3.NMEX T&C Shop Equipment Installation -8 -7 -6 -5 -4 -3 -2 -1 7 14 21 28 4 11 18 25 4 11 18 25 1 8 15 22 29 6 13 20 27 3 10 17 24 1 8 15 22 29 5 12 19 26 2 9 16 23 30 7 14 21 28 4 11 18 25 2 9 16 23 30 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 Resp 春節 NMEX_AGSNew Plant(30JPH)【SOP'13/11SOP Equip Schedule (MEX Common) Conveyor NMEX SA1 SA2 AGV NMEX SA1 SA2 Conveyor Installation Schedule General Installation Supplier selection plan RFQ ★PO PBS conveyor system Marking of the installation datums line steel structure installation Rail temporary installation Rail installation(including switch,stopper and friction drive) Rail fixing Rail polishing and adjusting(friction drive final confirmation adjustment) Paint out lifter PBS out lifter Trolley detection tool installation Air circuit installation Air circuit ventilation confirmation PBS control panel , Sensor and Duct PBS trolley Assembly PBS trolley inputs Safety fence PBS final confirmation ( trial test) Trim line conveyor system Marking of the installation datums line Dolly running rail installing and fixing Dolly guiding rail installing and fixing Rail polishing , horizantal adjusting Friction drive installing Trim Dolly Clamping device Trim line side platform Air circuit installation Air circuit ventilation confirmation Trim control panel , Sensor and Duct Trim Dolly Assembly Trim Dolly inputs Safety fence Trim final confirmation (trial test) Trim dolly check Jig installation Chassis UF conveyor system Marking of the installation datums line steel structure installation (post, net , safety fence on the net) Rail installation(including switch,stopper and friction driver) Trim Out lifter Chassis in lifter maintenance lifter chassis line detection tool installing chassis line hanger inputs Air circuit installation Air circuit ventilation confirmation Trim control panel , Sensor and Duct Chassis UF line hanger Assembly Chassis UF line hanger inputs Safety fence ( ground level) UF hanger Check jig UF final confirmation (trial test) CT final conveyor system Marking of the installation datums line Dolly running rail installing and fixing Dolly guiding rail installing and fixing Rail polishing , horizantal adjusting Friction drive installing Chassis Dolly Clamping device Chassis line side platform Air circuit installation Air circuit ventilation confirmation CT final control panel , Sensor and Duct Chassis Dolly Assembly Chassis Dolly inputs Safety fence Final confirmation (trial test) CT final dolly height change CS Line Marking of the installation datums line Rail installation Drive tensioning installing Rail polishing and adjusting Slat plate installing Chassis Out lifter Air circuit installation Air circuit ventilation confirmation CS Line control panel , Sensor and Duct Safety fence Final confirmation (trial test) Shower Line Marking of the installation datums line Rail installation Drive tensioning installing Rail polishing and adjusting Slat plate installing Air circuit installation Air circuit ventilation confirmation Shower line control panel , Sensor and Duct Safety fence Over All 8 9 4 3 1 2 FY13 10 11 12 5 6 7 Fabrication Transportation Prod Trial System Trial Single Trial Installation . Buy- Fabrication Transportation Installation Single Trial ▼Commisioning start Equip Test System Trial NMEX 春節:2/9~15 NMEX DA Start of Vehicle production Equipment completion

2 NMEX RFQ TC Conveyor Installation

Embed Size (px)

Citation preview

Page 1: 2 NMEX RFQ TC Conveyor Installation

3.NMEX T&C Shop Equipment Installation Schedule-8 -7 -6 -5 -4 -3 -2 -1

7 14 21 28 4 11 18 25 4 11 18 25 1 8 15 22 29 6 13 20 27 3 10 17 24 1 8 15 22 29 5 12 19 26 2 9 16 23 30 7 14 21 28 4 11 18 25 2 9 16 23 302 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1

Resp 春節

NMEX_AGS:New Plant(30JPH)【SOP:'13/11】 SOP

Equip Schedule (MEX Common)

Conveyor NMEX SA1 SA2

AGV NMEX SA1 SA2

Conveyor Installation Schedule

GeneralInstallation Supplier selection plan

★RFQ ★PO

PBS conveyor system

Marking of the installation datums line

steel structure installation

Rail temporary installation

Rail installation(including switch,stopper and friction drive)

Rail fixing

Rail polishing and adjusting(friction drive final confirmation adjustment)

Paint out lifter

PBS out lifter

Trolley detection tool installation

Air circuit installation

Air circuit ventilation confirmation

PBS control panel , Sensor and Duct

PBS trolley Assembly

PBS trolley inputs

Safety fence

PBS final confirmation ( trial test)

