P - 43 F.P.S.O CONVERSION Doc. No. 218338-Q-PA-020
DOC TITLE : Rev. A
INSPECTION AND TEST PLAN MATRIX Page
Process Description Procedure Acceptance Criteria Verifying Document Action Points
JSPL KBR ABS
1 CORPORATE PROCEDURES
1.1 Requisition of Material and Equipme PAD-06-01-P01 3 NA NA JSPL Records as Required. R M -
1.2 Purchasing PAD-06-03-P01 4 NA NA JSPL Records as Required. M M -
1.3 Purchase Order Preparation by ComPAD-06-03-P01-W01 I NA NA JSPL Records as Required. M M -
1.4 Incoming Inspection of Stock Materi PAD-10-01-P01 3 NA NA JSPL Records as Required. H M -
1.5 PAD-10-01-P02 2 NA NA JSPL Records as Required. H M -
1.6 Non-Conformance Reporting QMP-13-01-P01 6 NA NA JSPL Records as Required. R M M
1.7 Corrective Action. QMP-14-01-P01 4 NA NA JSPL Records as Required. R M M
1.8 Preventive Action. QMP-14-01-P03 I NA NA JSPL Records as Required. R M M
1.9 Control of Inspection and Test Equi QMP-11-01-P01 1 NA NA JSPL Records as Required. M M M
2 QUALITY OBJECTIVE - - NA NA - Project Quality Plan
3 CONTRACT REVIEW - - NA NA R R M
4 SUB-CONTRACTOR SOURCING SELECTION
Sub-Contractor Sourcing Selection NA JSPL Sub-Contractor Rating Approval Vendor List H M M
5 MATERIAL
7 of 20
S. No.
Rev.
SECTION JOB
QUALITY PLAN NO
SU
B-
CO
N
Incoming Inspection of Purchased Non-stock Material
Acknowledgement of contrace / PO
Quotation / Tender Relevant documents.
5.1 Receiving Inspection PAD-10-01-P02 - NA JSPL - Records as Required. H M M
P - 43 F.P.S.O CONVERSION Doc. No. 218338-Q-PA-020
Doc . Title : Rev. A
INSPECTION AND TEST PLAN MATRIX Page
Process Description Procedure Acceptance Criteria Verifying Document Action Points
JSPL KBR ABS
5.2 Material Verification - - APP. JSPL ABS Mill Certificate H M M
5.3 Review of Material Certificates - - NA JSPL Material Specification Mill Certificate R R R
6 QUALITY
6.1 NDT & PERSONNEL QUALIFICATION
6.1.1 NDT Procedures
6.1.1a 218338-Q-PA-001 A NA YES AWS D1.1 R R/A R/A
6.1.1b 218338-Q-PA-002 A NA YES ASME SEC VIII R R/A R/A
6.1.1c 218338-Q-PA-003 A NA YES ABS R R/A R/A
6.1.1d 218338-Q-PA-004 A NA YES AWS D1.1 R R/A R/A
6.1.1e 218338-Q-PA-005 A NA YES R R/A R/A
6.1.1f 218338-Q-PA-006 A NA YES ABS RULE FOR NDT R R/A R/A
6.1.1g 218338-Q-PA-007 A NA YES AWS D1.1 R R/A R/A
6.1.1h 218338-Q-PA-008 A NA YES ASME SEC VIII R R/A R/A
6.1.1i 218338-Q-PA-009 A NA YES AWS D1.1 R R/A R/A
8 of 20
S. No.
Rev.
SECTION JOB
QUALITY PLAN NO
SU
B-
CO
N
Setsco Procedure for Ultrasonic Testing ( AWS D1.1 )
I-PR-FGG-GENL-QM-BRY-
002Setsco Procedure for Ultrasonic Testing ( ASME V & VIII SPECIFICATION )
I-PR-FGG-GENL-QM-BRY-
002Setsco Procedure for Ultrasonic Testing ( ABS )
I-PR-FGG-GENL-QM-BRY-
002Setsco Procedure for Radiogrphy Testing ( AWS D1.1 )
I-PR-FGG-GENL-QM-BRY-
002Setsco Procedure for Radiogrphy Testing ( ASME SEC. V )
ASME SEC V, AWS D1.1 / ANSI B31.3
I-PR-FGG-GENL-QM-BRY-
002Setsco Procedure for Radiogrphy Testing ( ABS )
I-PR-FGG-GENL-QM-BRY-
002Setsco Procedure for Magnetic Particle Testing ( ASTM & AWS D1.1 )
I-PR-FGG-GENL-QM-BRY-
002Setsco Procedure for Magnetic Particle Testing ( ASTM SEC. V & VIII )
I-PR-FGG-GENL-QM-BRY-
002Setsco Procedure for Liquid Penetrant Testing ( ASTM E 165 & AWS D1.1 )
I-PR-FGG-GENL-QM-BRY-
002
6.1.1j 218338-Q-PA-010 A NA YES ASME SEC VIII R R/A R/A
6.1.1k 218338-Q-PA-011 A NA YES AWS D1.1 / ASME VIII/ABS R R/A R/A
P - 43 F.P.S.O CONVERSION Doc. No. 218338-Q-PA-020
Doc . Title : Rev. A
INSPECTION AND TEST PLAN MATRIX Page
Process Description Procedure Acceptance Criteria Verifying Document Action Points
JSPL KBR ABS
6.1.1l 218338-Q-PA-012 A NA YES AWS D1.1 /ASME VIII /ABS R R/A R/A
218338-Q-PA-013 A NA YES AWS D1.1 R R/A R/A
6.1.1n 218338-Q-PA-014 A NA YES ASME SEC VIII R R/A R/A
6.1.1o 218338-Q-PA-015 A NA YES ABS R R/A R/A
6.1.1p 218338-Q-PA-016 A NA YES AWS D1.1 / ASME VIII R R/A R/A
6.1.1q 218338-Q-PA-017 A NA YES AWS D1.1 / ASME VIII R R/A R/A
6.1.1r Procedure for Thichkness Gauging 218338-Q-PA-018 A NA YES R R/A R/A
6.1.2 Personnel Qualification I-PR-FGG-GENL-QM-BRY-002
6.1.2a Welding Inspector NA JSPL CSWIP-W1-6-92 Certificates R R R
6.1.2b NDT Personnel Quaification NA YES
a) Procedure Approval NA YES PCN Level - III Certificates R R R
b) Interpteter / Technician NA YES PCN Level - II Certificates R R R
Setsco Procedure for Liquid Penetrant Testing ( ASTM SEC. V & VIII )
I-PR-FGG-GENL-QM-BRY-
002Ebenzer Procedure for Radiography Testing
I-PR-FGG-GENL-QM-BRY-
002
9 of 20
S. No.
Rev.
SECTION JOB
QUALITY PLAN NO
SU
B-
CO
N
Mateval Procedure for Radiogrphy Testing
I-PR-FGG-GENL-QM-BRY-
0026.1.1
m
Mateval Procedure for Ultrasonic Testing ( AWS )
I-PR-FGG-GENL-QM-BRY-
002Mateval Procedure for Ultrasonic Testing ( ASME )
I-PR-FGG-GENL-QM-BRY-
002Mateval Procedure for Ultrasonic Testing ( ABS )
I-PR-FGG-GENL-QM-BRY-
002Mateval Procedure for Magnetic Particle Testing
I-PR-FGG-GENL-QM-BRY-
002Mateval Procedure for Liquid Penetrant Testing
I-PR-FGG-GENL-QM-BRY-
002ASME SEC V, AWS D1.1 /
ANSI B31.3 I-PR-FGG-GENL-QM-BRY-
002
Personnel Qualification Certifiacates
I-PR-FGG-GENL-QM-BRY-
002
6.1.2c Dimensional Control Inspector NA JSPL SEQUI R R R
6.1.2d Painting Inspection NA JSPL BGAS Certificates R R R
6.2 WELDING
P - 43 F.P.S.O CONVERSION Doc. No. 218338-Q-PA-020
Doc . Title : Rev. A
INSPECTION AND TEST PLAN MATRIX Page
Process Description Procedure Acceptance Criteria Verifying Document Action Points
JSPL KBR ABS
6.2.1 Welding Procedures / Qualificaiton Records NA JSPL WPS / PQS R R R/A
6.2.2 NA JSPL Certificates R R R/A
6.3 QUALITY ASSURANCE / CONTROL PROCEDURE
6.3.1 Dimensional Control Procedure 218338 - Q - PA - 019 A APP JSPL JSPL/KBR QAD - 10 - 02 - P 02 H M M
6.3.2 Inspection and Test Plan 218338 - Q - PA - 020 A NA JSPL JSPL / KBR/ABS I-PR-FGG-GENL-QM-BRY-002 H H H
6.3.3 NDT Plan for Process Piping 218338 - Q - PA - 021 A NA JSPL JSPL / KBR/ABS ET-3010.00-1200-200-PSE-001 H W W
7 CONSTRUCTION AND ASSEMBLY PROCEDURES
7.1 PROJECT
7.1.1 Material Control 218338 - Z - PA - 001 A NA JSPL CERTIFICATES Records as Required. M M M
7.12 Document Register 218338 - Z - PA - 002 A NA JSPL - Records as Required. R R -
7.1.3 Document Control 218338 - Z - PA - 003 A NA JSPL - Records as Required. R R -
7.1.4 Movement of Vessel 218338 - Z - PA - 004 A NA JSPL JSPL - M M -
SEQUI Qualification Serial Number
10 of 20
S. No.
Rev.
SECTION JOB
QUALITY PLAN NO
SU
B-
CO
N
ABS Rule , AWS D1.1, ASME B31.3
Welder and Welding Operator Qualification Test Procedure
ABS Rules, AWS D1.1, ASME V & VIII, ASME B 31.3
7.1.5 Project Quality Plan 218338 - Z - PA - 005 A NA JSPL JSPL/KBR Records as Required. R M R
7.1.6 Product Identification and Traceabil218338 - Z - PA - 006 A APP JSPL JSPL Records as Required. M M M
7.1.7 Preservation 218338 - Z - PA - 007 A APP JSPL JSPL Records as Required. M M M
P - 43 F.P.S.O CONVERSION Doc. No. 218338-Q-PA-020
Doc . Title : Rev. A
INSPECTION AND TEST PLAN MATRIX Page
Process Description Procedure Acceptance Criteria Verifying Document Action Points
JSPL KBR ABS
7.1.8 Weight Control Procedure 218338 - Z - PA - 002 A APP JSPL JSPL ET-3010.00-1200-941-PPC-002 M W -
7.2 SAFETY
7.2.1 Arrangement of safety & Utility 218838 - S - PA -001 A NA JSPL JSPL M M M
7.2.2 JSPL Project Safety Plan 218838 - S - PA -002 A NA JSPL JSPL M M M
7.3 STRUCTURE
7.3.1 Steel Fabrication 218338 - N - PA - 001 A APP YES JSPL ET-3010.49-1350-140-PPC-002, H M M
7.3.2 Block Erection 218338 - N - PA - 002 A APP YES JSPL ET-3010.49-1350-140-PPC-002 H M M
7.3.3 Control and Use of Welding Consum218338 - N - PA - 003 A NA JSPL Manufacture Recommendation Records as Required. M M M
7.3.4 Flare Boom Assembly Procedure 218338 - N - PA - 004 A APP YES - ET-3010.49-3050-105-PPC-002 H M M
7.3.5 218338 - N - PA - 005 A APP YES JSPL / KBR/ABS H W W
7.3.6 218338 - N - PA - 006 A APP YES KBR / ABS H W W
11 of 20
S. No.
Rev.
