Page 1: 2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS

2005/06/22

ALBA Building Project

David CarlesEngineering Services Division - CELLS

Page 2: 2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS

2005/06/22 ALBA Building Project 2

ALBA Building Project.

Time Schedule.

The Site.

Description of the Facility.0 ObjectiveA. Architecture and Civil Works.B. Mechanical Installations.C. Electrical Installations.D. Safety and Fire Protection.

Page 3: 2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS

2005/06/22 ALBA Building Project 3

Time Schedule

Ene Feb Mar Abr May Jun Jul Ago Sep Oct Nov Dic

• AVANT PROJECT

• BASIC PROJECT

• EXECUTIVE PROJECT

IdeasCompetition

Construction period: 24 months

2005: Redaction of the Project

17 Firms interested 5 Finalists

Page 4: 2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS

2005/06/22 ALBA Building Project 4

The Site (1/2)

UAB Campus

Sant Cugatdel

Vallès

ALBA

Cerdanyoladel

Vallès

ParcTecnològic

Page 5: 2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS

2005/06/22 ALBA Building Project 5

The Site (2/2)

BP-1413 Road between Cerdanyola and Sant Cugat

Works on site during last year:

Geotechnical Characterization Summer 2004

Monitored behaviour •Taking data daily •12 Monthly reports

Vibration campaignDec 2004

Sector CENTRE DIRECCIONAL

CERDANYOLA DEL VALLÊS

60.000 m2

Page 6: 2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS

2005/06/22 ALBA Building Project 6

Description of the Facility

0. Objective.

A. Architecture and Civil Works.

B. Mechanical Installations.

C. Electrical Installations.

D. Safety and Fire Protection.

Page 7: 2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS

2005/06/22 ALBA Building Project 7

0. Objective

MECHANICAL

STABILITY

ELECTRICAL THERMAL

Page 8: 2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS

2005/06/22 ALBA Building Project 8

A. Architecture and Civil Works.

1. Foundations - Slab2. Functionality Diagram3. Transit4. Basement5. Ground Floor6. 1st floor7. 2nd floor8. Cross Sections

Page 9: 2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS

2005/06/22 ALBA Building Project 9

A.1. Foundations - Slab• CRITICAL AREA (70 – 120 m diameter)

– A stiff test plate directly founded on the subsoil is so far the most promising solution.

– The vibration criteria in the low frequency range are very stringent and will govern the suitable solution.

– Based on the results of the Geotechnical investigations performed, it can be concluded that the deformation potential is low.

Page 10: 2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS

2005/06/22 ALBA Building Project 10

A.2. Functionality Diagram

OA: Foyer – Auditorium – Cafeteria - StoresMB: Service tunnelTB: Tanks – Water Treatment – Dynamic UPS

OA: Entrance – offices - meeting and show roomsMB: ALBA tunnel – Exp hall – Service area - Laboratories - Mechanical rooms – loading areaTB: cooling & heating plant – workshops - storage

GROUND FLOOR

FIRST FLOOR

SECOND FLOOR

BASEMENT

OA: offices – free suitable for officesMB: mechanical rooms – control room outer ring – free suitable central courtyard

OA: offices – free suitable for offices

Page 11: 2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS

2005/06/22 ALBA Building Project 11

A.3. Transit

PedestriantransitVIP vehicles

Park & Bus transit

General supply transitScientific & technical

supply transit

Park & Bus transit

Main Entrance

Entrance to the Building

Page 12: 2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS

2005/06/22 ALBA Building Project 12

A.4. Basement

Cafeteria – VendingAuditorium (200 p.)Compacts archive

Medical serviceChanging room

Waste store

Service tunnel

Electrical StationElectrical Control Room

TanksPumps and exchangers

Page 13: 2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS

2005/06/22 ALBA Building Project 13

A.5. Ground FloorExperimental Hall

ALBA TunnelBeam Lines

Laboratories:• BL Labs• ID + magnets• Vacuum lab • Comp & communic.• Metrology lab • Electronics lab• Detectors lab• RF lab

Entrance – HallOffice Area – 400 m2

Trucks access exp. area

Central courtyard

Workshops – 750 m2Storage – 600 m2

Cooling Plant & Cooling TowersDynamic UPS

Utilities

Page 14: 2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS

2005/06/22 ALBA Building Project 14

A.6. First Floor

Office Area 400 m2 (Phase 2)

1.100 m2 (Phase 1)

Technical Area2 * 500 m2

ALBA Control Room

Central courtyard

Free suitable forSupplementary labs. Phase 2

Page 15: 2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS

2005/06/22 ALBA Building Project 15

A.7. Second Floor

Office Area

400 m2 (Phase 2)

1.100 m2 (Phase 1)

Page 16: 2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS

2005/06/22 ALBA Building Project 16

A.8. Cross Sections

Page 17: 2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS

2005/06/22 ALBA Building Project 17

B. Mechanical Installations.

1. Production and Distribution

2. Water Treatment and Fluids

Page 18: 2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS

2005/06/22 ALBA Building Project 18

B.1. Production & Distribution

Cooling Towers9 MW Cap

Boilers1,5 MW

Cooling Plants

UTA’s•ALBA Tunnel•Service Area•Experimental Area•Beam Lines•Offices

ALBA Tunnel - Linac / BO / TL - S.R.Service AreaExperimental Area

Air Cond. 4 MWCooling 4 MW

Page 19: 2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS

2005/06/22 ALBA Building Project 19

B.2. Water Treatment & Fluids.

• Demineralised water.

• Natural gas.• Gas oil.• Compressed air.

– Distribution loops: perimeter laboratories and beam lines - Storage ring -Booster and Linac -Service area -Technical Building

• Gas nitrogen.– Supply from a liquid nitrogen tank to

laboratories and beam lines.• Other fluids.

– Space will be foreseen for possible future installations of other gases as liquid nitrogen or recuperation of helium gas.

Deionization UnitInverse Osmosis Unit

Page 20: 2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS

2005/06/22 ALBA Building Project 20

C. Electrical Installations.

Topology and Power

Page 21: 2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS

2005/06/22 ALBA Building Project 21

C. Topology & Power

4,5 MWALBA Machine

Total Power 12 MW

4,5 MWCooling & HVAC

2 MWOffices & Workshops

1 MWCritical Supply

StaticUPSDynamic

UPS

Page 22: 2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS

2005/06/22 ALBA Building Project 22

D. Safety and Fire Protection.

Page 23: 2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS

2005/06/22 ALBA Building Project 23

D. Safety and Fire Protection.

• In accordance with national rules.• Safety and Control Integrated System:

– Fire Detection– Fire Extinguishing (mobile, fixed, outdoor hydrants, automatic

plus water/pumping system)– Intrusion detection– Access control– Visits control– Closed TV system– Technical control– HVAC monitoring and protection– Electrical Power monitoring and protection– Emergency Plan– Waste management

Page 24: 2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS

2005/06/22 ALBA Building Project 24

Thanks for your attention