17.5/24kV 250A Deadbreak Elbow Type Test Report Test Sequence D1 Report Number: Test Start Date: Test Complete Date: RN-R7607-D1 2015 / 01 / 12 2015 / 03 / 17 Chardon Taiwan No. 37 Min-Chie Road Tung Lo Industrial Park Miao Li, Taiwan 366

17.5/24kV 250A Deadbreak Elbow Type Test Report...The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and following), in the impulse testing, the cable

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 17.5/24kV 250A Deadbreak Elbow Type Test Report...The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and following), in the impulse testing, the cable

17.5/24kV 250A Deadbreak Elbow Type Test Report

Test Sequence D1

Report Number: Test Start Date: Test Complete Date:

RN-R7607-D1 2015 / 01 / 12 2015 / 03 / 17

Chardon Taiwan No. 37 Min-Chie Road Tung Lo Industrial Park Miao Li, Taiwan 366

Page 2: 17.5/24kV 250A Deadbreak Elbow Type Test Report...The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and following), in the impulse testing, the cable

2

Copyright © 2015, Chardon Group All rights reserved

No. 37, Min-Chie Road, Tung Lo Industrial Park, Miao Li, 366 Taiwan, R.O.C.

Tel: +886-37-984385 | Fax: +886-37-984770 E-Mail: [email protected]

Table of Contents 1. DC Voltage Dry ................................................................................................... 3 2. AC Voltage Dry ................................................................................................... 5 3. Partial Discharge at Ambient Temperature ........................................................... 7

4. Impulse Voltage at Elevated Temperature ............................................................. 9 5. Heating Cycle Voltage in Air .............................................................................. 12

6. Heating Cycle Voltage in Water .......................................................................... 16 7. Disconnection/Connection ................................................................................. 19

8. Partial Discharge at Elevated and Ambient Temperature..................................... 21 9. Impulse Voltage at Ambient Temperature ........................................................... 24

10. AC Voltage Dry ................................................................................................. 27 11. Examination....................................................................................................... 29

Page 3: 17.5/24kV 250A Deadbreak Elbow Type Test Report...The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and following), in the impulse testing, the cable

3

Copyright © 2015, Chardon Group All rights reserved

No. 37, Min-Chie Road, Tung Lo Industrial Park, Miao Li, 366 Taiwan, R.O.C.

Tel: +886-37-984385 | Fax: +886-37-984770 E-Mail: [email protected]

1. DC Voltage Dry Object

To verify the connectors that the parts meet IEC 60502.4/HD629.1S2 DC Voltage Dry

test requirement of 76kV-15 min

Testing Samples

Deadbreak Elbow CHARDON 24-CE250 4 pcs

Mating Parts

Deadbreak Bushing CHARDON 24-DIB250

Testing Fixture Customized

Cable 20kV YJV 1*50

Termination CHARDON 25-CSTO

Procedure and Testing Spec

A voltage of negative polarity shall be applied to the cable conductor. The test shall be

made at ambient temperature and the procedure for voltage application shall be specified

in Section 4 of IEC 60060-1. The testing samples shall withstand the specified test

voltage for 15 minutes without flashover or puncture.

Results

Sample number DC Voltage Dry 76kV 15min

A1 PASS

A2 PASS

A3 PASS

A4 PASS

Page 4: 17.5/24kV 250A Deadbreak Elbow Type Test Report...The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and following), in the impulse testing, the cable

4

Copyright © 2015, Chardon Group All rights reserved

No. 37, Min-Chie Road, Tung Lo Industrial Park, Miao Li, 366 Taiwan, R.O.C.

Tel: +886-37-984385 | Fax: +886-37-984770 E-Mail: [email protected]

Testing Setup of DC Voltage Dry

Test Voltage

Page 5: 17.5/24kV 250A Deadbreak Elbow Type Test Report...The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and following), in the impulse testing, the cable

5

Copyright © 2015, Chardon Group All rights reserved

No. 37, Min-Chie Road, Tung Lo Industrial Park, Miao Li, 366 Taiwan, R.O.C.

