4
1 2 3 6 7 10 11 12 4 5 8 9 A B C F D E G H J K L 1 2 3 6 7 10 11 12 4 5 8 9 A B C F D E G H J K L 1 2 3 6 7 10 11 12 4 5 8 9 A B C F D E G H J K L 1 190 25 50 26 51 75 100 76 101 100 150 101 151 171 151 210 191 209 Substation CPH3 CPH4 CPH5 1 9 220 221 310 1 5 2 3 4 6 7 9 8 10 11 12 13 14 311 313 314 341 342 354 355 367 368 372 373 385 386 398 399 411 412 424 425 431 465 477 478 490 432 438 439 451 452 464 491 506 507 522 523 538 537 554 683 698 699 714 715 730 731 746 1st, 555 2nd, 619 1st, 570 2nd, 634 1st, 571 2nd, 635 1st, 586 2nd, 650 1st, 602 2nd, 666 1st, 587 2nd, 651 1st, 603 2nd, 667 1st, 618 2nd, 682 1st, 747 1st, 762 1st, 763 1st, 778 1st, 794 2nd, 779 1st, 795 1st, 810 234 247 248 235 260 future planning Permit planning Architecture CPH3_AR_future planning_FP_20-04-29_BA Basic plan: - 29.04.2020 R. Valenti - - 20024 1:250 Drawn by : Executed by: Project no.: Scale: Page size: DIN A0 excess length 1500/841 Mechanical : Electrical : Work scope: Work phase: Plan content: Release by the designer: Release by the ordering client: Construction project: Client: Designer : Legende: Building new paved area security fence proberty boundary green area Building existed parking spaces Nature Zone I Smaller parts can be used as a building zone, if the area's general nature value is preserved Nature Zone II high conservation registration of trees in the area: 1 arrow 2 ash 3 nine tribes of aspen 4 Six to seven strains of aspen 5 ash 6 maple 7 ash 8 aspen 9 maple 10 aspen 11 aspen 12 aspen 13 aspen 14 beech 1-14 Prerequisite for use as a construction zone is maintaining the ecological functionality of the area. Trees may only be felled in September Prerequisite for use as a construction zone is an exemption for the closure of existing water holes Trees may only be felled in September-Oct. Typically, replacement watering holes must be laid 1-2 years before existing watering holes can be closed base area property area: 46.076 m² green area: 9.949 m² paved area (internal roads): 17.788 m² parking spaces: 3.875 m² new buildings CPH3: 4.654 m² CPH4: 4.654 m² CPH5: 4.654 m² Supstation: 628 m² ---------------------------------------------------------------------------------------------------- total: 14.590 m² CPH3 CPH5 Lake renaturation CPH4 Industriparken Buildings must be given a height maximum the equivalent to 0.8 times the distance to buildings for the same plot number of parking spaces entrance area: 190 parking spaces left of CPH5: 30 parking spaces above of CPH4: 40 parking spaces ------------------------------------------------- total: 260 parking lots Planen & Bauen GmbH Darmstädter Straße 172 · 64625 Bensheim - Germany Tel.: 0 62 51 / 8 56 77 -0 · Fax: 8 56 77 -111 [email protected] · www.planen-bauen.eu CPH3 Data Center in Ballerup Industriparken 24 2750 Ballerup - Denmark Interxion Denmark SAS Industriparken 20A, Ballerup 2750 Ballerup - Denmark INVISCO tec Dresden GmbH Nürnberger Straße 41 01187 Dresden - Germany VOSS On Technische Planung GmbH & Co. KG Justus-Perthes-Straße 11 99867 Gotha - Germany parking lots permit planning future planning of parking lots open air area: 230 parking lots CPH3 ground floor: 64 parking lots CPH3 1st floor: 64 parking lots CPH5 ground floor: 64 parking lots CPH5 1st floor: 64 parking lots CPH5 2nd floor: 54 parking lots ------------------------------------------------- total: 540 parking lots total parking lots permit planning + future planning = 260 parking lots + 550 parking lots = 800 parking lots parking lots future planning

15,82 - Ballerup · CPH4: 4.654 m² CPH5: 4.654 m² Supstation: 628 m²-----total: 14.590 m² CPH3 CPH5 Lake renaturation CPH4 Industriparken Buildings must be given a height maximum

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • 1

    2

    3

    67

    10

    11

    12

    4

    5

    8

    9

    A B C FD E G H J K L

    1

    2

    3

    67

    10

    11

    12

    4

    5

    8

    9

    A B C FD E G H J K L

    1

    2

    3

    67

    10

    11

    12

    4

    5

    8

    9

    ABCF DEGHJKL

    1

    190

    25

    50

    26

    51

    75

    100

    76

    101

    100

    150

    101

    151

    171151

    210191

    209

    Substation

    CPH3

    CPH4

    CPH5

    1 9

    220

    221

    310

    1

    5

    2

    3

    4

    67

    9

    8

    10

    1112

    1314

    311 313

    314 341

    342 354 355 367

    368

    372

    373385386398

    399 411 412 424 425

    431

    465477478490

    432

    438

    439 451 452 464

    491 506

    507 522

    523 538

    537 554

    683 698

    699 714

    715 730

    731 746

    1st, 5552nd, 619

    1st, 5702nd, 634

    1st, 5712nd, 635

    1st, 5862nd, 650

    1st, 6022nd, 666

    1st, 5872nd, 651

    1st, 6032nd, 667

    1st, 6182nd, 682

    1st, 747 1st, 762

    1st, 763 1st, 778

    1st, 7942nd, 779

    1st, 795 1st, 810

    234

    247

    248

    235

    260

    future planning

    Permit planning

    Architecture

    CPH3_AR_future planning_FP_20-04-29_BA

    Basic plan: -

    29.04.2020R. Valenti

    --

    20024 1:250

    Drawn by: Executed by:

    Project no.: Scale:

    Page size: DIN A0 excess length 1500/841

    Mechanical:

    Electrical:

    Work scope:

    Work phase:

    Plan content:

    Release by the designer:Release by the ordering client:

    Construction project:

    Client:

    Designer :

    Legende:

    Building new

    paved area

    security fence

    proberty boundary

    green area

    Building existed

    parking spaces

    Nature Zone ISmaller parts can be used as a building zone,if the area's general nature value is preserved

    Nature Zone IIhigh conservation

    registration of trees in the area:1 arrow2 ash3 nine tribes of aspen4 Six to seven strains of aspen5 ash6 maple7 ash8 aspen9 maple10 aspen11 aspen12 aspen13 aspen14 beech

    1-14

    Prerequisite for use as a construction zone is maintaining the ecologicalfunctionality of the area. Trees may only be felled in September

    Prerequisite for use as a construction zone is an exemption forthe closure of existing water holes Trees may only be felled inSeptember-Oct. Typically, replacement watering holes must belaid 1-2 years before existing watering holes can be closed

    base area

    property area: 46.076 m²

    green area: 9.949 m²

    paved area (internal roads): 17.788 m²

    parking spaces: 3.875 m²

    new buildingsCPH3: 4.654 m²CPH4: 4.654 m²CPH5: 4.654 m²Supstation: 628 m²----------------------------------------------------------------------------------------------------total: 14.590 m²

    CPH3CPH5

    Lakerenaturation

    CPH4

    Industriparken

    Buildings must be given a height maximum the equivalent to0.8 times the distance to buildings for the same plot

    number of parking spacesentrance area: 190 parking spacesleft of CPH5: 30 parking spacesabove of CPH4: 40 parking spaces-------------------------------------------------total: 260 parking lots

    Planen & Bauen GmbHDarmstädter Straße 172 · 64625 Bensheim - GermanyTel.: 0 62 51 / 8 56 77 -0 · Fax: 8 56 77 [email protected] · www.planen-bauen.eu

