1st Fortnightly KPI Report August,15
S. No. BSC Name Region Vendor
1X
Call Setup Success Rate (>=95%)
July-2nd
1 HYDBSC6680 STR1/STR5 Huawei 98.29
2 KHIZTEBSC-03 KTR ZTE 99.82
3 KHIZTEBSC-04 KTR ZTE 99.74
4 QTAZTE Overall WTR ZTE 95.4
5 WTR ZTE 98.67
6 WTR ZTE 94.24
7 HYDZTEBSC STR1 ZTE 97.73
QTAZTE W/O Sites Basima and Sarap Zehri
QTAZTE only with Basima sarap zehri , Awaran , USF Mastung , naag , Nall
8 QTABSC6680 overall WTR Huawei 97.2
9 WTR Huawei 98.24
10 WTR Huawei 95.64
QTABSC6680 W/O Sites Kohlu USF+Dhandhar+Chamalong
(WarZone)+tolegi
QTABSC6680 only with kohlu & USF Sites+Dhandhar and Chamalong
(WarZone) + tolegi
1st Fortnightly KPI Report August,15
1X
Call Setup Success Rate (>=95%)Call Setup Success Rate (>=95%) Call Drop Rate (<=2%) Soft HO Success Rate (>=98%)
Aug-1st July-2nd Aug-1st July-2nd Aug-1st
98.28 1.53 1.97 99.67 98.48
99.76 0.73 0.51 99.89 99.9
99.84 0.93 0.92 98.65 98.65
89.66 1.59 1.49 99.6 99.3
98.74 1.74 1.47 99.36 99.72
86.74 1.53 1.50 99.66 99.15
96.18 1.36 1.24 99.68 99.55
97.55 3.45 2.88 98.88 99.12
98.62 3.14 2.63 99.07 99.35
96.09 3.94 3.23 98.6 98.83
1st Fortnightly KPI Report August,15
1X EVDO Stats
TCH Congestion (<=2%) Connection Requests (Times)
July-2nd Aug-1st July-2nd Aug-1st July-2nd
0.02 0.06 1219609 1199655 98.3
0.01 0 12256501 13477563 97.09
0 0 9060677 9996451 97.26
3.98 10.71 6892836 7187614 91.32
Connection Setup Success Ratio (>=96%)
0.2 0.18 6892836 7187614 91.32
5.39 14.58 6892836 7187614 91.32
0.85 1.57 9002446 9338343 93.8
0.32 0.04 NO EVDO SITES NO EVDO SITES
0 0.02 NO EVDO SITES NO EVDO SITES
0.81 0.07 NO EVDO SITES NO EVDO SITES
NO EVDO SITES
NO EVDO SITES
NO EVDO SITES
1st Fortnightly KPI Report August,15
EVDO Stats
Connection Drop Ratio (<=2%)
Aug-1st July-2nd Aug-1st
97.68 1.18 1.02
96.51 1.68 1.76
97.38 1.52 1.58
90.72 2.23 2.52
Connection Setup Success Ratio (>=96%)
90.72 2.23 2.52
90.72 2.23 2.52
93.97 1.79 1.62
NO EVDO SITES NO EVDO SITES
NO EVDO SITES NO EVDO SITES
NO EVDO SITES NO EVDO SITES
NO EVDO SITES
NO EVDO SITES
NO EVDO SITES
1st Fortnightly KPI Report August,15
2nd Fortnightly July 2015 Comments
All KPIs within target limit.
All KPIs within target limit.
All KPIs within target limit.
EvDO kpis are too low because of RTR Freqeuncy point issues on different sites. TCH
congestion is bit high due to remote sites power and media issues.
EvDO kpis are too low because of RTR Freqeuncy point issues on different sites. TCH
congestion is bit high due to remote sites power and media issues. CSR is bit low due to
Pa issues on turbat , uthal whereas congestion at naag and chitkan
EvDO kpis are too low because of RTR Freqeuncy point issues on different sites.
HYDZTEBSC EVDO CSSR is below the benchmark due to on-going Carrier Re-Framing
activity. RTR-B RSU are being swapped with RTR-D RSU supporting 1000 series carrier. It shall improve as the activity gets complete.
KPI's overall are low due to 10 july STM issue connecting BSC to KHI MSC on 10th CSR is 10
% which is affecting overall BSC stats
KPI's overall are low due to 10 july STM issue connecting BSC to KHI MSC on 10th CSR is 10
% which is affecting overall BSC stats
KPI's overall are low due to 10 july STM issue connecting BSC to KHI MSC on 10th CSR is 10
% which is affecting overall BSC stats
1st Fortnightly KPI Report August,15
1st Fortnightly August 2015 Comments
All KPIs within target limit.
All KPIs within target limit.
All KPIs within target limit.
