4
1 © 2 0 0 8 S p o n g e - J e t I n c . A l l r i g h t s r e s e r v e d . Preparing Gas Pipeline Weld Seams on Po River •Major river, spanning east to west Italy •Sensitive residential environment; cultivated fields and populated villages •New pipeline development •Weld seam preparation

©2008 Sponge-Jet Inc. All rights reserved. 1 Preparing Gas Pipeline Weld Seams on Po River Major river, spanning east to west Italy Sensitive residential

Embed Size (px)

Citation preview

Page 1: ©2008 Sponge-Jet Inc. All rights reserved. 1 Preparing Gas Pipeline Weld Seams on Po River Major river, spanning east to west Italy Sensitive residential

1

©20

08 S

pong

e-Jet Inc. A

ll rights re

served.

Preparing Gas Pipeline Weld Seams on Po River

• Major river, spanning east to west Italy

• Sensitive residential environment; cultivated fields and populated villages

• New pipeline development

• Weld seam preparation

Page 2: ©2008 Sponge-Jet Inc. All rights reserved. 1 Preparing Gas Pipeline Weld Seams on Po River Major river, spanning east to west Italy Sensitive residential

2

©20

08 S

pong

e-Jet Inc. A

ll rights re

served.

Preparing Gas Pipeline Weld Seams on Po River

Project Details:

- 35cm(14in) diameter pipe welded every 10m(33ft)

- River-crossing sections 2km(1.25miles)

- Total project 18km(11miles)

Specifications:

- Metal cleaned, then profiled to 50microns(2mils)

- SA2.5 / NACE 2 / SP-10

- To “White Blast Cleaning”

Page 3: ©2008 Sponge-Jet Inc. All rights reserved. 1 Preparing Gas Pipeline Weld Seams on Po River Major river, spanning east to west Italy Sensitive residential

3

©20

08 S

pong

e-Jet Inc. A

ll rights re

served.

Preparing Gas Pipeline Weld Seams on Po River

Chose Sponge-Jet based on:

• Conventional abrasive - hard to contain; potential water contamination

• Sponge Media is easily contained, collected and reused without leaving dust or pollutants in the pipe or air

• Used 200HP and 35-P Recycler

• Silver 80 Sponge-Media™

Page 4: ©2008 Sponge-Jet Inc. All rights reserved. 1 Preparing Gas Pipeline Weld Seams on Po River Major river, spanning east to west Italy Sensitive residential

4

©20

08 S

pong

e-Jet Inc. A

ll rights re

served.

Preparing Gas Pipeline Weld Seams on Po River

Outcome:

• Sponge Media blasting allowed the pipeline to be built adjacent to a residential bridge, reducing the planned pipe length from 38km (23miles) to 18km (11miles) - saving 20km (12.5miles) of pipeline

• No contamination to the river or surrounding villages

• Reduced staging and transport costs: Sponge Media was reused on site, so that Sponge Media, blasting/recycling equipment, welding equipment, crane, generator and compressor were all on one vehicle