13
17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)

17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)

Embed Size (px)

Citation preview

Page 1: 17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)

17.March.2005 C. A. Martins, CERN AB/PO 1

Power converterfor the

TT2 mercury target project

by

Carlos DE ALMEIDA MARTINS(AB/PO)

Page 2: 17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)

17.March.2005 C. A. Martins, CERN AB/PO 2

Historic overview

First technical proposal (on 31 March 2004):• ALICE/LHCb type power converter rated 6500Adc, 950Vdc, 6.7 MW

Power transformer A

Power transformer B

Rectifier bridge A

Rectifier bridge B

Filter capacitor bank

Magnet

18kV cell

Power transformer A

Power transformer B

Rectifier bridge A

Rectifier bridge B

Filter capacitor bank

Magnet

18kV cell

Rectifier

Transformers

Converter topology

Page 3: 17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)

17.March.2005 C. A. Martins, CERN AB/PO 3

Historic overview

First technical proposal (on 31 March 2004):• ALICE/LHCb type power converter rated 6500Adc, 950Vdc, 6.7 MW

Converter location

Possibility # 1 - in the ISR gallery• Short DC cables, between the power converter and the magnet (~30m); • Long AC cables, between the 18kV cell (in bld 193, AD) and the power converter

Possibility # 2 - in bld 193, AD• Longer DC cables, between the power converter and the magnet; • Short AC cables, between the 18kV cell (available in bld 193, AD) and the power converter

target

Page 4: 17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)

17.March.2005 C. A. Martins, CERN AB/PO 4

Historic overview

First technical proposal (on 31 March 2004):• ALICE/LHCb type power converter rated 6500Adc, 950Vdc, 6.7 MW

Advantages:• Brand new system;• Forced air cooling (no need for water circuit)• Cast resin power transformers. Can be placed indoor

Inconveniences:• Already short in time for buying a new power converter;• Already short in time for buying the power transformers;• One ALICE/LHCb spare power transformer can be lend, but that implies higher current harmonics in the 18 kV distribution network;• Ultimate current 7250A output;• Price: ~300 kCHF for the rectifier part only.

Page 5: 17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)

17.March.2005 C. A. Martins, CERN AB/PO 5

Historic overview

Second technical proposal (~November 2004):• Decommissioned West Area (WA) power converter rated 8000Adc, 1000Vdc, 8 MW

Advantages:• Availability at the moment;• Higher current and voltage ratings;• Available power transformers, allowing low current harmonic distortion on the 18kV network• Price (detailed later)

Inconveniences:• Water cooled. Needs water connection to the power converter;• Oil transformers. Need to be placed outdoor, in a special pit, for security reasons;• Refurbish of power part and control/interlocks cabling

Page 6: 17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)

17.March.2005 C. A. Martins, CERN AB/PO 6

West Area power converter8000Adc, 1000Vdc

Converter topology 18 kV cell

Power transformers

(in an oil tank)

2x4 Rectifier bridges

Passive LC filter

CROWBAR

To be placed in

parallel with the first group

Page 7: 17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)

17.March.2005 C. A. Martins, CERN AB/PO 7

West Area power converter8000Adc, 1000Vdc

Converter photos, 1

Global viewRectifier bridges

Passive filter self

Passive filter capacitors

self capacitors

DC output

Page 8: 17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)

17.March.2005 C. A. Martins, CERN AB/PO 8

West Area power converter8000Adc, 1000Vdc

Converter photos, 2

DCCT CROWBAR & controls Power transformers

Page 9: 17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)

17.March.2005 C. A. Martins, CERN AB/PO 9

AB/PO proposition8000Adc, 1000Vdc

Strategy:• Refurbishment of the West Area Power Converter, making it compatible with the project requirements

Conserving the main components of the power part

Installing a new digital control electronic system, type PS

Page 10: 17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)

17.March.2005 C. A. Martins, CERN AB/PO 10

AB/PO proposition8000Adc, 1000Vdc

Power Converters location:• At building 193 (AD) like ALICE/LHCb converter 2nd choice

target Power converter

(193, AD)

Page 11: 17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)

17.March.2005 C. A. Martins, CERN AB/PO 11

AB/PO proposition8000Adc, 1000Vdc

Available infrastructures at building 193 (AD):

• Water circuit in the vicinity of the power converter’s location;

• Pit for placement of the power transformer (outside the building);

• 18 kV cell

Page 12: 17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)

17.March.2005 C. A. Martins, CERN AB/PO 12

AB/PO proposition8000Adc, 1000Vdc

Estimated tasks, at charge of AB/PO, for refurbishment and costs:

• Disassembling of power converter at its actual location (BA6) and transport to its final location (Bld 193,AD);

• Preparation of the zone for reception;

• Reassembling, cabling work;

• New DCCT;

• New control electronics;

• Connection to the water circuit;

• Test and commissioning

• Decommissioning

10 kCHF

5 kCHF

15 kCHF

Total

10 kCHF

10 kCHF

10 kCHF

40 kCHF

110 kCHF

10 kCHF

Page 13: 17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)

17.March.2005 C. A. Martins, CERN AB/PO 13

AB/PO proposition8000Adc, 1000Vdc

Tasks not at charge of AB/PO (at charge of TS/EL)

• AC cabling between the 18kV cell and power transformer;

• AC cabling between power transformer and thyristor rectifier bridges;

• DC cabling between the power converter and the magnet