    CPH3 Data Center in BallerupIndustriparken 242750 Ballerup - Denmark

    Interxion Denmark SASIndustriparken 20A, Ballerup2750 Ballerup - Denmark

    INVISCO tec Dresden GmbHNürnberger Straße 4101187 Dresden - Germany

    VOSS On Technische Planung GmbH & Co. KGJustus-Perthes-Straße 1199867 Gotha - Germany

    parking lots permit planning

    future planning of parking lotsopen air area: 230 parking lotsCPH3 ground floor: 64 parking lotsCPH3 1st floor: 64 parking lotsCPH5 ground floor: 64 parking lotsCPH5 1st floor: 64 parking lotsCPH5 2nd floor: 54 parking lots-------------------------------------------------total: 540 parking lots

    total parking lots permit planning + future planning= 260 parking lots + 550 parking lots = 800 parking lots

    parking lots future planning

  • Sight protection+23,95

    Chiller

    Cooler

    Chiller

    Cooler

    Chiller

    Cooler

    CPH3.L2.013LV-Maintenance Bypass Panel 3A

    CPH3.L2.051LV-Maintenance Bypass Panel 3D

    CPH3.L2.071Data centre 1

    CPH3.L2.074Data centre 4

    CPH3.L2.008Corridor 2

    Ground floor-0,45

    1st floor+4,70

    2nd floor+9,85

    Roof+15,00

    Attica+16,95

    Steel Platform+19,27

    Cooler+22,50 Chiller

    +21,93

    16,9

    5

    5,15

    5,15

    5,15

    1,95

    4,80

    354,

    8035

    4,80

    35

    1,00

    Chimney+23,95

    CPH3.L2.048Corridor 7

    3,26

    1,00

    2,88

    591

    ,51,

    002,

    885

    91,5

    1,00

    2,88

    591

    ,5

    Ground±0,00

    11,15 11,15 2,00 11,15

    10,7210,7210,72

    2,00

    Raised floor

    Raised floor

    Raised floor

    Raised floor

    Raised floor

    Raised floor

    4,27

    downstand beam

    downstand beam

    downstand beam

    downstand beam

    downstand beam

    downstand beam

    3,45

    353,

    4535

    3,45

    35

    Sigh

    t pro

    tect

    ion

    2,50

    +20,45

    +0,55

    +5,70

    +10,85

    1,45

    6,35

    3,50

    7,00

    1 2 3 6 7 10 11 124 5 8 9

    64,50

    2,84 7,32 7,32 7,32 1,44 7,32 7,32 7,32 2,84 6,35 3838

    2,63 12,19

    2,00

    Generator

    1,60

    1,00

    Steel Platform+16,60

    7,35

    1,0045°

    45°+17,95

    15,82

    1,45

    +22,50

    5,90

    Soundabsorber

    6,06

    CoolerGenerator

    3,505,73

    Undergroundfuel tank

    5,00

    Heating plantroom

    2,71

    39,45

    CPH

    3.L2

    .076

    Coo

    ling

    riser

    room

    2

    2,862,43

    2,50 7129

    Sigh

    t pro

    tect

    ion

    3,27

    2,70

    Ground floor

    1st floor

    2nd floor

    Roof

    CRAC

    CRAC

    CRAC

    CRAC

    CRAC

    CRAC

    CRAC

    CRAC

    CRAC

    CRAC

    CRAC

    CRAC

    Flat roof sealant with gradient insulation

    Sight protection+23,95

    Ground floor-0,45

    1st floor+4,70

    2nd floor+9,85

    Roof+15,00

    Attica+16,95

    ETIC

    S 12

    cm +

    Cur

    tain

    wal

    l clin

    ker f

    acad

    e

    CPH3.L1.013LV-Maintenance Bypass Panel 2A

    CPH3.L1.051LV-Maintenance Bypass Panel 2D

    CPH3.L1.071Data centre 1

    CPH3.L1.074Data centre 4

    CPH3.L1.008Corridor 2

    CPH3.L1.048Corridor 7

    CPH

    3.L1

    .076

    Coo

    ling

    riser

    room

    2

    CPH3.L0.015LV-Maintenance Bypass Panel 1A

    CPH3.L0.057LV-Maintenance Bypass Panel 3D

    CPH3.L0.080Data centre 1

    CPH3.L0.083Data centre 4

    CPH3.L0.010Corridor 2

    CPH3.L0.054Corridor 7

    CPH

    3.L0

    .085

    Coo

    ling

    riser

    room

    2

    +0,55

    +5,70

    +10,85

    Grating

    Grating

    Grating

    +0,55+0,55

    Ceiling lower edge+20,00

    1,00

    2,29

    1,84

    ETIC

    S 12

    cm +

    Cur

    tain

    wal

    l clin

    ker f

    acad

    e

    2,5071

    ExhaustSilencer

    CPH3.L3.003Steel platform 2

    CPH3.L3.002Steel platform 1

    0 5 10m4321 6 7 8 9 Section A-A

    Overview plan:

    Page size: DIN A1 oversize 1050/594

    Section A-A

    Permit planning

    Architecture

    Planen & Bauen GmbHDarmstädter Straße 172 · 64625 Bensheim - GermanyTel.: 0 62 51 / 8 56 77 -0 · Fax: 8 56 77 [email protected] · www.planen-bauen.eu

    CPH3 Data Center in BallerupIndustriparken 242750 Ballerup - Denmark

    Interxion Denmark SASIndustriparken 20A, Ballerup2750 Ballerup - Denmark

    CPH3_AR_Section A-A_S1_20-04-23_BA

    Basic plan: CPH3_AR_S1_05_KP_20-04-03

    23.04.2020M. Montes

    --

    20024 1:100

    Drawn by: Executed by:

    Project no.: Scale:

    Mechanical:

    Electrical:

    INVISCO tec Dresden GmbHNürnberger Straße 4101187 Dresden - Germany

    VOSS On Technische Planung GmbH & Co. KGJustus-Perthes-Straße 1199867 Gotha - Germany

    Work scope:

    Work phase:

    Plan content:

    Release by the designer:Release by the ordering client:

    Construction project:

    Client:

    Designer :

    Reinforced concrete

    Legende:

    Brickwork

    Dry wall

    Water resistant reinforced concrete

    CPH3CPH5

    Lakerenaturation

    CPH4

    Industriparken

    Thermal insulation

  • 0 5 10m4321 6 7 8 9

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    1 2 3 6 7 10 11 124 5 8 9

    A

    B

    C

    F

    D

    E

    G

    H

    J

    K

    L

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    A A

    TET ±0,00

    TEFF +0,55

    TERF -0,45

    TEFF ±0,00

    TERF -0,45

    TET ±0,00

    TET ±0,00

    TET ±0,00TET ±0,00

    TET ±0,00

    S

    u

    s

    p

    e

    n

    d

    e

    d

    m

    i

    n

    e

    r

    a

    l

    f

    i

    b

    r

    e

    c

    e

    i

    l

    i

    n

    g

    S

    u

    s

    p

    e

    n

    d

    e

    d

    m

    i

    n

    e

    r

    a

    l

    f

    i

    b

    r

    e

    c

    e

    i

    l

    i

    n

    g

    Steel stairs

    3 slopes 18.3/26

    Entry

    S

    u

    s

    p

    e

    n

    d

    e

    d

    m

    i

    n

    e

    r

    a

    l

    f

    i

    b

    r

    e

    c

    e

    i

    l

    i

    n

    g

    S

    u

    s

    p

    e

    n

    d

    e

    d

    g

    y

    p

    s

    u

    m

    c

    e

    i

    l

    i

    n

    g

    Ramp 6% slope Ramp 6% slope

    Stairs 3 slopes

    18.3/26

    Sta

    irs 2

    8 slo

    pe

    s

    18

    .4

    /2

    6

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    Rolling gate

    Lift cage B=1,80m T=3,50m H=2,90m

    Loading capacity 6.000kg

    C

    P

    H

    3

    .L

    0

    .0

    5

    2

    L

    iftin

    g

    p

    la

    tfo

    rm

    1

    B

    =

    2

    ,2

    0

    m

    T

    =

    3

    ,7

    0

    m

    L

    o

    a

    d

    in

    g

    ca

    p

    a

    city 4

    .5

    0

    0

    kg

    C

    P

    H

    3

    .L

    0

    .0

    5

    3

    L

    iftin

    g

    p

    la

    tfo

    rm

    2B

    =

    2

    ,2

    0

    m

    T

    =

    3

    ,7

    0

    mL

    o

    a

    d

    in

    g

    ca

    p

    a

    city 4

    .5

    0

    0

    kg

    Lift cage B=1,80m T=3,50m H=2,90m

    Loading capacity 6.000kg

    Canopy (steel construction)

    low

    er edge +

    4,80m

    Ca

    no

    py (ste

    el co

    nstru

    ctio

    n)

