Example 1 : ESTIMATE OF RCC ROOF SLAB
Details of Measurements & Calculations of Quantities
7/25/2019 193133379 RCC Estimation
http://slidepdf.com/reader/full/193133379-rcc-estimation 2/20
7/25/2019 193133379 RCC Estimation
http://slidepdf.com/reader/full/193133379-rcc-estimation 3/20
Item
No.
Particulars of items &
details of worksNo.
Length
(m)
Breadth
(m)
Height
or
Depth(m)
Quantity Explanatory notes
1RCC work 1:2:3
excluding steel & its
bending, but including
centering & shutering &
binding steel
1 6.3 3.3 0.122.495
cum
No deduction for steel
bars
2 Steel bars including
bending(maild steel in
RCC work- Main bars
12mm dia @ 0.89 kg/m -
---
Straight bars 24cm c/c
(No= ((6.30-
0.80)/0.24)+1=27
27 3.44
Side cover 4 cm
L=3.30-2side covers + 2
hooks = 3.30-
0.08+(18x0.12)=3.44m
Bent up bars 24 cm c/c(No=((6.30-0.8)/0.24)=26
26 3.52 Adding one depth 8 cm
for two bent ups.
Total 184.4 @ 0.89
= 184.40
kg/M
*0.89=
164.12
kg
Distribution bars 6mm
(dia @ 0.22 kg/m)
Bottom bars central
portion 18 cm c/c
(Nos =( 2.00/18 ) + 1=12)
12 6.331=6.30-
0.08+(18*0.12)=6.33m
Bottom bars two sides 2x3 6.33
Top bars two sides 2x3 6.33
Total
151.92 @
0.22kg/m33.42 kg
151.92 x
0.22 =
33.42 kg
Total =197.54
kg1.975
quintal
7/25/2019 193133379 RCC Estimation
http://slidepdf.com/reader/full/193133379-rcc-estimation 4/20
1 RCC work 1:2:4
exculding steel and its
bending but including
centering and
shuttering and bendingof steel 2.495 cum= 675.00/cum= RS 1684.12
2 steel bars including
bending (mild steel ) in
RCC work 1.975 q @ 515.00 per quintel= Rs 1017.13
Total Rs 2701.25
5% cotige. & WE Rs 135.06
Grand toatal 2836.31
Abstract of estimated cost
7/25/2019 193133379 RCC Estimation
http://slidepdf.com/reader/full/193133379-rcc-estimation 5/20
SCHEDULE OF BARS --- RCC SLAB
Description ofbars Shape of Bending Dimensions In cm
Length
of each(m)
No.
Total
Length(m)
Weight(kg)
Main straight bars
12 mm. DIA 3.44 27 92.88
Main Bent up bars
12mm dia. 3.52 26 91.52
Total 184.4 164.12
Bottom distribution
buting bars
6 mm dia 6.33 18 113.94
Top distributing
Bars 6mm dia 6.33 6 37.98
151.92 33.42
7/25/2019 193133379 RCC Estimation
http://slidepdf.com/reader/full/193133379-rcc-estimation 6/20
EXAMPLE 2
ESTIMATING OF R.C.C BEAM
A detailed estimate of a R.C.C beam of 8m clear span and 75cm x 40cm
7/25/2019 193133379 RCC Estimation
http://slidepdf.com/reader/full/193133379-rcc-estimation 7/20
7/25/2019 193133379 RCC Estimation
http://slidepdf.com/reader/full/193133379-rcc-estimation 8/20
Item No.Particulars of items
& details of worksNo.
Length
(m)
Breadth
(m)
Height
or
Depth
(m)
Quantity Explanatory notes
1 R.C.C. work 1:2:4
excluding steel and
its bending but
including centering
1 8.6 0.4 0.75 2.58 cu.mNo deduction for vol. Of
steel bars.
2 Steel bars including
(mild steel) in R.C.Cwork Main bars –
22mm dia. Straight
4 8.92 35.68 x2.98 kg 106.33 kg
L=8.60-2 end cover + 2
hooks= 8.60-(2X4
cm)+(18X22mm) =8.92 m
20 mm dia. bent up
bars @2.47kg/m4 9.48 37.92
x 2.47
kg93.66 kg
L=8.60-2 end covers +2
hooks+one depth=8.60-8
cm +(18X20 mm) +60
cm=9.48 cm
12mm dia top bars
@0.89 kg/m2 8.74 17.48
x 0.89
kg15.56 kg
L=8.60-2 end covers +2
hooks = 8.60-8 cm+
(18X12 mm)= 8.74m
Stirrups, 10mm dia.
bars @0.62 kg/m-at
end 12 cm c. to.c.
5x2 2.42 - - -
Next at 20 cm c/c 4x2 2.42 - - -
Total
18 x 2.42 40.32 - -
Stirrups 6mm dia.
@0.22 kg/m At
central remaining
length of 5.20m at 35
cm c. to c.
14 2.42 - - -
Total 14 x 2.42 = 33.88 x0.22 kg
=7.45 kg
Total 250.01 kg
2.5 quintal
L=(65X2+32X2 cm)+2
hooks+extra 30 cm = 194
cm + (18X10 mm ) + 30
cm = 2.42m
7/25/2019 193133379 RCC Estimation
http://slidepdf.com/reader/full/193133379-rcc-estimation 9/20
ABSTRACT OF ESTIMATED COST
Item No.Particulars of item
of work
QuantitUnit Rate per cost
Rs P Rs P
1 R.C.C. work 1:2:4
excluding steel and
its bending but
including centering
and binding of steel
2.58 cu.m 675 cu.m 1714.5
2
Steel bars including
(mild steel) in R.C.C
work Main bars –
22mm dia. Straight
bars @ 2.98 kg/m.
2.5 quintal 515 quintal 1287.5
Total 3002
Add 3% for contingencies and 2% for workcharged Establishment
Grand Total 3152
D i T t l
7/25/2019 193133379 RCC Estimation
http://slidepdf.com/reader/full/193133379-rcc-estimation 10/20
Descrip
tion of
bars
Shape of Bending Dimensions In cmLength of
each (m)No.
Total
Length
(m)
Weight(
kg)
Main
straight
bars 22
mm. DIA
8.92 4 35.68 106.33
Main Bent
up bars
20mm
dia.
9.48 2 18.96 46.83
Main Bent
up bars
20mmdia.
9.48 2 18.96 46.83
Top
straight
Bars 20
mm dia
8.74 2 17.48 15.56
Stirrups
10 mm
dia
2.24 18 40.32 25
Stirrups 6
mm dia14 31.36 6.9
7/25/2019 193133379 RCC Estimation
http://slidepdf.com/reader/full/193133379-rcc-estimation 11/20
Note -- (i) If centering and shuttering is paid separately , the area and xost can be found as follows
Area of centering and shuttering = Bottom and two vertical sides x length + two ends[(40 cm + 2 x 75 cm ) x 8.60 m] + (2 x 40 cm x 75 cm ) = (1.90 x 8.60 ) + ( 2x 0.40 x 0.75 )
:= 16.34 + 0.60 = 16.94 sq
Cost of centering and shuttering @ Rs 20.00 per sq.m = 16.94 x20.00 = 338.80
(ii) For over lapping at joints 5% of the whole steel may be provided in the estimate .
7/25/2019 193133379 RCC Estimation
http://slidepdf.com/reader/full/193133379-rcc-estimation 12/20
RCC COLUMN WITH FOUNDATION
Example 3: Prepare a detailed estimate of a RCC column with foundation footing
7/25/2019 193133379 RCC Estimation
http://slidepdf.com/reader/full/193133379-rcc-estimation 13/20
1 Earth work in excavation in
7/25/2019 193133379 RCC Estimation
http://slidepdf.com/reader/full/193133379-rcc-estimation 14/20
1 Earth work in excavation infoundation
1x2.00x2.00x0.83m = 3.32 cu.m
2 Cement concrete 1 :4:8 in base1x2.00x2.00x0.08m= 0.32 cu.m
3 RCC work 1:2:4 in footingexcluding steel and its bendingbut including centering and
shuttering and binding steelBottom square portion1x2.00x2.00x0.25m = 1.00 cu.mTrapezoidal portion vol..
= h/6(A1+A2+4Am)
0.50/6 {0.22
+ 0.352
+ 4( 2 + 0.35 )2/ 2} = 0.804 cu.m
Total 1.804 cu.m
4RCC Work 1:2:4 in column aboveG.L excluding steel and its
bending but including centeringand shuttering and binding steel
Square portion below plinth level
1x0.35x0.35x60 = 0.074cu.m
Cicular portion above plinth level
1x(3.14x0.302)/4x3.30 = 0.233 cu.m
Total 0.307 cu.m
5 Steel reinforcing bars including bending --(I) 12 mm Dia bars @ 0.89 kg in base footing …………………
No of bars = (200 cm - 8 cm ) /15cm + 1 = 14 nos one way L = 200 -2 cover +2 hooks = 200 - 2x4 +18x1.2 = 213.6 = 2.14 cm
(ii) 16 mm dia dowel bars @ 1.58 kgs ………….. 6 nos x 1.27 x 1.58 = 12.04 kg(L= 0.45+0.75-cover + bend = 1.20 - 0.80 + 0.15 = 1.27m
(iii) 16 mm dia bars @ 1.58 kgs in column ………….. 6 nos x 4.10 x 1.58 = 38.87 kg(L= 3.30 +0.60 +0.10 +0.10 = 4.10m
(iv) 10 mm dia bars @ 0.62 kgs in lateral ties ………….. 27 nos x 0.70 x 0.62 = 11.72 kg
Lateral ties No = (3.90/0.15) + 1 = 27 nos Total 115.96kgL = (3.14 x 0.22) = 0.70 m 1.16q
ABSTRACT OF COST
7/25/2019 193133379 RCC Estimation
http://slidepdf.com/reader/full/193133379-rcc-estimation 15/20
ABSTRACT OF COST
Item noName of items and details of
workQuantity
Rate
(Rs.P)
Amount
(Rs.P)
1Earthwork in excavation in
foundation3.32 cu.m
350 per
cu.m 11.62
2Cement concrete 1:4:8 in base
with brick ballast
0.32cu.m300per
cu.m 96
3
RCC work 1:2:4 in footing
excluding steel and its bending
but including centering and
shuttering and binding steel
1.804cu.m625per
cu.m
1127.5
4
RCC Work 1:2:4 in column above
G.L excluding steel and its
bending but including centering
and shuttering and binding steel
0.307cu.m590per
cu.m
181.13
5Steel reinforcing bars including
bending --1.16q
515per
cu.m 597.4
Total 2013.65
100.68
Grand
Total 2114.33
Note -- Centering and shuttering if required may be estimated separately as follows
Footing trapezium portion --- 4 nos x (2.00+0.35) / 2 x sloping height
4x1.175xsqrt{ (0.825)2+ 0.52
2} = 4.531 sq.m
Square port ion above GL upto pl inth level 4 nos x 0.35 x 0.45 = 0.630 sq.m
Cicular portion above plinth level --- (3.14 x 0.30 ) x 3.30 = 3.109 sq.m
Total = 8.27sq.m
Add 5% for Contingences and Worcharged Establishment
7/25/2019 193133379 RCC Estimation
http://slidepdf.com/reader/full/193133379-rcc-estimation 16/20
A detailed estimate of R.C.C.
Staircase
Example 4
7/25/2019 193133379 RCC Estimation
http://slidepdf.com/reader/full/193133379-rcc-estimation 17/20
7/25/2019 193133379 RCC Estimation
http://slidepdf.com/reader/full/193133379-rcc-estimation 18/20
Details of Measurement and calculation of QuantitiesItem No. Particulars of item and No. length breadth height or depth Quantity Explanatory notes
details of works m m m
1 R.C.C. work 1:2:4
excluding steel and its bending
but including centering andbending steel--
Base of flights in ground floor 1 1.2 0.5 0.25 0.15
slab of flights(inclined) 2 3.12 1.2 0.15 1.156 bearing 15cm
Landing middle and first floor 2 2.7 1.35 0.15 1.094
total 2.4 cu m
2 Brickwork in steps in 1:4
cement mortar(cut brickwork) 2 1.2 1/2(.25.25) 0.495 cu m
3 20mm cement plaster 1:6
in steps finfshed neat cement
floating--
Tread and rise 2 1.2 (.25.25) 10.56
Ends of steps 2 1/2(.25.25) 0.41
Total 10.97 sq m
4 2.5cm Nosing in steps
in 1:3 cement mortar 2 1.2 - - 28.8
5 2.5cm c.c floor 1:2:4 finished
neat cement floating in landing
middle and first floor 2 2.7 1.2 - 6.48 sq m
Item No. Particulars of item and No. length breadth height or depth Quantity Explanatory notes
7/25/2019 193133379 RCC Estimation
http://slidepdf.com/reader/full/193133379-rcc-estimation 19/20
g g y ydetails of works m m m
6 steel work
including bending in rinforce-
ment and railing
(i)12mm Dia. [email protected] in
R.C.C work--main bars in
landing
No of bars 120/12=11 11 5.22 L=4.10+0.90+0.18
main bars in upper fright and
middle and first floor landing 11 6.25 L=1.3+3.7+1.05+
.18+0.12=6.25mTop bars first floor landing 11 1.8 L=1.08+.61+9.012
Extrs bsrs first floor middle
of each landing 2 1.49 L=1.2+.15-2cover+
2hooks=1.49m
Total 148.950.86 132.56kg
(ii)8mm Dia distributing bars@
0.39kg in R.C.C work
Lower flight 15nos and
upper flight 14nos 29 1.27 L=1.2-2cover+
2hooks=1.27m
middle landing 9nos and upper
landing 8 nos 17 2.77 L=2.70-2cover+
2hooks=2.77m
83.92 0.39 32.73kg
(iii) 16mm sq bars in railing@
2.01kg 47 0.90 2.01 85.02kg
Total 250.3kg
2.503q
7 R.C.C 1:2:4 hand rail includivereinforcement centering and
shuttering finished neat cement
floating with moulding 1 6.82 6.82rm L=23.21+0.40=6.82
8 R.C.C 1:2:4 Newal posts
including steel reinforcement
and from work finished
Ground floor 1 1 0.1 0.1 0.01
first floor 1 0.9 0.1 0.1 0.01
Total 0.02 cu m
9 Caps of Newal post of c.c 2 nos
ABSTRACT ESTIMATE
7/25/2019 193133379 RCC Estimation
http://slidepdf.com/reader/full/193133379-rcc-estimation 20/20
ABSTRACT ESTIMATE
Item No. Particulars of item and Quantity Unit Rate per cost
details of works Rs P Rs P
1 R.C.C. work 1:2:4
excluding steel and its bending
but including centering and
bending steel-- 2.4 cu m 775 /cu m 1860
2 Brickwork in steps in 1:4
cement mortar(cut brickwork) 0.495 cu m 365 /cu m 180.68
3 20mm cement plaster 1:6
in steps finfshed neat cement
floating-- 10.97 sq m 9.5 /sq m 104.22
4 2.5cm Nosing in steps
in 1:3 cement mortar 28.8 r m 5.5 /r m 158.4
5 2.5cm c.c floor 1:2:4 finished
neat cement floating 6.48 sq m 18 /sq m 116.64
6 steel work
including bending in rinforce-
ment and railing 2.503 q 515 /q 1289.05
7 R.C.C 1:2:4 hand rail includive
reinforcement centering andshuttering finished neat cement
floating with moulding 6.82 r m 24 /r m 163.68
8 R.C.C 1:2:4 Newal posts
including steel reinforcement
and from work 0.02 cu m 675 /cu m 13.5
9 Caps of Newal post of c.c 2 nos 10 each 20
Total 3905.17
Add 3%for contingenvies 117.18 Add 2% Workcharged Establishment 78.12