Trim line conveyor system

Marking of the installation datums line

Dolly running rail installing and fixing

Dolly guiding rail installing and fixingRail polishing , horizantal adjusting

Friction drive installing

Trim Dolly Clamping device

Trim line side platform

Air circuit installation

Air circuit ventilation confirmation

Trim control panel , Sensor and Duct

Trim Dolly Assembly

Trim Dolly inputs

Safety fence

Trim final confirmation (trial test)

Trim dolly check Jig installation

Chassis UF conveyor system

Marking of the installation datums line

steel structure installation (post, net , safety fence on the net)

Rail installation(including switch,stopper and friction driver)

Trim Out lifter

Chassis in lifter

maintenance lifter

chassis line detection tool installing

chassis line hanger inputs

Air circuit installation

Air circuit ventilation confirmation

Trim control panel , Sensor and Duct

Chassis UF line hanger Assembly

Chassis UF line hanger inputs

Safety fence ( ground level)

UF hanger Check jig

UF final confirmation (trial test)

CT final conveyor system

Marking of the installation datums line

Dolly running rail installing and fixing

Dolly guiding rail installing and fixingRail polishing , horizantal adjusting

Friction drive installing

Chassis Dolly Clamping device

Chassis line side platform

Air circuit installation

Air circuit ventilation confirmation

CT final control panel , Sensor and Duct

Chassis Dolly Assembly

Chassis Dolly inputs

Safety fence

Final confirmation (trial test)

CT final dolly height change

CS Line

Marking of the installation datums line

Rail installation

Drive tensioning installing

Rail polishing and adjusting

Slat plate installing

Chassis Out lifter

Air circuit installation

Air circuit ventilation confirmation

CS Line control panel , Sensor and Duct

Safety fence

Final confirmation (trial test)

Shower Line

Marking of the installation datums line

Rail installation

Drive tensioning installing

Rail polishing and adjusting

Slat plate installing

Air circuit installation

Air circuit ventilation confirmation

Shower line control panel , Sensor and Duct

Safety fence

Over All

8 9431 2

FY13

10 11 125 6 7

Fabrication Transportation

Prod Trial

System TrialSingle Trial

Installation .

Buy-

FabricationTransportation Installation

Single Trial

▼Commisioning start

Equip Test

System Trial

NMEX

春節:2/9~15

NMEX

★DA

Start of Vehicle production

Equipment completion

Page 2: 2 NMEX RFQ TC Conveyor Installation

3.NMEX T&C Shop Equipment Installation Schedule-8 -7 -6 -5 -4 -3 -2 -1

7 14 21 28 4 11 18 25 4 11 18 25 1 8 15 22 29 6 13 20 27 3 10 17 24 1 8 15 22 29 5 12 19 26 2 9 16 23 30 7 14 21 28 4 11 18 25 2 9 16 23 302 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1

Resp 春節

NMEX_AGS:New Plant(30JPH)【SOP:'13/11】 SOP

Equip Schedule (MEX Common)

Conveyor NMEX SA1 SA2

AGV NMEX SA1 SA2

Over All

8 9431 2

FY13

10 11 125 6 7

Fabrication Transportation

Prod Trial

System TrialSingle Trial

Installation .

Buy-

FabricationTransportation Installation

Single Trial

▼Commisioning start

Equip Test

System Trial

NMEX

春節:2/9~15

NMEX

★DA

Start of Vehicle production

Equipment completion

Final confirmation (trial test)

Engine dress line

Marking of the installation datums line

steel structure installation

Rail installation(including switch,stopper and friction driver)

Rail polishing , horizantal adjusting (friction drive final confirmation adjusting)

Engine dress line hanger Assembly

hanger inputs

Air circuit installation

Air circuit ventilation confirmation

Engine dress line control panel , Sensor and Duct

Safety fence

Final confirmation (trial test)

Door sub conveyor system

Marking of the installation datums line

steel structure installation

Rail installation(including switch,stopper and friction driver)

Rail polishing , horizantal adjusting (friction drive final confirmation adjusting)

Door sub trolley Assembly

Door sub trolley inputs

Air circuit installation

Air circuit ventilation confirmation

Engine dress line control panel , Sensor and Duct

Safety fence

Final confirmation (trial test)

Door supply cart

Unit marriage Line

Marking of the installation datums line

Dolly running rail installing and fixing

Dolly guiding rail installing and fixingRail polishing , horizantal adjusting

Control panel , Sensor and Duct

Dolly Assembly

Dolly inputs

Safety fence

Unit marriage final confirmation (trial test)

QRQC system

QRQC SW

Control panel and Duct

Final confirmation (trial test)

Line control panel

Control panel and Duct

Final confirmation (trial test)