    lo

    we

    r e

    dg

    e +

    4,0

    0m

    TEFF +0,55

    Ste

    el sta

    irs

    3 slo

    pe

    s 1

    8.3

    /2

    6

    TET ±0,00

    Stairs 28 slopes

    18.4/26

    Ste

    el sta

    irs

    3 slo

    pe

    s 1

    8.3

    /2

    6

    TET ±0,00

    Stairs 28 slopes

    18.4/26

    TE

    FF

    +

    0,55

    TE

    RF

    -0,45

    Sta

    irs 2

    8 slo

    pe

    s

    18

    .4

    /2

    6

    TEFF +0,55

    TERF -0,45

    TET ±0,00

    Steel stairs

    3 slopes 18.3/26

    Un

    de

    rg

    ro

    un

    d ste

    el ta

    nk 1

    B

    acco

    rd

    in

    g to

    D

    IN

    6

    60

    8

    80

    .0

    00

    L D

    ie

    se

    l

    un

    de

    rg

    ro

    un

    d ste

    el ta

    nk 2

    B

    acco

    rd

    in

    g to

    D

    IN

    6

    60

    8

    80

    .0

    00

    L D

    ie

    se

    l

    un

    de

    rg

    ro

    un

    d ste

    el ta

    nk 3

    B

    acco

    rd

    in

    g to

    D

    IN

    6

    60

    8

    40

    .0

    00

    L D

    ie

    se

    l

    Un

    de

    rg

    ro

    un

    d ste

    el ta

    nk 1

    A

    acco

    rd

    in

    g to

    D

    IN

    6

    60

    8

    80

    .0

    00

    L D

    ie

    se

    l

    un

    de

    rg

    ro

    un

    d ste

    el ta

    nk 2

    A

    acco

    rd

    in

    g to

    D

    IN

    6

    60

    8

    80

    .0

    00

    L D

    ie

    se

    l

    un

    de

    rg

    ro

    un

    d ste

    el ta

    nk 3

    A

    acco

    rd

    in

    g to

    D

    IN

    6

    60

    8

    40

    .0

    00

    L D

    ie

    se

    l

    Filling and

    refuelling area 1

    6,00m x 10,50m

    Wa

    ll B

    ox T

    an

    k A

    Fillin

    g cu

    pb

    oa

    rd

    Wa

    ll B

    ox T

    an

    k B

    Fillin

    g cu

    pb

    oa

    rd

    Filling and

    refuelling area 2

    6,00m x 10,50m

    People lock

    14 Tank pipes

    14

    T

    an

    k p

    ip

    es

    Grid wall

    Co

    olin

    g rise

    r 0

    1

    downstand beam

    downstand beam

    downstand beam

    downstand beam

    downstand beam

    downstand beam

    downstand beam

    downstand beam

    downstand beam

    downstand beam

    CR

    AC

    CR

    AC

    CR

    AC

    CR

    AC

    CR

    AC

    CR

    AC

    CR

    AC

    CR

    AC

    CR

    AC

    CR

    AC

    CR

    AC

    CR

    AC

    CR

    AC

    CR

    AC

    CR

    AC

    CR

    AC

    Grid wall

    Grid wallGrid wall

    Pre

    ssu

    re

    re

    lie

    f ch

    an

    ne

    l

    Pre

    ssu

    re

    re

    lie

    f ch

    an

    ne

    l

    Pre

    ssu

    re

    re

    lie

    f ch

    an

    ne

    l

    Pre

    ssu

    re

    re

    lie

    f ch

    an

    ne

    l

    Pre

    ssu

    re

    re

    lie

    f ch

    an

    ne

    l

    Pre

    ssu

    re

    re

    lie

    f ch

    an

    ne

    l

    Pre

    ssu

    re

    re

    lie

    f ch

    an

    ne

    l

    TE

    T ±0,00

    TE

    T ±0,00

    Curtain wall clinker facade

    Cu

    rta

    in

    w

    all clin

    ke

    r fa

    ca

    de

    Cu

    rta

    in

    w

    all clin

    ke

    r fa

    ca

    de

    Installation w

    all

    Installation w

    all

    Installation wall

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF ±0,00

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF -0,45

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TE

    FF

    +

    0,55

    TE

    RF

    -0,45

    TE

    FF

    +

    0,55

    TE

    RF

    -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    Steel stairs

    3 slopes 15/26

    Steel stairs

    3 slopes 15/26

    TEFF -0,45

    TERF -0,45

    CPH3.L0.073

    Data centre 2

    F: 576,00m²

    U: 106,31m

    CPH3.L0.072

    Data centre 1

    F: 576,00m²

    U: 106,31m

    CPH3.L0.074

    Data centre 3

    F: 576,00m²

    U: 106,31m

    CPH3.L0.075

    Data centre 4

    F: 576,00m²

    U: 106,31m

    CPH3.L0.027

    Corridor 4

    F: 40,64m²

    U: 44,64m

    CPH3.L0.030

    Corridor 5

    F: 67,31m²

    U: 70,56m

    CPH3.L0.003

    Corridor 1

    F: 71,66m²

    U: 73,81m

    CPH3.L0.058

    Corridor 8

    F: 56,94m²

    U: 60,19m

    CPH3.L0.016

    Corridor 3

    F: 89,54m²

    U: 86,36m

    CPH3.L0.039

    Corridor 6

    F: 71,74m²

    U: 69,31m

    CPH3.L0.008

    Corridor 2

    F: 72,76m²

    U: 69,32m

    CPH3.L0.048

    Corridor 7

    F: 72,76m²

    U: 69,32m

    CPH3.L0.076

    Cooling riser room 1

    F: 31,49m²

    U: 56,52m

    CPH3.L0.077

    Cooling riser room 2

    F: 31,49m²

    U: 56,52m

    Co

    olin

    g rise

    r 0

    2C

    oo

    lin

    g rise

    r 0

    3C

    oo

    lin

    g rise

    r 0

    4C

    oo

    lin

    g rise

    r 0

    5C

    oo

    lin

    g rise

    r 0

    6

    Co

    olin

    g rise

    r 1

    3C

    oo

    lin

    g rise

    r 1

    4C

    oo

    lin

    g rise

    r 1

    5C

    oo

    lin

    g rise

    r 1

    6C

    oo

    lin

    g rise

    r 1

    7C

    oo

    lin

    g rise

    r 1

    8

    Co

    olin

    g rise

    r 1

    2C

    oo

    lin

    g rise

    r 1

    1C

    oo

    lin

    g rise

    r 1

    0C

    oo

    lin

    g rise

    r 0

    9C

    oo

    lin

    g rise

    r 0

    8C

    oo

    lin

    g rise

    r 0

    7

    CPH3.L0.017

    Shaft / riser gas

    extinguishing 2

    F: 1,20m²

    U: 6,67m

    CPH3.L0.009

    Shaft / riser gas

    extinguishing 1

    F: 1,20m²

    U: 6,68m

    CPH3.L0.041

    Shaft / riser gas

    extinguishing 3

    F: 1,20m²

    U: 6,67m

    CPH3.L0.049

    Shaft / riser gas

    extinguishing 4

    F: 1,20m²

    U: 6,68m

    CPH3.L0.018

    E-Riser [V]

    F: 0,64m²

    U: 3,87m

    CPH3.L0.040

    E-Riser [W]

    F: 0,64m²

    U: 3,87m

    TEFF +0,55

    TERF -0,45

    TEFF +0,55

    TERF -0,45

    CPH3.L0.024

    E-Riser [A]

    F: 6,04m²

    U: 10,72m

    CPH3.L0.025

    E-Riser [B]

    F: 3,04m²

    U: 7,04m

    CPH3.L0.026

    E-Riser [C]

    F: 3,04m²

    U: 7,04m

    CPH3.L0.036

    E-Riser [D]

    F: 6,04m²

    U: 10,72m

    CPH3.L0.037

    E-Riser [E]

    F: 3,04m²

    U: 7,04m

    CPH3.L0.038

    E-Riser [F]

    F: 3,04m²

    U: 7,04m

    CPH3.L0.005

    E-Riser [K]

    F: 6,04m²

    U: 10,72m

    CPH3.L0.006

    E-Riser [L]

    F: 3,04m²

    U: 7,04m

    CPH3.L0.007

    E-Riser [M]

    F: 3,04m²

    U: 7,04m

    CPH3.L0.055

    E-Riser [G]

    F: 6,04m²

    U: 10,72m

    CPH3.L0.056

    E-Riser [H]

    F: 3,04m²

    U: 7,04m

    CPH3.L0.057

    E-Riser [J]