EvDO are low because of "TCC Timinig Increase " on 1st and 8th of August (GAWADER BTS , a main
contributor) consquenlty CSSR degraded to 77 % and 84 % .CDR is a bit High because of PA disabling on "Shafi colony EvDO BTS " 1x CSSR is low and TCH
Congestion High because of distant users (FWD Power Shortage) on Naag , Awaran , Basima and USF BTS's
Kalat Coal Mines , Goal Patt and Killi Noor Muhammad BTS's
EvDO Overall AvG KPI's are low because of TCC Timinig Increase on 1st and 8th of August (GAWADER BTS , a main contributor) consquenlty CSSR degraded
to 77 % and 84 % .CDR is a bit High because of PA disabling Issue on "Shafi colony EvDO BTS "
EvDO Overall AvG KPI's are low because of TCC Timinig Increase on 1st and 8th of August (GAWADER BTS , a main contributor) consquenlty CSSR degraded
to 77 % and 84 % .CDR is a bit High because of PA disabling on "Shafi colony EvDO BTS " 1x CSSR is low
and TCH Congestion High because of distant users (FWD Power Shortage) on Naag , Awaran , Basima and USF BTS's Kalat Coal Mines , Goal Patt and Killi Noor
Muhammad
HYDZTEBSC EVDO CSSR is on the improving trend as gradually RSU/Hardware issues are getting resolved.HW
& transmit power issues already highlighted with Operations Team.
Overall CDR is a bit high due to Distant Users on Kalat , Harnai , Upper Chaman and Barshore BTS's.
Media/BTS Interruption on USF Baghdad and Kadin BTS's causes Neighbouring BTS's to share the load for
distance users causing droppage in calls ,
CDR is a bit High because of Distant Users on Kalat , Harnai , Upper Chaman , Barshore BTS's
High CDR is due to BTS Outages either due to (Power/Media ), main contributors are USF Baghdad ,Kadin and KHOLU BTS's causes
Neighbouring BTS's to share the load of distance users consequently result in High CDR
EVDO Stats
Average Achieved Values 8239935 95.252
KPI (Targets) Connection Requests (Times)
Connection Setup Success Ratio (>=96%)
EVDO Stats CDMA 2000 1x Stats
1.7 96.88 1.50 99.17
Connection Drop Ratio (<=2%)
Call Setup Success Rate
(>=95%)
Call Drop Rate(<=2%)
Soft HO Success Rate (>=98%)
CDMA 2000 1x Stats
0.31
TCH Congestion (<=2%)
S. No. BSC Name Region Vendor
CDMA 2000 1x Stats
Call Setup Success Rate (>=95%)
1 HYDBSC6680 STR1/STR5 Huawei 98.45 99.20 80.6 99.2
2 KHIZTEBSC-03 KTR ZTE 98.73 98.80 98.9 98.9
3 KHIZTEBSC-04 KTR ZTE
4 WTR ZTE
7 HYDZTEBSC STR1 ZTE 97.63 98.00 98.3 98.0
8 QTABSC6680 overall WTR Huawei 97.83 91.30 91.0 90.3
April Report #2
May Report #1
May
Report #2 June
Report #1
QTAZTE W/O Sites Basima and Sarap
Zehri
1X EVDO Stats
Call Setup Success Rate (>=95%) Call Drop Rate (<=2%)
July-2nd Aug-1st July-2nd Aug-1st July-2nd Aug-1st July-2nd Aug-1st July-2nd Aug-1st
98.29 98.28 1.53 1.97 99.67 98.48 0.02 0 1219609 1199655
99.82 99.76 0.73 0.51 99.89 99.9 0.01 0 12256501 13477563
99.74 99.84 0.93 0.92 98.65 98.65 0 0 9060677 9996451
98.67 98.74 1.74 1.47 99.36 99.72 0.2 0.18 6892836 7187614
97.73 96.18 1.36 1.24 99.68 99.55 0.85 1.6 9002446 9338343
97.2 97.55 3.45 2.88 98.88 99.12 0.32 0.0
98.39 1.50 99.24 0.31 82399250 8239925
0
Soft HO Success Rate (>=98%)
TCH Congestion (<=2%)
Connection Requests (Times)
NO EVDO SITES
NO EVDO SITES
EVDO Stats
July-2nd Aug-1st July-2nd Aug-1st
98.3 97.68 1.18 1.02
97.09 96.51 1.68 1.76
97.26 97.38 1.52 1.58
91.32 90.72 2.23 2.52
93.8 93.97 1.79 1.62
95.252 1.7
Connection Setup Success Ratio (>=96%)
Connection Drop Ratio (<=2%)
NO EVDO SITES
NO EVDO SITES
NO EVDO SITES
NO EVDO SITES
Following BSCs have all Optimization (EVDO) KPIs upto the markHYDBSC6680KHIZTEBSC-03KHIZTEBSC-04
Sr.No
1
2
BSC Bad KPIs
HYDZTEBSC DO CSSR (93.97%)
ZTEQTA DO CSSR (90.92%)& DO Connection Drop (2.52%)
Remarks July #1
HYDZTEBSC EVDO CSSR is on the improving trend as gradually RSU/Hardware issues are getting resolved.HW
& transmit power issues already highlighted with Operations Team.
EvDO Overall AvG KPI's are low because of TCC Timinig Increase on 1st and 8th of August (GAWADER BTS , a
main contributor) consquenlty CSSR degraded to 77 % and 84 % .CDR is a bit High because of PA disabling
Issue on "Shafi colony EvDO BTS "
Following BSCs have all Optimization (EVDO) KPIs up to the mark:· HYDBSC6680· KHIZTEBSC-03· KHIZTEBSC-04
Following BSCs have all Optimization (1X) KPIs up to the mark:· HYDBSC6680· KHIZTEBSC-03· KHIZTEBSC-04· HYDZTEBSC