia)AlluvialGarnetMineralSands(100%AJM)DuringtheMarchquartertheCompanyreceivedstatutoryapprovalsfortheMiningProposalfrom

    theDepartmentofMinesandPetroleum(DMP)andthe5Clicenseapplicationforwaterextraction

    fromtheDepartmentofWater.

    Furthercapitalandoperatingexpenditure studieswerecompletedduring thequarter,however

    the ongoing appreciation of theAustralian dollar continues to have an adverse impact on the

    economicsoftheproject,andnodecisiontoproceedwiththeminehasbeenmadeatthisstage.

    AboutGarnetGarnetisanaturallyoccurringmaterialthatisminedinasimilarmethodtomineralsands. Garnetsandisa

    goodabrasiveandacommonreplacementforsilicasand insandblasting.Mixedwithveryhighpressure

    water,garnetisusedtocutsteelandothermaterialsinwaterjets.

    URANIUMLONGISLAND(MtShoobridgeNorthernTerritory)Uranium(100%AJM)Due

    to

    the

    wet

    season

    no

    field

    work

    has

    been

    undertaken,

    however

    further

    desktop

    studies

    have

    beenconducted. Subjecttothereceiptofstatutoryapproval,drillingwillresumelaterinQ22011.

    BASEANDPRECIOUSMETALSSHOOBRIDGE(MtShoobridgeNorthernTerritory)Lead,Copper,Zinc,Silver,Gold(AJM100%)Asnotedabove,nofurtherfieldworkhasbeenundertakenbecauseofthewetseason. Desktop

    studieshavebeenconductedandsubjecttothereceiptofstatutoryapproval,drillingwillresume

    laterintheJunequarter.

  • 8/3/2019 2011 04 29 Quarterly Activities Report Mar Qtr 2011 FINAL Circ

    13/14

    AlturaMiningLimitedQuarterlyActivitiesReportMarch2011

    Page13of14

    MININGSERVICESINDONESIA(PTAsiadrillBaraUtama)(100%AJM)TheminingservicegroupofAsiadrillBaraUtama (Asiadrill)andVelseis Indonesia (Velseis50%

    Altura)

    continued

    exploration

    support

    services

    during

    the

    quarter.

    The

    drilling

    operations

    were

    confinedtoIndonesiawithaprimaryfocusincoalexplorationanddevelopment.

    Drill rig deployment remained steady during the quarter. Asiadrill operated up to twenty (20)

    individual drill units consisting of track and skid mounted and man portable units during the

    quarter.

    Asiadrill has equipment deployed in South and East Kalimantan on the island of Borneo with

    officesinJakarta(WestJava),Balikpapan(EastKalimantan)andTanjung(SouthKalimantan).

    AboutPTAsiadrillBaraUtamaAsiadrilloperatesavariedfleetoftruckandtrackmounteddrills;supplementedbyafleetofheliliftand

    manportableunitsforenvironmentallysensitiveareas. Thecurrentfleettotalssixteen(16)largerunitsand

    fifteen(15)manportabledrills. AsiadrillspredominantlyIndonesianworkforcetotals48permanentandup

    to150contractstaff.

    INDONESIA(PTVelseisIndonesia)(50%AJM)Velseis Indonesia (Velseis 50% Altura) operated up to eleven (11) wireline units during the

    quartercomprisingtheentirefleetofunits,withafurthertwo(2)unitsplannedforpurchaseinQ2

    2011.Velseis

    has

    operated

    primarily

    in

    East

    and

    South

    Kalimantan

    provinces

    on

    the

    island

    of

    Borneo. VelseiscontinuestopartnerAsiadrillonanumberofprojectstoprovideclientswithboth

    drillingandgeophysicalservicesontheircoalexplorationprojects.

    AboutPTVelseisIndonesiaVelseisIndonesiaisjointventurecompanybetweenAlturaandVelseisPtyLtd(Brisbanebasedwirelineand

    seismic serviceprovider). Velseis operates afleet of eleven (11)portable and vehiclemountedwireline

    loggingunitsinIndonesia. TheVelseisIndonesianworkforcetotals24permanentstaff.

    AUSTRALIA(AlturaDrillingPtyLtd)(100%AJM)TheCompanysMaxdrill2000multipurposedrillrighasbeenutilisedat thePilgangooraLithium

    Prospect inWesternAustraliasPilbararegionduringtheMarchquarter,andwillcontinueinthis

    roleduringtheJunequarter.

  • 8/3/2019 2011 04 29 Quarterly Activities Report Mar Qtr 2011 FINAL Circ

    14/14

    AlturaMiningLimitedQuarterlyActivitiesReportMarch2011

    Page14of14

    AboutAlturaMiningLimited(ASX:AJM)Alturahasadiversemineralportfolio inAustraliaand Indonesia coupledwith cashflowpositivemining

    servicesunits in Indonesia. The company aims to systematicallyevaluateanddevelop the key resource

    projectscommencingwithTabalongCoalandMtWebberIronOreJV(30%Altura/70%AtlasIronLimited).

    KeyProjectsandProspects: IronOre:MtWebberDSOJointVenture(30%Altura). Coal:TabalongCoalProjectSouthKalimantan,Indonesiaminingapprovalprocesscommenced. Lithium: PilgangooraProjectWA,FinnissRangeProspectNTexplorationstage.

    Garnet: BallineMineralSandsProjectWA,miningapprovalsprocess.

    Uranium:MtShoobridgeNT,explorationstagewithkeyuraniumtargetsinHayesCreekregion. Base/PreciousMetals: MtShoobridgeNT, lead,copper,zinc,goldandsilverprospectatexploration

    stage.ForadditionalinformationaboutAltura,pleasevisittheCompanyswebsitewww.alturamining.com

    COMPETENTPERSONSSTATEMENTSTabalongCoalProject(Indonesia)

    The information in this report that relates to theTabalongCoalResources isbasedon informationcompiledbyMr

    StephenBarber,whoisamemberoftheMemberoftheAustralasianInstituteofMiningandMetallurgyandafulltime

    employee ofAlturaMining Limited. Stephen Barber has sufficient experience, which is relevant to the style of

    mineralisationandtypeofdepositunderconsiderationandtotheactivityheisundertaking,toqualifyasaCompetent

    Person intermsofthe AustralasianCodeforReportingofExplorationResults,MineralResourcesandOreReserves

    (JORCCode

    2004

    Edition).

    Stephen

    Barber

    consents

    to

    the

    inclusion

    of

    such

    information

    in

    this

    Report

    in

    the

    form

    and

    contextinwhichitappears.

    Pilgangoora(WA)

    TheinformationinthisreportthatrelatestothePilgangooraexplorationresultsisbasedoninformationcompiledby

    MrBryanBourke,who isamemberof theAustralian InstituteofGeoscientistsandafulltime employeeofAltura

    MiningLimited. BryanBourkehassufficientexperience,which isrelevant to thestyleofmineralisationand typeof

    depositunderconsiderationand to theactivityhe isundertaking, toqualifyasaCompetentPerson in termsof the

    Australasian Code for Reporting of Exploration Results,Mineral Resources and Ore Reserves (JORC Code 2004

    Edition). BryanBourkeconsentstotheinclusionofsuchinformationinthisReportintheformandcontextinwhichit

    appears.

    Forfurtherinformation,pleasecontact:

    JamesBrown,ManagingDirector Ph:+61738146900

    PaulMantell,ExecutiveDirector Ph:+61738146900