    F: 3,04m²

    U: 7,04m

    CPH3.L0.028

    Fuel cleaning and

    transmissions system A

    F: 16,86m²

    U: 17,74m

    CPH3.L0.002

    Fuel cleaning and

    transmissions system B

    F: 14,33m²

    U: 15,74m

    CPH3.L0.044

    HV1.0

    HV-switchboard grid

    connection operator RADIUS

    F: 40,51m²

    U: 25,48m

    CPH3.L0.045

    HV1.1

    HV-switchboard grid

    connection operator Interxion

    F: 39,78m²

    U: 25,24m

    CPH3.L0.021

    Fire Panel

    F: 9,57m²

    U: 12,39m

    CPH3.L0.022

    Fire Brigade

    Radio System

    F: 9,57m²

    U: 12,39m

    CPH3.L0.029

    Gas extinguishing station

    F: 147,43m²

    U: 60,48m

    CPH3.L0.035

    BMS

    Building-Monitoring-System

    F: 19,92m²

    U: 18,74m

    TEFF +0,55

    TERF -0,45

    CPH3.L0.034

    ICT-Room 1

    ICT Racks, PAC Panel,

    BMS Panel, CCTV server

    F: 23,22m²

    U: 19,82m

    CPH3.L0.033

    CPR-Room 1

    CPR Racks

    F: 42,28m²

    U: 26,06m

    TEFF +0,55

    TERF -0,45

    Grid

    w

    all

    CPH3.L0.031

    Stairway 3

    F: 16,86m²

    U: 17,74m

    CPH3.L0.032

    FO-Shaft 1

    Fibre optic caple riser

    F: 9,23m²

    U: 15,24m

    TEFF +0,55

    TERF -0,45

    CPH3.L0.064

    Stairway 1

    F: 16,86m²

    U: 17,74m

    CPH3.L0.015

    Stairway 2

    F: 16,86m²

    U: 17,74m

    CPH3.L0.047

    Stairway 4

    F: 16,86m²

    U: 17,74m

    CPH3.L0.060

    Unpacking

    F: 80,22m²

    U: 38,48m

    CPH3.L0.004

    Ventilation shaft 1

    F: 9,06m²

    U: 12,04m

    CPH3.L0.059

    Plant room district heating

    F: 26,03m²

    U: 20,74m

    CPH3.L0.068

    Sanitary station

    F: 37,45m²

    U: 24,48m

    CPH3.L0.001

    Lounge / waiting area

    F: 60,87m²

    U: 35,79m

    CPH3.L0.067

    FO-Shaft 2

    Fibre optic caple riser

    F: 9,23m²

    U: 15,24m

    CPH3.L0.066

    CPR-Room 2

    CPR Racks

    F: 23,95m²

    U: 20,06m

    CPH3.L0.065

    ICT-Room 2

    ICT Racks, PAC Panel,

    BMS Panel, CCTV server

    F: 23,22m²

    U: 19,82m

    Grid

    w

    all

    TET ±0,00

    Steel stairs

    3 slopes 18.3/26

    CPH3.L0.062

    Load-/ passenger lift 1

    F: 12,03m²

    U: 14,07m

    CPH3.L0.063

    Load-/ passenger lift 2

    F: 12,03m²

    U: 14,07m

    CPH3.L0.078

    Delivery ramp

    F: 18,58m²

    U: 17,07m

    CPH3.L0.012

    Entry / ramp

    F: 23,30m²

    U: 33,30m

    TEFF +0,275

    CPH3.L0.071

    Men´s restroom

    F: 6,57m²

    U: 10,90m

    CPH3.L0.070

    Women´s restroom

    F: 4,37m²

    U: 8,45m

    CPH3.L0.011

    Accessible restroom

    F: 6,63m²

    U: 10,42m

    CPH3.L0.069

    Cleaning room

    F: 2,16m²

    U: 6,00m

    CPH3.L0.023

    HVATS-Transformer 1B

    F: 27,49m²

    U: 21,22m

    CPH3.L0.010

    HVATS-Transformer 1A

    F: 27,49m²

    U: 21,22m

    CPH3.L0.042

    HVATS-Transformer 1C

    F: 27,49m²

    U: 21,22m

    CPH3.L0.054

    HVATS-Transformer 1D

    F: 27,49m²

    U: 21,22m

    CPH3.L0.014

    Battery 1A

    UPS1 and UPS2 lead battery

    F: 20,68m²

    U: 18,99m

    CPH3.L0.019

    Battery 1B

    UPS1 and UPS2 lead battery

    F: 20,68m²

    U: 18,99m

    CPH3.L0.046

    Battery 1C

    UPS1 and UPS2 lead battery

    F: 20,68m²

    U: 18,99m

    CPH3.L0.050

    Battery 1D

    UPS1 and UPS2 lead battery

    F: 20,68m²

    U: 18,99m

    CPH3.L0.013

    LV-Maintenance Bypass Panel 1A

    F: 82,48m²

    U: 39,22m

    CPH3.L0.020

    LV-Maintenance Bypass Panel 1B

    F: 82,48m²

    U: 39,22m

    CPH3.L0.051

    LV-Maintenance Bypass Panel 1D

    F: 82,48m²

    U: 39,22m

    CPH3.L0.043

    LV-Maintenance Bypass Panel 1C

    F: 82,48m²

    U: 39,22m

    V

    e

    n

    t

    i

    l

    a

    t

    i

    o

    n

    s

    h

    a

    f

    t

    2

    f

    r

    o

    m

    1

    s

    t

    f

    l

    o

    o

    r

    38

    6,35

    64,50

    2,84 7,32 7,32 7,32 1,44 7,32 7,32 7,32 2,84 6,35

    38

    64,50

    38

    6,3

    52

    ,2

    48

    ,9

    38

    ,9

    28

    ,9

    38

    ,9

    38

    ,9

    28

    ,9

    32

    ,2

    46

    ,3

    5

    38

    71

    ,5

    0

    2,51

    3,01

    99

    2,51

    3,01

    99

    2,51

    3,01

    26 24

    5,01

    24

    9,935

    12.5

    3,00

    20 24

    6,13

    24

    1,51

    24

    3,92

    4

    3,80

    24

    2,76

    24

    4,01

    9

    3,51

    24

    13,13

    24

    4,26

    24 2615

    1,375 1,26

    2,26

    74.5

    3,01

    3,01

    12.5

    42.5

    9,375

    1,375 1,26

    2,26

    12.5

    1,50 1,135

    2,01

    12.5 12.5

    1,135

    2,135

    2,00

    1,3

    75

    1,2

    6

    2,2

    6

    12

    .5

    1,3

    75

    1,2

    6

    2,2

    6

    12

    .5

    1,6

    01

    ,1

    35

    2,0

    1

    12

    .5

    26 24

    2,76

    24

    24,13

    24

    3,26

    24

    2,76

    24

    1,51

    24

    6,92

    4 24 24

    6,63

    24

    6,51

    24 26

    26 24

    1,61

    24

    2,01

    24

    2,01

    24

    2,00

    17.5

    42.5

    24

    21,72

    24

    1,20

    24

    21,72

    24

    42.5

    17.5

    2,00

    24

    2,01

    24

    2,01

    24

    1,61

    24 26

    42.5 42.5

    2,00

    17.5 42.5

    6,35 2,00

    17.542.5

    6,35

    2624

    1,61

    24

    2,01

    24

    2,0124

    2,00

    17.5

    42.5

    24

    21,72

    24

    1,20

    24

    21,72

    24

    42.5

    17.5

    2,00

    24

    2,01

    24

    2,01

    24

    1,61

    2426

    42.5 42.5

    2,0017.5 42.5

    6,35 2,00

    17.542.5

    6,35

    26 24

    3,01

    24

    7,65

    12.5

    3,26

    12.5

    1,80

    35

    1,80

    2415

    26

    6,1

    1

    24

    3,7

    5

    24

    4,5

    01

    3,5

    0

    24

    3,3

    85

    1,3

    85

    24

    2,7

    6

    24

    1,3

    85

    24

    3,3

    85

    24

    13

    ,5

    0

    4

    4,5

    0

    24

    3,7

    5

    24

    6,1

    1

    24

    26

    42

    4

    26

    24

    2,8

    6

    24

    3,0

    1

    24

    2,0

    0

    24

    1,5

    1

    24

    26

    24

    24

    1,5

    1

    24

    24

    2,0

    0

    24

    3,2

    5

    17

    .5

    25

    ,3

    9

    17

    .5

    26

    ,8

    12

    ,0

    0

    24

    3,4

    35

    1,5

    11

    ,3

    61

    ,5

    15

    ,6

    85

    5,3

    5

    12

    .5

    63

    .5

    26

    24

    2,2

    1

    25

    1,2

    0

    2.5

    1,2

    0

    24

    2.5

    1,2

    0

    2,3

    4

    12

    .5

    2,8

    9

    3,4

    35

    1,5

    11

    ,3

    61

    ,5

    15

    ,6

    85

    3,4

    35

    1,5

    11

    ,3

    61

    ,5

    15

    ,6

    85

    3,4

    35

    1,5

    11

    ,3