Tel: +886-37-984385 | Fax: +886-37-984770 E-Mail: [email protected]

2. AC Voltage Dry Object

To verify the connectors that the parts meet IEC 60502.4/HD629.1S2 AC Voltage Dry

test requirements of 57kV-15 min.

Testing Samples

Deadbreak Elbow CHARDON 24-CE250 4 pcs

Mating Parts

Deadbreak Bushing CHARDON 24-DIB250

Testing Fixture Customized

Cable 20kV YJV 1*50

Termination CHARDON 25-CSTO

Procedure and Testing Spec

The procedure for voltage application shall be specified in Section 5 of IEC60060-1. The

test voltage shall reach 57 kV within 30 sec. . The testing samples shall withstand the

specified test voltage for 5 minutes without flashover or puncture.

Results

Sample number AC Voltage Dry 57 kV 5min

A1 PASS

A2 PASS

A3 PASS

A4 PASS

Page 6: 17.5/24kV 250A Deadbreak Elbow Type Test Report...The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and following), in the impulse testing, the cable

6

Copyright © 2015, Chardon Group All rights reserved

No. 37, Min-Chie Road, Tung Lo Industrial Park, Miao Li, 366 Taiwan, R.O.C.

Tel: +886-37-984385 | Fax: +886-37-984770 E-Mail: [email protected]

Testing Setup of AC Voltage Dry Test

Testing Voltage

Page 7: 17.5/24kV 250A Deadbreak Elbow Type Test Report...The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and following), in the impulse testing, the cable

7

Copyright © 2015, Chardon Group All rights reserved

No. 37, Min-Chie Road, Tung Lo Industrial Park, Miao Li, 366 Taiwan, R.O.C.

Tel: +886-37-984385 | Fax: +886-37-984770 E-Mail: [email protected]

3. Partial Discharge at Ambient Temperature Object

To verify the connectors that the parts meet IEC 60502.4/HD629.1S2 Partial Discharge

testing requirement of 22kV≤10pC.

Testing Samples

Deadbreak Elbow CHARDON 24-CE250 4 pcs

Mating Parts

Deadbreak Bushing CHARDON 24-DIB250

Testing Fixture Customized

Cable 20kV YJV 1*50

Termination CHARDON 25-CSTO

Procedure and Testing Spec

The test voltage shall be raised to 20% above the corona voltage level of 22kV. If corona

exceeds 10pC, the test voltage shall be lowered to the corona voltage level of 22kV and

maintained at this level for at least 3 seconds but not more than 60 seconds. Corona

readings taken during this period shall not exceed 10 pC.

Results

Sample number Partial Discharge Readings

A1 26.7kV/2.1pC

A2 26.7kV/2.1pC

A3 26.4kV/1.8pC

A4 26.4kV/1.8pC

Page 8: 17.5/24kV 250A Deadbreak Elbow Type Test Report...The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and following), in the impulse testing, the cable

8

Copyright © 2015, Chardon Group All rights reserved

No. 37, Min-Chie Road, Tung Lo Industrial Park, Miao Li, 366 Taiwan, R.O.C.

Tel: +886-37-984385 | Fax: +886-37-984770 E-Mail: [email protected]

Testing Setup of Partial Discharge Testing

Voltage and Corona Readings

Page 9: 17.5/24kV 250A Deadbreak Elbow Type Test Report...The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and following), in the impulse testing, the cable

9

Copyright © 2015, Chardon Group All rights reserved

No. 37, Min-Chie Road, Tung Lo Industrial Park, Miao Li, 366 Taiwan, R.O.C.

Tel: +886-37-984385 | Fax: +886-37-984770 E-Mail: [email protected]

4. Impulse Voltage at Elevated Temperature Object

To verify the connectors that the parts meet IEC 60502.4/HD629.1S2 Impulse Voltage

testing requirements: To apply 10 positive and 10 negative full-wave impulses when the

cable conductor is heated and stabilized for at least 2 h at a temperature of 5℃ to 10 ℃

above the maximum cable conductor temperature in normal operation.

Testing Samples

Deadbreak Elbow CHARDON 24-CE250 4 pcs

Mating Parts

Deadbreak Bushing CHARDON 24-DIB250

Testing Fixture Customized

Cable 20kV YJV 1*50

Termination CHARDON 25-CSTO

Procedure and Testing Spec

The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and

following), in the impulse testing, the cable conductor shall be heated and maintain the

temperature to 5~10℃ above the normal operating temperature of the cable for at least 2h.

The test voltage shall be 1.2/50µs wave having the crest value (BIL) of 125kV. The

connector shall withstand 10 positive and 10 negative full-wave impulses without

flashover or puncture.

Results

Sample number 1.2×50μs±125kV Impulse Voltage

A1 PASS

A2 PASS

A3 PASS

A4 PASS

Page 10: 17.5/24kV 250A Deadbreak Elbow Type Test Report...The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and following), in the impulse testing, the cable

10

Copyright © 2015, Chardon Group All rights reserved

No. 37, Min-Chie Road, Tung Lo Industrial Park, Miao Li, 366 Taiwan, R.O.C.

Tel: +886-37-984385 | Fax: +886-37-984770 E-Mail: [email protected]

Testing Setup

Conductor Temperature

Page 11: 17.5/24kV 250A Deadbreak Elbow Type Test Report...The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and following), in the impulse testing, the cable

11

Copyright © 2015, Chardon Group All rights reserved

No. 37, Min-Chie Road, Tung Lo Industrial Park, Miao Li, 366 Taiwan, R.O.C.

Tel: +886-37-984385 | Fax: +886-37-984770 E-Mail: [email protected]

Impulse – Positive Wave

Impulse - Negative Wave

Page 12: 17.5/24kV 250A Deadbreak Elbow Type Test Report...The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and following), in the impulse testing, the cable

12

Copyright © 2015, Chardon Group All rights reserved

No. 37, Min-Chie Road, Tung Lo Industrial Park, Miao Li, 366 Taiwan, R.O.C.

Tel: +886-37-984385 | Fax: +886-37-984770 E-Mail: [email protected]

5. Heating Cycle Voltage in Air Object

To verify the connectors that parts can meet the requirements of Heating Cycle Voltage

in Air in IEC 60502.4/HD629.1S, under the condition of the cable conductor temperature

is 5℃~10℃ above the nominal operating temperature, and energized at 2.5U0(31.75 kV)

for 63 cycles.

Testing Samples

Deadbreak Elbow CHARDON 24-CE250 4 pcs

Mating Parts

Deadbreak Bushing CHARDON 24-DIB250

Testing Fixture Customized

Cable 20kV YJV 1*50

Termination CHARDON 25-CSTO

Procedure and Testing Spec

1The test assembly shall be subjected to 63 cycles, energized at 2.5U0(31.75 kV). The

arrangement and measurement in this test shall follow Clause 8 of EN 61442.

Results

Sample number Heating Cycle Voltage in Air

A1 PASS

A2 PASS

A3 PASS

A4 PASS

Page 13: 17.5/24kV 250A Deadbreak Elbow Type Test Report...The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and following), in the impulse testing, the cable

13

Copyright © 2015, Chardon Group All rights reserved

No. 37, Min-Chie Road, Tung Lo Industrial Park, Miao Li, 366 Taiwan, R.O.C.

Tel: +886-37-984385 | Fax: +886-37-984770 E-Mail: [email protected]

Test Setup

Heating Cycle

Thermocouple

Thermocouple

Page 14: 17.5/24kV 250A Deadbreak Elbow Type Test Report...The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and following), in the impulse testing, the cable

14

Copyright © 2015, Chardon Group All rights reserved

No. 37, Min-Chie Road, Tung Lo Industrial Park, Miao Li, 366 Taiwan, R.O.C.

Tel: +886-37-984385 | Fax: +886-37-984770 E-Mail: [email protected]

Circuit Setup

Current Readings

Page 15: 17.5/24kV 250A Deadbreak Elbow Type Test Report...The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and following), in the impulse testing, the cable

15

Copyright © 2015, Chardon Group All rights reserved

No. 37, Min-Chie Road, Tung Lo Industrial Park, Miao Li, 366 Taiwan, R.O.C.

Tel: +886-37-984385 | Fax: +886-37-984770 E-Mail: [email protected]

Voltage Readings

Temperature Readings

Page 16: 17.5/24kV 250A Deadbreak Elbow Type Test Report...The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and following), in the impulse testing, the cable

16

Copyright © 2015, Chardon Group All rights reserved

No. 37, Min-Chie Road, Tung Lo Industrial Park, Miao Li, 366 Taiwan, R.O.C.

Tel: +886-37-984385 | Fax: +886-37-984770 E-Mail: [email protected]

6. Heating Cycle Voltage in Water Object

To verify the connectors that parts can meet the requirements of Heating Cycle Voltage

in Water in IEC 60502.4/HD629.1S, under the condition of the cable conductor

temperature is 5℃~10℃ above the nominal operating temperature, and energized at

2.5U0(31.75 kV) for 63 cycles.

Testing Samples

Deadbreak Elbow CHARDON 24-CE250 4 pcs

Mating Parts

Deadbreak Bushing CHARDON 24-DIB250

Testing Fixture Customized

Cable 20kV YJV 1*50

Termination CHARDON 25-CSTO

Procedure and Test Spec

1The test assembly shall be subjected to 63 cycles, energized at 2.5U0(31.75 kV). The

arrangement and measurement in this test shall follow Clause 9 of EN 61442.

Results

Sample number Heating Cycle Voltage in Water

A1 PASS

A2 PASS

A3 PASS

A4 PASS

Page 17: 17.5/24kV 250A Deadbreak Elbow Type Test Report...The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and following), in the impulse testing, the cable

17

Copyright © 2015, Chardon Group All rights reserved

No. 37, Min-Chie Road, Tung Lo Industrial Park, Miao Li, 366 Taiwan, R.O.C.

Tel: +886-37-984385 | Fax: +886-37-984770 E-Mail: [email protected]

Test Setup

Thermocouple

Thermocouple

Page 18: 17.5/24kV 250A Deadbreak Elbow Type Test Report...The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and following), in the impulse testing, the cable

18

Copyright © 2015, Chardon Group All rights reserved

No. 37, Min-Chie Road, Tung Lo Industrial Park, Miao Li, 366 Taiwan, R.O.C.

Tel: +886-37-984385 | Fax: +886-37-984770 E-Mail: [email protected]

Circuit Setup

Page 19: 17.5/24kV 250A Deadbreak Elbow Type Test Report...The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and following), in the impulse testing, the cable

19

Copyright © 2015, Chardon Group All rights reserved

No. 37, Min-Chie Road, Tung Lo Industrial Park, Miao Li, 366 Taiwan, R.O.C.

Tel: +886-37-984385 | Fax: +886-37-984770 E-Mail: [email protected]

7. Disconnection/Connection Object

To verify the connectors that parts can meet the requirement of Disconnection /

Connection in IEC 60502.4/HD629.1S2.

Testing Samples

Deadbreak Elbow CHARDON 24-CE250 4 pcs

Mating Parts

Deadbreak Bushing CHARDON 24-DIB250

Testing Fixture Customized

Cable 20kV YJV 1*50

Termination CHARDON 25-CSTO

Procedure and Test Spec

5 complete operations, no visible damage to contact.

Results

Sample number Disconnection / Connection

A1 PASS

A2 PASS

A3 PASS

A4 PASS

Page 20: 17.5/24kV 250A Deadbreak Elbow Type Test Report...The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and following), in the impulse testing, the cable

20

Copyright © 2015, Chardon Group All rights reserved

No. 37, Min-Chie Road, Tung Lo Industrial Park, Miao Li, 366 Taiwan, R.O.C.

Tel: +886-37-984385 | Fax: +886-37-984770 E-Mail: [email protected]

Disconnection

Connection

Page 21: 17.5/24kV 250A Deadbreak Elbow Type Test Report...The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and following), in the impulse testing, the cable

21

Copyright © 2015, Chardon Group All rights reserved

No. 37, Min-Chie Road, Tung Lo Industrial Park, Miao Li, 366 Taiwan, R.O.C.

Tel: +886-37-984385 | Fax: +886-37-984770 E-Mail: [email protected]

8. Partial Discharge at Elevated and Ambient Temperature

Object

To verify the parts meet the requirements of Partial Discharge at Elevated Ambient in

IEC 60502.4/HD629.1S2, 22kV≤10pC.

Testing Samples

Deadbreak Elbow CHARDON 24-CE250 4 pcs

Mating Parts

Deadbreak Bushing CHARDON 24-DIB250

Testing Fixture Customized

Cable 20kV YJV 1*50

Termination CHARDON 25-CSTO

Procedure and Test Spec

The samples shall be tested when heating process is completed. The cable conductor shall

be heated and stabilized for at least 2 h at a temperature of 5℃ to 10 ℃ above the

maximum cable conductor temperature in normal operation, before and during the partial

discharge test. The test voltage shall be raised to 20% above the corona voltage level of

22kV. If corona exceeds 10pC, the test voltage shall be lowered to the corona voltage

level of 22kV and maintained at this level for at least 3 seconds but not more than 60

seconds. Corona readings taken during this period shall not exceed 10 pC.

Results

Sample number At Elevated Temperature At Ambient Temperature

A1 22.5kV/2.2pC 26.0kV/3.4pC

A2 22.5kV/2.2pC 26.0kV/3.4pC

A3 23.1kV/2.3pC 25.8kV/3.2pC

A4 23.1kV/2.3pC 25.8kV/3.2pC

Page 22: 17.5/24kV 250A Deadbreak Elbow Type Test Report...The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and following), in the impulse testing, the cable

22

Copyright © 2015, Chardon Group All rights reserved

No. 37, Min-Chie Road, Tung Lo Industrial Park, Miao Li, 366 Taiwan, R.O.C.

Tel: +886-37-984385 | Fax: +886-37-984770 E-Mail: [email protected]

Test Setup

Test Readings

Page 23: 17.5/24kV 250A Deadbreak Elbow Type Test Report...The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and following), in the impulse testing, the cable

23

Copyright © 2015, Chardon Group All rights reserved

No. 37, Min-Chie Road, Tung Lo Industrial Park, Miao Li, 366 Taiwan, R.O.C.

Tel: +886-37-984385 | Fax: +886-37-984770 E-Mail: [email protected]

Current and Temperature Readings

Page 24: 17.5/24kV 250A Deadbreak Elbow Type Test Report...The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and following), in the impulse testing, the cable

24

Copyright © 2015, Chardon Group All rights reserved

No. 37, Min-Chie Road, Tung Lo Industrial Park, Miao Li, 366 Taiwan, R.O.C.

Tel: +886-37-984385 | Fax: +886-37-984770 E-Mail: [email protected]

9. Impulse Voltage at Ambient Temperature Object

To verify the connectors that the parts can meet the Impulse Voltage at Ambient

Temperature test requirements, to apply 1.2×50μs 125kV, 10 positive and 10 negative

full-wave impulses at ambient temperature.

Testing Samples

Deadbreak Elbow CHARDON 24-CE250 4 pcs

Mating Parts

Deadbreak Bushing CHARDON 24-DIB250

Testing Fixture Customized

Cable 20kV YJV 1*50

Termination CHARDON 25-CSTO

The test voltage shall be 1.2/50µs wave having the crest value (BIL) of 125kV. The

connector shall withstand 10 positive and 10 negative full-wave impulses without

flashover or puncture.

Results

Sample number 1.2×50μs±125kV Impulse Voltage

A1 PASS

A2 PASS

A3 PASS

A4 PASS

Page 25: 17.5/24kV 250A Deadbreak Elbow Type Test Report...The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and following), in the impulse testing, the cable

25

Copyright © 2015, Chardon Group All rights reserved

No. 37, Min-Chie Road, Tung Lo Industrial Park, Miao Li, 366 Taiwan, R.O.C.

Tel: +886-37-984385 | Fax: +886-37-984770 E-Mail: [email protected]

Test Setup

Impulse – Positive Wave

Page 26: 17.5/24kV 250A Deadbreak Elbow Type Test Report...The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and following), in the impulse testing, the cable

26

Copyright © 2015, Chardon Group All rights reserved

No. 37, Min-Chie Road, Tung Lo Industrial Park, Miao Li, 366 Taiwan, R.O.C.

Tel: +886-37-984385 | Fax: +886-37-984770 E-Mail: [email protected]

Impulse – Negative Wave

Page 27: 17.5/24kV 250A Deadbreak Elbow Type Test Report...The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and following), in the impulse testing, the cable

27

Copyright © 2015, Chardon Group All rights reserved

No. 37, Min-Chie Road, Tung Lo Industrial Park, Miao Li, 366 Taiwan, R.O.C.

Tel: +886-37-984385 | Fax: +886-37-984770 E-Mail: [email protected]

10. AC Voltage Dry Object

To verify the connectors that parts can meet the AC Voltage Dry test requirements of

31.75kV - 15min in IEC 60502.4/HD629.1S2.

Testing Samples

Deadbreak Elbow CHARDON 24-CE250 4 pcs

Mating Parts

Deadbreak Bushing CHARDON 24-DIB250

Testing Fixture Customized

Cable 20kV YJV 1*50

Termination CHARDON 25-CSTO

Procedure and Test Spec

The test voltage shall reach 31.75 kV within 30 sec. . The testing samples shall withstand

the specified test voltage for 15 minutes without flashover or puncture.

Results

Sample number AC Voltage Dry - 31.75 kV - 15min

A1 PASS

A2 PASS

A3 PASS

A4 PASS

Page 28: 17.5/24kV 250A Deadbreak Elbow Type Test Report...The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and following), in the impulse testing, the cable

28

Copyright © 2015, Chardon Group All rights reserved

No. 37, Min-Chie Road, Tung Lo Industrial Park, Miao Li, 366 Taiwan, R.O.C.

Tel: +886-37-984385 | Fax: +886-37-984770 E-Mail: [email protected]

安装回路

测试数据显示

Page 29: 17.5/24kV 250A Deadbreak Elbow Type Test Report...The test shall be conducted according to the procedure given in IEC 60230( Clause 3 and following), in the impulse testing, the cable

29

Copyright © 2015, Chardon Group All rights reserved

No. 37, Min-Chie Road, Tung Lo Industrial Park, Miao Li, 366 Taiwan, R.O.C.

Tel: +886-37-984385 | Fax: +886-37-984770 E-Mail: [email protected]

11. Examination Object

To verify the connectors that parts meet the requirement of IEC 60502.4/HD629.1S2

about examination of the tested samples.

Testing Samples

Deadbreak Elbow CHARDON 24-CE250 4 pcs

Procedure and Test Spec

The accessories shall be examined and the following information :

(i) Cracking in the filling media and/or tape or tube components;

(ii) A moisture path bridging a primary seal;

(iii)Corrosion and/or tracking and/or erosion which would, in time, lead to failure of

the accessory.

Results

Sample number Examination

A1 PASS

A2 PASS

A3 PASS

A4 PASS