SECTION JOB
QUALITY PLAN NO
SU
B-
CO
N
HEALTH,SAFETY AND GENERAL
ENVIRONMENTAL
REQUIREMENTS (ANNEX J)
HEALTH,SAFETY AND GENERAL
ENVIRONMENTAL
REQUIREMENTS (ANNEX J)
NDT & Stress Relieving Plan for Flare Boom
ET-3010.44-3050-104-PPC-002 , ANSI
B31.3 , AWS D1.1
Procedure for Weld Build-up for Pitting, Scar and Root Gap
ET-3010.44-3050-104-PPC-002 , WPS
7.3.7 218338 - N - PA - 007 A NA JSPL JSPL/KBR I-PR-FGG-GENL-QM-BRY-002 M M M
7.3.8 218338 - N - PA - 008 A APP YES JSPL/KBR ET-3010.44-3050-104-PPC-002 H M M
7.3.9 Steel Plate Traceabilty 218338 - N - PA - 009 A APP JSPL JSPL Records as Required. M M M
P - 43 F.P.S.O CONVERSION Doc. No. 218338-Q-PA-020
Doc . Title : Rev. A
INSPECTION AND TEST PLAN MATRIX Page
Process Description Procedure Acceptance Criteria Verifying Document Action Points
JSPL KBR ABS
7.3.10 Steel Work Inspection Procedure 218338 - N - PA - 010 A APP JSPL KBR / ABS Records as Required. H W H
7.3.11 Thermal Fairing Procedure 218338 - N - PA - 011 A APP YES JSPL ET-3010.44-3050-104-PPC-002, M M M
7.3.12 Tightness Test Procedure 218338 - N - PA - 012 A APP JSPL KBR / ABS ABS RULES H W W
7.3.13 Weld Repair in Steel Structure 218338 - N - PA - 013 A APP YES KBR / ABS Records as Required. H W H
7.3.14 218338 - N - PA - 014 A APP YES JSPL/KBR M M M
7.4 PIPING
7.4.1 Cold Galvanizing Procedure 218338- P - PA - 001 A APP YES JSPL/KBR - M M M
7.4.2 Fibre Glass Pipe Assembly Procedur218338- P - PA - 002 A APP YES JSPL/KBR - H W W
7.4.3 Fibre Glass Pipe Repair Procedure 218338- P - PA - 003 A APP YES JSPL/KBR - H W W
7.4.4 Hot Dip Galvanizing Procedure 218338- P - PA - 004 A APP YES JSPL/KBR ET-3010.49-1350-140-PPC-001 M M M
7.4.5 218338- P - PA - 005 A APP YES JSPL/KBR ET-3010.49-1200-200-PSE-001 H W W
7.4.6 Piping Weld Repair Procedure 218338- P - PA - 006 A APP YES JSPL / KBR/ABS Records as Required. H W W
Procedure for Welders Performance Records for StructureProcedure for Carbon ARC - Air Cutting / Gouging in Steel Structure
12 of 20
S. No.
Rev.
SECTION JOB
QUALITY PLAN NO
SU
B-
CO
N
Stress Relief and Hardness Test Procedure ( Structure )
INDUSTRIAL HEATING TECH. SPEC.
Piping Fabrication and Installation Procedure ( New Pipe )
7.4.7 218338- P - PA - 007 A APP YES JSPL/KBR
7.4.8 218338- P - PA - 008 A NA JSPL JSPL/KBR I-PR-FGG-GENL-QM-BRY-002 M M M
7.4.9 218338- P - PA - 009 A APP YES JSPL/KBR M M M
P - 43 F.P.S.O CONVERSION Doc. No. 218338-Q-PA-020
Doc . Title : Rev. A
INSPECTION AND TEST PLAN MATRIX Page
Process Description Procedure Acceptance Criteria Verifying Document Action Points
JSPL KBR ABS
7.4.10 218338 - P - PA - 010 A APP YES ANSI B31.3 H W W
7.5 ELECTRICAL
7.5.1 Battery Bank Conection & Test Proc218338 - E - PA - 001 A APP YES JSPL/KBR H W M
7.5.2 Cable Stripping Procedure 218338 - E - PA - 002 A APP YES JSPL/KBR H M M
7.5.3 Cable Termination Procedure 218338 - E - PA - 003 A APP YES JSPL/KBR IEC - 79 - 0, 79 - 10 H M M
7.5.4 Cable Tagging Procedure 218338 - E - PA - 004 A APP YES JSPL/KBR IEC - 92 H M M
7.5.5 218338 - E - PA - 005 A APP YES JSPL/KBR IEC - 92 H W M
7.5.6 218338 - E - PA - 006 A APP YES JSPL/KBR IEC - 92, IEEE - 141 H M M
7.5.7 Electrical Installation Procedure 218338 - E - PA - 007 A APP YES JSPL/KBR IEC 93 - IEEE - 141 H W M
7.5.8 Electrical Isolation Procedure 218338 - E - PA - 008 A APP YES JSPL/KBR - H W -
7.5.9 218338 - E - PA - 009 A APP YES JSPL/KBR H M M
7.5.10 Lighting System Test Procedure 218338 - E - PA - 010 A APP YES JSPL/KBR IEC - 92, IEC - 79-0, 79-10 H M M
Rubber lining Application & Inspection Procedure
MANUFACTURER TECH. SPECH.
Procedure for Welders Performance Records for Process PipingStress Relief and Hardness Test Procedure ( Process Pipe )
INDUSTRIAL HEATING TECH. SPEC.
13 of 20
S. No.
Rev.
SECTION JOB
QUALITY PLAN NO
SU
B-
CO
N
Procedure for Testing of Process and Marine Piping
CALIBRATION REPORT, TEST PACKAGE , ASMEB31.1
IEC - 92 , ET-
3010.49-5140-700-PPC-001IEC - 92 , ET-
3010.49-5140-700-PPC-001
Cathodic Protection Connection & Test ProcedreElectrical Cable Installation Procedure
Electrical Motor Connection & Test Procedure
IEC - 92,
ET-3000.00-5140-741-PPC-001
7.5.11 New Main Switchboard Installation 218338 - E - PA - 011 A APP YES JSPL/KBR H W M
7.5.12 Procedure for conductivity test of F 218338 - E - PA - 012 A APP YES JSPL/KBR - H W M
7.5.13 Procedure for Receiving, Storage & 218338 - E - PA - 013 A APP YES JSPL/KBR VENDOR DOCUMENTS H M M
7.5.14 218338 - E - PA - 014 A APP YES JSPL/KBR IEC - 92, IEC - 79-0 H W M
P - 43 F.P.S.O CONVERSION Doc. No. 218338-Q-PA-020
Doc . Title : Rev. A
INSPECTION AND TEST PLAN MATRIX Page
Process Description Procedure Acceptance Criteria Verifying Document Action Points
JSPL KBR ABS
7.6 MECHANICAL
7.6.1 Disassembly Plan 218338 - M - PA - 00 A NA JSPL JSPL - H M M
7.6.2 Erection Plan 218338 - M - PA - 00 A NA JSPL JSPL - H M M
7.6.3 Load Movement 218338 - M - PA - 00 A NA JSPL - - M M M
7.6.4 Mechanical Completion 218338 - M - PA - 00 A NA JSPL JSPL - H M M
7.6.5 Winch Installation Procedure 218338 - M - PA - 00 A APP JSPL MAKER - M M M
7.6.6 218338 - M - PA - 00 A NA YES
7.7 INSTRUMENTATION
7.7.1 Instrumentation Calibration Record 218338 - I - PA - 001 A NA NA VENDOR DATA CHECK LIST H W W
7.7.2 Instrumentation ( Calibration ) 218338 - I - PA - 002 A NA NA VENDOR DATA - H W W
7.7.3 218338 - I - PA - 003 A APP YES KBR / VENDOR DATA ET-3010.40-5510-760-PPT-602 H W W
IEC - 92, ET-
3000.00-5140-741-PPC-001
Rectifier, Battery Charges., UPS Connection & Test Procedures
14 of 20
S. No.
Rev.
SECTION JOB
QUALITY PLAN NO
SU
B-
CO
N
Procedure of chock fasting for New Equipment
Installation of Telecommunication Equipment
7.7.4 218338 - I - PA - 004 A NA NO - - -
7.7.5 218338 - I - PA - 005 A APP NO - - -
7.8 PAINTING
7.8.1 218338 - C - PA - 001 A APP YES JSPL ET-3010.49-1350-140-PPC-001 W W -
7.8.2 Hydro Blasting and Painting 218338 - C - PA - 002 A APP YES JSPL/KBR ET-3010.49-1350-140-PPC-001 M M -
P - 43 F.P.S.O CONVERSION Doc. No. 218338-Q-PA-020
Doc . Title : Rev. A
INSPECTION AND TEST PLAN MATRIX Page
Process Description Procedure Acceptance Criteria Verifying Document Action Points
JSPL KBR ABS
7.8.3 Hull Grit blasting and Painting 218338 - C - PA - 003 A APP YES JSPL/KBR ET-3010.49-1350-140-PPC-001 W W -
7.8.4 Paint storage 218338 - C - PA - 004 A NA YES JSPL/KBR - M M -
7.8.5 218338 - C - PA - 005 A APP YES JSPL/KBR ET-3010.49-1350-140-PPC-001 W W -
7.8.6 218338 - C - PA - 006 A APP YES JSPL/KBR ET-3010.49-1350-140-PPC-001 W W -
7.8.7 218338 - C - PA - 007 A APP YES JSPL/KBR ET-3010.49-1350-140-PPC-001 W W -
7.8.8 Tank Coating Procedure 218338 - C - PA - 008 A APP YES JSPL/KBR ET-3010.49-1350-140-PPC-003 W W -
7.8.9 Thermal Spraying Procedure 218338 - C - PA - 009 A APP YES JSPL/KBR ET-3010.00-1200-940-PPC-001 W W -
7.9 HVAC
7.9.1 Installation of Ventilation Duct 218338 - H - PA - 001 A NA YES JSPL / VENDOR - H M M
7.9.2 Installation of Insulation 218338 - F - PA - 002 A NA YES JSPL/KBR - H M M
Installation of Resistance Measurement ProcedureProcedure for Instrument Cable Installation
Control and Repair of Burnmarks and Mechanical Damage on Painted Area
15 of 20
S. No.
Rev.
SECTION JOB
QUALITY PLAN NO
SU
B-
CO
N
Procedure for Painting of New Fabricated Steel Structure.Procedure for Blasting and Painting InspectionProcedure for Painting of New Fabrication Pipe
8 STRUCTURAL WORK
8.1 ACCOMMODATION ( Design Criteria : Secondary )
a ) Fit up - APP YES WPS / IACS/Client Tech. Spec H M M
b ) Welding - APP YES AWS D1.1 WPS H W W
c ) Visual - APP JSPL Inspection Reports H M H
d ) NDT - APP YES AWS D1.1 / ABS Rule NDT Reports R R/A R/A
P - 43 F.P.S.O CONVERSION Doc. No. 218338-Q-PA-020
Doc . Title : Rev. A
INSPECTION AND TEST PLAN MATRIX Page
Process Description Procedure Acceptance Criteria Verifying Document Action Points
JSPL KBR ABS
e ) Tightness Test - APP JSPL ABS Rule Tightness Test Reports H W H
f ) Records - NA JSPL - All Reports R R/A R/A
8.2 CHAIN PIPE ( Design Criteria : Secondary )
Fabrication & Installation -
a ) Fit up - APP YES WPS / IACS/ Client Tech. Spec Inspection Reports H M M
b ) Welding - APP YES WPS / PQR H W W
c ) Visual - APP JSPL AWS D1.1 / ABS Rule Inspection Reports H M H
d ) NDT - APP YES AWS D1.1 / ABS Rule NDT Reports R R/A R/A
e ) Records - NA JSPL - All Reports R R/A R/A
AFC Drawings, Inspection Reports
AWS D1.1,ABS Rule and Client Tech. Spec.
16 of 20
S. No.
Rev.
SECTION JOB
QUALITY PLAN NO
SU
B-
CO
N
8.3 HELIDECK ( Design Criteria : Fabrication : Secondary & Installation : Primar
Fabrication(Design Criteria :Second -
Installation (Design Criteria :Primar -
a ) Fit up - APP YES WPS / IACS/Client Tech, Spec Inspection Reports H M M
b ) Welding - APP YES AWS D1.1 WPS H W W
c ) Visual - APP JSPLAWS D1.1 and Client Tech,Spec., Inspection Reports H M H
P - 43 F.P.S.O CONVERSION Doc. No. 218338-Q-PA-020
Doc . Title : Rev. A
INSPECTION AND TEST PLAN MATRIX Page
Process Description Procedure Acceptance Criteria Verifying Document Action Points
JSPL KBR ABS
d ) Dimensional Control - APP JSPL Client Tech Spec. Dimensional Control Report H R R
e ) NDT - APP YES AWS D1.1 / ABS Rule NDT Report H R/A R/A
f ) Records - NA JSPL - All Reports R R/A R/A
8.4 CRANE PEDESTAL ( Disign.Criteria : Special / Primary )
a ) Fit up - APP YES Inspection Reports H M M
b ) Welding - APP YES AWS D1.1 WPS H W W
c ) Visual - APP NA Inspection Reports, H W W
d ) Dimensional Control - APP JSPL Client Spec. Dimensional Control Report H R R
e ) Tightness Test - APP JSPL ABS Rule Tightness Test Report H W H
17 of 20
S. No.
Rev.