    61

    ,5

    15

    ,6

    85

    1,2

    5

    17

    .5

    1,5

    1

    17

    .5

    20

    ,6

    15

    17

    .5

    2,9

    1

    17

    .5

    2,9

    15

    17

    .5

    22

    ,3

    0

    17

    .5

    1,2

    5

    1,2

    5

    17

    .5

    1,5

    1

    17

    .5

    20

    ,6

    15

    17

    .5

    2,9

    1

    17

    .5

    2,9

    15

    17

    .5

    22

    ,3

    0

    17

    .5

    1,2

    5

    24

    ,6

    2

    24

    17

    2.5

    15

    17

    2.5

    24

    24

    ,6

    2

    26

    ,5

    85

    26

    ,5

    85

    71

    ,5

    0

    26

    6,1

    1

    24

    3,7

    5

    24

    4,5

    01

    3,5

    0

    24

    3,3

    85

    1,3

    85

    24

    2,7

    6

    24

    1,3

    85

    24

    3,3

    85

    24

    13

    ,5

    0

    4

    4,5

    0

    24

    3,7

    5

    24

    6,1

    1

    24

    26

    4

    24

    26

    24

    2,8

    6

    24

    3,0

    1

    24

    2,0

    0

    24

    1,5

    1

    24

    26

    24

    24

    1,5

    1

    24

    24

    2,0

    0

    24

    3,2

    5

    17

    .5

    25

    ,3

    9

    17

    .5

    25

    ,3

    85

    17

    .5

    3,2

    5

    24

    2,9

    4

    24

    2,9

    4

    2,9

    35

    24

    2,9

    35

    24

    26

    4,50 2,60 25,68

    17.5

    19,745 2,60 4,50

    4,50 2,60 20,32

    17.5

    24,93 2,60 4,50

    3,80 3,26

    Pre

    ssu

    re

    re

    lie

    f ch

    an

    ne

    l

    Pre

    ssu

    re

    re

    lie

    f ch

    an

    ne

    l

    Pre

    ssu

    re

    re

    lie

    f ch

    an

    ne

    l

    Windowsill height 0,00m Windowsill height 0,00m

    Pre

    ssu

    re

    re

    lie

    f ch

    an

    ne

    l

    Pre

    ssu

    re

    re

    lie

    f ch

    an

    ne

    l

    17.5

    Ste

    el sta

    irs

    13

    slo

    pe

    s 1

    8.5

    /2

    6

    Steel stairs

    13 slopes 18.5/26

    1 2

    A

    B

    L

    14 Tank pipes

    14

    T

    an

    k p

    ip

    es

    TEFF +2,40

    CPH3.L0.028.1

    Fuel Pump A

    F: 12,87m²

    U: 17,74m

    CPH3.L0.002.1

    Fuel Pump B

    F: 10,33m²

    U: 15,74m

    26 24

    5,01

    24

    26 24

    2,76

    24

    26

    24

    6,1

    1

    24

    26

    24

    2,8

    6

    24

    Ste

    el sta

    irs

    13

    slo

    pe

    s 1

    8.5

    /2

    6

    Steel stairs

    13 slopes 18.5/26

    1

    Steel platform mezzanine level

    +2,40

    TEFF +2,40

    Steel platform mezzanine level

    +2,40

    24

    In

    sta

    lla

    tio

    n o

    pe

    nin

    g tra

    nsfo

    rm

    er fro

    m ±0

    ,0

    0

    be

    su

    bse

    qu

    en

    tly clo

    se

    d w

    ith

    b

    rickw

    ork

    Curtain wall clinker facadeVentilation grille Ventilation grille Ventilation grille Ventilation grille Ventilation grille Ventilation grille

    Ventilation grille Ventilation grille Ventilation grille Ventilation grille Ventilation grilleVentilation grille

    Op

    en

    ab

    le

    w

    in

    do

    w

    fo

    r sm

    oke

    re

    mo

    va

    l

    1,0

    05

    Pa

    ra

    pe

    t h

    eig

    ht 2

    ,3

    5m

    AR

    C p

    re

    ssu

    re

    re

    lie

    f

    3,2

    6

    4,1

    5

    62

    62

    1,0

    05

    Pa

    ra

    pe

    t h

    eig

    ht 2

    ,3

    5m

    AR

    C p

    re

    ssu

    re

    re

    lie

    f

    3,2

    6

    4,1

    5

    62

    In

    sta

    lla

    tio

    n o

    pe

    nin

    g tra

    nsfo

    rm

    er fro

    m ±0

    ,0

    0

    be

    su

    bse

    qu

    en

    tly clo

    se

    d w

    ith

    b

    rickw

    ork

    1,0

    05

    1,2

    5

    1,2

    5

    1,0

    05

    Pa

    ra

    pe

    t h

    eig

    ht 2

    ,3

    5m

    AR

    C p

    re

    ssu

    re

    re

    lie

    f

    3,2

    6

    4,1

    5

    62

    62

    1,0

    05

    1,2

    5

    1,2

    5

    1,0

    05

    Pa

    ra

    pe

    t h

    eig

    ht 2

    ,3

    5m

    AR

    C p

    re

    ssu

    re

    re

    lie

    f

    3,2

    6

    4,1

    5

    62

    62

    62

    2,631,25

    1,25

    2,63

    Parapet height 2,35m

    ARC pressure relief

    2,05 1,26

    2,26

    12.5

    TET ±0,00

    Steel stairs

    3 slopes 18.3/26

    1,0

    05

    1,2

    5

    1,2

    5

    1,0

    05

    1,2

    5

    1,2

    5

    2,01

    2,26

    Parapet height 0,00m

    1,185

    Installation opening transformer

    ARC pressure relief / Ventilation grille

    68.8

    1,135

    2,26

    68.8

    In

    sta

    lla

    tio

    n o

    pe

    nin

    g tra

    nsfo

    rm

    er fro

    m ±0

    ,0

    0

    be

    su

    bse

    qu

    en

    tly clo

    se

    d w

    ith

    b

    rickw

    ork

    In

    sta

    lla

    tio

    n o

    pe

    nin

    g tra

    nsfo

    rm

    er fro

    m ±0

    ,0

    0

    be

    su

    bse

    qu

    en

    tly clo

    se

    d w

    ith

    b

    rickw

    ork

    1 slope 15cm

    1 slope 15cm

    1 slo

    pe

    1

    5cm

    TEFF +0,15

    TERF -0,45

    TE

    FF

    +

    0,55

    TE

    RF

    -0,45

    E-R

    ise

    r [P

    ]E

    -R

    ise

    r [Q

    ]E

    -R

    ise

    r [N

    ]E

    -R

    ise

    r [O

    ]

    E-R

    ise

    r [R

    ]E

    -R

    ise

    r [S

    ]E

    -R

    ise

    r [T

    ]E

    -R

    ise

    r [U

    ]

    CPH3.L0.061

    Corridor 9

    F: 21,45m²

    U: 19,24m

    TE

    T ±0,00

    1 slope 15cm

    11,495 1,135

    2,135

    11,50

    Steel stairs

    4 slopes 15/26

    R

    e

    in

    f

    o

    r

    c

    e

    d

    c

    o

    n

    c

    r

    e

    t

    e

    c

    e

    ilin

    g

    L

    o

    w

    e

    r

    e

    d

    g

    e

    +

    2

    ,

    5

    6

    Floor plan ground floor

    Permit planning

    Architecture

    CPH3_AR_Floor plan_L0_20-04-29_BA

    Basic plan: 20024_AR_L0_04_KP_20-04-03

    23.04.2020

    L. Werr

    29.04.2020

    L. Werr

    20024 1:100

    Drawn by: Executed by:

    Project no.: Scale:

    Page size: DIN A0 1189/841

    Mechanical:

    Electrical:

    Work scope:

    Work phase:

    Plan content:

    Release by the designer:Release by the ordering client:

    Construction project:

    Client:

    Designer :

    Reinforced concrete

    Legende:

    Brickwork

    Thermal insulation

    TET ±0,00 Top edge of terrain

    Top edge of finished floor

    Top edge of raw floor

    TEFF +0,55

    TERF -0,45

    Dry wall

    Overview plan:

    CPH3

    CPH5

    Lake

    renaturation

    CPH4

    Industriparken

    Planen & Bauen GmbH

    Darmstädter Straße 172 · 64625 Bensheim - Germany

    Tel.: 0 62 51 / 8 56 77 -0 · Fax: 8 56 77 -111

    [email protected] · www.planen-bauen.eu

    CPH3 Data Center in BallerupIndustriparken 242750 Ballerup - Denmark

    Interxion Denmark SAS

    Industriparken 20A, Ballerup

    2750 Ballerup - Denmark

    INVISCO tec Dresden GmbH

    Nürnberger Straße 41

    01187 Dresden - Germany

    VOSS On Technische Planung GmbH & Co. KG

    Justus-Perthes-Straße 11

    99867 Gotha - Germany

  • 0 5 10m4321 6 7 8 9

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    IN

    OU

    T

    A

    TEFF +5,70

    TERF +4,70

    TEFF +5,70

    S

    u

    s

    p

    e

    n

    d

    e

    d

    m

    i

    n

    e

    r

    a

    l

    f

    i

    b

    r

    e

    c

    e

    i

    l

    i

    n

    g

    S

    u

    s

    p

    e

    n

    d

    e

    d

    m

    i

    n

    e

    r

    a

    l

    f

    i

    b

    r

    e

    c

    e

    i

    l

    i

    n

    g

    Sta

    irs 2

    8 slo

    pe

    s

    18

    .4

    /2

    6

    TEFF +5,70

    TERF +5,67

    Lift cage B=1,80m T=3,50m H=2,90m

    Loading capacity 6.000kg

    Lift cage B=1,80m T=3,50m H=2,90m

    Loading capacity 6.000kg

    Canopy (steel construction)

    low

    er edge +

    4,80m

    Ca

    no

    py (ste

    el co

    nstru

    ctio

    n)

    lo

    we

    r e

    dg

    e +

    4,0

    0m

    Stairs 28 slopes

    18.4/26

    TE

    FF

    +

    5,70

    TE

    RF

    +

    5,67

    Stairs 28 slopes

    18.4/26

    Sta

    irs 2

    8 slo

    pe

    s

    18

    .4

    /2

    6

    TEFF +5,70

    TERF +5,67

    14 Tank pipes

    14

    T

    an

    k p

    ip

    es

    Grid wall

    Co

    olin

    g rise

    r 0

    1

    downstand beam

    downstand beam

    downstand beam

    downstand beam

    downstand beam

    downstand beam

    downstand beam

    downstand beam

    downstand beam

    downstand beam

    CR

    AC

    CR

    AC

    CR

    AC

    CR

    AC

    CR

    AC

    CR

    AC

    CR

    AC

    CR

    AC

    CR

    AC

    CR

    AC

    CR

    AC

    CR

    AC

    CR

    AC

    CR

    AC

    CR

    AC

    CR

    AC

    Grid wall

    Grid wallGrid wall

    Pre

    ssu

    re

    re

    lie

    f ch

    an

    ne

    l

    Pre

    ssu

    re

    re

    lie

    f ch

    an

    ne

    l

    Pre

    ssu

    re

    re

    lie

    f ch

    an

    ne

    l

    Pre

    ssu

    re

    re

    lie

    f ch

    an

    ne

    l

    Pre

    ssu

    re

    re

    lie

    f ch

    an

    ne

    l

    Pre

    ssu

    re

    re

    lie

    f ch

    an

    ne

    l

    Pre

    ssu

    re

    re

    lie

    f ch

    an

    ne

    l

    Cu

    rta

    in

    w

    all clin

    ke

    r fa

    ca

    de

    Cu

    rta

    in

    w

    all clin

    ke

    r fa

    ca

    de

    Installation w

    all

    TEFF +5,70 TEFF +5,70 TEFF +5,70 TEFF +5,70TEFF +5,70 TEFF +5,70

    TEFF +5,70

    TEFF +5,70

    TEFF +5,70

    TERF +4,70

    TEFF +5,70

    TERF +4,70

    TEFF +5,70

    TERF +4,70

    TEFF +5,70

    TERF +4,70

    TEFF +5,70

    TERF +4,70

    TEFF +5,70

    TERF +4,70

    TEFF +5,70

    TEFF +5,70TEFF +5,70 TEFF +5,70

    TEFF +5,70

    TERF +4,70

    TEFF +5,70

    TERF +4,70

    TEFF +5,70

    TERF +4,70

    TEFF +5,70 TEFF +5,70 TEFF +5,70

    TE

    FF

    +

    5,70

    TE

    RF

    +

    4,70

    TE

    FF

    +

    5,70

    TE

    RF

    +

    4,70

    TEFF +5,70

    TERF +4,70

    TEFF +5,70

    TERF +4,70

    TEFF +5,70

    TERF +4,70

    TEFF +5,70

    TERF +4,70

    TEFF +5,70

    TERF +4,70

    TEFF +5,70

    TERF +4,70

    TEFF +5,70

    TERF +4,70

    TEFF +5,70

    TERF +4,70

    TEFF +5,70

    TERF +4,70

    TEFF +5,70

    TERF +4,70

    TEFF +5,70

    TERF +4,70

    TEFF +5,70

    TERF +4,70

    TEFF +5,70

    TERF +4,70

    TEFF +5,70

    TERF +4,70

    CPH3.L1.073

    Data centre 6

    F: 576,00m²

    U: 106,31m

    CPH3.L1.072

    Data centre 5

    F: 576,00m²

    U: 106,31m

    CPH3.L1.074

    Data centre 7

    F: 576,00m²

    U: 106,31m

    CPH3.L1.075

    Data centre 8

    F: 576,00m²

    U: 106,31m

    CPH3.L1.027

    Corridor 4

    F: 40,64m²

    U: 44,64m

    CPH3.L1.030

    Corridor 5

    F: 67,31m²

    U: 70,56m

    CPH3.L1.003

    Corridor 1

    F: 68,81m²

    U: 72,06m

    CPH3.L1.058

    Corridor 8

    F: 56,94m²

    U: 60,19m

    CPH3.L1.016

    Corridor 3

    F: 89,54m²

    U: 86,36m

    CPH3.L1.039

    Corridor 6

    F: 71,74m²

    U: 69,31m

    CPH3.L1.008

    Corridor 2

    F: 72,76m²

    U: 69,32m

    CPH3.L1.048

    Corridor 7

    F: 72,76m²

    U: 69,32m

    CPH3.L1.076

    Cooling riser room 1

    F: 31,49m²

    U: 56,52m

    CPH3.L1.077

    Cooling riser room 2

    F: 31,49m²

    U: 56,52m

    Co

    olin

    g rise

    r 0

    2C

    oo

    lin

    g rise

    r 0

    3C

    oo

    lin

    g rise

    r 0

    4C

    oo

    lin

    g rise

    r 0

    5C

    oo

    lin

    g rise

    r 0

    6

    Co

    olin

    g rise

    r 1

    3C

    oo

    lin

    g rise

    r 1

    4C

    oo

    lin

    g rise

    r 1

    5C

    oo

    lin

    g rise

    r 1

    6C

    oo

    lin

    g rise

    r 1

    7C

    oo

    lin

    g rise

    r 1

    8

    Co

    olin

    g rise

    r 1

    2C

    oo

    lin

    g rise

    r 1

    1C

    oo

    lin

    g rise

    r 1

    0C

    oo

    lin

    g rise

    r 0

    9C

    oo

    lin

    g rise

    r 0

    8C

    oo

    lin

    g rise

    r 0

    7

    CPH3.L1.017

    Shaft / riser gas

    extinguishing 2

    F: 1,20m²

    U: 6,67m

    CPH3.L1.009

    Shaft / riser gas

    extinguishing 1

    F: 1,20m²

    U: 6,68m

    CPH3.L1.041

    Shaft / riser gas

    extinguishing 3

    F: 1,20m²

    U: 6,67m

    CPH3.L1.049

    Shaft / riser gas

    extinguishing 4

    F: 1,20m²

    U: 6,68m

    CPH3.L1.018

    E-Riser [V]

    F: 0,64m²

    U: 3,87m

    CPH3.L1.040

    E-Riser [W]

    F: 0,64m²

    U: 3,87m

    CPH3.L1.022

    E-Riser [Q]

    F: 0,64m²

    U: 3,87m

    CPH3.L1.021

    E-Riser [P]

    F: 0,64m²

    U: 3,87m

    CPH3.L1.012

    E-Riser [O]

    F: 0,64m²

    U: 3,87m

    CPH3.L1.011

    E-Riser [N]

    F: 0,64m²

    U: 3,87m

    CPH3.L1.044

    E-Riser [S]

    F: 0,64m²

    U: 3,87m

    CPH3.L1.045

    E-Riser [R]

    F: 0,64m²

    U: 3,87m

    CPH3.L1.052

    E-Riser [U]

