2008 Wyoming EOR / IOR ConferenceSeptember 15 & 16, 2008

Jackson, WyomingPresented by:

Rick Binks, Harold Johnson & John PutnamFabrication Technologies, Inc.

Casper, Wyoming

Page 2: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview

Implementing a Chemical EOR Project

Surface FacilitiesA Key to Field Success

Page 3: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview

Presentation Overview

– The Goals of Facility Performance– Facilities Design Parameters– Process Flow Schematics– Scope of Equipment & Services– Fabricators– Conclusions

Page 4: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview

Performance Requirements

Define Facility GoalsScale – pilot or full-field?

Page 5: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview

EOR Chemical Injection Plant Design Parameters Project Name: 

Parameter Description Design Data Example   Total Field Injection 5,000 to 7,000 BPDMax. Inj. Pressure 1500 PSINo. of Injection Wells (IW’s) 3 IW injection range, per well 500 to 2500 BPDDoes ea. IW require separate Injection control? 

Yes, must be able to adjustPolymer concentration to ea. IW 

   Chemical Design DataPolymer concentration injected 1800 ppmAlkaline 

NaOH (state % active) No Na2CO3 1.0 percent active

Surfactant No. 1 0.5 percent active% active  50 Surfactant No. 2 or Solvent  % active   Injection Water DataTotal hardness 450 ppmSurface temperature range 20 ‐ 25°C   Environmental DataGeographical location TexasAmbient temperature range 0 ‐ 33°CHumidity range 10 to 100 R.H.Elevation  500 Ft. MSL   Facility Type Modular skid building Yes Max. module width / length(for transportation issues) 

16’ W X 60’ L 

Permanent building w/ concrete floor 

No 

 Other:      

Seismic Zone 2

Page 6: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview

Performance Requirements

Define Facility GoalsScale – pilot or full-field?

Modular & MobileExpandableNon-mobile & Permanent

Page 7: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview
Page 8: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview
Page 9: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview

Design Requirements...

Operating LogisticsRaw Chemical Receiving & Handling

Page 10: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview
Page 11: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview

Design Requirements...

Operating LogisticsRaw Chemical Receiving & HandlingOperator Oversight

Full-TimePart-Time

Page 12: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview

Site Infrastructure Inspection

Water SourceRequired water treatment

Facilities LocationChemical & Process facilitySupply tanksDelivery truck access

Electrical PowerFlow Line & Injection Header

Page 13: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview

Talk It Through

• Design Meetings are a must-have• Decide what is necessary• Define expectations

• Scope of Equipment Supply• Primary Equipment & System• Spare Parts

• Services• Pre-Fabrication Design Drawings• Factory Testing• Installation, Start-up & Operator Training• Warranty Support

Page 14: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview

Talking It Through...

• Know your limitations• Local service providers

• Contractors, pipe-fitting, electrical• Cranes & rigging

• The selected fabricator• EOR Experience• Design & Engineering• Codes & Standards• Field Support

Page 15: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview
Page 16: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview
Page 17: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview

Polymer Water Flood

Page 18: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview
Page 19: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview
Page 20: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview
Page 21: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview

Typical Facilities

• Raw chemical storage & handling

Page 22: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview
Page 23: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview

Typical Facilities

• Raw chemical storage & handling• Chemical processing

Page 24: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview
Page 25: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview

Typical Facilities

• Raw chemical storage & handling• Chemical processing• High Pressure Injection

Page 26: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview
Page 27: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview

Typical Facilities

• Raw chemical storage & handling• Chemical processing• High Pressure Injection• Automation & Data Management

Page 28: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview
Page 29: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview

Typical Facilities

• Raw chemical storage & handling• Chemical processing• High Pressure Injection• Automation & Data Management• Facility Start-Up & Commissioning

Page 30: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview
Page 31: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview

Typical Facilities

• Raw chemical storage & handling• Chemical processing• High Pressure Injection• Automation & Data Management• Facility Start-Up & Commissioning• Operator Training

Page 32: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview
Page 33: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview

Conclusions

Purpose designed & builtPre-design communicationsStake holder collaboration

Operator trainingUnderstanding the process

Lab to FieldQuality fluids down holeMeaningful data = accurate interpretation