88
7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 1/88 https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/testcase/urn:com.ibm.rqm:testcase:17601 PORT_OTO_SDM_BH SIT Pre-Contract Artifact Summary ID: 17601 Owner: unassigned Creator: [email protected] Last Modified: Mar 27, 2012 3:09 PM Creation Date: Mar 27, 2012 2:57 PM State: Draft Trigger: Activity: Description: Test the process flow (C4) of creating a pre-contract. Summary Categories Business Process: Unassigned Business Scenario: Unassigned Category: Unassigned Control Point Review Status: Unassigned Domain Subteam: Portfolio Process Step: Unassigned SolMan Project: Unassigned SolMan SystemID: Unassigned Test Component: Unassigned Test Environment: Unassigned Test Object: Unassigned Test Phase: Unassigned Weight: 100 Test Case Design Formal Review Review Type Name Status Comments Due Date Requirements Risk Assessment Risk Assessment: Risk Importance Mitigation Action Pre Condition Post Condition Expected Results Test Scripts ID Name Description Script Type State 43415 PORT_OTO_SDM_BH SIT Pre-Contract Create a Pre-Contract contract (Business flow C4) Manual Draft

17601 - Port_oto_sdm_bh Sit Pre-contract

Embed Size (px)

Citation preview

Page 1: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 1/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/testcase/urn:com.ibm.rqm:testcase:17601

PORT_OTO_SDM_BH SIT Pre-ContractArtifact Summary

ID: 17601Owner: unassigned Creator: [email protected] Modified: Mar 27, 2012 3:09 PM Creation Date: Mar 27, 2012 2:57 PMState: DraftTrigger: Activity:

Description: Test the process flow (C4) of creating a pre-contract.

Summary

Categories

Business Process: UnassignedBusiness Scenario: UnassignedCategory: UnassignedControl Point Review Status: UnassignedDomain Subteam: PortfolioProcess Step: Unassigned

SolMan Project: UnassignedSolMan SystemID: UnassignedTest Component: UnassignedTest Environment: UnassignedTest Object: UnassignedTest Phase: Unassigned

Weight: 100

Test Case Design

Formal Review

Review Type Name Status Comments Due Date

Requirements

Risk Assessment

Risk Assessment:

Risk Importance Mitigation Action

Pre Condition

Post Condition

Expected Results

Test Scripts

ID Name Description Script Type State

43415 PORT_OTO_SDM_BH SIT Pre-Contract Create a Pre-Contract contract (Business flow C4) Manual Draft

Page 2: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 2/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/testcase/urn:com.ibm.rqm:testcase:17601

Test Execution Records

ID Name Test Plan Test Case

20894 PORT_OTO_SDM_BH SIT Pre-Contract_QA3 PORT_OTO_SDM_BH SIT Pre-Contract

Attachments

ID File Size

Development Items

Summary

Requirement Links

Execution Variables

Name Value

Page 3: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 3/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/testscript/urn:com.ibm.rqm:testscript:43415

PORT_OTO_SDM_BH SIT Pre-ContractArtifact Summary

ID: 43415Owner: [email protected] Creator: [email protected] Modified: Aug 9, 2012 6:16 AM Creation Date: Feb 22, 2012 7:29 AMScript Type: Manual State: Draft

Description: Create a Pre-Contract contract (Business flow C4)

Summary

Categories

Business Process: UnassignedCP Test Type: UnassignedDomain/Subteam: UnassignedTest Object: Unassigned

Individual Step Details

Step 1

Execution Step

Description

Open GPE application

Expected Results

GPE application is opened

Welcome to Gross Profit Estimator (SDM GPE) page

Comments

Attachments:

Step 2

Execution Step

Description

File -> Sign In

Sign in with valid user name and password 

Expected Results

"Sign In Successfully" message is shown

Comments

Attachments:

Step 3

Execution Step

Page 4: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 4/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/testscript/urn:com.ibm.rqm:testscript:43415

Description

Click "GPE Pricing Tool" in tool bar

Expected Results

GPE Pricing Tool perspective is shown

Comments

Attachments:

Step 4

Execution Step

Description

Select ITS as Line of Business in Bid Information

Expected Results

ITS is selected

Comments

Attachments:

Step 5

Execution Step

Description

Fill in all required fields in Bid Information perspective:

Bid Settings:

Contract Type: Fixed Price

Input Mode: Yearly

IOT: Europe

IMT: Germany

Lead Country: Germany

Default Perform Country: Germany

Risk Rating: Any value among 0 - 9

Is this a PCR: No

Is this a Rate Card Quote: No

Do conditions requiring FX terms exist? : No

Select Bill arrears,net 120 as Billing/Payment terms

Customer Information:

Fill in suitable Customer Name, Sector and Industry

Project Information:

Set a value for Project Name

Page 5: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 5/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/testscript/urn:com.ibm.rqm:testscript:43415

Provider Information:

Service Product Line: 6950-93G and 6950-93C

BTT: Not applicable

Sales Type: Face to face

Enter Tier: 1

Will the total opportunity be GT &750K? : No

Is this a Revenue Splitting Opportunity? : No

Pre-Contract Indicator: None

User Information:

Search in Bluepage for the values of User Info and Opportunity Owner Info

Expected Results

All required fields are filled in

No error is shown in Notifications

section

Days to pay is set to 120

Comments

Attachments:

Step 6

Execution Step

Description

Go to Labor tab

Expected Results

Labor perspective is shown

Comments

Attachments:

Step 7

Execution Step

Description

Add 1 line item in IBM Banded Hourly Cost labor

Input value in Description for 1 line item as Test Manager

Set Category and Band

Set Total Hours

Set Fixed Price

Page 6: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 6/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/testscript/urn:com.ibm.rqm:testscript:43415

Expected Results

Line item is added

Comments

Attachments:

Step 8

Execution Step

Description

Add 1 line item in IBM and Subcontractor Hourly Cost labor, for each:

Input value in Description for the line item as Project Manager

Set Resource Type as: Subcontractor

Set Base Cost/Hr

Set Fixed Price

Set Total Hours

Gross/Net: Gross

Set a different Product ID than the one from step 7

Note: Gross/Net and Fixed Price columns are shown by right click on columns and select Toggle Column(s) -> Gross/Net / Fixed Price

Expected Results

Line item is added

Comments

Attachments:

Step 9

Execution Step

Description

Go to GPE Quote perspective

Expected Results

GPE Quote perspective is shown

Comments

Attachments:

Step 10Execution Step

Description

Click on Lookup Quote Header button

Expected Results

SAP Quote Search page is popup

Comments

Page 7: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 7/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/testscript/urn:com.ibm.rqm:testscript:43415

Attachments:

Step 11

Execution Step

Description

Search Quote with:

Lead country: Germany

And make sure -

Quote Type: ZQT1

SAP Quote status: Quotation created

Expected Results

Search results are shown

Comments

Attachments:

Step 12

Execution Step

Description

Select the Quote and click on Select button

Expected Results

Quote data from SAP page is popup

Comments

Attachments:

Step 13

Execution Step

Description

Check "Replace existing case data with the following:" checkbox

Click on OK button 

Expected Results

A standard Quote which Lead country is Germany is associated with the price case 

Comments

Attachments:

Step 14

Execution Step

Description

Save the price case

Page 8: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 8/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/testscript/urn:com.ibm.rqm:testscript:43415

Expected Results

Price case is saved in local path

Comments

Attachments:

Step 15

Execution Step

Description

Click Data Export -> Initiate SAP Quote Approval on GPE Quote perspective 

Expected Results

SAP Quote Approval progress starts, GPE does the validation, then there is a progress bar, it will take time to validate.

The system sends an email message to the pricer indicating that the transfer to SAP was successful 

Comments

Attachments:

Step 16

Execution Step

Description

Click on Refresh button

Expected Results

Server Quote Status is "OK"

Comments

Attachments:

Step 17

Execution Step

Description

Log in SAP with valid user id and password

Expected Results

SAP application is opened 

Comments

Attachments:

Step 18

Execution Step

Description

Change the Line Items Status as "Price Approved" 

Page 9: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 9/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/testscript/urn:com.ibm.rqm:testscript:43415

Expected Results

Quote status is changed to "Price Approved"

Comments

Attachments:

Step 19

Execution Step

Description

Changed the status to "Pre-Contract Required"

Expected Results

Status is set to "Pre-Contract Required"

Comments

Attachments:

Step 20Execution Step

Description

Save the Quote

Expected Results

The quote is saved

Comments

Attachments:

Step 21Execution Step

Description

Use the option "Create Follow-up" and selected ZPCR Quote type.

Expected Results

ZPCR Quote is selected from popup window

Comments

Attachments:

Step 22Execution Step

Description

Highlight all line items and use the option 'choose'

Expected Results

All line items are and approvals were copied over the ZPCR quote.

