2011-03 HEAD LOSSES CALCULATIONS.pdf

Embed Size (px)

Citation preview

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    1/44

    HEAD LOSSES CALCULATIONS

    FERNANDO CHANDUVI

    KINGSTON JAMAICA

    MARCH 2011

    TCP/JAM/3203 PROMOTING RAINWATER HARVESTING

    AND SMALL SCALE IRRIGATION IN SOUTH SAINT

    ELIZABETH

    FAO AND NATIONAL IRRIGATION COMMISSION LIMITED

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    2/44

    HEAD LOSSES CALCULATIONS

    ACKNOWKEDGEMENT IS GIVEN TO MR. ASHER AZENKOT (CARDI)

    M.Sc. OF THE MINISTRY OF AGRICULTURE, EXTENSION SERVICE,

    FIELD SERVICE WHO PREPARE THE BASE MATERIAL IN A PDF FILE.

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    3/44

    WATER FLOW IN PIPES

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    4/44

    WATER FLOW IN PIPES

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    5/44

    WATER FLOW IN PIPES

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    6/44

    SAMPLE CALCULATIONS

    ANSWER:

    a. Convert m3/h to cm3/sec, 27,780 cm3/sec

    b. Cross section of pipe, 314.2 cm2

    c. Water flow velocity, 88.8 cm/sec

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    7/44

    S

    A

    M

    P

    L

    E

    C

    AL

    C

    U

    L

    A

    TI

    O

    N

    S

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    8/44

    SAMPLE CALCULATIONS

    ANSWER: Q = 67.8 m3/h and V = 9.6 m/sec

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    9/44

    SAMPLE CALCULATIONS

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    10/44

    HYDROSTATIC

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    11/44

    HYDROSTATIC

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    12/44

    HYDROSTATIC

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    13/44

    HYDROSTATIC

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    14/44

    HYDROSTATIC

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    15/44

    HYDROSTATIC

    http://udel.edu/~inamdar/EGTE215/Hydrostatics.pdf

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    16/44

    PRESSURE HEAD

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    17/44

    PRESSURE HEAD

    WE KNOW THAT 1 ATMOSPHERE = 0.76 m OF MERCURY COLUMN

    SPECIFIC WEIGHT OF WATER = 1 kg/dm3

    SPECIFIC WEIGHT OF MERCURY= 13.6 kg/dm3

    THEREFORE:

    1 ATMOSPHERE = 10.33 meters of water column.

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    18/44

    HEAD LOSSES: EMPIRICAL FORMULA

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    19/44

    C COEFFICIENTS FOR PIPES

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    20/44

    S

    A

    M

    P

    L

    E

    C

    A

    L

    C

    U

    L

    A

    TI

    O

    N

    S

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    21/44

    HEAD LOSS IN A PIPE

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    22/44

    HEAD LOSSES IN PLASTIC PIPES

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    23/44

    HEAD LOSS IN PIPES

    http://www.engineeringtoolbox.com/pump-head-pressure-d_663.html

    http://www.engineeringtoolbox.com/hazen-williams-water-d_797.html

    http://www.piping-toolbox.com/pvc-pipes-friction-loss-d_802.html

    http://www.lmnoeng.com/hazenwilliams.htm

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    24/44

    HEAD LOSSES IN PIPES

    TOTAL HEAD LOSS = 22 meters

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    25/44

    HEAD LOSS IN PIPES

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    26/44

    HEAD LOSS IN PIPES

    Visit also FLOW CONVERTER in the WEB

    Difference in elevation: 125-94 = 31 meters = 89 feet

    Head loss= 16.2 feet = 5.62 m (from Engineering Toolbox)

    Required pressure at head of field = 4 atm = 41.32 m = 118.7 feet

    TOTAL HEAD REQUIRED AT PUMP = 89 ft + 16.2 ft + 118.7 ft

    TOTAL HEAD REQUIRED AT PUMP = 223.9 ft = 77.91 m = 7.5 atm

    2,155 feet

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    27/44

    LOCAL HEAD LOSS

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    28/44

    MINOR LOSS COEFFICIENTS

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    29/44

    HEAD LOSS IN PIPES AND FITTINGS

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    30/44

    LATERAL LINES

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    31/44

    REDUCTION COEFFICIENTS

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    32/44

    CHARACTERISTICS OF LATERAL PIPE

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    33/44

    PRESSURE AND HEAD LOSS IN LATERAL

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    34/44

    FLOWS IN LATERAL

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    35/44

    HEAD LOSS ALONG A LATERAL PIPE

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    36/44

    EXAMPLE PROBLEM

    Example:

    A flat field, 360 x 360 m, is irrigated with a hand moved

    aluminum lateral pipe (C = 140). The water source to the

    lateral pipe is from a sub main, which crosses the center ofthe field. The selected sprinklers are Naan 233/92 with a

    nozzle of 4.5 mm, 25 m pressure of (hs) and flow rate (qs ) of

    1.44 m3/hr. The space between the sprinklers is 12 meters

    apart, and the location of the first sprinkler is 6 meters awayfrom lateral inlet. The riser height is 0.8 meter and the

    diameter is 3/4".

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    37/44

    EXAMPLE PROBLEM

    360 m

    360 m

    Lateral line

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    38/44

    EXAMPLE PROBLEM

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    39/44

    EXAMPLE PROBLEM

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    40/44

    EXAMPLE PROBLEM

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    41/44

    EXAMPLE PROBLEM

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    42/44

    EXAMPLE PROBLEM

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    43/44

    THANK YOU VERY MUCH

  • 7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf

    44/44