Practical Work Report APPROVAL SHEET FDI ( FLUID DENSITY INERTIAL ) INSTRUMENT STUDY FOR CASED-HOLE LOGGING PROCESS IN PT. HALLIBURTON WIRELINE & PERFORATING, TAMBAK SAWAH- SIDOARJO (July 15 th 2014 – August 25 th 2014) Winda Cynthia Dewi 2411 100 087 Has completed MK TF 091 274 Engineering Ethics and Work Practice in accordance with the syllabus in the curriculum 2009/2014 - Graduate Program.. Sidoarjo, August 2014 Perceive, Field Services Coordinator Halliburton W&P Surabaya Pamudji Raharjo Supervisor of Internship Program/ Maintance Coordinator Oscar Ongkokusumo Surabaya, August 2014 Perceive, Head of Engineering Physics Department Educational Advisor Jurusan Teknik Fisika- FTI- ITS ii

2. Halaman Awal_2

Embed Size (px)

DESCRIPTION

kp

Citation preview

Page 1: 2. Halaman Awal_2

Practical Work Report PT. Halliburton Wireline & Perforating

APPROVAL SHEET

FDI ( FLUID DENSITY INERTIAL ) INSTRUMENT STUDY FOR CASED-HOLE LOGGING PROCESS IN PT. HALLIBURTON WIRELINE & PERFORATING,

TAMBAK SAWAH- SIDOARJO

(July 15th 2014 – August 25th 2014)

Winda Cynthia Dewi 2411 100 087

Has completed MK TF 091 274 Engineering Ethics and Work Practice in accordance with

the syllabus in the curriculum 2009/2014 - Graduate Program..

Sidoarjo, August 2014

Perceive,

Field Services Coordinator Halliburton

W&P Surabaya

Pamudji Raharjo

Supervisor of

Internship Program/ Maintance Coordinator

Oscar Ongkokusumo

Surabaya, August 2014

Perceive,

Head of Engineering Physics Department

Dr.Ir. Totok Soehartanto, DEA

NIP. 19650309 1990021001

Educational Advisor

Dr. Ir. Aulia Siti Aisjah, M.T.

NIP. 196601161989032001

Jurusan Teknik Fisika- FTI- ITS ii

Page 2: 2. Halaman Awal_2

Practical Work Report PT. Halliburton Wireline & Perforating

COMPANY APPROVAL SHEET

PRACTICAL WORK REPORT

PT. HALLIBURTON WIRELINE & PERFORATING

TAMBAK SAWAH - SIDOARJO

July 15th 2014 – August 25th 2014

FDI ( FLUID DENSITY INERTIAL ) INSTRUMENT STUDY FOR CASED-HOLE LOGGING PROCESS IN PT. HALLIBURTON WIRELINE & PERFORATING,

TAMBAK SAWAH- SIDOARJO

Compiled by:

Winda Cynthia Dewi (2411 100 087)

Approved,

Field Services Coordinator Halliburton

W&P Surabaya

Pamudji Raharjo

Supervisor of

Internship Program/ Maintance Coordinator

Oscar Ongkokusumo

Jurusan Teknik Fisika- FTI- ITS iii

Page 3: 2. Halaman Awal_2

Practical Work Report PT. Halliburton Wireline & Perforating

STUDY INSTRUMENT FDI (FLUID DENSITY INERTIAL) TOOL FOR PROCESS IN CASED-HOLE LOGGING IN HALLIBURTON WIRELINE &

PERFORATING, TAMBAK SAWAH- SIDOARJO

Name of Student : Winda Cynthia DewiNRP : 2411 100 087Department : Engineering Physics

Abstract

Halliburton is one of the largest oil service company in the world, operating in over 80

countries, has branches in various places, especially in Indonesia. One branch of this

company is part of Halliburton Wireline and Perforating unit that prepares Surabaya

Logging and Perforating activities in the area of operation for the user. One of the tools

used in the logging process is FDI (Fluid Density Inertial) which is used to measure the

density of the oil in the wellbore. Logging results will be evaluated whether the area has an

appropriate quality oil or not the economic value to be gained. The working principle of

FDI is the liquid density measurement using a tuning fork sensor will oscillate according

naturalnya frequency, while the fluid (oil) here serves as a vibration damper that will result

will be sent via telemetry in the form of frequency and found the density of oil in the area.