Comments

Page 10: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 10/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/testscript/urn:com.ibm.rqm:testscript:43415

Attachments:

Step 23

Execution Step

Description

Indicate that approvals needed to be copied over in field 'Do you want to copy all the identifiers on to the target Quote:' select Y

Expected Results

The form for selecting the line items is shown

Comments

Attachments:

Step 24

Execution Step

Description

The window for selecting the line items in the Quote was displayed and it allowed me to select the line item for copy. Highlight the line item and thenclick on 'choose'

Expected Results

Line item was copied, all the prices were copied over, the approved price ( ZAPP) from PMM was copied over

Comments

Attachments:

Step 25

Execution Step

Description

Add the Contract ID in PCR quote as folow:

In Custom-defined Level>Master Contract Ref

At the Item Level for all items: In Custom-defined Level>Contract Reference N

(Ex. Contract Nr 7000019153) 

Expected Results

Contract number is set in all f ields

Comments

Attachments:

Step 26

Execution Step

Description

Change the status of both quotes, the original one and the one just created, in CF in process

Page 11: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 11/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/testscript/urn:com.ibm.rqm:testscript:43415

Expected Results

Status of both quotes are now CF in process

Comments

Attachments:

Step 27

Execution Step

Description

Open SCR application 

Expected Results

SCR application is opened

Comments

Attachments:

Step 28

Execution Step

Description

Log in using valid user id/password

Expected Results

Quote search page is opened

Comments

Attachments:

Step 29Execution Step

Description

Search the Quote created in SAP (original quote) 

Expected Results

Quote details are displayed

Comments

Attachments:

Step 30

Execution Step

Description

In Quote detail, check the PCR quote box, and input PCR quote 

Expected Results

PCR quote box is selected and PCR quote number stored

Page 12: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 12/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/testscript/urn:com.ibm.rqm:testscript:43415

Comments

Attachments:

Step 31

Execution Step

Description

Click on Configure Split Criteria link

Expected Results

Set Up Tag/Split Criteria page (SCR004)

Comments

Attachments:

Step 32

Execution Step

DescriptionAdd one or more optional split criteria

Expected Results

Set values for each split criteria

Comments

Attachments:

Step 33

Execution Step

Description

Click on Continue button 

Expected Results

SCR Line Items page(SCR005)

Comments

Attachments:

Step 34

Execution Step

Description

Set values for all required fields

Expected Results

Values are set successfully

Comments

Attachments:

Page 13: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 13/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/testscript/urn:com.ibm.rqm:testscript:43415

Step 35

Execution Step

Description

Click on Continue button

Expected Results

SAP quote items page (SCR006)

Comments

Attachments:

Step 36

Execution Step

Description

Set the values in Contract Line Number column the same as the ones user set in Pre-Contract contract (ex. 10) 

Expected Results

Values are set successfully

Comments

Attachments:

Step 37

Execution Step

Description

Click on Sent Quote to SAP for contract registration button 

Expected ResultsQuote case is sent to SAP successfully

All data in Pre-Contract contract in SAP are overwritten by the ones in Original contract

Comments

Attachments:

Step 38

Execution Step

Description

Compare the data of Quote case between SCR and SAP 

Expected Results

Data are the same in both side 

Comments

Attachments:

Page 14: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 14/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/testscript/urn:com.ibm.rqm:testscript:43415

Step 39

Execution Step

Description

Send SDM guids from WBS_Prep table to Angela Wagner and May Ohlhoff to verify base data cases in ECC matches. 

Expected Results

Quote is sent to SAP and BH correctly. 

Comments

Attachments:

Step 40

Execution Step

Description

Verify all execution results have been recorded.

Expected Results

Execution results are properly recorded

Comments

Attachments:

Execution Variables

Name Value

Page 15: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 15/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionworkitem/urn:com.ibm.rqm:executionworkitem:20894

PORT_OTO_SDM_BH SIT Pre-Contract_QA3Artifact Summary

ID: 20894Last Modified: Aug 17, 2012 7:04 AMOwner: [email protected] Creator: [email protected]

Test Plan: Test Milestone:Test Case: PORT_OTO_SDM_BH SIT Pre-Contract Test Script: PORT_OTO_SDM_BH SIT Pre-Contract

Frequency: Once Regression: falsePriority: Weight: 100Risk: Tags:

Description:

Summary

Categories

Test EnvironmentQA3

Type: Machine

Blocking Defects

Summary

Execution Results

Current Result: Passed

ID Name Test Case Test Script State

41038 PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract PORT_OTO_SDM_BH SIT Pre-Contract In Progress

Notes

Page 16: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 16/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:41038

PORT_OTO_SDM_BH SIT Pre-Contract_QA3Artifact Summary

State: Draft

ID: 41038

Actual Result: In ProgressHost Name:Owner: [email protected]

Test Plan:Test Milestone: Start Time: Apr 9, 2012 5:46:17 AMTest Case: PORT_OTO_SDM_BH SIT Pre-

ContractEnd Time:

Test Script: PORT_OTO_SDM_BH SIT Pre-Contract

Test Data:Build:Weight: 100

Description:

Weight Distribution

Points Passed: 12 Points Failed: 0Points Inconclusive: 0 Points Blocked: 0Points Attempted: 12

Test Environment

QA3

Type: Machine

Categories

Categories

Execution Variables

Name Value

Previous Results

Name Test Script State Start Time

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract In Progress Apr 9, 2012 5:46 AM

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract In Progress May 8, 2012 7:26 AM

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract In Progress Jun 25, 2012 10:45 AM

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract In Progress Jun 25, 2012 11:16 AM

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract Passed Jul 24, 2012 5:24 PM

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract Passed Aug 17, 2012 7:04 AM

Page 17: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 17/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:41038

Defects

Summary

Notes

Result Details

Step 1 Pass

Execution Step

Start Time: Apr 9, 2012 7:51:49 AM End Time: Apr 9, 2012 7:51:49 AM

Description

Created price case with multiple line items under different categories in GPE application

Search and associate with a quote which has lead country as Germany

Expected Results

The price case is created successfully

Actual Results

Comments

Work Items:Attachments:

Step 2 Pass

Execution Step

Start Time: Apr 9, 2012 7:52:22 AM End Time: Apr 9, 2012 7:52:22 AM

Description

Submit the quote case for approval

Expected Results

The quote case is not approved by customer yet

The status of the quote cases is other than Proposal accepted by client

Actual Results

Comments

Work Items:Attachments:

Step 3 Pass

Execution Step

Start Time: Apr 9, 2012 9:46:24 AM End Time: Apr 9, 2012 9:46:24 AM

Description

Created another price case with multiple line items under different categories in GPE application

Mark the price case as Pre-Contract by select PCBL or PCNB in Pre-Contract indicator dropdown list under Provider information section in GPE

Search and associate with quote which has lead country as Germany

Page 18: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 18/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:41038

Expected Results

The price case is created successfully

Actual Results

Comments

Work Items:Attachments:

Step 4 Not Run

Execution Step

Start Time: End Time:

Description

Submit the Pre-Contract quote case for approval

Expected Results

The Pre-Contract quote case is approved

The status of the quote cases is Proposal accepted by client

Actual Results

Comments

Work Items:Attachments:

Step 5 Not Run

Execution Step

Start Time: End Time:

DescriptionOpen SCR application

Expected Results

SCR application is opened

Actual Results

Comments

Work Items:Attachments:

Step 6 Not Run

Execution Step

Start Time: End Time:

Description

Log in using valid user id/password

Expected Results

Quote search page is opened

Actual Results

Page 19: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 19/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:41038

Comments

Work Items:Attachments:

Step 7 Not Run

Execution StepStart Time: End Time:

Description

Search the Quote created in SAP

Expected Results

Quote details are displayed

Actual Results

Comments

Work Items:Attachments:

Step 8 Not Run

Execution Step

Start Time: End Time:

Description

Click on Configure Split Criteria link

Expected Results

Set Up Tag/Split Criteria page (SCR004)

Actual Results

Comments

Work Items:Attachments:

Step 9 Not Run

Execution Step

Start Time: End Time:

Description

Add one or more optional split criteria

Expected Results

Set values for each split criteria

Actual Results

Comments

Work Items:Attachments:

Step 10 Not Run

Page 20: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 20/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:41038

Execution Step

Start Time: End Time:

Description

Click on Continue button

Expected Results

SCR Line Items page(SCR005)

Actual Results

Comments

Work Items:Attachments:

Step 11 Not Run

Execution Step

Start Time: End Time:

Description

Set values for all required fields

Expected Results

Values are set successfully

Actual Results

Comments

Work Items:Attachments:

Step 12 Not Run

Execution StepStart Time: End Time:

Description

Click on Continue button

Expected Results

SAP quote items page (SCR006)

Actual Results

Comments

Work Items:Attachments:

Step 13 Not Run

Execution Step

Start Time: End Time:

Description

Click on Sent to SAP button

Page 21: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 21/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:41038

Expected Results

Quote case is sent to SAP successfully

Pre-Contract contract is generated

Note:

Under this circumstance, new contract is treated as Pre-Contract contract

Actual Results

Comments

Work Items:Attachments:

Step 14 Not Run

Execution Step

Start Time: End Time:

Description

User gets approval of original price case

Update data as same as in Pre-Contract case in GPE

Submit as a PCR for approval

Expected Results

The original quote case is approved

The status of the quote cases is Proposal accepted by client

Actual Results

Comments

Work Items:Attachments:

Step 15 Not Run

Execution Step

Start Time: End Time:

Description

Open SCR application

Expected Results

SCR application is opened

Actual Results

Comments

Work Items:Attachments:

Page 22: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 22/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:41038

Step 16 Not Run

Execution Step

Start Time: End Time:

Description

Log in using valid user id/password

Expected Results

Quote search page is opened

Actual Results

Comments

Work Items:Attachments:

Step 17 Not Run

Execution Step

Start Time: End Time:

Description

Search the Quote created in SAP

Expected Results

Quote details are displayed

Actual Results

Comments

Work Items:Attachments:

Step 18 Not Run

Execution Step

Start Time: End Time:

Description

Click on Configure Split Criteria link

Expected Results

Set Up Tag/Split Criteria page (SCR004)

Actual Results

Comments

Work Items:Attachments:

Step 19 Not Run

Execution Step

Start Time: End Time:

Description

Add one or more optional split criteria

Page 23: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 23/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:41038

Expected Results

Set values for each split criteria

Actual Results

Comments

Work Items:Attachments:

Step 20 Not Run

Execution Step

Start Time: End Time:

Description

Click on Continue button

Expected Results

SCR Line Items page(SCR005)

Actual Results

Comments

Work Items:Attachments:

Step 21 Not Run

Execution Step

Start Time: End Time:

Description

Set values for all required fields

Expected ResultsValues are set successfully

Actual Results

Comments

Work Items:Attachments:

Step 22 Not Run

Execution Step

Start Time: End Time:

Description

Click on Continue button

Expected Results

SAP quote items page (SCR006)

Actual Results

Comments

Page 24: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 24/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:41038

Work Items:Attachments:

Step 23 Not Run

Execution Step

Start Time: End Time:

Description

Set the values in Contract Line Number column the same as the ones user set in Pre-Contract contract

Expected Results

Values are set successfully

Actual Results

Comments

Work Items:Attachments:

Step 24 Not RunExecution Step

Start Time: End Time:

Description

Click on Sent to SAP button

Expected Results

Quote case is sent to SAP successfully

All data in Pre-Contract contract in SAP are overwritten by the ones in Original contract

Actual Results

Comments

Work Items:Attachments:

Step 25 Not Run

Execution Step

Start Time: End Time:

Description

Verify all execution results have been recorded.

Expected Results

Execution results are properly recorded

Actual Results

Comments

Work Items:Attachments:

Page 25: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 25/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:44214

PORT_OTO_SDM_BH SIT Pre-Contract_QA3Artifact Summary

State: Draft

ID: 44214

Actual Result: In ProgressHost Name:Owner: [email protected]

Test Plan:Test Milestone: Start Time: May 8, 2012 7:26:47 AMTest Case: PORT_OTO_SDM_BH SIT Pre-

ContractEnd Time:

Test Script: PORT_OTO_SDM_BH SIT Pre-Contract

Test Data:Build:Weight: 100

Description:

Weight Distribution

Points Passed: 4 Points Failed: 0Points Inconclusive: 0 Points Blocked: 0Points Attempted: 4

Test Environment

QA3

Type: Machine

Categories

Categories

Execution Variables

Name Value

Previous Results

Name Test Script State Start Time

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract In Progress Apr 9, 2012 5:46 AM

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract In Progress May 8, 2012 7:26 AM

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract In Progress Jun 25, 2012 10:45 AM

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract In Progress Jun 25, 2012 11:16 AM

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract Passed Jul 24, 2012 5:24 PM

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract Passed Aug 17, 2012 7:04 AM

Page 26: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 26/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:44214

Defects

Summary

Notes

Result Details

Step 1 Pass

Execution Step

Start Time: May 8, 2012 8:14:11 AM End Time: May 8, 2012 8:14:11 AM

Description

Created price case with multiple line items under different categories in GPE application

Select Bill arrears,net 120 as Billing/Payment terms

Search and associate with a quote which has lead country as Germany 

Expected Results

Values are set

Days to pay is set to 120

The price case is created successfully 

Actual Results

Comments

Work Items:Attachments:

Step 2 Not Run

Execution Step

Start Time: End Time:

Description

Submit the quote case for approval

Expected Results

The quote case is not approved by customer yet

The status of the quote cases is other than Proposal accepted by client

Actual Results

Comments

Work Items:Attachments:

Step 3 Not Run

Execution Step

Start Time: End Time:

Page 27: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 27/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:44214

Description

Created another price case with multiple line items under different categories in GPE application

Mark the price case as Pre-Contract by select PCBL or PCNB in Pre-Contract indicator dropdown list under Provider information section in GPE

Search and associate with quote which has lead country as Germany

Expected Results

The price case is created successfully

Actual Results

Comments

Work Items:Attachments:

Step 4 Not Run

Execution Step

Start Time: End Time:

Description

Submit the Pre-Contract quote case for approval

Expected Results

The Pre-Contract quote case is approved

The status of the quote cases is Proposal accepted by client

Actual Results

Comments

Work Items:

Attachments:

Step 5 Not Run

Execution Step

Start Time: End Time:

Description

Open SCR application

Expected Results

SCR application is opened

Actual Results

Comments

Work Items:Attachments:

Step 6 Not Run

Execution Step

Start Time: End Time:

Page 28: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 28/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:44214

Description

Log in using valid user id/password

Expected Results

Quote search page is opened

Actual Results

Comments

Work Items:Attachments:

Step 7 Not Run

Execution Step

Start Time: End Time:

Description

Search the Quote created in SAP

Expected Results

Quote details are displayed

Actual Results

Comments

Work Items:Attachments:

Step 8 Not Run

Execution Step

Start Time: End Time:

DescriptionClick on Configure Split Criteria link

Expected Results

Set Up Tag/Split Criteria page (SCR004)

Actual Results

Comments

Work Items:Attachments:

Step 9 Not Run

Execution Step

Start Time: End Time:

Description

Add one or more optional split criteria

Expected Results

Set values for each split criteria

Actual Results

Page 29: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 29/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:44214

Comments

Work Items:Attachments:

Step 10 Not Run

Execution StepStart Time: End Time:

Description

Click on Continue button

Expected Results

SCR Line Items page(SCR005)

Actual Results

Comments

Work Items:Attachments:

Step 11 Not Run

Execution Step

Start Time: End Time:

Description

Set values for all required fields

Expected Results

Values are set successfully

Actual Results

Comments

Work Items:Attachments:

Step 12 Not Run

Execution Step

Start Time: End Time:

Description

Click on Continue button

Expected Results

SAP quote items page (SCR006)

Actual Results

Comments

Work Items:Attachments:

Step 13 Not Run

Page 30: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 30/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:44214

Execution Step

Start Time: End Time:

Description

Click on Sent to SAP button

Expected Results

Quote case is sent to SAP successfully

Pre-Contract contract is generated

Note:

Under this circumstance, new contract is treated as Pre-Contract contract

Actual Results

Comments

Work Items:Attachments:

Step 14 Not Run

Execution Step

Start Time: End Time:

Description

User gets approval of original price case

Update data as same as in Pre-Contract case in GPE

Submit as a PCR for approval

Expected Results

The original quote case is approved

The status of the quote cases is Proposal accepted by client

Actual Results

Comments

Work Items:Attachments:

Step 15 Not RunExecution Step

Start Time: End Time:

Description

Open SCR application

Expected Results

SCR application is opened

Page 31: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 31/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:44214

Actual Results

Comments

Work Items:Attachments:

Step 16 Not Run

Execution Step

Start Time: End Time:

Description

Log in using valid user id/password

Expected Results

Quote search page is opened

Actual Results

Comments

Work Items:Attachments:

Step 17 Not Run

Execution Step

Start Time: End Time:

Description

Search the Quote created in SAP

Expected Results

Quote details are displayed

Actual Results

Comments

Work Items:Attachments:

Step 18 Not Run

Execution Step

Start Time: End Time:

Description

Click on Configure Split Criteria link

Expected Results

Set Up Tag/Split Criteria page (SCR004)

Actual Results

Comments

Work Items:Attachments:

Page 32: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 32/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:44214

Step 19 Not Run

Execution Step

Start Time: End Time:

Description

Add one or more optional split criteria

Expected Results

Set values for each split criteria

Actual Results

Comments

Work Items:Attachments:

Step 20 Not Run

Execution Step

Start Time: End Time:

Description

Click on Continue button

Expected Results

SCR Line Items page(SCR005)

Actual Results

Comments

Work Items:Attachments:

Step 21 Not Run

Execution Step

Start Time: End Time:

Description

Set values for all required fields

Expected Results

Values are set successfully

Actual Results

Comments

Work Items:Attachments:

Step 22 Not Run

Execution Step

Start Time: End Time:

Description

Click on Continue button

Page 33: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 33/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:44214

Expected Results

SAP quote items page (SCR006)

Actual Results

Comments

Work Items:Attachments:

Step 23 Not Run

Execution Step

Start Time: End Time:

Description

Set the values in Contract Line Number column the same as the ones user set in Pre-Contract contract

Expected Results

Values are set successfully

Actual Results

Comments

Work Items:Attachments:

Step 24 Not Run

Execution Step

Start Time: End Time:

Description

Click on Sent to SAP button

Expected ResultsQuote case is sent to SAP successfully

All data in Pre-Contract contract in SAP are overwritten by the ones in Original contract

Actual Results

Comments

Work Items:Attachments:

Step 25 Not Run

Execution Step

Start Time: End Time:

Description

Verify all execution results have been recorded.