    F: 0,64m²

    U: 3,87m

    CPH3.L1.053

    E-Riser [T]

    F: 0,64m²

    U: 3,87m

    TEFF +5,70

    TERF +4,70

    TEFF +5,70

    TERF +4,70

    CPH3.L1.024

    E-Riser [A]

    F: 6,04m²

    U: 10,72m

    CPH3.L1.025

    E-Riser [B]

    F: 3,04m²

    U: 7,04m

    CPH3.L1.026

    E-Riser [C]

    F: 3,04m²

    U: 7,04m

    CPH3.L1.036

    E-Riser [D]

    F: 6,04m²

    U: 10,72m

    CPH3.L1.037

    E-Riser [E]

    F: 3,04m²

    U: 7,04m

    CPH3.L1.038

    E-Riser [F]

    F: 3,04m²

    U: 7,04m

    CPH3.L1.005

    E-Riser [K]

    F: 6,04m²

    U: 10,72m

    CPH3.L1.006

    E-Riser [L]

    F: 3,04m²

    U: 7,04m

    CPH3.L1.007

    E-Riser [M]

    F: 3,04m²

    U: 7,04m

    CPH3.L1.055

    E-Riser [G]

    F: 6,04m²

    U: 10,72m

    CPH3.L1.056

    E-Riser [H]

    F: 3,04m²

    U: 7,04m

    CPH3.L1.057

    E-Riser [J]