AGV

Guide rail (magnetic tape) installation

Battery charger installation

Battery charger arm installation

LB BOX Assembly

Control panel and Duct

Final confirmation (trial test)

Page 3: 2 NMEX RFQ TC Conveyor Installation

4-1 SCOPE OF CONTRACTOR’S WORK

(1)Installation work

Explanatory note1 : Equipment Design snd Fabrication2 : Shipping supplier3333 : Mechanical Installation4444 : Electrical Installation5555 : Electric operation supplier of Conveyor Trial6 : In house Nissan Installation Supervisor 7 : Equipment Design snd Fabrication Installation Sup ervisor

JOB

PR

OC

ES

S

Pro

ject

Man

agem

ent

Mar

ine

tran

spor

tatio

n

Impo

rt p

roce

dure

Con

tain

er tr

ansp

orta

tion

from

bond

ed w

areh

ouse

at p

ort t

oco

ntai

ner

yard

Con

tain

er tr

ansp

orta

tion

from

cont

aine

r ya

rd to

Nis

san

plan

tsi

te(c

onta

iner

yar

d )

Bul

k tr

ansp

orta

tion

from

bond

ed w

areh

ouse

to N

issa

npl

ant s

ite(c

onta

iner

yar

d )

Dis

burd

enm

ent f

rom

aco

ntai

ner

Tra

nspo

rtat

ion

from

Dis

burd

enm

ent a

rea

to U

n-pa

ckin

g ar

ea

Un-

pack

ing

of M

echa

nica

l Par

ts

Disposal of packing m

aterials of

Mechanical Parts

Un-

pack

ing

of E

lect

rical

Par

ts

Disposal of packing m

aterials of

Electrical Parts

Mec

hani

cal P

arts

Tra

nspo

rtat

ion

from

Un-

pack

ing

area

to in

stal

latio

n ar

eaE

lect

rical

Par

ts T

rans

port

atio

nfr

om U

n-pa

ckin

g ar

ea to

inst

alla

tion

area

Mec

hani

cal i

nsta

llatio

n S

V

Ele

ctric

al in

stal

latio

n S

V

Marking of the installation place

for M

echanical Equipm

ent

Marking of the installation place

for Electrical Equipm

ent

Mec

hani

cal i

nsta

llatio

n

Ele

ctric

al in

stal

latio

n

Ele

ctric

ope

ratio

n of

Con

veyo

rT

rial a

nd a

djus

tmen

t

Com

mis

sion

ing

(Fin

alin

spec

tion)

Paint out lifter 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLPBS FDS conveyor 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLPBS dolly 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLPBS out lifter 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLTrim Dolly Clamping device 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLTrim line FDS conveyor 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLTrim dolly base 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLTrim dolly fixture 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLTrim out lifter 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLTrim Dolly Clamping device 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLChassis U/F FDS OHC 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLChassis U/F hanger 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLChassis trim in lifter 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLChassis Dolly Clamping device 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLChassis dolly base 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLChassis dolly Scissors lifter 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLChassis dolly fixture 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLChassis line FDS conveyor 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLChassis dolly height changer 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLChassis Dolly Clamping device 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLChassis out lifter 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLChassis Dolly Clamping device 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLQRQC system 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLConveyor Total Control Panel 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLDoor sub line conveyor 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLDoor sub line hanger 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLUnit marriage line dolly with Lifter

6 2 2 2 2 2 3 3 3 34 4

34

6 6 34

34

5 ALLEngine dress line FDS OHC 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLCS conveyor 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLShower conveyor 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLAGV (Main Line) 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLAGV lithium Battery (Main Line) 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALLAGV Battery Charger (Main 6 2 2 2 2 2 3 3 3 3 4 4 3 4 6/7 6/7 3 4 3 4 5 ALL

Page 4: 2 NMEX RFQ TC Conveyor Installation

Land transportation

PLANTPLANTPLANTPLANT

container yard

at Nissan plant site

UNLOADING

form

Container

Unloading container

T&C shop Building

Unpacking AREAInstallation AREA

Dust AREA

Start of the Installation Supplier Job Scope

Unloading by Fork lift truck directly

4-2. Detail of transportation, unpacking(Unloading ,Unpacking crate cases. Disposal of all packing materials.)