Expected Results

Execution results are properly recorded

Actual Results

Page 34: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 34/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:44214

Comments

Work Items:Attachments:

Page 35: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 35/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:48813

PORT_OTO_SDM_BH SIT Pre-Contract_QA3Artifact Summary

State: Draft

ID: 48813

Actual Result: In ProgressHost Name:Owner: [email protected]

Test Plan:Test Milestone: Start Time: Jun 25, 2012 10:45:53 AMTest Case: PORT_OTO_SDM_BH SIT Pre-

ContractEnd Time:

Test Script: PORT_OTO_SDM_BH SIT Pre-Contract

Test Data:Build:Weight: 100

Description:

Weight Distribution

Points Passed: 0 Points Failed: 0Points Inconclusive: 0 Points Blocked: 0Points Attempted: 0

Test Environment

QA3

Type: Machine

Categories

Categories

Execution Variables

Name Value

Previous Results

Name Test Script State Start Time

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract In Progress Apr 9, 2012 5:46 AM

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract In Progress May 8, 2012 7:26 AM

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract In Progress Jun 25, 2012 10:45 AM

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract In Progress Jun 25, 2012 11:16 AM

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract Passed Jul 24, 2012 5:24 PM

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract Passed Aug 17, 2012 7:04 AM

Page 36: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 36/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:48813

Defects

Summary

Notes

Result Details

Step 1 Not Run

Execution Step

Start Time: End Time:

Description

Created price case with multiple line items under different categories in GPE application

Select Bill arrears,net 120 as Billing/Payment terms

Search and associate with a quote which has lead country as Germany 

Expected Results

Values are set

Days to pay is set to 120

The price case is created successfully 

Actual Results

Comments

Work Items:Attachments:

Step 2 Not Run

Execution Step

Start Time: End Time:

Description

Submit the quote case for approval

Expected Results

The quote case is not approved by customer yet

The status of the quote cases is other than Proposal accepted by client

Actual Results

Comments

Work Items:Attachments:

Step 3 Not Run

Execution Step

Start Time: End Time:

Page 37: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 37/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:48813

Description

Created another price case with multiple line items under different categories in GPE application

Mark the price case as Pre-Contract by select PCBL or PCNB in Pre-Contract indicator dropdown list under Provider information section in GPE

Search and associate with quote which has lead country as Germany

Expected Results

The price case is created successfully

Actual Results

Comments

Work Items:Attachments:

Step 4 Not Run

Execution Step

Start Time: End Time:

Description

Submit the Pre-Contract quote case for approval

Expected Results

The Pre-Contract quote case is approved

The status of the quote cases is Proposal accepted by client

Actual Results

Comments

Work Items:

Attachments:

Step 5 Not Run

Execution Step

Start Time: End Time:

Description

Open SCR application

Expected Results

SCR application is opened

Actual Results

Comments

Work Items:Attachments:

Step 6 Not Run

Execution Step

Start Time: End Time:

Page 38: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 38/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:48813

Description

Log in using valid user id/password

Expected Results

Quote search page is opened

Actual Results

Comments

Work Items:Attachments:

Step 7 Not Run

Execution Step

Start Time: End Time:

Description

Search the Quote created in SAP

Expected Results

Quote details are displayed

Actual Results

Comments

Work Items:Attachments:

Step 8 Not Run

Execution Step

Start Time: End Time:

DescriptionClick on Configure Split Criteria link

Expected Results

Set Up Tag/Split Criteria page (SCR004)

Actual Results

Comments

Work Items:Attachments:

Step 9 Not Run

Execution Step

Start Time: End Time:

Description

Add one or more optional split criteria

Expected Results

Set values for each split criteria

Actual Results

Page 39: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 39/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:48813

Comments

Work Items:Attachments:

Step 10 Not Run

Execution StepStart Time: End Time:

Description

Click on Continue button

Expected Results

SCR Line Items page(SCR005)

Actual Results

Comments

Work Items:Attachments:

Step 11 Not Run

Execution Step

Start Time: End Time:

Description

Set values for all required fields

Expected Results

Values are set successfully

Actual Results

Comments

Work Items:Attachments:

Step 12 Not Run

Execution Step

Start Time: End Time:

Description

Click on Continue button

Expected Results

SAP quote items page (SCR006)

Actual Results

Comments

Work Items:Attachments:

Step 13 Not Run

Page 40: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 40/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:48813

Execution Step

Start Time: End Time:

Description

Click on Sent to SAP button

Expected Results

Quote case is sent to SAP successfully

Pre-Contract contract is generated

Note:

Under this circumstance, new contract is treated as Pre-Contract contract

Actual Results

Comments

Work Items:Attachments:

Step 14 Not Run

Execution Step

Start Time: End Time:

Description

User gets approval of original price case

Update data as same as in Pre-Contract case in GPE

Submit as a PCR for approval

Expected Results

The original quote case is approved

The status of the quote cases is Proposal accepted by client

Actual Results

Comments

Work Items:Attachments:

Step 15 Not RunExecution Step

Start Time: End Time:

Description

Open SCR application

Expected Results

SCR application is opened

Page 41: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 41/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:48813

Actual Results

Comments

Work Items:Attachments:

Step 16 Not Run

Execution Step

Start Time: End Time:

Description

Log in using valid user id/password

Expected Results

Quote search page is opened

Actual Results

Comments

Work Items:Attachments:

Step 17 Not Run

Execution Step

Start Time: End Time:

Description

Search the Quote created in SAP

Expected Results

Quote details are displayed

Actual Results

Comments

Work Items:Attachments:

Step 18 Not Run

Execution Step

Start Time: End Time:

Description

Click on Configure Split Criteria link

Expected Results

Set Up Tag/Split Criteria page (SCR004)

Actual Results

Comments

Work Items:Attachments:

Page 42: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 42/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:48813

Step 19 Not Run

Execution Step

Start Time: End Time:

Description

Add one or more optional split criteria

Expected Results

Set values for each split criteria

Actual Results

Comments

Work Items:Attachments:

Step 20 Not Run

Execution Step

Start Time: End Time:

Description

Click on Continue button

Expected Results

SCR Line Items page(SCR005)

Actual Results

Comments

Work Items:Attachments:

Step 21 Not Run

Execution Step

Start Time: End Time:

Description

Set values for all required fields

Expected Results

Values are set successfully

Actual Results

Comments

Work Items:Attachments:

Step 22 Not Run

Execution Step

Start Time: End Time:

Description

Click on Continue button

Page 43: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 43/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:48813

Expected Results

SAP quote items page (SCR006)

Actual Results

Comments

Work Items:Attachments:

Step 23 Not Run

Execution Step

Start Time: End Time:

Description

Set the values in Contract Line Number column the same as the ones user set in Pre-Contract contract

Expected Results

Values are set successfully

Actual Results

Comments

Work Items:Attachments:

Step 24 Not Run

Execution Step

Start Time: End Time:

Description

Click on Sent to SAP button

Expected ResultsQuote case is sent to SAP successfully

All data in Pre-Contract contract in SAP are overwritten by the ones in Original contract

Actual Results

Comments

Work Items:Attachments:

Step 25 Not Run

Execution Step

Start Time: End Time:

Description

Verify all execution results have been recorded.

Expected Results

Execution results are properly recorded

Actual Results

Page 44: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 44/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:48813

Comments

Work Items:Attachments:

Page 45: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 45/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:48825

PORT_OTO_SDM_BH SIT Pre-Contract_QA3Artifact Summary

State: Draft

ID: 48825

Actual Result: In ProgressHost Name:Owner: [email protected]

Test Plan:Test Milestone: Start Time: Jun 25, 2012 11:16:50 AMTest Case: PORT_OTO_SDM_BH SIT Pre-

ContractEnd Time:

Test Script: PORT_OTO_SDM_BH SIT Pre-Contract

Test Data:Build:Weight: 100

Description:

Weight Distribution

Points Passed: 4 Points Failed: 0Points Inconclusive: 0 Points Blocked: 0Points Attempted: 4

Test Environment

QA3

Type: Machine

Categories

Categories

Execution Variables

Name Value

Previous Results

Name Test Script State Start Time

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract In Progress Apr 9, 2012 5:46 AM

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract In Progress May 8, 2012 7:26 AM

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract In Progress Jun 25, 2012 10:45 AM

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract In Progress Jun 25, 2012 11:16 AM

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract Passed Jul 24, 2012 5:24 PM

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract Passed Aug 17, 2012 7:04 AM

Page 46: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 46/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:48825