    F: 3,04m²

    U: 7,04m

    CPH3.L1.028

    Fuel Pipe A

    F: 9,84m²

    U: 15,44m

    CPH3.L1.002

    Fuel Pipe B

    F: 8,07m²

    U: 13,24m

    CPH3.L1.035

    Storage 4

    F: 103,14m²

    U: 45,98m

    CPH3.L1.029

    Storage 3

    F: 175,85m²

    U: 69,78m

    TEFF +5,70

    TERF +4,70

    CPH3.L1.034

    ICT-Room 1

    ICT Racks, PAC Panel,

    BMS Panel, CCTV server

    F: 23,22m²

    U: 19,82m

    CPH3.L1.033

    CPR-Room 1

    CPR Racks

    F: 42,28m²

    U: 26,06m

    TEFF +5,70

    TERF +4,70

    Grid

    w

    all

    CPH3.L1.031

    Stairway 3

    F: 16,86m²

    U: 17,74m

    CPH3.L1.032

    FO-Shaft 1

    Fibre optic caple riser

    F: 9,23m²

    U: 15,24m

    TEFF +5,70

    CPH3.L1.064

    Stairway 1

    F: 16,86m²

    U: 17,74m

    CPH3.L1.015

    Stairway 2

    F: 16,86m²

    U: 17,74m

    CPH3.L1.047

    Stairway 4

    F: 16,86m²

    U: 17,74m

    CPH3.L1.060

    Storage 5

    F: 97,16m²

    U: 47,48m

    CPH3.L1.004

    Ventilation shaft 1

    F: 9,06m²

    U: 12,04m

    CPH3.L1.068

    Storage 1

    F: 37,45m²

    U: 24,48m

    CPH3.L1.001

    Storage 2

    F: 77,44m²

    U: 49,24m

    CPH3.L1.067

    FO-Shaft 2

    Fibre optic caple riser

    F: 9,23m²

    U: 15,24m

    CPH3.L1.066

    CPR-Room 2

    CPR Racks

    F: 23,95m²

    U: 20,06m

    CPH3.L1.065

    ICT-Room 2

    ICT Racks, PAC Panel,

    BMS Panel, CCTV server

    F: 23,22m²

    U: 19,82m

    Grid

    w

    all

    CPH3.L1.062

    Load-/ passenger lift 1

    F: 12,03m²

    U: 14,07m

    CPH3.L1.063

    Load-/ passenger lift 2

    F: 12,03m²

    U: 14,07m

    CPH3.L1.071

    Men´s restroom

    F: 6,57m²

    U: 10,90m

    CPH3.L1.070

    Women´s restroom

    F: 4,37m²

    U: 8,45m

    CPH3.L1.069

    Cleaning room

    F: 2,16m²

    U: 6,00m

    CPH3.L1.023

    HVATS-Transformer 2B

    F: 27,49m²

    U: 21,22m

    CPH3.L1.010

    HVATS-Transformer 2A

    F: 27,49m²

    U: 21,22m

    CPH3.L1.042

    HVATS-Transformer 2C

    F: 27,49m²

    U: 21,22m

    CPH3.L1.054

    HVATS-Transformer 2D

    F: 27,49m²

    U: 21,22m

    CPH3.L1.014

    Battery 2A

    UPS1 and UPS2 lead battery

    F: 20,68m²

    U: 18,99m

    CPH3.L1.019

    Battery 2B

    UPS1 and UPS2 lead battery

    F: 20,68m²

    U: 18,99m

    CPH3.L1.046

    Battery 2C

    UPS1 and UPS2 lead battery

    F: 20,68m²

    U: 18,99m

    CPH3.L1.050

    Battery 2D

    UPS1 and UPS2 lead battery

    F: 20,68m²

    U: 18,99m

    CPH3.L1.013

    LV-Maintenance Bypass Panel 2A

    F: 80,25m²

    U: 41,62m

    CPH3.L1.020

    LV-Maintenance Bypass Panel 2B

    F: 80,25m²

    U: 41,62m

    CPH3.L1.051

    LV-Maintenance Bypass Panel 2D

    F: 80,25m²

    U: 41,62m

    CPH3.L1.043

    LV-Maintenance Bypass Panel 2C

    F: 80,25m²

    U: 41,62m

    38

    6,35

    64,50

    2,84 7,32 7,32 1,44 7,32 7,32 7,32 2,84 6,35

    38

    64,50

    38

    6,3

    52

    ,2

    48

    ,9

    38

    ,9

    28

    ,9

    38

    ,9

    38

    ,9

    28

    ,9

    32

    ,2

    4

    38

    71

    ,5

    0

    26 24

    5,01

    24

    13,26

    24

    6,13

    24

    1,51

    24

    3,92

    4

    3,80

    24

    2,76

    24

    4,01

    9

    3,51

    24

    14,38

    24

    3,01

    24 2615

    1,375 1,26

    1,26

    12.5

    1,375 1,26

    1,26

    12.5

    1,3

    75

    1,2

    6

    1,2

    6

    12

    .5

    1,3

    75

    1,2

    6

    1,2

    6

    12

    .5

    26 24

    1,61

    24

    28,78

    24

    2,76

    24

    1,51

    24

    6,92

    4 24

    16,88

    24 26

    26 24

    1,61

    24

    2,01

    24

    2,01

    24

    2,00

    17.5

    42.5

    24

    21,72

    24

    1,20

    24

    21,72

    24

    42.5

    17.5

    2,00

    24

    2,01

    24

    2,01

    24

    1,61

    24 26

    5,51

    42.517.5

    5,51

    42.5 17.5

    2,00

    17.5 42.5

    6,35 2,00

    17.542.5

    6,35

    2624

    1,61

    24

    2,01

    24

    2,0124

    2,00

    17.5

    42.5

    24

    21,72

    24

    1,20

    24

    21,72

    24

    42.5

    17.5

    2,00

    24

    2,01

    24

    2,01

    24

    1,61

    2426

    5,51

    42.517.5

    5,51

    42.5

    17.5

    2,0017.5

    42.5

    6,35 2,00

    17.542.5

    6,35

    26 24

    3,01

    24

    11,185

    12.5

    1,80

    35

    1,80

    24

    26

    4,2

    6

    24

    3,7

    5

    24

    4,5

    01

    3,5

    0

    24

    3,3

    85

    1,3

    85

    24

    2,7

    6

    24

    1,3

    85

    24

    3,3

    85

    24

    13

    ,5

    0

    4

    4,5

    0

    24

    3,7

    5

    24

    6,1

    1

    24

    26

    42

    4

    26

    24

    1,6

    1

    24

    3,0

    1

    24

    2,0

    0

    24

    1,5

    1

    24

    26

    24

    24

    1,5

    1

    24

    24

    2,0

    0

    24

    3,2

    5

    17

    .5

    25

    ,3

    9

    17

    .5

    26

    ,8

    1

    24

    3,2

    6

    17

    .5

    1,5

    1

    17

    .5

    1,0

    1

    17

    .5

    1,5

    1

    17

    .5

    5,5

    1

    6,1

    1

    26

    24

    2,3

    35

    12

    .5

    1,2

    0

    2.5

    1,2

    0

    24

    2.5

    1,2

    0

    2,3

    4

    12

    .5

    2,8

    9

    3,2

    6

    17

    .5

    1,5

    1

    17

    .5

    1,0

    1

    17

    .5

    1,5

    1

    17

    .5

    5,5

    1

    3,2

    6

    17

    .5

    1,5

    1

    17

    .5

    1,0

    1

    17

    .5

    1,5

    1

    17

    .5

    5,5

    13

    ,2

    6

    17

    .5

    1,5

    1

    17

    .5

    1,0

    1

    17

    .5

    1,5

    1

    17

    .5

    5,5

    1

    1,2

    5

    17

    .5

    1,5

    1

    17

    .5

    20

    ,6

    15

    17

    .5

    2,9

    1

    17

    .5

    2,9

    15

    17

    .5

    22

    ,3

    0

    17

    .5

    1,2

    5

    1,2

    5

    17

    .5

    1,5

    1

    17

    .5

    20

    ,6

    15

    17

    .5

    2,9

    1

    17

    .5

    2,9

    15

    17

    .5

    22

    ,3

    0

    17

    .5

    1,2

    5

    24

    ,6

    2

    24

    17

    2.5

    15

    17

    2.5

    24

    24

    ,6

    2

    26

    ,5

    85

    26

    ,5

    85

    71

    ,5

    0

    26

    6,1

    1

    24

    3,7

    5

    24

    4,5

    01

    3,5

    0

    24

    3,3

    85

    1,3

    85

    24

    2,7

    6

    24

    1,3

    85

    24

    3,3

    85

    24

    13

    ,5

    0

    4

    4,5

    0

    24

    3,7

    5

    24

    6,1

    1

    24

    26

    4

    24

    26

    24

    2,8

    6

    24

    3,0

    1

    24

    2,0

    0

    24

    1,5

    1

    24

    26

    24

    24

    1,5

    1

    24

    24

    2,0

    0

    24

    3,2

    5

    17

    .5

    25

    ,3

    9

    17

    .5

    25

    ,3

    85

    17

    .5

    3,2

    5

    24

    2,9

    4

    24

    2,9

    4

    4,50 2,60 25,68

    17.5

    19,745 2,60 4,50

    4,50 2,60 20,32

    17.5

    24,93 2,60 4,50

    3,80

    Pre

    ssu

    re

    re

    lie

    f ch

    an

    ne

    l

    Pre

    ssu

    re

    re

    lie

    f ch

    an

    ne

    l

    Pre

    ssu

    re

    re

    lie

    f ch

    an

    ne

    l

    Pre

    ssu

    re

    re

    lie

    f ch

    an

    ne

    l

    Pre

    ssu

    re

    re

    lie

    f ch

    an

    ne

    l

    17.5

    7,32

    6,3

    5

    24

    A

    1,0

    1

    TEFF +5,70

    TERF +4,70

    TEFF +5,70

    TEFF +3,125

    TERF +3,095

    TE

    FF

    +

    3,125

    TE

    RF

    +

    3,095

    TEFF +3,125

    TERF +3,095

    TEFF +5,70

    TERF +4,70

    TE

    FF

    +

    5,70

    TE

    RF

    +

    5,67

    TE

    FF

    +

    3,125

    TE

    RF

    +

    3,095

    CPH3.L1.059

    Ventilation shaft 2

    F: 9,06m²

    U: 12,04m

    24

    1,8

    5

    Windowsill height 1,315m

    Windowsill height 1,315m

    Win

    do

    wsill h

    eig

    ht 1

    ,3

    15

    m

    Win

    do

    wsill h

    eig

    ht 1

    ,3

    15

    m

    Curtain wall clinker facade

    Curtain wall clinker facadeVentilation grille Ventilation grille Ventilation grille Ventilation grille Ventilation grille Ventilation grille

    Ventilation grille Ventilation grille Ventilation grille Ventilation grille Ventilation grilleVentilation grille Openable window

    for smoke removal

    Openable window

    for smoke removal

    Op

    en

    ab

    le

    w

    in

    do

    w

    fo

    r sm

    oke

    re

    mo

    va

    l

    Op

    en

    ab

    le

    w

    in

    do

    w

    fo

    r sm

    oke

    re

    mo

    va

    l

    1,0

    05

    1,2

    5

    1,2

    5

    1,0

    05

    Pa

    ra

    pe

    t h

    eig

    ht 2

    ,3

    5m

    AR

    C p

    re

    ssu

    re

    re

    lie

    f

    3,2

    6

    4,6

    0

    62

    62

    1,0

    05

    1,2

    5

    1,2

    5

    1,0

    05

    Pa

    ra

    pe

    t h

    eig

    ht 2

    ,3

    5m

    AR

    C p

    re

    ssu

    re

    re

    lie

    f

    3,2

    6

    4,6

    0

    62

    1,0

    05

    1,2

    5

    1,2

    5

    1,0

    05

    Pa

    ra

    pe

    t h

    eig

    ht 2

    ,3

    5m

    AR

    C p

    re

    ssu

    re

    re

    lie

    f

    3,2

    6

    4,6

    0

    62

    62

    1,0

    05

    1,2

    5

    1,2

    5

    1,0

    05

    Pa

    ra

    pe

    t h

    eig

    ht 2

    ,3

    5m

    AR

    C p

    re

    ssu

    re

    re

    lie

    f

    3,2

    6

    4,6

    0

    62

    62

    62

    In

    sta

    lla

    tio

    n o

    pe

    nin

    g tra

    nsfo

    rm

    er fro

    m +

    4,7

    0

    be

    su

    bse

    qu

    en

    tly clo

    se

    d w

    ith

    b

    rickw

    ork

    In

    sta

    lla

    tio

    n o

    pe

    nin

    g tra

    nsfo

    rm

    er fro

    m +

    4,7

    0

    be

    su

    bse

    qu

    en

    tly clo

    se

    d w

    ith

    b

    rickw

    ork

    In

    sta

    lla

    tio

    n o

    pe

    nin

    g tra

    nsfo

    rm

    er fro

    m 4

    ,7

    0

    be

    su

    bse

    qu

    en

    tly clo

    se

    d w

    ith

    b

    rickw

    ork

    1 2 3 6 7 10 11 124 5 8 9

    A

    B

    C

    F

    D

    E

    G

    H

    J

    K

    L

    2,0

    0

    In

    sta

    lla

    tio

    n o

    pe

    nin

    g tra

    nsfo

    rm

    er fro

    m +

    4,7

    0

    be

    su

    bse

    qu

    en

    tly clo

    se

    d w

    ith

    b

    rickw

    ork

    CPH3.L1.061

    Corridor 9

    F: 21,45m²

    U: 19,24m

    R

    e

    in

    f

    o

    r

    c

    e

    d

    c

    o

    n

    c

    r

    e

    t

    e

    c

    e

    ilin

    g

    L

    o

    w

    e

    r

    e

    d

    g

    e

    +

    7

    ,

    7

    1

    Floor plan 1st floor

    Permit planning

    Architecture

    CPH3_AR_Floor plan_L1_20-04-29_BA

    Basic plan: 20024_AR_L1_02_KP_20-03-30

    23.04.2020

    L. Werr

    29.04.2020

    L. Werr

    20024 1:100

    Drawn by: Executed by:

    Project no.: Scale:

    Page size: DIN A0 1189/841

    Mechanical:

    Electrical:

    Work scope:

    Work phase:

    Plan content:

    Release by the designer:Release by the ordering client:

    Construction project:

    Client:

    Designer :

    Reinforced concrete

    Legende:

    Brickwork

    Thermal insulation

    TET ±0,00 Top edge of terrain

    Top edge of finished floor

    Top edge of raw floor

    TEFF +5,70

    TERF +4,70

    Dry wall

    Overview plan:

    CPH3

    CPH5

    Lake

    renaturation

    CPH4

    Industriparken

    Planen & Bauen GmbH

    Darmstädter Straße 172 · 64625 Bensheim - Germany

    Tel.: 0 62 51 / 8 56 77 -0 · Fax: 8 56 77 -111

    [email protected] · www.planen-bauen.eu

    CPH3 Data Center in BallerupIndustriparken 242750 Ballerup - Denmark

    Interxion Denmark SAS

    Industriparken 20A, Ballerup

    2750 Ballerup - Denmark

    INVISCO tec Dresden GmbH

    Nürnberger Straße 41

    01187 Dresden - Germany

    VOSS On Technische Planung GmbH & Co. KG

    Justus-Perthes-Straße 11

    99867 Gotha - Germany