Q'ty of container (40ft container)

The amount of the container is cf. attached document

Emty container

Shipping Supplier Job Scope

Shipping Supplier Job Scope

Page 5: 2 NMEX RFQ TC Conveyor Installation

4-3. Estimated Quantity of Containers for NMEX T&C Conveyors

1. MEXOversize

Mechanical Electrical Crate1 PBS 21 4.5

2 TRIM 4 3

3 TRIM Dolly 7

4 Chassis U/F OH CV 30 2.5

5 Chassis Trim and Final CV 3 3.5

6 Chassis Dolly Height Change 1 0.5

7 Chassis Final Out Lifer 1 0.5

8 Chassis Dolly 6

9 CS Line 5 2

10 Shower Line 4 2

11 Engine Dress Line 10 2

12 Door Sub Line 26 3

13 QRQC 1

14 Conveyor Total Control Panel 0.5

15 Spare parts

16 Unit Marriage Line 4 1

122 26 0

Notes:1. Quantity of containers is estimated quantity, for reference only.2.Lifter platform width will be controlled to be less than 2.2m,so it will not be considered to be oversize any more.

40 FT Sea ContainersMEX Line Remarks

Page 6: 2 NMEX RFQ TC Conveyor Installation

5. Supplied item from Nissan

1)Equipment

Equipment Item Supplied by Nissan

Size

(Vertical X horizontal X Thickness)

Weight Quantity

Paint out lifter ○

PBS FDS conveyor ○

PBS dolly ○

PBS out lifter ○

Trim Dolly Clamping device ○

Trim line FDS conveyor ○

Trim dolly base ○

Trim dolly fixture ○

Trim out lifter ○

Trim Dolly Clamping device ○

Chassis U/F FDS OHC ○

Chassis U/F hanger ○

Chassis trim in lifter ○

Chassis Dolly Clamping device ○

Chassis dolly base ○

Chassis dolly Scissors lifter ○

Chassis dolly fixture ○

Chassis line FDS conveyor ○

Chassis dolly height changer ○

Chassis Dolly Clamping device ○

Chassis out lifter ○

Chassis Dolly Clamping device ○

QRQC system ○

Conveyor Total Control Panel ○

Door sub line conveyor ○

Door sub line hanger ○

Unit marriage line dolly with Lifter ○

Engine dress line FDS OHC ○

CS conveyor ○

Shower conveyor ○

AGV (Main Line) ○

AGV lithium Battery (Main Line) ○

AGV Battery Charger (Main Line) ○

2)Others

1. 工事用の電源は、日産側で、組立工場内に、1ケ所準備しますので、工事に必要な電源は、この場所まで、配線すること

2. The infrastructure such as the restroom ,dining room and shower room is prepared by supplier.

2. 食堂・トイレ・シャワールーム等のインフラはサプライヤーで準備する

3. The supplier prepare for temporary container houses for installation activity.

3. 設置工事のための仮設のコンテナハウス等を準備すること

4. Because there is no lighting during a installation period, the supplier prepare for lighting in a plant as needed.

4. 工事期間、工場内に照明はないので、必要に応じて照明を、準備すること。

5. 工事に伴い発生した、残材、ゴミ等は所定の場所まで持っていくこと

  But it`s not needed if English communication is possible by supplier supervisor.

6. SVとのコミニュケーションのために、英語の通訳を準備すること。

  但し、英語のコミニュケーションが可能であれば、通訳は不要とする。

7. When problems/damages is found at unpacking, responsibility will be discussed by related members.

7. 問題/ダメージが開梱時に確認された場合、責任については関係者で協議される

8. When problems/damages is found at installation as well ,responsibility will be discussed by related members.

8. 同様に問題/ダメージが設置時に確認された場合、責任については関係者で協議される

詳細は、個別仕様書参照

see individual specification about detail

1. The power supply for installation is prepared for 1 point in T&C plant by Nissan.

The supplier wire a power supply cable ,if necessary for installation, to this place.

5. The supplier bring the remaining materials(packing materials etc)and garbage to wastage area which is decided by Nissan.

6. The supplier prepare for an English interpreter for the communication with the supervisor who is from Nissan Japan.

Page 7: 2 NMEX RFQ TC Conveyor Installation

6.1 Buy Off Conditions6.1 Buy Off Conditions6.1 Buy Off Conditions6.1 Buy Off Conditions "X" means the Buy off condition for the supplier."X" means the Buy off condition for the supplier."X" means the Buy off condition for the supplier."X" means the Buy off condition for the supplier.

No. Milestone

Installation Paint

application

Condition Way to Validate

1 Execution of the Agreement

X

Supplier receives a purchase order from NISSAN. -

2 Final Acceptance

X

To satisfy the equipment specifications of engineering process

X

To complete all correction items indicated by Nissan

X

To complete modification of specification change agreed after

contract

X

Observe the installation schedule at the time of the contract.

But it is excluded when a schedule is delayed in a factor

except the supplier responsibility.

3 Start of production

X

To submit all of approvable documentation Finishing of receipt

X

No failure caused by fabrication errors, or installation errors

6.2 Warranty6.2 Warranty6.2 Warranty6.2 Warranty

Regarding the problems caused by construction work should be guaranteed 1 year with no Nissan payment.