SECTION JOB
QUALITY PLAN NO
SU
B-
CO
N
WPS / IHI SPAIS 1996/ Client Tech. Spec
AWS D1.1 and Client Tech,Spec.,
f ) NDT - APP YES AWS D1.1 / ABS Rule NDT Reports R R/A R/A
g ) Records - NA JSPL - All Reports R R/A R/A
8.5 RISER I TUBES ( Design Criteria : Primary)
a ) Fit up - APP YES WPS, Client Tech, Spec., Inspection Reports H M M
b ) Welding - APP YES AWS D1.1 WPS H W W
c ) Visual - APP JSPL Inspection Reports H W W
P - 43 F.P.S.O CONVERSION Doc. No. 218338-Q-PA-020
Doc . Title : Rev. A
INSPECTION AND TEST PLAN MATRIX Page
Process Description Procedure Acceptance Criteria Verifying Document Action Points
JSPL KBR ABS
d ) Dimensional Control - APP JSPL Client Spec. Dimensional Control Report H R R
e ) NDT - APP YES AWS D1.1 / ABS Rule NDT Reports R R/A R/A
f ) Records - NA JSPL - All Reports R R/A R/A
8.6 FLARE BOOM ( Design Criteria : Primary)
a ) Fit up - APP YES Inspection Reports H W W
b ) Welding - APP YES AWS D1.1 WPS H W W
c ) Visual - APP JSPL Inspection Reports H M H
d ) Dimensional Control - APP JSPL Client Spec. Dimensional Control Report H R R
e ) NDT - APP YES AWS D1.1 / ABS Rule NDT Report R R/A R/A
AWS D1.1,ABS Rule and Client Tech. Spec.
18 of 20
S. No.
Rev.
SECTION JOB
QUALITY PLAN NO
SU
B-
CO
N
AWS D1.1,ABS Rule and Client Tech. Spec.
AWS D1.1,ABS Rule and Client Tech. Spec.
f ) PWHT - APP YES ASME B 31. 3 / AWS D1.1 PHWT & Hardness Report R R/A R/A
g ) Tightness Test - APP NA ABS RULES Tightness Test Report H W H
h ) Records - NA NA - All Reports R R/A R/A
8.7 OFF LOADING (Design Criteria : Secondary)
a ) Fit up - APP YES H M M
b ) Welding - APP YES AWS D1.1 WPS H W W
P - 43 F.P.S.O CONVERSION Doc. No. 218338-Q-PA-020
Doc . Title : Rev. A
INSPECTION AND TEST PLAN MATRIX Page
Process Description Procedure Acceptance Criteria Verifying Document Action Points
JSPL KBR ABS
c ) Visual - APP JSPL Inspection Reports H W H
d ) NDT - APP YES AWS D1.1 / ABS Rule NDT Reports R R/A R/A
e ) Records - NA JSPL Spec., ABS Rule All Reports R R/A R/A
8.8 TELECOMMUNICATION TOWER ( Design Criteria : Primary )
a ) Fit up - APP YES H M M
b ) Welding - APP YES AWS D1.1 WPS H R R
c ) Visual - APP JSPL Inspection Reports H W H
d ) NDT - APP YES AWS D1.1 / ABS Rule NDT Reports R R/A R/A
e ) Records - NA JSPL - All Reports R R/A R/A
AWS D1.1,ABS Rule and Client Tech. Spec.
Weld map, Inspection Reports
19 of 20
S. No.
Rev.
SECTION JOB
QUALITY PLAN NO
SU
B-
CO
N
AWS D1.1,ABS Rule and Client Tech. Spec.
AWS D1.1,ABS Rule and Client Tech. Spec.
Weld map, Inspection Reports
AWS D1.1,ABS Rule and Client Tech. Spec.
8.9 STRUCTURAL RENEWAL ( D.Criteria : Primary/Secodary )
a ) Thickness Gauging - NA YES ABS Rule & Client Spec., Thickness Gauging Reports R R R
b ) Close Up Survey - NA YES ABS Rule & Client Spec., Close up Survey Reports R R R
c ) Renewal Plan - APP NA ABS Rule & Client Spec., Renewal Plan H A A
d ) Fit up - APP YES ABS Rule & Tech. Spec., Weld map, Inspection Reports H M M
e ) Welding APP YES AWS D1.1 WPS H M M
f ) Visual - APP JSPL ABS Rule & Tech. Spec., Inspection Reports H M H
P - 43 F.P.S.O CONVERSION Doc. No. 218338-Q-PA-020
Doc . Title : Rev. A
INSPECTION AND TEST PLAN MATRIX Page
Process Description Procedure Acceptance Criteria Verifying Document Action Points
JSPL KBR ABS
g ) NDT - APP YES AWS D1.1 / ABS Rule NDT Reports R R/A R/A
h ) Tightness Test ( As Applicable ) - APP JSPL ABS Rule Tightness Test Reports H W H
I ) Records - NA JSPL - All Reports H R/A R/A
9 BLASTING & PAINTING Painting
9.1 Surface Preparation AFC Procedure APP YES ET-3010.49-1350-140-PPC-003 Blasting Report H W M
9.2 Paint Appllication AFC Procedure APP YES ET-3010.49-1350-140-PPC-003 Painting Scheme H W M
9.3 Dry Film Tickness Check AFC Procedure APP YES ET-3010.49-1350-140-PPC-003 Painting Report H W M
10 FINAL DOSSIER DOCUMENTATION
20 of 20
S. No.
Rev.
SECTION JOB
QUALITY PLAN NO
SU
B-
CO
N
10.1 Struture NA JSPL KBR H R/A R
10.2 Piping NA JSPL KBR H R/A R
10.3 Blasting & Painting NA JSPL KBR H R/A R
10.4 Mechanical NA JSPL KBR H R/A R
10.5 E & I NA JSPL KBR H R/A R
Notes :APP : JOB QUALITY PLAN SHALL BE PROVIDED BY RESPECTIVE SECTIONSNA : NOT APPLICABLEYES : SUB-CONTRACTOR WILL BE ASSIGNED FOR THE JOBJSPL : JSPL DIRECT EMPLOYEES WIIL CARRY OUT / CONTROL THE JOB
All Inspection and Test Reports
All Inspection and Test Reports
All Inspection and Test Reports
All Inspection and Test Reports
All Inspection and Test Reports
P - 43 F.P.S.O CONVERSION Doc. No. 218338-Q-PA-020
Rev. A
INSPECTION AND TEST PLAN MATRIX Page
Process Description Procedure Acceptance Criteria Verifying Document Action Points
JSPL KBR ABS
1 CORPORATE PROCEDURES
1.1 Requisition of Material and Equipment. PAD-06-01-P01 NA NA JSPL Records as Required. R M -
1.2 Purchasing PAD-06-03-P01 NA NA JSPL Records as Required. M M -
1.3 Purchase Order Preparation by Comput PAD-06-03-P01-W01 NA NA JSPL Records as Required. M M -
1.4 Incoming Inspection of Stock Material PAD-10-01-P01 NA NA JSPL Records as Required. H M -
1.5 PAD-10-01-P02 NA NA JSPL Records as Required. H M -
1.6 Non-Conformance Reporting QMP-13-01-P01 NA NA JSPL R M M
1.7 Corrective Action. QMP-14-01-P01 NA NA JSPL Records as Required. R M M
1.8 Preventive Action. QMP-14-01-P03 NA NA JSPL Records as Required. R M M
1.9 Control of Inspection and Test Equipme QMP-11-01-P01 NA NA JSPL Records as Required. M M M
2 QUALITY OBJECTIVE - NA NA - Project Quality Plan
3 CONTRACT REVIEW - NA NA R R M
4 SUB-CONTRACTOR SOURCING SELECTION
Sub-Contractor Sourcing Selection NA JSPL Sub-Contractor Rating Approval Vendor List H M M
5 MATERIAL
7 of 20
S. No.
Section Job Quality
Plan No: SU
B-
CO
N
Incoming Inspection of Purchased Non-stock Material
Non-conformity report Concession
requests
Acknowledgement of contract / PO
Quotation / Tender Relevant documents.
5.1 Receiving Inspection PAD-10-01-P02 NA JSPL - Records as Required. H M M
5.2 Material Verification - APP. JSPL ABS Mill Certificate H M M
5.3 Review of Material Certificates - NA JSPL Material Specification Mill Certificate R R R
6 QUALITY
6.1 NDT & PERSONNEL QUALIFICATION
6.1.1 NDT Procedures
6.1.1a 218338-Q-PA-001 NA YES AWS D1.1 I-PR-FGG-GENL-QM-BRY-002 R R/A R/A
6.1.1b 218338-Q-PA-002 NA YES ASME SEC VIII I-PR-FGG-GENL-QM-BRY-002 R R/A R/A
6.1.1c 218338-Q-PA-003 NA YES ABS I-PR-FGG-GENL-QM-BRY-002 R R/A R/A
6.1.1d 218338-Q-PA-004 NA YES AWS D1.1 I-PR-FGG-GENL-QM-BRY-002 R R/A R/A
6.1.1e 218338-Q-PA-005 NA YES I-PR-FGG-GENL-QM-BRY-002 R R/A R/A
6.1.1f 218338-Q-PA-006 NA YES ABS RULE FOR NDT I-PR-FGG-GENL-QM-BRY-002 R R/A R/A
6.1.1g 218338-Q-PA-007 NA YES AWS D1.1 I-PR-FGG-GENL-QM-BRY-002 R R/A R/A
6.1.1h 218338-Q-PA-008 NA YES ASME SEC VIII I-PR-FGG-GENL-QM-BRY-002 R R/A R/A
6.1.1i 218338-Q-PA-009 NA YES AWS D1.1 I-PR-FGG-GENL-QM-BRY-002 R R/A R/A
6.1.1j 218338-Q-PA-010 NA YES ASME SEC VIII I-PR-FGG-GENL-QM-BRY-002 R R/A R/A
6.1.1k 218338-Q-PA-011 NA YES AWS D1.1 / ASME VIII/ABS I-PR-FGG-GENL-QM-BRY-002 R R/A R/A
6.1.1l 218338-Q-PA-012 NA YES AWS D1.1 /ASME VIII /ABS I-PR-FGG-GENL-QM-BRY-002 R R/A R/A
218338-Q-PA-013 NA YES AWS D1.1 I-PR-FGG-GENL-QM-BRY-002 R R/A R/A
6.1.1n 218338-Q-PA-014 NA YES ASME SEC VIII I-PR-FGG-GENL-QM-BRY-002 R R/A R/A
Setsco Procedure for Ultrasonic Testing ( AWS D1.1 )Setsco Procedure for Ultrasonic Testing ( ASME V & VIII SPECIFICATION )Setsco Procedure for Ultrasonic Testing ( ABS )Setsco Procedure for Radiography Testing ( AWS D1.1 )Setsco Procedure for Radiography Testing ( ASME SEC. V )
ASME SEC V, AWS D1.1 / ANSI B31.3
Setsco Procedure for Radiography Testing ( ABS )Setsco Procedure for Magnetic Particle Testing ( ASTM & AWS D1.1 )Setsco Procedure for Magnetic Particle Testing ( ASTM SEC. V & VIII )Setsco Procedure for Liquid Penetrant Testing ( ASTM E 165 & AWS D1.1 )Setsco Procedure for Liquid Penetrant Testing ( ASTM SEC. V & VIII )Ebenzer Procedure for Radiography TestingMateval Procedure for Radiography Testing
6.1.1m
Mateval Procedure for Ultrasonic Testing ( AWS )Mateval Procedure for Ultrasonic Testing ( ASME )
6.1.1o 218338-Q-PA-015 NA YES ABS I-PR-FGG-GENL-QM-BRY-002 R R/A R/A
6.1.1p Mateval Procedure for Magnetic Particl 218338-Q-PA-016 NA YES AWS D1.1 / ASME VIII I-PR-FGG-GENL-QM-BRY-002 R R/A R/A
6.1.1q Mateval Procedure for Liquid Penetrant 218338-Q-PA-017 NA YES AWS D1.1 / ASME VIII`
R R/A R/A
6.1.1r Procedure of Thickness Gauging 218338-Q-PA-018 NA YES R R/A R/A
6.1.2 Personnel Qualification I-PR-FGG-GENL-QM-BRY-002
6.1.2a Welding Inspector NA JSPL CSWIP-W1-6-92 Certificates R R R
6.1.2b NDT Personnel Qualification NA YES
a) Procedure Approval NA YES PCN Level - III Certificates R R R
b) Interpreter / Technician NA YES PCN Level - II Certificates R R R
6.1.2c Dimensional Control Inspector NA JSPL SEQUI R R R
6.1.2d Painting Inspection NA JSPL BGAS Certificates R R R
6.2 WELDING
6.2.1 Welding Procedures / Qualification Records NA JSPL WPS / PQS R R R/A
6.2.2 NA JSPL Certificates R R R/A
6.3 QUALITY ASSURANCE / CONTROL PROCEDURE
