17/18 May 2003 IMACS SAC meeting update
1
IMACS:Inamori-Magellan Areal Camera and
Spectrograph
Magellan SAC Status Report
17/18 May 2003
Univ. of Michigan, Ann Arbor
17/18 May 2003 IMACS SAC meeting update
3
17/18 May 2003 IMACS SAC meeting update
4
17/18 May 2003 IMACS SAC meeting update
5
Optics Status:
Field lens and Collimator optics : done, installed
f/4 camera optics: done, installed
f/2 camera optics*: done, installed
Grisms: 200 l/mm* done, installed
300 l/mm ready to mount in cell
600 l/mm ready to mount in cell
Filters: 2 sets, CTIO B,V,I, done, installed
2 sets of CTIO R done, installed
CTIO U (LCAM) awaits ADC coating
*new since last report
17/18 May 2003 IMACS SAC meeting update
6
Optics Status cont.
Imaging Mirrors: Ag mirror installed
Al mirror ready to mount
Echellette Optics
Grating done
Prism (Zygo) due end of May
Durham IFU: due end of May
17/18 May 2003 IMACS SAC meeting update
8
Mechanical Engineering Status:
Guide camera stages (Hare) done, mounted
Calibration lamp system (Hare) done, mounting IP
Mask server (Bigelow) done, mounted
Field Lens (Hare) done, mounted
Shutters (Hare) done, mounted
Filter servers (All hands...) done, mounted
Disperser server (Hare) done, mounted
- 6 Grating cells (Bigelow) done, mounted
- 3 Grism cells (Bigelow) 1 done, 2 IP
- 2 Mirror cells (Bigelow) 1 done, 1 IP
17/18 May 2003 IMACS SAC meeting update
9
IFU mass dummy and old center field guider
17/18 May 2003 IMACS SAC meeting update
10
New center-field guide camera stage
17/18 May 2003 IMACS SAC meeting update
11
4 of 6 grating cells
17/18 May 2003 IMACS SAC meeting update
12
Grating cell mounted in tilt mechanism, on DSS wheel
17/18 May 2003 IMACS SAC meeting update
13
Mechanical Engineering cont.
Collimator mech. (Bigelow) done
f/4 camera opto-mech. (Bigelow) done
f/2 camera opto-mech. (Bigelow) done
Dewar (Luppino) done
Instrument Structure (Gunnels) done
Instrument Carriage (Gunnels) done
Instrument Enclosures (Gunnels) done
Instrument Utility wrap (Gunnels) done
17/18 May 2003 IMACS SAC meeting update
14
“Changing the oil” in the short camera quartet
17/18 May 2003 IMACS SAC meeting update
15
Short camera with quartet installed
17/18 May 2003 IMACS SAC meeting update
16
Installing the f/2 camera
17/18 May 2003 IMACS SAC meeting update
17
200 l/mm grism in cell, on DSS wheel
17/18 May 2003 IMACS SAC meeting update
18
Science array CCDs installed in dewar
17/18 May 2003 IMACS SAC meeting update
19
Dewar integrated with SA controller
17/18 May 2003 IMACS SAC meeting update
20
Grism spectra with “Gus’ mask”
17/18 May 2003 IMACS SAC meeting update
21
Flexure map, f/2 camera, imaging mode
17/18 May 2003 IMACS SAC meeting update
22
Flexure map, f/4 camera, imaging mode
17/18 May 2003 IMACS SAC meeting update
23
Electronic Engineering (Baggish):
Schematics design (all motion stages) done
(4) Motion control (MC) chassis, done
(1) Power supply chassis, done
(1) Shutter control chassis done
(2) Electronics racks for chassis done
(2) SA + FC power supply chassis done
(2) Guider power supply chassis done
Instr. wiring harnesses done
Temperature, pressure, voltage sensors IP
17/18 May 2003 IMACS SAC meeting update
24
Detector systems:
Flexure sensor detectors
- First light on first sensor 5/15/03!
Science array CCD/controller performance:
- SITe RN spec: 4.5e- min < 5.2e- typ < 6.5e- max, 20us/px
- Measured single chip RN 3.5e- at 10us/px
- Full array 4.8e- at 10us/px (estimate, not optimized)
- No measurable crosstalk
- CCD operating temperature: -110C
- Column-wise image bleeding - in CCDs?
- Additional cold room testing in May
17/18 May 2003 IMACS SAC meeting update
25
First light image from one of two flexure control detectors in the IMACS focal plane.
17/18 May 2003 IMACS SAC meeting update
26
Software:
Instrument Control (Birk)
Individual module testing:Module GUI status SW/HW Int.Pr. Guider done doneSH guider done doneCF guider done IPSlit Mask Server done doneDisperser Server done doneLong Camera Focus done doneFilter Servers (2) done doneFlexure Control (LUT) done doneDetector Focus done doneHP Sensor System done IP
17/18 May 2003 IMACS SAC meeting update
27
Software:
Instrument Control cont.
Test and integration instrument control:
- One GUI at this level, showing all
critical aspects of each module: ready to ship
User Level Software:
- Two GUIs at this level:
- Instrument control interface: ready to ship
- Graphical Instr. Status Display: ready to ship
17/18 May 2003 IMACS SAC meeting update
28
Software:
Science Array Control (Birk)
Shutter control:
- micro-controller for linear motors done
CCD readout / camera control:
- “ccdserver” for array readout ready to ship
- “camgui” for user interface ready to ship
Quick-Look Tool: ready to ship
17/18 May 2003 IMACS SAC meeting update
29
Coming up:
- Function and performance testing (in progress)
- Cold testing of mechanisms (in progress)
- Cold testing of optical systems
- Thermal focus look-up table for f/4 camera
- Flexure maps and control loops (open and closed)
- Plumbing of liquid cooling system (in progress)
- Installation of air over-pressure and circulation systems
- Mounting of last two grisms and Al imaging mirror
- Design of echellette opto-mechanics
- Final test and integration of FC detectors (“wing chips”)
17/18 May 2003 IMACS SAC meeting update
30
Shipping and installation:
- Pre-shipment review 5/28/03
- External reviewers:
- Harland Epps, UCSC
- Jerry Nelson, UCSC
- Dan Fabricant, Harvard/SAO
- Bob Fata, Harvard/SAO
- Disassembly starts week of 6/16/03
- Shipment to Long Beach on 7/1/03
- Columbus voyage #357 departs 7/5/03, arrives 7/23/03
- Container arrives at LCO on or around 8/1/03
17/18 May 2003 IMACS SAC meeting update
31
Shipping and installation:
Continued:
- Installation preparation starts 8/1/03
- Installation time runs 8/6 - 8/18
Local Preparations:
- Installation schedule (Bigelow) 90%
- Commissioning schedule (Dressler, Oemler) IP
- Shipping plan (Bigelow) IP
- LCO Support agreement (Bigelow, Dressler) IP
- Shipping crates and containers (OCIW) 90%
17/18 May 2003 IMACS SAC meeting update
32
Shipping and installation:
- Instrument document suite (all web-based):
- Engineering manual + drawings IP
- Electronics manual + schematics IP
- Software manual IP
- Detector systems manual IP
- User’s manual IP