Defects

Summary

Notes

Result Details

Step 1 Pass

Execution Step

Start Time: Jun 25, 2012 11:16:56 AM End Time: Jun 25, 2012 11:16:56 AM

Description

Created price case with multiple line items under different categories in GPE application

Select Bill arrears,net 120 as Billing/Payment terms

Search and associate with a quote which has lead country as Germany 

Expected Results

Values are set

Days to pay is set to 120

The price case is created successfully 

Actual Results

Comments

Work Items:Attachments:

Step 2 Not Run

Execution Step

Start Time: End Time:

Description

Submit the quote case for approval

Expected Results

The quote case is not approved by customer yet

The status of the quote cases is other than Proposal accepted by client

Actual Results

Comments

Work Items:Attachments:

Step 3 Not Run

Execution Step

Start Time: End Time:

Page 47: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 47/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:48825

Description

Created another price case with multiple line items under different categories in GPE application

Mark the price case as Pre-Contract by select PCBL or PCNB in Pre-Contract indicator dropdown list under Provider information section in GPE

Search and associate with quote which has lead country as Germany

Expected Results

The price case is created successfully

Actual Results

Comments

Work Items:Attachments:

Step 4 Not Run

Execution Step

Start Time: End Time:

Description

Submit the Pre-Contract quote case for approval

Expected Results

The Pre-Contract quote case is approved

The status of the quote cases is Proposal accepted by client

Actual Results

Comments

Work Items:

Attachments:

Step 5 Not Run

Execution Step

Start Time: End Time:

Description

Open SCR application

Expected Results

SCR application is opened

Actual Results

Comments

Work Items:Attachments:

Step 6 Not Run

Execution Step

Start Time: End Time:

Page 48: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 48/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:48825

Description

Log in using valid user id/password

Expected Results

Quote search page is opened

Actual Results

Comments

Work Items:Attachments:

Step 7 Not Run

Execution Step

Start Time: End Time:

Description

Search the Quote created in SAP

Expected Results

Quote details are displayed

Actual Results

Comments

Work Items:Attachments:

Step 8 Not Run

Execution Step

Start Time: End Time:

DescriptionClick on Configure Split Criteria link

Expected Results

Set Up Tag/Split Criteria page (SCR004)

Actual Results

Comments

Work Items:Attachments:

Step 9 Not Run

Execution Step

Start Time: End Time:

Description

Add one or more optional split criteria

Expected Results

Set values for each split criteria

Actual Results

Page 49: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 49/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:48825

Comments

Work Items:Attachments:

Step 10 Not Run

Execution StepStart Time: End Time:

Description

Click on Continue button

Expected Results

SCR Line Items page(SCR005)

Actual Results

Comments

Work Items:Attachments:

Step 11 Not Run

Execution Step

Start Time: End Time:

Description

Set values for all required fields

Expected Results

Values are set successfully

Actual Results

Comments

Work Items:Attachments:

Step 12 Not Run

Execution Step

Start Time: End Time:

Description

Click on Continue button

Expected Results

SAP quote items page (SCR006)

Actual Results

Comments

Work Items:Attachments:

Step 13 Not Run

Page 50: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 50/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:48825

Execution Step

Start Time: End Time:

Description

Click on Sent to SAP button

Expected Results

Quote case is sent to SAP successfully

Pre-Contract contract is generated

Note:

Under this circumstance, new contract is treated as Pre-Contract contract

Actual Results

Comments

Work Items:Attachments:

Step 14 Not Run

Execution Step

Start Time: End Time:

Description

User gets approval of original price case

Update data as same as in Pre-Contract case in GPE

Submit as a PCR for approval

Expected Results

The original quote case is approved

The status of the quote cases is Proposal accepted by client

Actual Results

Comments

Work Items:Attachments:

Step 15 Not RunExecution Step

Start Time: End Time:

Description

Open SCR application

Expected Results

SCR application is opened

Page 51: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 51/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:48825

Actual Results

Comments

Work Items:Attachments:

Step 16 Not Run

Execution Step

Start Time: End Time:

Description

Log in using valid user id/password

Expected Results

Quote search page is opened

Actual Results

Comments

Work Items:Attachments:

Step 17 Not Run

Execution Step

Start Time: End Time:

Description

Search the Quote created in SAP

Expected Results

Quote details are displayed

Actual Results

Comments

Work Items:Attachments:

Step 18 Not Run

Execution Step

Start Time: End Time:

Description

Click on Configure Split Criteria link

Expected Results

Set Up Tag/Split Criteria page (SCR004)

Actual Results

Comments

Work Items:Attachments:

Page 52: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 52/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:48825

Step 19 Not Run

Execution Step

Start Time: End Time:

Description

Add one or more optional split criteria

Expected Results

Set values for each split criteria

Actual Results

Comments

Work Items:Attachments:

Step 20 Not Run

Execution Step

Start Time: End Time:

Description

Click on Continue button

Expected Results

SCR Line Items page(SCR005)

Actual Results

Comments

Work Items:Attachments:

Step 21 Not Run

Execution Step

Start Time: End Time:

Description

Set values for all required fields

Expected Results

Values are set successfully

Actual Results

Comments

Work Items:Attachments:

Step 22 Not Run

Execution Step

Start Time: End Time:

Description

Click on Continue button

Page 53: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 53/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:48825

Expected Results

SAP quote items page (SCR006)

Actual Results

Comments

Work Items:Attachments:

Step 23 Not Run

Execution Step

Start Time: End Time:

Description

Set the values in Contract Line Number column the same as the ones user set in Pre-Contract contract

Expected Results

Values are set successfully

Actual Results

Comments

Work Items:Attachments:

Step 24 Not Run

Execution Step

Start Time: End Time:

Description

Click on Sent to SAP button

Expected ResultsQuote case is sent to SAP successfully

All data in Pre-Contract contract in SAP are overwritten by the ones in Original contract

Actual Results

Comments

Work Items:Attachments:

Step 25 Not Run

Execution Step

Start Time: End Time:

Description

Verify all execution results have been recorded.

Expected Results

Execution results are properly recorded

Actual Results

Page 54: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 54/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:48825

Comments

Work Items:Attachments:

Page 55: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 55/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:51295

PORT_OTO_SDM_BH SIT Pre-Contract_QA3Artifact Summary

State: Draft

ID: 51295

Actual Result: PassHost Name: Local ComputerOwner: [email protected]

Test Plan:Test Milestone: Start Time: Jul 24, 2012 5:24:44 PMTest Case: PORT_OTO_SDM_BH SIT Pre-

ContractEnd Time: Jul 24, 2012 5:24:56 PM

Test Script: PORT_OTO_SDM_BH SIT Pre-Contract

Test Data:Build:Weight: 100

Description:

Weight Distribution

Points Passed: 100 Points Failed: 0Points Inconclusive: 0 Points Blocked: 0Points Attempted: 100

Test Environment

QA3

Type: Machine

Categories

Categories

Execution Variables

Name Value

Previous Results

Name Test Script State Start Time

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract In Progress Apr 9, 2012 5:46 AM

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract In Progress May 8, 2012 7:26 AM

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract In Progress Jun 25, 2012 10:45 AM

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract In Progress Jun 25, 2012 11:16 AM

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract Passed Jul 24, 2012 5:24 PM

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract Passed Aug 17, 2012 7:04 AM

Page 56: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 56/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:51295

Defects

Summary

Notes

Result Details

Step 1 Pass

Execution Step

Start Time: Jul 24, 2012 5:24:55 PM End Time: Jul 24, 2012 5:24:55 PM

Description

Open GPE application

Expected Results

GPE application is opened

Welcome to Gross Profit Estimator (SDM GPE) page

Actual Results

Comments

Work Items:Attachments:

Step 2 Pass

Execution Step

Start Time: End Time:

Description

File -> Sign In

Sign in with valid user name and password 

Expected Results

"Sign In Successfully" message is shown

Actual Results

Comments

Work Items:

Attachments:

Step 3 Pass

Execution Step

Start Time: End Time:

Description

Click "GPE Pricing Tool" in tool bar

Page 57: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 57/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:51295

Expected Results

GPE Pricing Tool perspective is shown

Actual Results

Comments

Work Items:Attachments:

Step 4 Pass

Execution Step

Start Time: End Time:

Description

Select ITS as Line of Business in Bid Information

Expected Results

ITS is selected

Actual Results

Comments

Work Items:Attachments:

Step 5 Pass

Execution Step

Start Time: End Time:

Description

Fill in all required fields in Bid Information perspective:

Bid Settings:

Contract Type: Fixed Price

Input Mode: Yearly

IOT: Europe

IMT: Germany

Lead Country: Germany

Default Perform Country: Germany

Risk Rating: Any value among 0 - 9

Is this a PCR: No

Is this a Rate Card Quote: No

Do conditions requiring FX terms exist? : No

Select Bill arrears,net 120 as Billing/Payment terms

Customer Information:

Page 58: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 58/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:51295

Fill in suitable Customer Name, Sector and Industry

Project Information:

Set a value for Project Name

Provider Information:

Service Product Line: 6950-93G and 6950-93C

BTT: Not applicable

Sales Type: Face to face

Enter Tier: 1

Will the total opportunity be GT &750K? : No

Is this a Revenue Splitting Opportunity? : No

Pre-Contract Indicator: None

User Information:

Search in Bluepage for the values of User Info and Opportunity Owner Info

Expected Results

All required fields are filled in

No error is shown in Notifications

section

Days to pay is set to 120

Actual Results

Comments

Work Items:Attachments:

Step 6 Pass

Execution Step

Start Time: End Time:

Description

Go to Labor tab

Expected Results

Labor perspective is shown

Actual Results

Comments

Work Items:Attachments:

Page 59: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 59/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:51295

Step 7 Pass

Execution Step

Start Time: End Time:

Description

Add 1 line item in IBM Banded Hourly Cost labor

Input value in Description for 1 line item as Test Manager

Set Category and Band

Set Total Hours

Set Fixed Price

Expected Results

Line item is added

Actual Results

Comments

Work Items:Attachments:

Step 8 Pass

Execution Step

Start Time: End Time:

Description

Add 1 line item in IBM and Subcontractor Hourly Cost labor, for each:

Input value in Description for the line item as Project Manager

Set Resource Type as: Subcontractor

Set Base Cost/Hr

Set Fixed Price

Set Total Hours

Gross/Net: Gross

Set a different Product ID than the one from step 7

Note: Gross/Net and Fixed Price columns are shown by right click on columns and select Toggle Column(s) -> Gross/Net / Fixed Price

Expected Results

Line item is added

Actual Results

Comments

Work Items:Attachments:

Step 9 Pass

Page 60: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 60/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:51295

Execution Step

Start Time: End Time:

Description

Go to GPE Quote perspective

Expected Results

GPE Quote perspective is shown

Actual Results

Comments

Work Items:Attachments:

Step 10 Pass

Execution Step

Start Time: End Time:

Description

Click on Lookup Quote Header button

Expected Results

SAP Quote Search page is popup

Actual Results

Comments

Work Items:Attachments:

Step 11 Pass

Execution StepStart Time: End Time:

Description

Search Quote with:

Lead country: Germany

And make sure -

Quote Type: ZQT1

SAP Quote status: Quotation created

Expected Results

Search results are shown

Actual Results

Comments

Work Items:Attachments:

Page 61: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 61/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:51295

Step 12 Pass

Execution Step

Start Time: End Time:

Description

Select the Quote and click on Select button

Expected Results

Quote data from SAP page is popup

Actual Results

Comments

Work Items:Attachments:

Step 13 Pass

Execution Step

Start Time: End Time:

Description

Check "Replace existing case data with the following:" checkbox

Click on OK button 

Expected Results

A standard Quote which Lead country is Germany is associated with the price case 

Actual Results

Comments

Work Items:Attachments:

Step 14 Pass

Execution Step

Start Time: End Time:

Description

Save the price case

Expected Results

Price case is saved in local path

Actual Results

Comments

Work Items:Attachments:

Step 15 Pass

Execution Step

Page 62: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 62/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:51295

Start Time: End Time:

Description

Click Data Export -> Initiate SAP Quote Approval on GPE Quote perspective 

Expected Results

SAP Quote Approval progress starts, GPE does the validation, then there is a progress bar, it will take time to validate.

The system sends an email message to the pricer indicating that the transfer to SAP was successful 

Actual Results

Comments

Work Items:Attachments:

Step 16 Pass

Execution Step

Start Time: End Time:

Description

Click on Refresh button

Expected Results

Server Quote Status is "OK"

Actual Results

Comments

Work Items:Attachments:

Step 17 Pass

Execution Step

Start Time: End Time:

Description

Log in SAP with valid user id and password

Expected Results

SAP application is opened 

Actual Results

Comments

Work Items:Attachments:

Step 18 Pass

Execution Step

Start Time: End Time:

Page 63: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 63/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:51295

Description

Change the Line Items Status as "Price Approved" 

Expected Results

Quote status is changed to "Price Approved"

Actual Results

Comments

Work Items:Attachments:

Step 19 Pass

Execution Step

Start Time: End Time:

Description

Changed the status to "Pre-Contract Required"

Expected Results

Status is set to "Pre-Contract Required"

Actual Results

Comments

Work Items:Attachments:

Step 20 Pass

Execution Step

Start Time: End Time:

Description

Save the Quote

Expected Results

The quote is saved

Actual Results

Comments

Work Items:Attachments:

Step 21 Pass

Execution Step

Start Time: End Time:

Description

Use the option "Create Follow-up" and selected ZPCR Quote type.

Expected Results

ZPCR Quote is selected from popup window

Page 64: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 64/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:51295

Actual Results

Comments

Work Items:Attachments:

Step 22 Pass

Execution Step

Start Time: End Time:

Description

Highlight all line items and use the option 'choose'

Expected Results

All line items are and approvals were copied over the ZPCR quote.

Actual Results

Comments

Work Items:Attachments:

Step 23 Pass

Execution Step

Start Time: End Time:

Description

Indicate that approvals needed to be copied over in field 'Do you want to copy all the identifiers on to the target Quote:' select Y

Expected Results

The form for selecting the line items is shown

Actual Results

Comments

Work Items:Attachments:

Step 24 Pass

Execution Step

Start Time: End Time:

Description

The window for selecting the line items in the Quote was displayed and it allowed me to select the line item for copy. Highlight the line item and thenclick on 'choose'

Expected Results

Line item was copied, all the prices were copied over, the approved price ( ZAPP) from PMM was copied over

Actual Results

Comments

Work Items:

Page 65: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 65/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:51295

Attachments:

Step 25 Pass

Execution Step

Start Time: End Time:

DescriptionAdd the Contract ID in PCR quote as folow:

In Custom-defined Level>Master Contract Ref

At the Item Level for all items: In Custom-defined Level>Contract Reference N

(Ex. Contract Nr 7000019153) 

Expected Results

Contract number is set in all f ields

Actual Results

Comments

Work Items:Attachments:

Step 26 Pass

Execution Step

Start Time: End Time:

Description

Change the status of both quotes, the original one and the one just created, in CF in process

Expected Results

Status of both quotes are now CF in process

Actual Results

Comments

Work Items:Attachments:

Step 27 Pass

Execution Step

Start Time: End Time:

Description

Open SCR application 

Expected Results

SCR application is opened

Actual Results

Page 66: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 66/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:51295

Comments

Work Items:Attachments:

Step 28 Pass

Execution StepStart Time: End Time:

Description

Log in using valid user id/password

Expected Results

Quote search page is opened

Actual Results

Comments

Work Items:Attachments:

Step 29 Pass

Execution Step

Start Time: End Time:

Description

Search the Quote created in SAP (original quote) 

Expected Results

Quote details are displayed

Actual Results

Comments

Work Items:Attachments:

Step 30 Pass

Execution Step

Start Time: End Time:

Description

In Quote detail, check the PCR quote box, and input PCR quote 

Expected Results

PCR quote box is selected and PCR quote number stored

Actual Results

Comments

Work Items:Attachments:

Page 67: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 67/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:51295

Step 31 Pass

Execution Step

Start Time: End Time:

Description

Click on Configure Split Criteria link

Expected Results

Set Up Tag/Split Criteria page (SCR004)

Actual Results

Comments

Work Items:Attachments:

Step 32 Pass

Execution Step

Start Time: End Time:

Description

Add one or more optional split criteria

Expected Results

Set values for each split criteria

Actual Results

Comments

Work Items:Attachments:

Step 33 Pass

Execution Step

Start Time: End Time:

Description

Click on Continue button 

Expected Results

SCR Line Items page(SCR005)

Actual Results

Comments

Work Items:Attachments:

Step 34 Pass

Execution Step

Start Time: End Time:

Page 68: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 68/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:51295

Description

Set values for all required fields

Expected Results

Values are set successfully

Actual Results

Comments

Work Items:Attachments:

Step 35 Pass

Execution Step

Start Time: End Time:

Description

Click on Continue button

Expected Results

SAP quote items page (SCR006)

Actual Results

Comments

Work Items:Attachments:

Step 36 Pass

Execution Step

Start Time: End Time:

DescriptionClick on Sent to SAP button

Expected Results

Quote case is sent to SAP successfully

Pre-Contract contract is generated

Note:

Under this circumstance, new contract is treated as Pre-Contract contract

Actual Results

Comments

Work Items:Attachments:

Step 37 Pass

Execution Step

Start Time: End Time:

Page 69: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 69/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:51295

Description

Open SCR application

Expected Results

SCR application is opened

Actual Results

Comments

Work Items:Attachments:

Step 38 Pass

Execution Step

Start Time: End Time:

Description

Log in using valid user id/password

Expected Results

Quote search page is opened

Actual Results

Comments

Work Items:Attachments:

Step 39 Pass

Execution Step

Start Time: End Time:

DescriptionSearch the Quote created in SAP

Expected Results

Quote details are displayed

Actual Results

Comments

Work Items:Attachments:

Step 40 Pass

Execution Step

Start Time: End Time:

Description

Click on Configure Split Criteria link

Expected Results

Set Up Tag/Split Criteria page (SCR004)