6.3.1 Dimensional Control Procedure 218338 - Q - PA - 019 APP JSPL JSPL/KBR QAD - 10 - 02 - P 02 H M M
6.3.2 Inspection and Test Plan 218338 - Q - PA - 020 NA JSPL JSPL / KBR/ABS I-PR-FGG-GENL-QM-BRY-002 H H H
6.3.3 NDT Plan for Process Piping 218338 - Q - PA - 021 NA JSPL JSPL / KBR/ABS ET-3010.00-1200-200-PSE-001 H W W
7 CONSTRUCTION AND ASSEMBLY PROCEDURES
Mateval Procedure for Ultrasonic Testing ( ABS )
ASME SEC V, AWS D1.1 / ANSI B31.3
RL-3010.49-1350-970-JSL-001
Personnel Qualification Certificates
I-PR-FGG-GENL-QM-BRY-
002
SEQUI Qualification Serial Number
ABS Rule , AWS D1.1, ASME B31.3
Welder and Welding Operator Qualification Test Procedure
ABS Rules, AWS D1.1, ASME V & VIII, ASME B 31.3
7.1 PROJECT
7.1.1 Material Control 218338 - Z - PA - 001 NA JSPL CERTIFICATES Records as Required. M M M
7.1.2 Document Register 218338 - Z - PA - 002 NA JSPL - Records as Required. R R -
7.1.3 218338 - Z - PA - 003 NA JSPL - R R -
7.1.4 Project Quality Plan 218338 - Z - PA - 004 NA JSPL JSPL/KBR Records as Required. R M R
7.1.5 Product Identification and Traceability 218338 - Z - PA - 005 APP JSPL JSPL M M M
7.1.6 Preservation 218338 - Z - PA - 006 APP JSPL JSPL Records as Required. M M M
7.2 SAFETY
7.2.1 JSPL Project HSE Management Plan 218838 - S - PA -001 NA JSPL JSPL M M M
7.2.2 218838 - S - PA -002 NA JSPL JSPL M M M
7.2.3 218838 - S - PA -003 NA JSPL JSPL M M M
7.2.4 218838 - S - PA -004 NA JSPL JSPL M M M
7.2.5 218838 - S - PA -005 NA JSPL JSPL M M M
7.2.6 218838 - S - PA -006 NA JSPL JSPL M M M
7.2.7 218838 - S - PA -007 NA JSPL JSPL M M M
7.3 STRUCTURE
7.3.1 Steel Fabrication 218338 - N - PA - 001 APP YES JSPL H M M
7.3.2 Block Erection 218338 - N - PA - 002 APP YES JSPL H M M
7.3.3 Control and Use of Welding Consumable218338 - N - PA - 003 NA JSPL Manufacture Recommendation Records as Required. M M M
7.3.4 Flare Boom Assembly Procedure 218338 - N - PA - 004 APP YES - H M M
Project Document Coding Manual / Document Control
Document Transmittal Certified approved
drawings, documents & procedure
Material,Welding & NDE maps& material identities
Nameplates
Health, Safety and General Environmental Requirements
(ANNEX J)P 43 HSE Plan for all Subcontractor Personnel
Health, Safety and General Environmental Requirements
(ANNEX J)P 43 Subcontractor Hazard Assessment and STOP/HOC Unsafe Act
Health, Safety and General Environmental Requirements
(ANNEX J)P 43 Subcontractor Accident / Incident Reporting System
Health, Safety and General Environmental Requirements
(ANNEX J)P 43 Subcontractor Performance the progress on HSE Training of Management / Supervision / Work force ( Two Weeks Before Start of Work )
Health, Safety and General
Environmental Requirements
(ANNEX J)P 43 Subcontractor Project Health Assessment Report. ( Thirty Days After Contract Award )
Health, Safety and General Environmental Requirements
(ANNEX J)P 43 Subcontractor Project Safety Assessment Report. ( Thirty Days After Contract Award )
Health, Safety and General Environmental Requirements
(ANNEX J)
ET-3010.49-1350-140-PPC-002,
ET-3010.49-1350-140-PPC-002
ET-3010.49-3050-105-PPC-002
7.3.5 218338 - N - PA - 005 APP YES JSPL / KBR/ABS H W W
7.3.6 218338 - N - PA - 006 APP YES KBR / ABS H W W
7.3.7 218338 - N - PA - 007 NA JSPL JSPL/KBR I-PR-FGG-GENL-QM-BRY-002 M M M
7.3.8 218338 - N - PA - 008 APP YES JSPL/KBR H M M
7.3.9 Steel Plate Traceability 218338 - N - PA - 009 APP JSPL JSPL Records as Required. M M M
7.3.10 Steel Work Inspection Procedure 218338 - N - PA - 010 APP JSPL KBR / ABS Records as Required. H W H
7.3.11 Thermal Fairing Procedure 218338 - N - PA - 011 APP YES JSPL M M M
7.3.12 Tightness Test Procedure 218338 - N - PA - 012 APP JSPL KBR / ABS ABS RULES H W W
7.3.13 Weld Repair in Steel Structure 218338 - N - PA - 013 APP YES KBR / ABS Records as Required. H W H
7.3.14 218338 - N - PA - 014 APP YES JSPL/KBR M M M
7.4 PIPING
7.4.1 Cold Galvanizing Procedure 218338- P - PA - 001 APP YES JSPL/KBR - M M M
7.4.2 Fibre Glass Pipe Assembly Procedure 218338- P - PA - 002 APP YES JSPL/KBR - H W W
7.4.3 Fibre Glass Pipe Repair Procedure 218338- P - PA - 003 APP YES JSPL/KBR - H W W
7.4.4 Hot Dip Galvanizing Procedure 218338- P - PA - 004 APP YES JSPL/KBR M M M
7.4.5 218338- P - PA - 005 APP YES JSPL/KBR H W W
7.4.6 Piping Weld Repair Procedure 218338- P - PA - 006 APP YES JSPL / KBR/ABS Records as Required. H W W
7.4.7 218338- P - PA - 007 APP YES JSPL/KBR Manufacture Tech. Spec.,
7.4.8 218338- P - PA - 008 NA JSPL JSPL/KBR I-PR-FGG-GENL-QM-BRY-002 M M M
7.4.9 218338- P - PA - 009 APP YES JSPL/KBR M M M
NDT & Stress Relieving Plan for Flare Boom
ET-3010.44-3050-104-PPC-002 , ANSI B31.3 , AWS
D1.1Procedure for Weld Build-up for Pitting, Scar and Root Gap
ET-3010.44-3050-104-PPC-002 , WPS
Procedure for Welders Performance Records for StructureProcedure for Carbon ARC - Air Cutting / Gouging in Steel Structure
ET-3010.44-3050-104-PPC-002
ET-3010.44-3050-104-PPC-002,
Stress Relief and Hardness Test Procedure ( Structure )
Industrial Heating Tech. Spec.,
ET-3010.49-1350-140-PPC-001
Piping Fabrication and Installation Procedure ( New Pipe )
ET-3010.49-1200-200-PSE-001
Rubber lining Application & Inspection ProcedureProcedure for Welders Performance Records for Process Piping
Stress Relief and Hardness Test Procedure ( Process Pipe )
Industrial Heating Tech. Spec.,
7.4.10 218338 - P - PA - 010 APP YES ANSI B31.3 H W W
7.5 ELECTRICAL
7.5.1 Battery Bank Connection & Test Proced 218338 - E - PA - 001 APP YES JSPL/KBR H W M
7.5.2 Cable Stripping Procedure 218338 - E - PA - 002 APP YES JSPL/KBR H M M
7.5.3 Cable Termination Procedure 218338 - E - PA - 003 APP YES JSPL/KBR IEC - 79 - 0, 79 - 10 H M M
7.5.4 Cable Tagging Procedure 218338 - E - PA - 004 APP YES JSPL/KBR IEC - 92 H M M
7.5.5 218338 - E - PA - 005 APP YES JSPL/KBR IEC - 92 H W M
7.5.6 Electrical Cable Installation Procedure 218338 - E - PA - 006 APP YES JSPL/KBR IEC - 92, IEEE - 141 H M M
7.5.7 Electrical Installation Procedure 218338 - E - PA - 007 APP YES JSPL/KBR IEC 93 - IEEE - 141 H W M
7.5.8 Electrical Isolation Procedure 218338 - E - PA - 008 APP YES JSPL/KBR - H W -
7.5.9 218338 - E - PA - 009 APP YES JSPL/KBR H M M
7.5.10 Lighting System Test Procedure 218338 - E - PA - 010 APP YES JSPL/KBR IEC - 92, IEC - 79-0, 79-10 H M M
7.5.11 New Main Switchboard Installation Pro 218338 - E - PA - 011 APP YES JSPL/KBR H W M
7.5.12 Procedure for conductivity test of FRP 218338 - E - PA - 012 APP YES JSPL/KBR - H W M
7.5.13 Procedure for Receiving, Storage & Del 218338 - E - PA - 013 APP YES JSPL/KBR Vendor Documents H M M
7.5.14 218338 - E - PA - 014 APP YES JSPL/KBR IEC - 92, IEC - 79-0 H W M
7.6 MECHANICAL
7.6.1 Disassembly Plan 218338 - M - PA - 001 NA JSPL JSPL - H M M
7.6.2 Erection Plan 218338 - M - PA - 002 NA JSPL JSPL - H M M
7.6.3 Winch Installation Procedure 218338 - M - PA - 003 APP JSPL Maker - M M M
Procedure for Testing of Process and Marine Piping
Calibration Report , Test Package , ASMEB31.1
IEC - 92 , ET-3010.49-5140-
700-PPC-001IEC - 92 , ET-3010.49-5140-
700-PPC-001
Cathodic Protection Connection & Test Procedure
Electrical Motor Connection & Test Procedure
IEC - 92, ET-3000.00-5140-741-PPC-001
IEC - 92,
ET-3000.00-5140-741-PPC-001
Rectifier, Battery Charges., UPS Connection & Test Procedures
7.6.4 218338 - M - PA - 004 NA YES
7.7 INSTRUMENTATION
7.7.1 Instrumentation Calibration Records 218338 - I - PA - 001 NA NA Vendor Data Check List H W W
7.7.2 Instrumentation ( Calibration ) 218338 - I - PA - 002 NA NA Vendor Data - H W W
7.7.3 218338 - I - PA - 003 APP YES KBR / Vendor Data H W W
7.7.4 218338 - I - PA - 004 NA NO - - -
7.7.5 218338 - I - PA - 005 APP NO - - -
7.8 PAINTING
7.8.1 218338 - C - PA - 001 APP YES JSPL W W -
7.8.2 Hydro Blasting and Painting 218338 - C - PA - 002 APP YES JSPL/KBR M M -
7.8.3 Hull Grit blasting and Painting 218338 - C - PA - 003 APP YES JSPL/KBR W W -
7.8.4 Paint storage 218338 - C - PA - 004 NA YES JSPL/KBR - M M -
7.8.5 218338 - C - PA - 005 APP YES JSPL/KBR W W -
7.8.6 218338 - C - PA - 006 APP YES JSPL/KBR W W -
7.8.7 218338 - C - PA - 007 APP YES JSPL/KBR W W -
7.8.8 Tank Coating Procedure 218338 - C - PA - 008 APP YES JSPL/KBR W W -
7.8.9 Thermal Spraying Procedure 218338 - C - PA - 009 APP YES JSPL/KBR W W -
7.9 HVAC
7.9.1 Installation of Ventilation Duct 218338 - H - PA - 001 NA YES JSPL / VENDOR H M M
7.9.2 Installation of Insulation 218338 - F - PA - 002 NA YES JSPL/KBR H M M
Procedure of chock fasting for New Equipment
Installation of Telecommunication Equipment
ET-3010.40-5510-760-PPT-602
Installation of Resistance Measurement ProcedureProcedure for Instrument Cable Installation
Control and Repair of Burnmarks and Mechanical Damage on Painted Area
ET-3010.49-1350-140-PPC-001 / All Inspection ReportET-3010.49-1350-140-PPC-001 / All Inspection ReportET-3010.49-1350-140-PPC-001 / All Inspection Report
Procedure for Painting of New Fabricated Steel Structure.
ET-3010.49-1350-140-PPC-001 / All Inspection Report
Procedure for Blasting and Painting Inspection
ET-3010.49-1350-140-PPC-001 / All Inspection Report
Procedure for Painting of New Fabrication Pipe
ET-3010.49-1350-140-PPC-001 / All Inspection ReportET-3010.49-1350-140-PPC-
001 / All Inspection ReportET-3010.00-1200-940-PPC-
001 / All Inspection Report
ET-3000.00-5250-325-PPC-001 / ET -
3000.00-3250-325-PPC-002ET-3000.00-5250-325-PPC-001 / ET -
3000.00-3250-325-PPC-002
8 STRUCTURAL WORK
8.1 ACCOMMODATION ( Design Criteria : Secondary )
a ) Fit up - APP YES WPS / IACS/Client Tech. Spec H M M
b ) Welding - APP YES AWS D1.1 WPS H W W
c ) Visual - APP JSPL Inspection Reports H M H
d ) NDT - APP YES AWS D1.1 / ABS Rule NDT Reports R R/A R/A
e ) Tightness Test - APP JSPL ABS Rule Tightness Test Reports H W H
f ) Records - NA JSPL - All Reports R R/A R/A
8.2 CHAIN PIPE ( Design Criteria : Secondary )
Fabrication & Installation -
a ) Fit up - APP YES H M M
b ) Welding - APP YES WPS / PQR H W W
c ) Visual - APP JSPL AWS D1.1 / ABS Rule Inspection Reports H M H
d ) NDT - APP YES AWS D1.1 / ABS Rule NDT Reports R R/A R/A
e ) Records - NA JSPL - All Reports R R/A R/A
8.3 HELIDECK ( Design Criteria : Fabrication : Secondary & Installation : Prima
Fabrication(Design Criteria :Secondary -
Installation (Design Criteria :Primary) -
a ) Fit up - APP YES WPS / IACS/Client Tech. Spec. H M M
b ) Welding - APP YES AWS D1.1 WPS H W W
AFC Drawings, Inspection Reports
AWS D1.1,ABS Rule and Client Tech. Spec.
WPS / IACS/ Client Tech. Spec.
AFC Drawings, Inspection Reports
AFC Drawings, Inspection Reports
c ) Visual - APP JSPLAWS D1.1 and Client Tech. Spec. Inspection Reports H M H
d ) Dimensional Control - APP JSPL Client Tech. Spec. Dimensional Control Report H R R
e ) NDT - APP YES AWS D1.1 / ABS Rule NDT Report H R/A R/A
f ) Records - NA JSPL - All Reports R R/A R/A
8.4 CRANE PEDESTAL ( Design. Criteria : Special / Primary )
a ) Fit up - APP YES H M M
b ) Welding - APP YES AWS D1.1 WPS H W W
c ) Visual - APP NA Inspection Reports, H W W
d ) Dimensional Control - APP JSPL Client Spec. Dimensional Control Report H R R
e ) Tightness Test - APP JSPL ABS Rule Tightness Test Report H W H
f ) NDT - APP YES AWS D1.1 / ABS Rule NDT Reports R R/A R/A
g ) Records - NA JSPL - All Reports R R/A R/A
8.5 RISER I TUBES & DICAS ( Design Criteria : Primary)
a ) Fit up - APP YES WPS, Client Tech. Spec. H M M
b ) Welding - APP YES AWS D1.1 WPS H W W
c ) Visual - APP JSPL Inspection Reports H W W
d ) Dimensional Control - APP JSPL Client Spec. Dimensional Control Report H R R
e ) NDT - APP YES AWS D1.1 / ABS Rule NDT Reports R R/A R/A
f ) Records - NA JSPL - All Reports R R/A R/A
8.6 FLARE BOOM ( Design Criteria : Primary)
WPS / IACS / Client Tech. Spec.
AFC Drawings, Inspection Reports
AWS D1.1 and Client Tech.Spec.
AFC Drawings, Inspection Reports
AWS D1.1,ABS Rule and Client Tech. Spec.
a ) Fit up - APP YES H W W
b ) Welding - APP YES AWS D1.1 WPS H W W
c ) Visual - APP JSPL Inspection Reports H M H
d ) Dimensional Control - APP JSPL Client Spec. Dimensional Control Report H R R
e ) NDT - APP YES AWS D1.1 / ABS Rule NDT Report R R/A R/A
f ) PWHT - APP YES ASME B 31. 3 / AWS D1.1 PHWT & Hardness Report R R/A R/A
g ) Tightness Test - APP NA ABS RULES Tightness Test Report H W H
h ) Records - NA NA - All Reports R R/A R/A
8.7 OFF LOADING (Design Criteria : Secondary)
a ) Fit up - APP YES H M M
b ) Welding - APP YES AWS D1.1 WPS H W W
c ) Visual - APP JSPL Inspection Reports H W H
d ) NDT - APP YES AWS D1.1 / ABS Rule NDT Reports R R/A R/A
e ) Records - NA JSPL Spec. ABS Rule All Reports R R/A R/A
8.8 TELECOMMUNICATION TOWER ( Design Criteria : Primary )
a ) Fit up - APP YES H M M
b ) Welding - APP YES AWS D1.1 WPS H R R
c ) Visual - APP JSPL Inspection Reports H W H
d ) NDT - APP YES AWS D1.1 / ABS Rule NDT Reports R R/A R/A
e ) Records - NA JSPL - All Reports R R/A R/A
AWS D1.1,ABS Rule and Client Tech. Spec.
AFC Drawings, Inspection Reports
AWS D1.1,ABS Rule and Client Tech. Spec.
AWS D1.1,ABS Rule and Client Tech. Spec.
AFC Drawings, Inspection Reports, Weld Map
AWS D1.1,ABS Rule and Client Tech. Spec.
AWS D1.1,ABS Rule and Client Tech. Spec.
AFC Drawings, Inspection Reports, Weld Map
AWS D1.1,ABS Rule and Client Tech. Spec.
8.9 STRUCTURAL RENEWAL ( Design Criteria : Primary/Secondary )
a ) Thickness Gauging - NA YES ABS Rule & Client Spec., Thickness Gauging Reports R R R
b ) Close Up Survey - NA YES ABS Rule & Client Spec., Close up Survey Reports R R R
c ) Renewal Plan - APP NA ABS Rule & Client Spec., AFC Renewal Plan H A A
d ) Fit up - APP YES ABS Rule & Client Spec., Weld map, Inspection Reports H M M
e ) Welding APP YES AWS D1.1 WPS H M M
f ) Visual - APP JSPL ABS Rule & Client Spec., Inspection Reports H M H
g ) NDT - APP YES AWS D1.1 / ABS Rule NDT Reports R R/A R/A
h ) Tightness Test ( As Applicable ) - APP JSPL ABS Rule Tightness Test Reports H W H
I ) Records - NA JSPL - All Reports H R/A R/A
9 FINAL DOSSIER DOCUMENTATION
9.1 Structure NA JSPL KBR H R/A R
9.2 Piping NA JSPL KBR H R/A R
9.3 Blasting & Painting NA JSPL KBR H R/A R
9.4 Mechanical NA JSPL KBR H R/A R
9.5 E & I NA JSPL KBR H R/A R
Notes :APP : JOB QUALITY PLAN SHALL BE PROVIDED BY RESPECTIVE SECTIONSNA : NOT APPLICABLEYES : SUB-CONTRACTOR WILL BE ASSIGNED FOR THE JOBJSPL : JSPL DIRECT EMPLOYEES WILL CARRY OUT / CONTROL THE JOBIEC : INTERNATIONAL ELECTROTECHNIQUE COMMISSIONIEEE : INSTITUTE OF ELECTRICAL & ELECTRONIC ENGINEERS
All Inspection and Test Reports
All Inspection and Test Reports
All Inspection and Test Reports
All Inspection and Test Reports
All Inspection and Test Reports
INDEPENDENCE HUB (11-1074) Doc. No 111074-Q-PA-010-04
Rev A
INSPECTION AND TEST PLAN MATRIX ( MECHANICAL )
Process Description Project Specific Procedure Acceptance Criteria Verifying Document Action Points
JSPL AOL GT ABS
1 Mechanical
1.1 Review of Mechanical package documentation
1.1.1 R R R
1.2 Receiving of equipment packages
1.2.1 W W W
1.3 Equipment Package inspection
1.3.1 W W W
1.4 Equipment storage
1.4.1 Preservation Procedure W M M
1.5 Periodic equipment storage preservation
1.5.1 Vendor's Preservation procedure As per Vendor's specification and Maintenance Records W M M
1.6 Equipment seat location Inspection
S. No.
Check against specification lifting and installation, procedure, storage and preservative requirements, maintenance requirements etc.,
Drawings, Maintenance Manual and Engineering Data, Material Control Procedure
As per relevant specification and vendor documents.
Project Quality Plan (111074-Q04)
Check for quantity and damage check
Maintenance Manual and Engineering Data, Material Control Procedure.
As per relevant specification and vendor documents.
Purchase order/ delivery order,& inspection report
Check equipment for compliance with specification, approved vendor documents/drawing. Preparation of equipment receiving report
Maintenance Manual and Engineering Data, Material Control Procedure
As per relevant specification and vendor documents.
Purchase order/ delivery order, & inspection report
Ensure complies with vendor specification / requirements
As per relevant specification and vendor documents.
Project Quality Plan (111074-Q04)
Ensure complies with vendor specification / requirements
INDEPENDENCE HUB (11-1074) Doc. No 111074-Q-PA-010-04
Rev A
INSPECTION AND TEST PLAN MATRIX ( MECHANICAL )
Process Description Project Specific Procedure Acceptance Criteria Verifying Document Action Points
JSPL AOL GT ABS
S. No.
1.7 Installation Verification Check
1.7.1 H H H
1.8 Installation Equipment
1.8.1 Vendor's installation procedure M M M
1.8.2 Vendor's installation procedure M M M
1.8.3 H H H
1.8.4 Leveling /Shimming/grouting H M M
1.8.5 Bolting /torque of securing bolts As per Engineering Specifications H H H
1.8.6 AS per drawing Vendor's drawing Inspection weld records H H H
1.9 Mechanical completion
1.9.1 H W W
Check frame work, mounting/anchor bolt location/leveling etc
Project Drawing,Equipment Drawing and Manufacture's Recommendations
Manufacturer's Installation Procedure/ Criteria As per Specification & Manufacture'sTolerances
Inspection Report QAD-75-01-IT-PO1/P05
Installation / lifting procedure if heavy lifting is require
Vendor's Procedures & Equipment Drawings
1) MES-75-01-LF-P01 2) MES-75-01-LF-P01-W01
Rigging and lifting of the equipment
Vendor's Procedures & Equipment Drawings
1) MES-75-01-LF-P01 2) MES-75-01-LF-P01-W01
Verification of location ( Dimensional check )
Project Drawing, Equipment Drawing and Manufacture's Recommendation
Vendor's InstallationProcedure /Criteria
Inspection Report QAD-75-01-IT-PO1/P05
Project Drawing, Equipment Drawing and Manufacture's Recommendation
Vendor's InstallationProcedure /Criteria
Inspection Report QAD-75-01-IT-PO1/P05
As per design calculations if any and ASME B31.3
Inspection Report QAD-75-01-IT-PO1/P05
Check securing of equipment by welding
Alignment of rotating equipment after hook-up
Project drawing, equipment drawing and manufacture's recommendations (Both before and after piping tie in )
As per specification and manufacturer's criteria
Inspection Report QAD-75-01-IT-PO1/P05
INDEPENDENCE HUB (11-1074) Doc. No 111074-Q-PA-010-04
Rev A
INSPECTION AND TEST PLAN MATRIX ( MECHANICAL )
Process Description Project Specific Procedure Acceptance Criteria Verifying Document Action Points
JSPL AOL GT ABS
S. No.
1.9.2 H W W
1.9.3 Project Procedure H H H
1.9.4 Final check on completion Project Procedures R R R
1.10 Vendors Procedures R R R
1.12 Final Documentation Contract Documents Contract Documents H R + AR + A
Legend:
A step of activity where one may proceed with the work, if the organization’s representative is not available at the appointed time.
A hold on activity so that it does not progress to the next activity until formal verification has been completed or documented consent has been given by indicated authority.
R: Review
Review of certificates, records and documentation
M: Monitoring
Random / spot checks of the activities, i.e. in-process inspection. No formal notification required.
A : Approve
A document or an activity for which a document will be produced. The document will be reviewed by the indicated authority and their approval shall be obtained.