Keywords : Halliburton, FDI, Tuning Fork

Jurusan Teknik Fisika- FTI- ITS iv

Page 4: 2. Halaman Awal_2

Practical Work Report PT. Halliburton Wireline & Perforating

PROLOGUE

Praise to God we pray to Allah SWT, thanks to His mercy and guidance activities in PT

HALLIBURTON Wireline & Perforating Wetland Pond-Sidaorjo for one month starting

from 15 July until 25 August 2014 with the title STUDY INSTRUMENT FDI (FLUID

DENSITY INERTIAL) TOOL FOR PROCESS IN CASED-HOLE LOGGING IN

HALLIBURTON WIRELINE & PERFORATING, TAMBAK SAWAH- SIDOARJO

can be done well until the end of this report can kerjapraktek stacking writer to finish.

Practical work and the preparation of this report do not support all the parties separated.

The author would like to thank:

1. God Almighty for His will above all was the author given the ability and patience

to be able to complete this practical work.

2. Both parents and families who have given the full spirit and support both morally

and materially to the author during practical work is underway.

3. Mr. Rangga as a mentor who has guided for Job Training activities.

4. Mr. Oscar Ongkokusumo as Supervisor of Internship Program / Maintenance

Coordinator.

5. Mr. Nata and Mr. Agus who have shared their knowledge and experiences during

practical work.

6. Mr. Edwin, Mr. Arif and Mr. Moamar, Mr. Satra who have shared knowledge

about the tools that will be discussed during the practical work.

7. All members of the ME and SONDE LAB which has given a lot of material and

knowledge for the writer to do practical work.

8. Mr. Pamudji Raharjo as Field Services Coordinator Halliburton W & P Surabaya.

9. Mrs. Aulia Siti Aisjah as supervisor who has helped in the construction of this

practical work report.

10. Gigis Kintan Miyarthaluna student of engineering physics ITS, as co-workers

practice.

11. Bazi Aji student of engineering physics ITS who have given moral support and

assistance in the supply of equipment for the manufacture of practical work.

Jurusan Teknik Fisika- FTI- ITS v

Page 5: 2. Halaman Awal_2

Practical Work Report PT. Halliburton Wireline & Perforating

12. All my friends and all those who have contributed, either directly or indirectly in

this practical work which can’t be authors mention one by one thank you for all

your help.

The author realizes that this report is still far from perfect. For that advice and constructive

criticism is expected. Hopefully this report useful for us all. End the authors apologize for

any mistakes made during implementation to the preparation of this report.

Surabaya, August 2014

Author,

Winda Cynthia Dewi

2411 100 087

Jurusan Teknik Fisika- FTI- ITS vi

Page 6: 2. Halaman Awal_2

Practical Work Report PT. Halliburton Wireline & Perforating

TABLE OF CONTENTS

COVER PAGE........................................................................................................................i

APPROVAL SHEET.............................................................................................................ii

COMPANY APPROVAL SHEET.......................................................................................iii

ABSTRACT..........................................................................................................................iv

INTRODUCTION..................................................................................................................v

TABLE OF CONTENTS.....................................................................................................vii

LIST OF FIGURES................................................................................................................x

LIST OF TABLES...............................................................................................................xii

CHAPTER I INTRODUCTION............................................................................................1

1.1. Practical Work Background..........................................................................................1

1.2. Practical Work Purpose................................................................................................1

1.3. Practical Work Material................................................................................................2

1.4. Place and Time of Execution........................................................................................3

1.5. Schedule of Program Activities....................................................................................4

CHAPTER II COMPANY PROFILE....................................................................................6

2.1. History of PT.Halliburton.............................................................................................6

2.2. Vision and Mission.......................................................................................................7

2.3. Organzational Structure................................................................................................8

2.4. Operation Area............................................................................................................11

2.5. Operation Facilities.....................................................................................................12

2.6. Kasus Manajerial tentang Keselamatan Kerja............................................................13

2.6.1. Job Safety Analysys (JSA)..............................................................................13

BAB III STUDY INSTRUMENT FDI ( FLUID DENSITY INERTIAL ) TOOL UNTUK

PROSES LOGGING PADA CASED-HOLE DI PT. HALLIBURTON WIRELINE

& PERFORATING....................................................................................................20

3.1. Logging....................................................................................................................20

3.2. Wireline Logging.....................................................................................................20

3.3. Cased-Hole Logging.................................................................................................22

Jurusan Teknik Fisika- FTI- ITS vii

Page 7: 2. Halaman Awal_2

Practical Work Report PT. Halliburton Wireline & Perforating

3.4. Production Logging Tool (PLT)...............................................................................23

3.4.1. Quartz, Pressure Gauge, QPS.......................................................................27

3.4.2. Sensor CCL...................................................................................................27

3.4.3. Gamma Ray..................................................................................................28

3.4.4. ILS Flowmeter..............................................................................................28

3.4.5. Densitas........................................................................................................29

3.4.3. Kapasitansi....................................................................................................28

3.4.4. Suhu..............................................................................................................28

3.4.5. Flowmeter.....................................................................................................29

3.5. Fluid Density Inertial (FDI) Tool.............................................................................24

3.6. Density......................................................................................................................25

3.7. Komponen Fluid Density Inertial Tool....................................................................26

3.7.1. Tuning Fork..................................................................................................27

3.7.2. Piezoelectric Stack........................................................................................27

3.7.3. Electronics Assembly...................................................................................28

3.7.4. Oil Reservoir.................................................................................................28

3.7.5. Oil Fill Port...................................................................................................29

3.8. Block Diagram System.............................................................................................29

3.8.1. Ultrawire Toolbus.........................................................................................30

3.8.2. Ultrawire Power Supply...............................................................................30

3.8.3. Telemetry Board...........................................................................................30

3.8.4. Oscillator Board...........................................................................................30

3.8.3. Analogue to Digital Convertion Board........................................................30

3.8.4. Tuning Fork..................................................................................................30

3.8.3. Crystal Stack.................................................................................................31

3.8.4. Temperature Sensor.....................................................................................31

3.9. Tool Calibration.......................................................................................................31

3.10. Tool Assembly.........................................................................................................33

BAB IV Conclusion and Recommendation35

4.1. Conclusion35

4.2. Recommendation35

DAFTAR PUSTAKA..........................................................................................................36

Jurusan Teknik Fisika- FTI- ITS viii

Page 8: 2. Halaman Awal_2

Practical Work Report PT. Halliburton Wireline & Perforating

LAMPIRAN.............................................................................................................................

Jurusan Teknik Fisika- FTI- ITS ix

Page 9: 2. Halaman Awal_2

Practical Work Report PT. Halliburton Wireline & Perforating

DAFTAR GAMBAR

Gambar 2.1 Struktur Organisasi Perusahaan

Gambar 2.2 Logging Unit di Offshore

Gambar 2.3 Halliburton Life Rules12

Gambar 3.1 Proses Logging20

Gambar 3.2 Cased-hole Logging22

Gambar 3.3 Standard Length Production Logging Tool23

Gambar 3.4 Fluid Density Inertial Tool26

Gambar 3.5. Struktur Alat FDI27

Gambar 3.6 Tuning Fork pada FDI27

Gambar 3.7 Diagram Blok FDI29

Gambar 3.8 Tampilan Program Warrior untuk FDI30

Gambar 3.9 Instruksi Manual Perakitan FDI 32

Jurusan Teknik Fisika- FTI- ITS x

Page 10: 2. Halaman Awal_2

Practical Work Report PT. Halliburton Wireline & Perforating

DAFTAR TABEL

Tabel 1.1 Realisasi Kegiatan

Jurusan Teknik Fisika- FTI- ITS xi