Actual Results

Page 70: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 70/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:51295

Comments

Work Items:Attachments:

Step 41 Pass

Execution StepStart Time: End Time:

Description

Add one or more optional split criteria

Expected Results

Set values for each split criteria

Actual Results

Comments

Work Items:Attachments:

Step 42 Pass

Execution Step

Start Time: End Time:

Description

Click on Continue button

Expected Results

SCR Line Items page(SCR005)

Actual Results

Comments

Work Items:Attachments:

Step 43 Pass

Execution Step

Start Time: End Time:

Description

Set values for all required fields

Expected Results

Values are set successfully

Actual Results

Comments

Work Items:Attachments:

Step 44 Pass

Page 71: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 71/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:51295

Execution Step

Start Time: End Time:

Description

Click on Continue button

Expected Results

SAP quote items page (SCR006)

Actual Results

Comments

Work Items:Attachments:

Step 45 Pass

Execution Step

Start Time: End Time:

Description

Set the values in Contract Line Number column the same as the ones user set in Pre-Contract contract (ex. 10) 

Expected Results

Values are set successfully

Actual Results

Comments

Work Items:Attachments:

Step 46 PassExecution Step

Start Time: End Time:

Description

Click on Sent Quote to SAP for contract registration button 

Expected Results

Quote case is sent to SAP successfully

All data in Pre-Contract contract in SAP are overwritten by the ones in Original contract

Actual Results

Comments

Work Items:Attachments:

Step 47 Pass

Execution Step

Start Time: End Time:

Page 72: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 72/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:51295

Description

Compare the data of Quote case between SCR and SAP 

Expected Results

Data are the same in both side 

Actual Results

Comments

Work Items:Attachments:

Step 48 Pass

Execution Step

Start Time: End Time:

Description

Verify all execution results have been recorded.

Expected Results

Execution results are properly recorded

Actual Results

Comments

Work Items:Attachments:

Page 73: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 73/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:52718

PORT_OTO_SDM_BH SIT Pre-Contract_QA3Artifact Summary

State: Draft

ID: 52718

Actual Result: PassHost Name:Owner: [email protected]

Test Plan:Test Milestone: Start Time: Aug 17, 2012 7:04:40 AMTest Case: PORT_OTO_SDM_BH SIT Pre-

ContractEnd Time:

Test Script: PORT_OTO_SDM_BH SIT Pre-Contract

Test Data:Build:Weight: 100

Description:

Weight Distribution

Points Passed: 95 Points Failed: 0Points Inconclusive: 3 Points Blocked: 0Points Attempted: 98

Test Environment

QA3

Type: Machine

Categories

Categories

Execution Variables

Name Value

Previous Results

Name Test Script State Start Time

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract In Progress Apr 9, 2012 5:46 AM

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract In Progress May 8, 2012 7:26 AM

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract In Progress Jun 25, 2012 10:45 AM

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract In Progress Jun 25, 2012 11:16 AM

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract Passed Jul 24, 2012 5:24 PM

PORT_OTO_SDM_BH SIT Pre-Contract_QA3 Results PORT_OTO_SDM_BH SIT Pre-Contract Passed Aug 17, 2012 7:04 AM

Page 74: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 74/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:52718

Defects

Summary

Notes

Result Details

Step 1 Pass

Execution Step

Start Time: Aug 17, 2012 7:04:48 AM End Time: Aug 17, 2012 7:04:48 AM

Description

Open GPE application

Expected Results

GPE application is opened

Welcome to Gross Profit Estimator (SDM GPE) page

Actual Results

Comments

Work Items:Attachments:

Step 2 Pass

Execution Step

Start Time: Aug 17, 2012 7:04:54 AM End Time: Aug 17, 2012 7:04:54 AM

Description

File -> Sign In

Sign in with valid user name and password 

Expected Results

"Sign In Successfully" message is shown

Actual Results

Comments

Work Items:

Attachments:

Step 3 Pass

Execution Step

Start Time: Aug 17, 2012 7:04:56 AM End Time: Aug 17, 2012 7:04:56 AM

Description

Click "GPE Pricing Tool" in tool bar

Page 75: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 75/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:52718

Expected Results

GPE Pricing Tool perspective is shown

Actual Results

Comments

Work Items:Attachments:

Step 4 Pass

Execution Step

Start Time: Aug 17, 2012 7:05:00 AM End Time: Aug 17, 2012 7:05:00 AM

Description

Select ITS as Line of Business in Bid Information

Expected Results

ITS is selected

Actual Results

Comments

Work Items:Attachments:

Step 5 Pass

Execution Step

Start Time: Aug 17, 2012 7:05:03 AM End Time: Aug 17, 2012 7:05:03 AM

Description

Fill in all required fields in Bid Information perspective:

Bid Settings:

Contract Type: Fixed Price

Input Mode: Yearly

IOT: Europe

IMT: Germany

Lead Country: Germany

Default Perform Country: Germany

Risk Rating: Any value among 0 - 9

Is this a PCR: No

Is this a Rate Card Quote: No

Do conditions requiring FX terms exist? : No

Select Bill arrears,net 120 as Billing/Payment terms

Customer Information:

Page 76: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 76/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:52718

Fill in suitable Customer Name, Sector and Industry

Project Information:

Set a value for Project Name

Provider Information:

Service Product Line: 6950-93G and 6950-93C

BTT: Not applicable

Sales Type: Face to face

Enter Tier: 1

Will the total opportunity be GT &750K? : No

Is this a Revenue Splitting Opportunity? : No

Pre-Contract Indicator: None

User Information:

Search in Bluepage for the values of User Info and Opportunity Owner Info

Expected Results

All required fields are filled in

No error is shown in Notifications

section

Days to pay is set to 120

Actual Results

Comments

Work Items:Attachments:

Step 6 Pass

Execution Step

Start Time: Aug 17, 2012 7:05:10 AM End Time: Aug 17, 2012 7:05:10 AM

Description

Go to Labor tab

Expected Results

Labor perspective is shown

Actual Results

Comments

Work Items:Attachments:

Page 77: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 77/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:52718

Step 7 Pass

Execution Step

Start Time: Aug 17, 2012 7:05:15 AM End Time: Aug 17, 2012 7:05:15 AM

Description

Add 1 line item in IBM Banded Hourly Cost labor

Input value in Description for 1 line item as Test Manager

Set Category and Band

Set Total Hours

Set Fixed Price

Expected Results

Line item is added

Actual Results

Comments

Work Items:Attachments:

Step 8 Pass

Execution Step

Start Time: Aug 17, 2012 7:05:18 AM End Time: Aug 17, 2012 7:05:18 AM

Description

Add 1 line item in IBM and Subcontractor Hourly Cost labor, for each:

Input value in Description for the line item as Project Manager

Set Resource Type as: Subcontractor

Set Base Cost/Hr

Set Fixed Price

Set Total Hours

Gross/Net: Gross

Set a different Product ID than the one from step 7

Note: Gross/Net and Fixed Price columns are shown by right click on columns and select Toggle Column(s) -> Gross/Net / Fixed Price

Expected Results

Line item is added

Actual Results

Comments

Work Items:Attachments:

Step 9 Pass

Page 78: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 78/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:52718

Execution Step

Start Time: Aug 17, 2012 7:05:27 AM End Time: Aug 17, 2012 7:05:27 AM

Description

Go to GPE Quote perspective

Expected Results

GPE Quote perspective is shown

Actual Results

Comments

Work Items:Attachments:

Step 10 Pass

Execution Step

Start Time: Aug 17, 2012 7:05:29 AM End Time: Aug 17, 2012 7:05:29 AM

Description

Click on Lookup Quote Header button

Expected Results

SAP Quote Search page is popup

Actual Results

Comments

Work Items:Attachments:

Step 11 Pass

Execution StepStart Time: Aug 17, 2012 7:05:34 AM End Time: Aug 17, 2012 7:05:34 AM

Description

Search Quote with:

Lead country: Germany

And make sure -

Quote Type: ZQT1

SAP Quote status: Quotation created

Expected Results

Search results are shown

Actual Results

Comments

Work Items:Attachments:

Page 79: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 79/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:52718

Step 12 Pass

Execution Step

Start Time: Aug 17, 2012 7:05:36 AM End Time: Aug 17, 2012 7:05:36 AM

Description

Select the Quote and click on Select button

Expected Results

Quote data from SAP page is popup

Actual Results

Comments

Work Items:Attachments:

Step 13 Pass

Execution Step

Start Time: Aug 17, 2012 7:05:41 AM End Time: Aug 17, 2012 7:05:41 AM

Description

Check "Replace existing case data with the following:" checkbox

Click on OK button 

Expected Results

A standard Quote which Lead country is Germany is associated with the price case 

Actual Results

Comments

Work Items:Attachments:

Step 14 Pass

Execution Step

Start Time: Aug 17, 2012 7:05:46 AM End Time: Aug 17, 2012 7:05:46 AM

Description

Save the price case

Expected Results

Price case is saved in local path

Actual Results

Comments

Work Items:Attachments:

Step 15 Pass

Execution Step

Page 80: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 80/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:52718

Start Time: Aug 17, 2012 7:05:48 AM End Time: Aug 17, 2012 7:05:48 AM

Description

Click Data Export -> Initiate SAP Quote Approval on GPE Quote perspective 

Expected Results

SAP Quote Approval progress starts, GPE does the validation, then there is a progress bar, it will take time to validate.