Ensure coupling and coupling guide are install after alignment
Project drawing, equipment drawing and manufacture's recommendations
As per specification and manufacturer's criteria
Inspection Report QAD-75-01-IT-PO1/P05
Fill up mechanical completion check sheet
Inspection records and all project drawings
Mechanical Completion & Commisionning Check Sheet
Inspection records and all project drawings
Mechanical completion check list
Preservation of equipment after installation
As per specification and manufacturer's criteria
Project Quality Plan (111074-Q04)
Final Documentation and Punchlist
W: Witness Point (Formal written notification one day ahead from JSPL is required )
H: Hold Point (Formal written notification one day ahead from JSPL is required)
· R: Review
SEADRILL 8 SEMI-SUBMERSIBLE ( 11-1085 ) 111085-Q002C
Revision No. A
INSPECTION AND TEST PLAN MATRIX ( MECHANICAL )
Process Description Project Specific Procedure Acceptance Criteria Verifying Document Action Points
JSPL SEADRILL ABS
1 Mechanical
1.1 Review of Mechanical Package Documentation
1.1.1 R R -
1.2 Receiving of Equipment Packages
1.2.1 W W -
1.3 Equipment Package Inspection
1.3.1 W W -
1.4
1.4.1 W M -
1.4.2 W M -
Document No.
S. No.
Check against specification requirements for lifting/installation procedures, storage, preservative, maintenance, etc.
Project Quality Plan (111085-Q001) Equipment receiving procedure(111085-Q027) Vendor Procedures
As per relevant specifications, purchase orders and vendor documentations.
Purchase Orders, Drawings, Maintenance Manual and Engineering/Material Safety Data Sheets.
Check quantity and physical condition
Maintenance Manual, Equipment receiving procedure(111085-Q027)
As per relevant specifications, purchase orders and vendor documentations.
Purchase orders, delivery orders, Engineering/Material Safety Data Sheets & inspection reports / records.
Check equipment for compliance to specifications, vendor documents / drawings. Preparation of equipment receiving reports
FAD-75-04-PA-P02 Vendor Procedures Equipment receiving procedure(111085-Q027)
As per relevant specifications, purchase orders and vendor documentations.
Purchase orders, delivery orders & inspection reports / records.
Equipment Storage and Periodic Preservation / Maintenance
Ensure compliance to vendor and AOL storage, preservation and maintenance requirements
Project Quality Plan (111085-Q001) FAD-75-04-PA-P02 Preservation Procedures(111085-Q026) Maintenance Manuals
As per relevant specifications and vendor documentations.
Preservation & Maintenance Inspection reports / records, Engineering / Material Safety Data Sheets, and Equipment Protection Plan Checklists.
Ensure equipment are stored in suitable area free from contaminants, etc and seating on level/stable ground/ platform.
SEADRILL 8 SEMI-SUBMERSIBLE ( 11-1085 ) 111085-Q002C
Revision No. A
INSPECTION AND TEST PLAN MATRIX ( MECHANICAL )
Process Description Project Specific Procedure Acceptance Criteria Verifying Document Action Points
JSPL SEADRILL ABS
Document No.
S. No.
1.6 Installation Verification Check
1.6.1 H H R
1.7 Equipment Installation
1.7.1 M M -
1.7.2 M M -
1.7.3 H H R
1.7.4 H M R
1.7.5 H H R
1.7.6 H H R
1.7.7 H M R
Check framework, mounting, anchor bolt location, levelling, etc
Vendor's Installation Procedure Vendor's Recommendations
As per relevant specifications and vendor's tolerances
Inspection reports / records As-Built Drawings QAD-75-01-IT-PO1/P05
Check heavy lifting requirements
Relevant SEADRILL, JSPL and vendor's installation procedures
As per relevant specifications and vendor's equipment drawings
1) MES-75-01-LF-P01 2) MES-75-01-LF-P01-W01
Check and verify suitability, physical condition and cerification of rigging /lifting tools/equipment, i.e. crane, slings, wire ropes, etc.Check /verify location, elevation and orientation ( Dimensional check )
As per relevant specifications, SEADRILL/Vendor's equipment drawings, and vendor's recommendation
Inspection Report QAD-75-01-IT-PO1/P05Check / verify equipment
levelling, shimming and grouting processes
Check / verify bolting and tightening (torque requirements) of securing bolts
As per relevant engineering specifications / design calculations (if any), SEADRILL / vendor's equipment drawings and ASME B31.3
Inspection Report QAD-75-01-IT-PO1/P05
Check / verify requirements for securing equipment by welding As per relevant specifications,
SEADRILL/Vendor's equipment drawings, and vendor's recommendation
Weld Inspection Reports / Records
Check alignment of equipment (rotating and stationary) before hook-up to piping
Inspection Report QAD-75-01-IT-PO1/P05
SEADRILL 8 SEMI-SUBMERSIBLE ( 11-1085 ) 111085-Q002C
Revision No. A
INSPECTION AND TEST PLAN MATRIX ( MECHANICAL )
Process Description Project Specific Procedure Acceptance Criteria Verifying Document Action Points
JSPL SEADRILL ABS
Document No.
S. No.
1.8 Mechanical Completion
1.8.1 H W R
1.8.2 H W R
1.8.3 Project Procedures H H R
1.8.4 Final check to completion Project Procedures R R R
1.8.5 R R R
1.8.6 Final Documentation Contract Documents Contract Documents H R + A
Legend:
A step of activity where one may proceed with the work, if the organization’s representative is not available at the appointed time.
A hold on activity so that it does not progress to the next activity until formal verification has been completed or documented consent has been given by indicated authority.
R : Review
Review of certificates, records and documentation
M : Monitoring
Random / spot checks of the activities, i.e. in-process inspection. No formal notification required.
A : Approve
A document or an activity for which a document will be produced. The document will be reviewed by the indicated authority and their approval shall be obtained.
Check alignment of equipment (rotating and stationary) after hook-up to piping
Project drawings, equipment drawings and vendor's recommendations
As per relevant specifications, SEADRILL/Vendor's equipment drawings, and vendor's recommendations / criteria
Inspection Report QAD-75-01-IT-PO1/P05
Ensure coupling and coupling guide are installed on completion of alignment
Project drawings, equipment drawings and vendor's recommendations
As per relevant specifications, SEADRILL/Vendor's equipment drawings, and vendor's recommendations / criteria
Inspection Report QAD-75-01-IT-PO1/P05
Fill up mechanical completion check sheet
Inspection records and all related project drawings
Mechanical Completion & Commisionning Check Sheet
Inspection records and all related project drawings
Mechanical completion check list
Preservation of equipment after installation
Project Quality Plan (111085-Q001) FAD-75-04-PA-P02 Preservation Procedures(111085-Q026) Maintenance Manuals
As per relevant specifications and vendor documentations.
Preservation & Maintenance Inspection reports / records, Engineering / Material Safety Data Sheets, and Equipment Protection Plan Checklists.Final Documentation and Punchlist
R + A
W : Witness Point (Formal written notification one day ahead from JSPL is required )
H : Hold Point (Formal written notification one day ahead from JSPL is required)·
INDEPENDENCE HUB (11-1074) Doc. No 111074-Q-PA-010-04
Rev A
INSPECTION AND TEST PLAN MATRIX ( MECHANICAL )
Process Description Project Specific Procedure Acceptance Criteria Verifying Document Action Points
JSPL AOL GT ABS
1 Mechanical
1.1 Review of Mechanical package documentation
1.1.1 R R R NA
1.2 Receiving of equipment packages
1.2.1 W W W NA
1.3 Equipment Package inspection
1.3.1 W W W NA
1.4 Equipment storage
1.4.1 Preservation Procedure W M M NA
1.5 Periodic equipment storage preservation
1.5.1 Vendor's Preservation procedure As per Vendor's specification and Maintenance Records W M M NA
1.6 Equipment seat location Inspection
1.7 Installation Verification Check
1.7.1 H H H R
S. No.
Check against specification lifting and installation, procedure, storage and preservative requirements, maintenance requirements etc.,
Drawings, Maintenance Manual and Engineering Data, Material Control Procedure
As per relevant specification and vendor documents.
Project Quality Plan (111074-Q04)
Check for quantity and damage check
Maintenance Manual and Engineering Data, Material Control Procedure.
As per relevant specification and vendor documents.
Purchase order/ delivery order,& inspection report
Check equipment for compliance with specification, approved vendor documents/drawing. Preparation of equipment receiving report
Maintenance Manual and Engineering Data, Material Control Procedure
As per relevant specification and vendor documents.
Purchase order/ delivery order, & inspection report
Ensure complies with vendor specification / requirements
As per relevant specification and vendor documents.
Project Quality Plan (111074-Q04)
Ensure complies with vendor specification / requirements
Check frame work, mounting/anchor bolt location/leveling etc
Project Drawing,Equipment Drawing and Manufacture's Recommendations
Manufacturer's Installation Procedure/ Criteria As per Specification & Manufacture'sTolerances
Inspection Report QAD-75-01-IT-PO1/P05
INDEPENDENCE HUB (11-1074) Doc. No 111074-Q-PA-010-04
Rev A
INSPECTION AND TEST PLAN MATRIX ( MECHANICAL )
Process Description Project Specific Procedure Acceptance Criteria Verifying Document Action Points
JSPL AOL GT ABS
S. No.
1.8 Installation Equipment
1.8.1 Vendor's installation procedure M M M NA
1.8.2 Vendor's installation procedure M M M NA
1.8.3 H H H R
1.8.4 Leveling /Shimming/grouting H M M R
1.8.5 Bolting /torque of securing bolts As per Engineering Specifications H H H R
1.8.6 AS per drawing Vendor's drawing Inspection weld records H H H NA
1.9 Mechanical completion
1.9.1 H W W R
1.9.2 H W W R
1.9.3 Project Procedure H H H R
1.9.4 Final check on completion Project Procedures R R R R
1.10 Vendors Procedures R R R R
Installation / lifting procedure if heavy lifting is require
Vendor's Procedures & Equipment Drawings
1) MES-75-01-LF-P01 2) MES-75-01-LF-P01-W01
Rigging and lifting of the equipment
Vendor's Procedures & Equipment Drawings
1) MES-75-01-LF-P01 2) MES-75-01-LF-P01-W01
Verification of location ( Dimensional check )
Project Drawing, Equipment Drawing and Manufacture's Recommendation
Vendor's InstallationProcedure /Criteria
Inspection Report QAD-75-01-IT-PO1/P05
Project Drawing, Equipment Drawing and Manufacture's Recommendation
Vendor's InstallationProcedure /Criteria
Inspection Report QAD-75-01-IT-PO1/P05
As per design calculations if any and ASME B31.3
Inspection Report QAD-75-01-IT-PO1/P05
Check securing of equipment by welding
Alignment of rotating equipment after hook-up
Project drawing, equipment drawing and manufacture's recommendations (Both before and after piping tie in )
As per specification and manufacturer's criteria
Inspection Report QAD-75-01-IT-PO1/P05
Ensure coupling and coupling guide are install after alignment
Project drawing, equipment drawing and manufacture's recommendations
As per specification and manufacturer's criteria
Inspection Report QAD-75-01-IT-PO1/P05
Fill up mechanical completion check sheet
Inspection records and all project drawings
Mechanical Completion & Commisionning Check Sheet
Inspection records and all project drawings
Mechanical completion check list
Preservation of equipment after installation
As per specification and manufacturer's criteria
Project Quality Plan (111074-Q04)
INDEPENDENCE HUB (11-1074) Doc. No 111074-Q-PA-010-04
Rev A
INSPECTION AND TEST PLAN MATRIX ( MECHANICAL )
Process Description Project Specific Procedure Acceptance Criteria Verifying Document Action Points
JSPL AOL GT ABS
S. No.
1.12 Final Documentation Contract Documents Contract Documents H R + AR + AR + A
Legend:
A step of activity where one may proceed with the work, if the organization’s representative is not available at the appointed time.
A hold on activity so that it does not progress to the next activity until formal verification has been completed or documented consent has been given by indicated authority.
R: Review
Review of certificates, records and documentation
M: Monitoring
Random / spot checks of the activities, i.e. in-process inspection. No formal notification required.
A : Approve
A document or an activity for which a document will be produced. The document will be reviewed by the indicated authority and their approval shall be obtained.
Final Documentation and Punchlist
W: Witness Point (Formal written notification one day ahead from JSPL is required )
H: Hold Point (Formal written notification one day ahead from JSPL is required)
· R: Review
P - 43 F.P.S.O CONVERSION Doc. No 218338 - Q - PA - 008
Doc . Title : Rev . A
INSPECTION AND TEST PLAN Page 7 of 20
APPENDIX - I
S. No. Process Description Procedure Rev. Acceptance Criteria Verifying Document Action Points
JSL CLIENT ABS
1 QUALITY OBJECTIVE - - - - Project Quality Plan
2 CONTRACT REVIEW - - - R R
3 SUB-CONTRACTOR SOURCING SELECTION
Sub-Contractor Sourcing Selection Sub-Contractor Rating Approval Vendor List
4 MATERIAL
4.1 Receiving Inspection PAD-10-01-P02 - - - H M M
4.2 Material Indetification and Traceability Check QAD-08-01P01 - - - - H M M
4.3 Visual and Dimensional Check - - - - Mill Certificate H M M
4.4 Review of Material Certificates - - - Material Specification Mill Certificate R R R
5 PERSONNEL QUALIFICATION
5.1 Welding Inspector CSWIP-W1-6-92 Certificates
5.2 NDT Personnel Quaification
a) Procedure Approval PCN Level - III Certificates
Design Criteria
Acknowledgement of contrace / PO
Quotation / Tender Relevant documents.
Material / Equipment in coming Check List for Pad-10-01-P01-01
b) Interpteter / Technician PCN Level - III Certificates
P - 43 F.P.S.O CONVERSION Doc. No 218338 - Q - PA - 008
Doc . Title : Rev . A
INSPECTION AND TEST PLAN Page 8 of 20
APPENDIX - I
S. No. Process Description Procedure Rev. Acceptance Criteria Verifying Document Action Points
JSL CLIENT ABS
5.3 Dimensional Control Inspector SEQUI Certificates
5.4 Painting Inspection BGAS Certificates
6 CONSTRUCTION AND ASSEMBLY PROCEDURES
6.1 PROJECT
6.1.1 Customer Supplied Product Control 218338 - Z - PA - 001 A - - PAD - 07 -01 - P02 M M M
6.1.2 Document Register 218338 - Z - PA - 002 A - - - R R -
6.1.3 Document Control 218338 - Z - PA - 003 A - - R R -
6.1.4 Movement of Vessel 218338 - Z - PA - 004 A - JSL - M M -
6.1.5 Project Quality Plan 218338 - Z - PA - 005 A - JSL / CLIENT R R R
6.1.6 Product Identification and Traceability 218338 - Z - PA - 006 A - JSL M M M
6.1.7 Preservation 218338 - Z - PA - 007 A - JSL QAD - 14 - 01 - P03 M M M
6.1.8 Weight Control Procedure 218338 - Z - PA - 002 A - JSL M W -
Design Criteria
JSL QUALITY MANUAL QMS - OS
QMP - 02 - 02 - P01 PETROBRAS TECH. SPEC.
PAD - 08 - 01 - P02, ANNEX - 1
ET - 3010.00 - 1200 - 941 - PPC - 002
6.2 SAFETY
6.2.1 Arrangement of safety & Utility 218838 - S - PA -001 A - JSL ANNEX - J M M M
P - 43 F.P.S.O CONVERSION Doc. No 218338 - Q - PA - 008
Doc . Title : Rev . A
INSPECTION AND TEST PLAN Page 9 of 20
APPENDIX - I
S. No. Process Description Procedure Rev. Acceptance Criteria Verifying Document Action Points
JSL CLIENT ABS
6.2.2 JSL Project Safety Plan 218838 - S - PA -002 A - JSL ANNEX - J M M M
6.3 STRUCTURE
6.3.1 Steel Fabrication 218338 - N - PA - 001 A - JSL H M M
6.3.2 Block Erection 218338 - N - PA - 002 A - JSL H M M
6.3.3 Control and Use of Welding Consumables. 218338 - N - PA - 003 A - Manufacture Recommendation QAD - 15 - 02 - P 01 M M M
6.3.4 Flare Boom Assembly Procedure 218338 - N - PA - 004 A - - H M M
6.3.5 NDT & Stress Relieving Plan for Flare Boom 218338 - N - PA - 005 A - JSL / CLIENT/ABS H W W
6.3.6 218338 - N - PA - 006 A - CLIENT / ABS H W W
6.3.7 218338 - N - PA - 007 A - JSL / CLIENT - M M M
6.3.8 218338 - N - PA - 008 A - JSL / CLIENT H M M
6.3.9 Steel Plate Traceabilty 218338 - N - PA - 009 A - JSL HCD - 08 - 01 - P 01 M M M
Design Criteria
ET - 3010.49 - 1350 - 104 - PPC- 002, IHI . SPAIS STANDARDET - 3010.49 - 1350 - 140 - PPC
- 002, IHI SPAIIS
ET - 3010.49 - 3050 - 105 - PPC - 002, IHI SPAIS
ET - 3010.44 - 3050 - 104 - PPC - 002, ANSI B31.3 , AWS D1.1
Procedure for Weld Build-up for Pitting, Scar and Root Gap
ET - 3010.44 - 3050 - 104 - PPC - 002, IHI SPAIS, WPS
Procedure for Welders Performance Records for StructureProcedure for Carbon ARC - Air Cutting / Gouging in Steel Structure
ET - 3010.44 - 3050 - 104 - PPC - 002, IHI SPAIS
6.3.10 Steel Work Inspection Procedure 218338 - N - PA - 010 A - CLIENT / CLASS QAD - 10 - 03 - P01 H W H
6.3.11 Thermal Fairing Procedure 218338 - N - PA - 011 A - JSL M M M
6.3.12 Tightness Test Procedure 218338 - N - PA - 012 A - CLIENT / CLASS ABS RULES H W W
P - 43 F.P.S.O CONVERSION Doc. No 218338 - Q - PA - 008
Doc . Title : Rev . A
INSPECTION AND TEST PLAN Page 10 of 20
APPENDIX - I
S. No. Process Description Procedure Rev. Acceptance Criteria Verifying Document Action Points
JSL CLIENT ABS
6.3.13 Weld Repair in Steel Structure 218338 - N - PA - 013 A - CLIENT / ABS QAD - 13 - 01 - P 01 H W H
6.4 PIPING
6.4.1 Cold Galvanizing Procedure 218338- P - PA - 001 A - JSL / CLIENT - M M M
6.4.2 Fibber Glass Pipe Assembly Procedure 218338- P - PA - 002 A - JSL / CLIENT AMERON TECH. SPECH. H W W
6.4.3 Fibber Glass Pipe Repair Procedure 218338- P - PA - 003 A - JSL / CLIENT AMERON TECH. SPECH. H W W
6.4.4 Hot Dip Galvanizing Procedure 218338- P - PA - 004 A - JSL / CLIENT M M M
6.4.5 218338- P - PA - 005 A - JSL / CLIENT H W W
6.4.6 Piping Weld Repair Procedure 218338- P - PA - 006 A - JSL / CLIENT/ABS QAD - 13 - 01 - P 01 H W W
6.4.7 218338- P - PA - 007 A - JSL / CLIENT
6.4.8 218338- P - PA - 008 A - JSL / CLIENT ANNEX - I M M M
ET - 3010.44 - 3050 - 104 - PPC - 002, IHI SPAIS
Design Criteria
ET - 3010.49 - 1350 - 140 - PPC - 001
Piping Fabrication and Installation Procedure ( New Pipe )
ET - 3010.49 - 1200 - 200 - PSE - 001
Rubber lining Application & Inspection Procedure
MANUFACTURER TECH. SPECH.
Procedure for Welders Performance Records for Process Piping
6.4.9 218338- P - PA - 009 A - JSL / CLIENT M M M
6.4.10 218338 - P - PA - 010 A - ANSI B31.3 H W W
6.5 QUALITY
6.5.1 Calibration Plan for Measuring Instruments 218338 - Q - PA - 001 A - JSL / CLIENT CALIBRATION RECORDS H M M
P - 43 F.P.S.O CONVERSION Doc. No 218338 - Q - PA - 008
Doc . Title : Rev . A
INSPECTION AND TEST PLAN Page 11 of 20
APPENDIX - I
S. No. Process Description Procedure Rev. Acceptance Criteria Verifying Document Action Points
JSL CLIENT ABS
6.5.2 218338 - Q - PA - 002 A - JSL / CLIENT CALIBRATION RECORDS H M M
6.5.3 Calibration Procedure for Steel Tri Square 218338 - Q - PA - 003 A - JSL / CLIENT CALIBRATION RECORDS H M M
6.5.4 Calibration procedure for Sprit Level 218338 - Q - PA - 004 A - JSL / CLIENT CALIBRATION RECORDS H M M
6.5.5 Calibration Procedure for Draft Mark 218338 - Q - PA - 005 A - JSL / CLIENT CALIBRATION RECORDS H M M
6.5.6 218338 - Q - PA - 006 A - JSL / CLIENT CALIBRATION RECORDS H M M
6.5.7 Dimensional Control Procedure 218338 - Q - PA - 007 A - JSL / CLIENT QAD - 10 - 02 - P 02 H M M
6.5.8 Inspection and Test Plan 218338 - Q - PA - 008 A - JSL / CLIENT/ABS ANNEX - I H H H
6.5.9 NDT Plan for Process Piping 218338 - Q - PA - 009 A - JSL / CLIENT/ABS H W W
6.5.10 Procedure for Radiography Testing 218338 - Q - PA - 010 A - CLIENT R R R
Stress Relief and Hardness Test Procedure ( Process Pipe )
INDUSTRIAL HEATING TECH. SPEC.
Procedure for Testing of Process and Marine Piping
CALIBRATION REPORT, TEST PACKAGE , ASMEB31.1
Design Criteria
Calibration Procedure for Steel Measuring Tapes.
Calibration Procedure for Steel Graduated Ruler
ET - 3010.00 - 1200 - 200 - PSE - 001.
ASME SEC. V, AWS D1. V, ABS RULE / ANSI B 31.3
6.5.11 Procedure for Magnetic Particle Testing 218338 - Q - PA - 011 A - CLIENT R R R
6.5.12 Procedure for Ultrasonic Testing ( ASME ) 218338 - Q - PA - 012 A - CLIENT ASEME SEC. V / ANSI B 31. 3 R R R
6.5.13 Procedure for Ultrasonic Testing ( AWS ) 218338 - Q - PA - 013 A - CLIENT ASME - V, AWS D1.1 R R R
6.5.14 Procedure for Ultrasonic Testing ( ABS ) 218338 - Q - PA - 014 A - CLIENT R R R
6.5.15 Procedure for Liquid Penetrate Testing 218338 - Q - PA - 015 A - CLIENT R R R
P - 43 F.P.S.O CONVERSION Doc. No 218338 - Q - PA - 008
Doc . Title : Rev . A
INSPECTION AND TEST PLAN Page 12 of 20
APPENDIX - I
S. No. Process Description Procedure Rev. Acceptance Criteria Verifying Document Action Points
JSL CLIENT ABS
6.6 ELECTRICAL
6.6.1 Battery Bank Conection & Test Procedure 218338 - E - PA - 001 A - JSL / CLIENT H W M
6.6.2 Cable Stripping Procedure 218338 - E - PA - 002 A - JSL / CLIENT H M M
6.6.3 Cable Termination Procedure 218338 - E - PA - 003 A - JSL / CLIENT IEC - 79 - 0, 79 - 10 H M M
6.6.4 Cable Tagging Procedure 218338 - E - PA - 004 A - JSL / CLIENT IEC - 92 H M M
6.6.5 218338 - E - PA - 005 A - JSL / CLIENT IEC - 92 H W M
6.6.6 Electrical Cable Installation Procedure 218338 - E - PA - 006 A - JSL / CLIENT IEC - 92, IEEE - 141 H M M
6.6.7 Electrical Installation Procedure 218338 - E - PA - 007 A - JSL / CLIENT IEC 93 - IEEE - 141 H W M
ASME SEC V, AWS D1.1 / ANSI B31.3
ASME - V, ABS RULE FOR NDT
ASME - V, ABS RULE FOR NDT
Design Criteria
IEC - 92 , ET - 3010.4 9 - 5140 - 700 -
PPC - 001IEC - 92 , ET - 3010.4 9 - 5140 - 700 -
PPC - 001
Cathodic Protection Connection & Test Procedre
6.6.8 Electrical Isolation Procedure 218338 - E - PA - 008 A - JSL / CLIENT - H W -
6.6.9 Electrical Motor Connection & Test Procedure 218338 - E - PA - 009 A - JSL / CLIENT H M M
6.6.10 Lighting System Test Procedure 218338 - E - PA - 010 A - JSL / CLIENT IEC - 92, IEC - 79-0, 79-10 H M M
6.6.11 New Main Switchboard Installation Procedure 218338 - E - PA - 011 A - JSL / CLIENT H W M
6.6.12 Procedure for conductivity test of FPR Piping 218338 - E - PA - 012 A - JSL / CLIENT H W M
6.6.13 Procedure for Receiving, Storage & Delivery 218338 - E - PA - 013 A - JSL / CLIENT VENDOR DOCUMENTS H M M
P - 43 F.P.S.O CONVERSION Doc. No 218338 - Q - PA - 008
Doc . Title : Rev . A
INSPECTION AND TEST PLAN Page 13 of 20
APPENDIX - I
S. No. Process Description Procedure Rev. Acceptance Criteria Verifying Document Action Points
JSL CLIENT ABS
6.6.14 218338 - E - PA - 014 A - JSL / CLIENT IEC - 92, IEC - 79-0 H W M
6.7 MECHANICAL
6.7.1 Disassembly Plan 218338 - M - PA - 001 A - JSL - H M M
6.7.2 Erection Plan 218338 - M - PA - 002 A - JSL - H M M
6.7.3 Load Movement 218338 - M - PA - 003 A - - - M M -
6.7.4 Mechanical Completion 218338 - M - PA - 004 A - JSL -
6.7.5 Winch Installation Procedure 218338 - M - PA - 005 A - MAKER - M M -
IEC - 92, ET - 3000.00 - 5140 - 741 -
PPC - 001
IEC - 92, ET - 3000.00 - 5140 - 741 -
PPC - 001AMERON / INSPECTION AND
CHECK SHEETS
Design Criteria
Rectifier, Battery Charges., UPS Connection & Test Procedures
6.7.6 Procedure of chock fasting for New Equipment 218338 - M - PA - 006 A -
6.8 INSTRUMENTATION
6.8.1 Instrumentation Calibration Records 218338 - I - PA - 001 A - VENDOR DATA CHECK LIST H W W
6.8.2 Instrumentation ( Calibration ) 218338 - I - PA - 002 A - VENDOR DATA - H W W
6.8.3 Installation of Telecommunication Equipment 218338 - I - PA - 003 A - CLIENT / VENDOR H W W
6.8.4 218338 - I - PA - 004 A
6.8.5 Procedure for Instrument Cable Installation 218338 - I - PA - 005 A
P - 43 F.P.S.O CONVERSION Doc. No 218338 - Q - PA - 008
Doc . Title : Rev . A
INSPECTION AND TEST PLAN Page 14 of 20
APPENDIX - I
S. No. Process Description Procedure Rev. Acceptance Criteria Verifying Document Action Points
JSL CLIENT ABS
6.9 PAINTING
6.9.1 218338 - C - PA - 001 A - JSL W W -
6.9.2 Hydro Blasting and Painting 218338 - C - PA - 002 A - JSL/ CLIENT M M -
6.9.3 Hull Grit blasting and Painting 218338 - C - PA - 003 A - JSL/ CLIENT W W -
6.9.4 Paint storage 218338 - C - PA - 004 A - JSL/ CLIENT JSL M M -
6.9.5 218338 - C - PA - 005 A - JSL/ CLIENT W W -
ET - 3010.40 - 5510 - 760 - PPT - 602
Installation of Resistance Measurement Procedure
Design Criteria
Control and Repair of Burnmarks and Mechanical Damage on Painted Area
ET - 3010.49 - 1350 - 140 - PPC - 001
ET - 3010.49 - 1350 - 140 - PPC - 001
ET - 3010.49 - 1350 - 140 - PPC - 001
Procedure for Painting of New Fabricated Steel Structure.
ET - 3010.49 - 1350 - 140 - PPC - 001
6.9.6 Procedure for Blasting and Painting Inspection 218338 - C - PA - 006 A - JSL/ CLIENT W W -
6.9.7 218338 - C - PA - 007 A - JSL/ CLIENT W W -
6.9.8 Tank Coating Procedure 218338 - C - PA - 008 A - JSL/ CLIENT W W -
6.9.9 Thermal Spraying Procedure 218338 - C - PA - 009 A - JSL/ CLIENT W W -
6.1 VAC
6.10.1 Installation of Ventilation Duct 218338 - H - PA - 001 A - JSL / VENDOR VIKING TECH. SPEC. H M M
6.10.2 Installation of Insulation 218338 - F - PA - 002 A - JSL / CLIENT VIKING TECH. SPEC. H M M
7 STRUCTURAL WORK
P - 43 F.P.S.O CONVERSION Doc. No 218338 - Q - PA - 008
Doc . Title : Rev . A
INSPECTION AND TEST PLAN Page 15 of 20
APPENDIX - I
S. No. Process Description Procedure Rev. Acceptance Criteria Verifying Document Action Points
JSL CLIENT ABS
7.1 ACCOMMODATION - Secondary
a ) Fit up - - H M M
b ) Welding - - AWS D1.1 WPS H W W
c ) Visual - - Inspection Reports H M H
d ) NDT - - AWS D1.1 / ABS Rule NDT Reports R R R
ET - 3010.49 - 1350 - 140 - PPC - 001
Procedure for Painting of New Fabrication Pipe
ET - 3010.49 - 1350 - 140 - PPC - 001
ET - 3010.49 - 1350 - 140 - PPC - 003
ET - 3010.00 - 1200 - 940 - PPC - 001
Design Criteria
WPS / IACS/JSQS/ Client Tech, Spec
Approved Drawings, Inspection Reports
AWS D1.1 and Client Tech, Spec., ABS Rule
e ) Tightness Test - - ABS Rule Tightness Test Reports H W H
f ) Records - - - All Inspection & Test Reports R R -
7.2 CHAIN PIPE
Fabrication & Installation - Secondary
a ) Fit up - - Inspection Reports H M M
b ) Welding - - WPS / PQR H W W
c ) Visual - - AWS D1.1 / ABS Rule Inspection Reports H M H
d ) NDT - - AWS D1.1 / ABS Rule NDT Reports R R R
e ) Records - - - - R R -
P - 43 F.P.S.O CONVERSION Doc. No 218338 - Q - PA - 008
Doc . Title : Rev . A
INSPECTION AND TEST PLAN Page 16 of 20
APPENDIX - I
S. No. Process Description Procedure Rev. Acceptance Criteria Verifying Document Action Points
JSL CLIENT ABS
7.3 HELIDECK
Fabrication - Secondary
Installation - Primary
a ) Fit up - - Inspection Reports H M M
WPS / IACS/JSQS/ Client Tech, Spec
Design Criteria
WPS / IACS/JSQS/ Client Tech, Spec
b ) Welding - - AWS D1.1 WPS H W W
c ) Visual - - AWS D1.1 and Client Tech,Spec., Inspection Reports H M H
d ) Dimensional Control - - Client Tech Spec. Dimensional Control Report H R R
e ) NDT - - AWS D1.1 / ABS Rule NDT Report H R R
f ) Records - - - R R -
7.4 CRANE PEDESTAL
Crane Pedestal ( Fabrication / Installation ) - - - - - -
a ) Fit up - - Inspection Reports H M M
b ) Welding - - AWS D1.1 WPS H W W
c ) Visual - - Inspection Reports, H W W
P - 43 F.P.S.O CONVERSION Doc. No 218338 - Q - PA - 008
Doc . Title : Rev . A
INSPECTION AND TEST PLAN Page 17 of 20
APPENDIX - I
S. No. Process Description Procedure Rev. Acceptance Criteria Verifying Document Action Points
JSL CLIENT ABS
d ) Tightness Test - - ABS Rule Tightness Test Report
e ) NDT - - AWS D1.1 / ABS Rule NDT Reports R R R
f ) Records - - - R R -
All Inspection , Test Reports and Traceability Records
Special / Primary
WPS / IHI SPAIS 1996/ Client Tech, Spec
AWS D1.1 and Client Tech,Spec.,
Design Criteria
All Inspection & Test Reports, Material & Weld Traceability
7.5 RISER I TUBES - Primary
a ) Fit up - - WPS, Client Tech, Spec., Weld map, Inspection Reports H M M
b ) Welding - - AWS D1.1 WPS H W W
c ) Visual - - Inspection Reports H W W
d ) NDT - - AWS D1.1 / ABS Rule NDT Reports R R R
e ) Records - - - R R -
7.6 FLARE BOOM - Primary
a ) Fit up - - Weld map, Inspection Reports H W W
b ) Welding - - AWS D1.1 WPS H W W
c ) Visual - - Inspection Reports H M H
d ) Dimensional Control - - Client Spec. Dimentional Control Report H R R
P - 43 F.P.S.O CONVERSION Doc. No 218338 - Q - PA - 008
Doc . Title : Rev . A
INSPECTION AND TEST PLAN Page 18 of 20
APPENDIX - I
S. No. Process Description Procedure Rev. Acceptance Criteria Verifying Document Action Points
JSL CLIENT ABS
e ) NDT - - AWS D1.1 / ABS Rule NDT Report R R R
f ) PWHT - - ASME B 31. 3 / AWS D1.1 PHWT & Hardness Report R R R
AWS D1.1 and Client Tech, Spec., ABS Rule
All Inspection & Test Reports, Material & Weld Traceability
AWS D1.1 and Client Tech, Spec., ABS Rule
AWS D1.1 and Client Tech,Spec., ABS Rule
Design Criteria
g ) Tightness Test - - ABS RULES
h ) Records - - - R R -
7.7 OFF LOADING - Secondary
a ) Fit up - - Weld map, Inspection Reports H M M
b ) Welding - - AWS D1.1 WPS H W W
c ) Visual - - Inspection Reports H W H
d ) NDT - - AWS D1.1 / ABS Rule NDT Reports R R R
e ) Records - - Spec., ABS Rule Inspection Reports - - -
d ) NDT - - AWS D1.1 / ABS Rule NDT Reports R R R
e ) Records - - - All Inspection & Test Reports R R -
7.8 - Secondary
P - 43 F.P.S.O CONVERSION Doc. No 218338 - Q - PA - 008
Doc . Title : Rev . A
INSPECTION AND TEST PLAN Page 19 of 20
APPENDIX - I
S. No. Process Description Procedure Rev. Acceptance Criteria Verifying Document Action Points
JSL CLIENT ABS
a ) Fit up - - Weld map, Inspection Reports H M M
b ) Welding - - AWS D1.1 WPS H R R
Material, Weld Traceability, All inspection & Test Reports
AWS D1.1 and Client Tech,Spec., ABS Rule
AWS D1.1 and Client Tech, Spec., ABS Rule
TELECOMMUNICATION TOWER
Design Criteria
AWS D1.1 and Client Tech, Spec., ABS Rule
c ) Visual - - Inspection Reports H W H
d ) NDT - - AWS D1.1 / ABS Rule NDT Reports R R R
e ) Records - - - All Inspection & Test Reports R R -
7.9 STRUCTURAL RENEWAL - As Applicable
a ) Thickness Gauging - - ABS Rule & Client Spec., Thickness Gauging Reports R R R
b ) Close Up Survey - - ABS Rule & Client Spec., Close up Survey Reports R R R
c ) Renewal Plan - - ABS Rule & Client Spec., Renewal Plan H A A
d ) Fit up - - ABS Rule & Tech. Spec., Weld map, Inspection Reports H M M
e ) Welding AWS D1.1 WPS H M M
f ) Visual - - ABS Rule & Tech. Spec., Inspection Reports H M H
g ) NDT - - AWS D1.1 / ABS Rule NDT Reports R R R
h ) Tightness Test ( As Applicable ) - - ABS Rule Tightness Test Reports H M H
P - 43 F.P.S.O CONVERSION Doc. No 218338 - Q - PA - 008
Doc . Title : Rev . A
INSPECTION AND TEST PLAN Page 20 of 20
APPENDIX - I
S. No. Process Description Procedure Rev. Acceptance Criteria Verifying Document Action Points
JSL CLIENT ABS
I ) Records - - - H M W
AWS D1.1 and Client Tech, Spec., ABS Rule
Design Criteria
All Inspection & Test Reports Material & Weld Traceablility
( As Applicable )
8 BLASTING & PAINTING Painting
8.1 Surface Preparation Approved Procedure - ET-3010.49-1350-140-PPC-003 Blastig Report H W M
8.2 Paint Appllication Approved Procedure - ET-3010.49-1350-140-PPC-003 Painting Scheme H W M
8.3 Dry Film Tickness Check Approved Procedure - ET-3010.49-1350-140-PPC-003 Painting Report H W M
9 DOCUMENTATION
All Inspection Test Reports H R H
LEGENDS : -
INTERVENTION POINTS INTERNATIONALY ACCEPTED STRUCTURAL FABRICATION AND INSTALATION STANDARDSM MonitorR Review IACS INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCITIES 1996W Witness J.S.Q.S. JAPAN SHIPBUILDING QUALITY STANDARD 1995H Hold ABS RULE
Inspection Dossier Enusre all Test/Inspection are done.