The system sends an email message to the pricer indicating that the transfer to SAP was successful 

Actual Results

Comments

Work Items:Attachments:

Step 16 Pass

Execution Step

Start Time: Aug 17, 2012 7:05:59 AM End Time: Aug 17, 2012 7:05:59 AM

Description

Click on Refresh button

Expected Results

Server Quote Status is "OK"

Actual Results

Comments

Work Items:Attachments:

Step 17 Pass

Execution Step

Start Time: Aug 17, 2012 7:06:01 AM End Time: Aug 17, 2012 7:06:01 AM

Description

Log in SAP with valid user id and password

Expected Results

SAP application is opened 

Actual Results

Comments

Work Items:Attachments:

Step 18 Pass

Execution Step

Start Time: Aug 17, 2012 7:06:04 AM End Time: Aug 17, 2012 7:06:04 AM

Page 81: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 81/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:52718

Description

Change the Line Items Status as "Price Approved" 

Expected Results

Quote status is changed to "Price Approved"

Actual Results

Comments

Work Items:Attachments:

Step 19 Pass

Execution Step

Start Time: Aug 17, 2012 7:06:17 AM End Time: Aug 17, 2012 7:06:17 AM

Description

Changed the status to "Pre-Contract Required"

Expected Results

Status is set to "Pre-Contract Required"

Actual Results

Comments

Work Items:Attachments:

Step 20 Pass

Execution Step

Start Time: Aug 17, 2012 7:06:27 AM End Time: Aug 17, 2012 7:06:27 AM

Description

Save the Quote

Expected Results

The quote is saved

Actual Results

Comments

Work Items:Attachments:

Step 21 Pass

Execution Step

Start Time: Aug 17, 2012 7:06:30 AM End Time: Aug 17, 2012 7:06:30 AM

Description

Use the option "Create Follow-up" and selected ZPCR Quote type.

Expected Results

ZPCR Quote is selected from popup window

Page 82: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 82/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:52718

Actual Results

Comments

Work Items:Attachments:

Step 22 Pass

Execution Step

Start Time: Aug 17, 2012 7:06:51 AM End Time: Aug 17, 2012 7:06:51 AM

Description

Highlight all line items and use the option 'choose'

Expected Results

All line items are and approvals were copied over the ZPCR quote.

Actual Results

Comments

Work Items:Attachments:

Step 23 Pass

Execution Step

Start Time: Aug 17, 2012 7:07:06 AM End Time: Aug 17, 2012 7:07:06 AM

Description

Indicate that approvals needed to be copied over in field 'Do you want to copy all the identifiers on to the target Quote:' select Y

Expected Results

The form for selecting the line items is shown

Actual Results

Comments

Work Items:Attachments:

Step 24 Pass

Execution Step

Start Time: Aug 17, 2012 7:07:35 AM End Time: Aug 17, 2012 7:07:35 AM

Description

The window for selecting the line items in the Quote was displayed and it allowed me to select the line item for copy. Highlight the line item and thenclick on 'choose'

Expected Results

Line item was copied, all the prices were copied over, the approved price ( ZAPP) from PMM was copied over

Actual Results

Comments

Work Items:

Page 83: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 83/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:52718

Attachments:

Step 25 Pass

Execution Step

Start Time: Aug 17, 2012 7:07:43 AM End Time: Aug 17, 2012 7:07:43 AM

DescriptionAdd the Contract ID in PCR quote as folow:

In Custom-defined Level>Master Contract Ref

At the Item Level for all items: In Custom-defined Level>Contract Reference N

(Ex. Contract Nr 7000019153) 

Expected Results

Contract number is set in all f ields

Actual Results

Comments

Work Items:Attachments:

Step 26 Pass

Execution Step

Start Time: Aug 17, 2012 7:07:52 AM End Time: Aug 17, 2012 7:07:52 AM

Description

Change the status of both quotes, the original one and the one just created, in CF in process

Expected Results

Status of both quotes are now CF in process

Actual Results

Comments

Work Items:Attachments:

Step 27 Pass

Execution Step

Start Time: Aug 17, 2012 7:08:09 AM End Time: Aug 17, 2012 7:08:09 AM

Description

Open SCR application 

Expected Results

SCR application is opened

Actual Results

Page 84: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 84/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:52718

Comments

Work Items:Attachments:

Step 28 Pass

Execution StepStart Time: Aug 17, 2012 7:08:11 AM End Time: Aug 17, 2012 7:08:11 AM

Description

Log in using valid user id/password

Expected Results

Quote search page is opened

Actual Results

Comments

Work Items:Attachments:

Step 29 Pass

Execution Step

Start Time: Aug 17, 2012 7:20:49 AM End Time: Aug 17, 2012 7:20:49 AM

Description

Search the Quote created in SAP (original quote) 

Expected Results

Quote details are displayed

Actual Results

Comments

Work Items:Attachments:

Step 30 Pass

Execution Step

Start Time: Aug 17, 2012 7:20:52 AM End Time: Aug 17, 2012 7:20:52 AM

Description

In Quote detail, check the PCR quote box, and input PCR quote 

Expected Results

PCR quote box is selected and PCR quote number stored

Actual Results

Comments

Work Items:Attachments:

Page 85: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 85/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:52718

Step 31 Pass

Execution Step

Start Time: Aug 17, 2012 7:20:55 AM End Time: Aug 17, 2012 7:20:55 AM

Description

Click on Configure Split Criteria link

Expected Results

Set Up Tag/Split Criteria page (SCR004)

Actual Results

Comments

Work Items:Attachments:

Step 32 Pass

Execution Step

Start Time: Aug 17, 2012 7:20:58 AM End Time: Aug 17, 2012 7:20:58 AM

Description

Add one or more optional split criteria

Expected Results

Set values for each split criteria

Actual Results

Comments

Work Items:Attachments:

Step 33 Pass

Execution Step

Start Time: Aug 17, 2012 7:21:04 AM End Time: Aug 17, 2012 7:21:04 AM

Description

Click on Continue button 

Expected Results

SCR Line Items page(SCR005)

Actual Results

Comments

Work Items:Attachments:

Step 34 Pass

Execution Step

Start Time: Aug 17, 2012 7:21:07 AM End Time: Aug 17, 2012 7:21:07 AM

Page 86: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 86/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:52718

Description

Set values for all required fields

Expected Results

Values are set successfully

Actual Results

Comments

Work Items:Attachments:

Step 35 Pass

Execution Step

Start Time: Aug 17, 2012 7:21:17 AM End Time: Aug 17, 2012 7:21:17 AM

Description

Click on Continue button

Expected Results

SAP quote items page (SCR006)

Actual Results

Comments

Work Items:Attachments:

Step 36 Pass

Execution Step

Start Time: Aug 17, 2012 7:21:38 AM End Time: Aug 17, 2012 7:21:38 AM

DescriptionSet the values in Contract Line Number column the same as the ones user set in Pre-Contract contract (ex. 10) 

Expected Results

Values are set successfully

Actual Results

Comments

Work Items:Attachments:

Step 37 PassExecution Step

Start Time: Aug 17, 2012 7:21:42 AM End Time: Aug 17, 2012 7:21:42 AM

Description

Click on Sent Quote to SAP for contract registration button 

Expected Results

Quote case is sent to SAP successfully

Page 87: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 87/88

https://bhx002.pok.ibm.com:9444/jazz/service/com.ibm.rqm.integration.service.IIntegrationService/resources/BH+Global+Template/executionresult/urn:com.ibm.rqm:executionresult:52718

All data in Pre-Contract contract in SAP are overwritten by the ones in Original contract

Actual Results

Comments

Work Items:Attachments:

Step 38 Pass

Execution Step

Start Time: Aug 17, 2012 7:21:45 AM End Time: Aug 17, 2012 7:21:45 AM

Description

Compare the data of Quote case between SCR and SAP 

Expected Results

Data are the same in both side

 

Actual Results

Comments

Work Items:Attachments:

Step 39 Inconclusive

Execution Step

Start Time: Aug 17, 2012 7:23:46 AM End Time: Aug 17, 2012 7:23:46 AM

Description

Send SDM guids from WBS_Prep table to Angela Wagner and May Ohlhoff to verify base data cases in ECC matches. 

Expected Results

Quote is sent to SAP and BH correctly. 

Actual Results

 

Comments

Work Items:Attachments:

Step 40 Pass

Execution Step

Start Time: End Time:

Description

Verify all execution results have been recorded.

Expected Results

Execution results are properly recorded

Page 88: 17601 - Port_oto_sdm_bh Sit Pre-contract

7/28/2019 17601 - Port_oto_sdm_bh Sit Pre-contract

http://slidepdf.com/reader/full/17601-portotosdmbh-sit-pre-contract 88/88

Actual Results

Comments

Work Items:Attachments: