7/25/2019 15.2.1-Interface Management Plan_ R3
1/31
SADARA PROJECTLSPB CONTRACT
TECHNICAL DATA BOOKATTACHMENT IV TO SCHEDULE B
15.2.1 BUILD INTERFACE MANAGEMENTPLAN
Document No:A554-R-730-IN-GEN-INT-001
RTIP Rev: 1 2 3 3
FW Preparedby:
Majid MAlghamdi
Majid MAlghamdi
Majid MAlghamdi
FW Approvedby:
Mike Dowden Mike Dowden Mike Dowden
Owner
Approved by: Daniel Abanto Daniel Abanto Daniel Abanto
Revision Date: 11 July 2012 28 Aug 2012 10 Sept 2012
IssuePurpose:
ITB IFT IFT
7/25/2019 15.2.1-Interface Management Plan_ R3
2/31
SADARA Project Document No. A554-R-730-IN-GEN-INT-001
Revision: 3
SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender
SUMMARY OF DOCUMENT REVISIONS
Rev.No.
DateRevised
SectionRevised Revision Descript ion
1 3 July-12 Issued for Client Review
2 28 Aug-12 Attachment 2 Interface Dependency Table Update
3 10-Sept-12 Attachment 2 Interface Dependency Table Update
7/25/2019 15.2.1-Interface Management Plan_ R3
3/31
SADARA Project Document No. A554-R-730-IN-GEN-INT-001
Revision: 3
SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender
TABLE OF CONTENTS
Section Topic
1.0 PURPOSE ................................................................................................................ 4
2.0 SCOPE ..................................................................................................................... 4
3.0 DEFINITIONS ........................................................................................................... 4
4.0 RESPONSIBILITIES ................................................................................................ 5
4.1 INTERFACE PARTIES ............................................................................................ 6
4.2 CONTRACTOR F ..................................................................................................... 6
4.3 CONTRACTOR O .................................................................................................... 7
4.4 PROGRAM INTERFACE MANAGEMENT TEAM (PIMT) ....................................... 8
5.0 INTERFACE TYPES ................................................................................................ 8
5.1 EXTERNAL INTERFACE ......................................................................................... 8
5.2 INTERNAL INTERFACE .......................................................................................... 9
6.0 INTERFACE NUMBERING ...................................................................................... 9
7.0 COMMUNICATION ................................................................................................ 10
7.1 INTERFACE QUERIES (IQS) ................................................................................ 11
7.2 IQ NUMBERING ..................................................................................................... 11
7.3 TRANSMISSION OF DOCUMENTATION ............................................................. 11
8.0 INTERFACE GUIDELINES .................................................................................... 11
8.1 PIPING ................................................................................................................... 12
8.1.1 ABOVE GROUND PIPING INTERFACES ............................................................. 12
8.1.2 UNDERGROUND PIPING INTERFACES .............................................................. 12
8.2 CIVIL INTERFACES .............................................................................................. 13
8.2.1 ROAD INTERFACE ............................................................................................... 13
7/25/2019 15.2.1-Interface Management Plan_ R3
4/31
SADARA Project Document No. A554-R-730-IN-GEN-INT-001
Revision: 3
SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender
7/25/2019 15.2.1-Interface Management Plan_ R3
5/31
SADARA Project Document No. A554-R-730-IN-GEN-INT-001
Revision: 3
SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender
1.0 PURPOSE
This document defines how interfaces are to be managed by the PackagesContractors. It defines the role and responsibilities of each interface Party. Itdoes not define the engineering requirements of each interface.
This document is intended to:
Ensure all interfaces are identified
Define clear responsibilities for each Party
Ensure there are no interface gaps or overlaps
Define the physical method of making the interface (flange, junction box, etc)
Ensure schedule compatibility, relating to interfaces
2.0 SCOPE
This document defines the requirements for the management of interfaces duringconstruction phase
The physical interface definition includes the following connections:
Piping (above and underground)
Civil (roads, paving, ditches, ducts) IT/Telecoms
Electric power cable and Control Cable
3.0 DEFINITIONS
Title Definition
BL Battery limit
ContractorPackage A, B, C,Or D Contractor
The SDL Building Project is divided into four Packages, A,B,C and D. Each Package will be constructed by a Packagecontractor
7/25/2019 15.2.1-Interface Management Plan_ R3
6/31
SADARA Project Document No. A554-R-730-IN-GEN-INT-001
Revision: 3
SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender
3rdParty contractor Contractors nominated for works outside of the buildingbattery limit or not included in Contractor A,B,C& D scope ofwork
ICF Interconnecting Facilities Contractor
ITC Information Technology Contractor
EW Early Work ContractorIDT Interface Dependency Table
External Interface External Interface is an interface between any PackageContractor and a third party contractor e.g. betweenPackage C Contractor and ICF Contractor
Internal Interface An Internal Interface is an interface between any twoPackage Contractors
IP Interface Point
IQ Interface Query
ISBL Inside Battery Limit. A category of work scope for facilitiesinside a process Unit BL
OSBL Outside Battery Limits. Outside the Process Unit BL butwithin the Site boundary
PMT Project Management Team
SPOC Single Point of Contact
4.0 RESPONSIBILITIES
This section outlines the respective responsibilities of the Project Management
Team and the Packages Contractors.
Package Contractors are wholly responsible for the completion of allInterface Points within the parameters of the contract price. PackageContractor shall be responsible to communicate with any other PackageContractor as required to complete all works relating to the InterfacePoints Package Contractor shall also be responsible for all documentation
7/25/2019 15.2.1-Interface Management Plan_ R3
7/31
SADARA Project Document No. A554-R-730-IN-GEN-INT-001
Revision: 3
SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender
on the role they will be assigned to as an Originator contractor OrFinalization contractor.
III. Contractor O will be the first contractor to install their works in acondition that Contractor F will be able to complete the IP per theContract Documents.
IV. Contractor F prior to starting any works at an IP shall confirm
Contractor O installation is acceptable to complete the IP per theterms of the contract documents. This is to include layout andelevations and general soundness of the installation.
V. Contractor O shall facilitate Contractor F as required to complete theIP, providing required access or traffic control, etc. etc.
VI. Upon completion of any irregularities and acceptance of Contractor O
IP works, Contractor F shall complete the IP per the requirements ofthe contract documents.
VII. Contractor F shall be responsible for future protection of the IP and allsnag list works associated with the said IP.
VIII. It is the responsibility of the parties involved to ensure that theappropriate Non-Disclosure Agreements are in place where theexchange of information and / or drawings & documents as specifiedin this document.
4.1 Interface Parties
There are four parties involved in the management of interface points:
Finalization Contractor Contractor F
Originator Contractor Contractor O
3rdparty Contractor
Project Management Team
For each IP, Contractor F and Contractor O will be identified by the PMT.
7/25/2019 15.2.1-Interface Management Plan_ R3
8/31
SADARA Project Document No. A554-R-730-IN-GEN-INT-001
Revision: 3
SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender
6. Populate interfaces completion dates in the Interface Dependency Schedule(See Attachment 2) and update regularly to manage and monitor the timing ofcompletion of interface points and gates. Copy to be provided to PMT.
7. Reach agreement on interfaces with other Contractors in a timely manner tosupport the overall Project schedule.
8. Identify and agree with Contractor O the inspections, tests and constructionand pre-commissioning records that are required to be performed and/ormaintained by itself and Contractor O. This applies to situations where both
Contractors have an overlap of activities at the interface such as the jointhydrotest of both sides of an interface point at the same time. Otherwise theContractors shall each be responsible for their 'side' of the interface.
9. Identify and agree with Contractor O any inspections, tests, drying and anyother requirements to be witnessed by itself and Contractor O.
10. Prior to starting any interface works, confirm the acceptability of the in-placeworks instated by Contractor O. This confirmation shall include the overallacceptability of the in place IP works, including: layout, alignment elevation
and the integrity of the elements being attached to or abutted. If anyunacceptable conditions are identified then an equitable resolution shall besought with Contractor O and the PMT. If Contractor F connects to an IPwithout identifying any deficiencies then Contractors O IP works will beconsidered as accepted without exception. This will not include any latent orimpossible to identify problems. The PMT will act as arbitrator as required.
11. Upon acceptance of Contractor O works at IP Contractor F shall complete theIP works and provide protection until final turnover of the works.
12. Complete all Snag list works associated with the IP13. Be fully responsible for the procurement and construction of the part ofsystem within its own area.
14. Identify IPs that are no longer relevant, and communicate such to ContractorO and the PMT in a timely manner. .
4.3 Contractor O
Contractor O shall:
1. Be the contractor that starts the works at an IP2. Participate in the creation and maintenance of the IDT Interface Dependency
Table3. Participate in all requested IP coordination meetings4. Mutually agree with Contractor F that the IP and associated data is correct,
7/25/2019 15.2.1-Interface Management Plan_ R3
9/31
SADARA Project Document No. A554-R-730-IN-GEN-INT-001
Revision: 3
SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender
hydrotest of both sides of an interface point at the same time. Otherwise theContractors shall each be responsible for their 'side' of the interface.
9. Identify and agree with Contractor F any inspections, tests, drying and anyother requirements to be witnessed by itself and Contractor O.
10. Complete the first stage of the works relating to subject IP per thedocumented agreements made with Contractor F.
11. Facilitate all requested inspections of the IP with Contractor F and or the PMTto confirm installation is installed per the contract requirements, position and
elevation. Any and all unacceptable conditions shall be rectified promptly toprevent any schedule disruption of Contractor F and the overall programschedule.
12. Provide all required interface assistance including access, traffic control andany other reasonable or required assistance to allow Contractor F completethe IP.
13. Identify IPs that are no longer relevant, and communicate such to ContractorF in a timely manner. Also communicate to PMT.
14. Be fully responsible for the procurement and construction of the part of aSystem within its own area.
4.4 Project Management Team (PMT) will :
1. Develop, communicate and maintain the Interface Management Plan andassociated guidelines for:
Identifying and defining interface points Assigning responsibilities of parties at each IP
Data required to define each interface point construction phase2. Provide Final resolution of any queries at interface points
5.0 INTERFACE TYPES
5.1 External Interface
External Interface specifically refers to 3rdparties outside of the contractors nominated forthe building envelope.
7/25/2019 15.2.1-Interface Management Plan_ R3
10/31
SADARA Project Document No. A554-R-730-IN-GEN-INT-001
Revision: 3
SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender
5.2 Internal Interface
Internal Interface is an interface between Package Contractors nominated for theBuilding scope.
Unit 1
Unit 2
Unit 3
Envelope
Package A
Package C
Package B
Unit
External Interface Point
Unit 1
Unit 2
Unit 3
Envelope
External Interface Point
Package A
Package C
Package B
Unit
7/25/2019 15.2.1-Interface Management Plan_ R3
11/31
SADARA Project Document No. A554-R-730-IN-GEN-INT-001
Revision: 3
SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender
d Discipline code, see below
w/u Package Contractors Code
The first number shown (w) is Contractor O and the secondnumber (u) is Contractor F.
nnnn Serial number (a unique number will be assigned for eachdiscipline)
Discipline codes:
CAE Cable Tray - Electrical
CAT Cable Tray IT
CBE Cable Trench Electrical
CBT Cable Trench/Duct Bank - ITCC Civil Open Ditch
CF Civil Fence Crossing
CR Civil Road
CRT Road Crossing - IT
E Electrical Cable
F Firewater
P Piping
S Structural
T Telecommunications Cable
TS Miscellaneous IT (Supplementary Interface Table)
U Underground Piping (gravity flow only)
The following is the specific Package Contractors Codes, which will be used toprovide clarity.
7/25/2019 15.2.1-Interface Management Plan_ R3
12/31
SADARA Project Document No. A554-R-730-IN-GEN-INT-001
Revision: 3
SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender
7.0 COMMUNICATION
Packages Contractors shall communicate directly with each other to agreedefinition and completion of interfaces. PMT will maintain, the master SPOCsList which will include the names and contact details of the interface coordinators(Single Points of Contact) for all parties.
Communication may take place in a combination of the following formats:
Interface Queries (IQs)
Transmission of documentation
Meetings (with decisions subsequently recorded by IQs using MOM as aproof of agreements)
Emails
Each Package Contractor shall appoint a SPOC to efficiently manage suchcommunications. Each Package Contractor shall maintain a log of all IQssent/received. IQs raised by any Contractor shall be addressed to the otherPartys Contractor SPOC and shall also be copied to the PMT SPOC additional people may be copied but all IQs must be sent only To the PackageContractor SPOC
7.1 Interface Queries (IQs)
Interface Queries (IQs) may be raised by any Party to make a query, provide orrequest information or to confirm an agreement, using the form in Attachment P,
Contractors shall communicate directly with all other Contractors havingan interest in the interface. All formal agreements and requests shall berecorded in an IQ.
7.2 IQ Numbering
IQs shall be numbered in the form:
IQ-x-y-nnnn
Where:
7/25/2019 15.2.1-Interface Management Plan_ R3
13/31
SADARA Project Document No. A554-R-730-IN-GEN-INT-001
Revision: 3
SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender
7.3 Transmission of Documentation
A record shall be kept of all documentation (documents and drawings)transmitted between Contractors and IQs shall be used for the transmittal.
8.0 INTERFACE GUIDELINES
The following defines the split of responsibilities between Contractors duringconstruction at IPs and provides guidance on how to implement interfaces fordifferent situations that may arise. The engineering requirements are defined inthe relevant Program documents and drawings. The list of IPs are listed inAt tachment 2
The following is general guidance
For external interfaces between a Package and a 3rdParty contractor, thenthe Package Contractor will be Contractor F.
For internal interfaces between Packages, then Contractor F will beassigned by the Project Management Team.
8.1 Piping
8.1.1 Above Ground Piping Interfaces
8.1.1.1 General
1. The default position shall be that Contractor F shall provide the requiredisolation, based on the service, at the IP for commissioning and operatingpurposes. This isolation could be blind flanges, figure 8 blinds, valves orother means. Contractor F shall provide any final spacers, gaskets and boltsrequired for the final closure of the IP.
CONTRACTOR FCONTRACTOR O
7/25/2019 15.2.1-Interface Management Plan_ R3
14/31
SADARA Project Document No. A554-R-730-IN-GEN-INT-001
Revision: 3
SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender
8.1.2 Underground Piping Interfaces
8.1.2.1 Firewater
1. Contractor O shall provide fire mains and appurtenances along the mainroads for the overall firemain outside Buildings area and provide spurs off thering main at the indicated on the drawings
2. The IP, which consists of a valve supplied by Contractor O will be installed in
a valve box constructed by Contractor O. Contractor F will be responsible forgrouting and sealing the valve box where his pipe protrudes.3. Contractor O shall install and test the fire main up to the IP.4. Contractor F shall install and test his fire main up to the isolation valve.5. Contractor F shall provide the gaskets, bolts etc to make the final closure.
8.1.2.2 Other services
1. Each contractor shall construct, test, flush, clean, and back fill their pipingup to their respective battery limits. Contractor F will then complete thesystem with a short section of pipe. These final joints will be consideredGolden Joints followed by service test before backfilling.
8.2 Civil Interfaces
8.2.1 Road Interfaces
1. Contractor O shall lay and compact the pavement materials to an acceptable
CONTRACTOR F
ANCHOR
ANCHOR
TEMPORARY END
PIECES FOR TESTING
FINAL SPOOL, JOINTS & TESTING BY
CONTRACTOR O
ANCHOR
ANCHOR
TEMPORARY END
PIECES FOR TESTING
FINAL SPOOL, JOINTS & TESTING BY
CONTRACTOR F
7/25/2019 15.2.1-Interface Management Plan_ R3
15/31
SADARA Project Document No. A554-R-730-IN-GEN-INT-001
Revision: 3
SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender
It is the responsibility of Contractor F to complete the interface, unless PMTinstructed otherwise, recognizing that the edge of the courses, shown above,may have worn during the interim period. They will be responsible for rectificationwork to the edge.
8.2.2 Paving Interfaces
1. Paving interface shall typically be at the high point of paving.2. Contractor O shall lay and compact the pavement materials to an acceptablestable slope beyond the extent of his wearing surface slope.
3. Contractor F shall ensure the soundness of this material prior to laying allsubsequent layers.
Centreline of Road
Interface
CONTRACTOR F CONTRACTOR ICF
*Dimensions to be confirmed by CONTRACTOR F
1.0m*1.0m*
Surface wearing course
Base course
Sub base (if required)
Sub -grade
Interface
Interface
PLANPLAN
CONTRACTOR FCONTRACTOR F
CONTRACTOR ICF CONTRACTOR ICF
Final Joint
7/25/2019 15.2.1-Interface Management Plan_ R3
16/31
SADARA Project Document No. A554-R-730-IN-GEN-INT-001
Revision: 3
SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender
8.2.3 Ditch Interfaces
1. If the IP is a direct tie-in to the Contractor O ditch, Contractor O willConstruct the ditch without provision for Contractor F, who will tie-in inaccordance with Project Specifications.
2. If the IP is not a direct tie-in to the Contractor O ditch, ContractorO shall extend the reinforcement to permit continuity by Contractor F.
3. Contractors O & F shall provide initial construction joint with
Water stops.
8.2.4 Telecommunication Concrete Encased Duct Banks
1. The Contractor O ensures the integrity of the conduits to be free from damage.
2. Conduit ends shall be cap and plugged at the interface point to ensure that no un-
desired material will enter into the conduits.3. The Contractor O shall leave at least 300mm of the conduit, free of concrete for the
Contractor F to conveniently place the couplings.
4. Contractor F shall provide and install the couplings to properly connect the conduits.
5. Contractor F shall provide and install the completion of concrete encasement for the
conduit protection
CONTRACTOR F
CONTRACTOR O
0.5m *
exposed
reinforcement
Expansion Joint
Slope
Plan
Elevation
Section
7/25/2019 15.2.1-Interface Management Plan_ R3
17/31
SADARA Project Document No. A554-R-730-IN-GEN-INT-001
Revision: 3
SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender
8.3 IT/ Telecom Interface
All telecommunication cables inside buildings will be supplied and installed byPackage Contractors as per Package Contractor scope, however ITC willterminate the cables at the wall faceplates and at the building interface terminalstrip; Package Contractor will supervise terminations within the building.
8.4 Electrical Interface
Electrical interfaces will be as described in DocA554-R-730-IN-GEN-INT-002
7/25/2019 15.2.1-Interface Management Plan_ R3
18/31
SADARA Project Document No. A554-R-730-IN-GEN-INT-001
Revision: 3
SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender
ATTACHMENT 1 INTERFACE QUERY FORM
IQ-xxx-yyy-nnn
7/25/2019 15.2.1-Interface Management Plan_ R3
19/31
SADARA Project Document No. A554-R-730-IN-GEN-INT-001
Revision: 3
SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender
7/25/2019 15.2.1-Interface Management Plan_ R3
20/31
ATTACHMENT 2 INTERFACE DEPENDENCY TABLE
No. Interface PointContractor
OContractor
F Type IP StatusContractor OTarget Date
Contractor FTarget Date
Diff.Days
ELECTRICAL
1 IPCBEB/A0001 B A ElectricalTrench
2 IPCBEB/A0002 B A ElectricalTrench
3 IPCBEB/A0003 B A ElectricalTrench
4 IPCBEB/ICF0004 B ICF ElectricalTrench
5 IPCBEB/ICF0005 B ICF ElectricalTrench
6 IPCBEB/ICF0006 B ICF ElectricalTrench
7 IPCBEB/C0007 B C ElectricalTrench
8 IPCBEB/C0008 B C ElectricalTrench
9 IPCBED/C0009 D C ElectricalTrench
10 IPCBEB/C0010 B C ElectricalTrench
11 IPCBED/A0011 D A ElectricalTrench
12 IPCBEC/A0012 C A ElectricalTrench
13 IPCBED/C0013 D C ElectricalTrench
14 IPCBED/C0014 D C ElectricalTrench
15 IPCBED/C0015 D C ElectricalTrench
16 IPCBEC/A0016 C A ElectricalTrench
17 IPCBEC/A0017 C A ElectricalTrench
18 IPCBEC/A0018 C A ElectricalTrench
19 IPCBEC/A0019 C A ElectricalTrench
20 IPCAEA/ICF0001 A ICF ElectricalCable
7/25/2019 15.2.1-Interface Management Plan_ R3
21/31
SADARA PROJECT Document No. A554-R-730-IN-GEN-INT-001Revision: 3
SDL BUILDING CONSTRUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: TENDER
Contains Confidential Information of Both Dow and Saudi AramcoPage 21 of 31
Tray
21 IPCAEA/ICF0002 A ICFElectricalCableTray
22 IPCAEA/ICF0003 A ICFElectricalCableTray
IT
1 IPCBT B/A0001 B A ITDuctBanks
2 IPCBT B/A0002 B A ITDuctBanks
3 IPCBT A/ICF0003 A ICF ITDuctBanks
4 IPCBTA/ICF0004 A ICF ITDuctBanks
5 IPCBT A/ICF0005 A ICF ITDuctBanks
6 IPCBTB/C0006 B C ITDuctBanks
7 IPCBTD/C0007 D C ITDuctBanks
8 IPCBT D/C0008 D C ITDuctBanks
9 IPCBTD/C0009 D C ITDuctBanks
10 IPCBT D/C0010 D C ITDuctBanks
11 IPCBT D/C0011 D C ITDuctBanks
12 IPCBTB/C0012 B C ITDuctBanks
13 IPCBT B/ICF0013 B ICF ITDuctBanks
14 IPCBT B/A0014 C ICF ITDuctBanks
15 IPCBTC/A0015 C A ITDuctBanks
16 IPCBTD/A0016 D A ITDuctBanks
17 IPCBT D/C0017 D C ITDuctBanks
7/25/2019 15.2.1-Interface Management Plan_ R3
22/31
SADARA PROJECT Document No. A554-R-730-IN-GEN-INT-001Revision: 3
SDL BUILDING CONSTRUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: TENDER
Contains Confidential Information of Both Dow and Saudi AramcoPage 22 of 31
18 IPCBT D/C0018 D C ITDuctBanks
19 IPCBTD/C0019 D C ITDuctBanks
20 IPCBT A/C0020 A C ITDuctBanks
21 IPCBT C/ICF0021 C ICF ITDuctBanks
22 IPCBTD/A0022 D A ITDuctBanks
23IP
CBT
B/C
0023
B
D
IT
Duct
Banks
24 IPCBT B/D0024 B D ITDuctBanks
25 IPCBTD/C0025 D C ITDuctBanks
26 IPCBTB/ICF0026 B ICF ITDuctBanks
27 IPCBTB/ITC0027 B ITC ITDuctBanks
28 IPCBTB/ITC0028 C ITC ITDuctBanks
29IP
CBT
B/ITC
0029
B
ITC
IT
Duct
Banks
30 IPCBTB/ICF0030 B ICF ITDuctBanks
31 IPCBT/0031IntentionallyNotUsed
32 IPCBTD/A0032 D A ITDuctBanks
33 IPCBT C/EW0033 C EW ITDuctBanks
34IP
CBT
C/EW
0034
C
EW
IT
Duct
Banks
35 IPCBT D/EW0035 D EW ITDuctBanks
36 IPCBT D/EW0036 D EW ITDuctBanks
37 IPCBT D/EW0037 D EW ITDuctBanks
38 IPCBT D/EW0038 D EW ITDuctBanks
39 IPCBT D/EW0039 D EW ITDuctBanks
3
3
3
7/25/2019 15.2.1-Interface Management Plan_ R3
23/31
SADARA PROJECT Document No. A554-R-730-IN-GEN-INT-001Revision: 3
SDL BUILDING CONSTRUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: TENDER
Contains Confidential Information of Both Dow and Saudi AramcoPage 23 of 31
40 IPCBT D/EW0040 D EW ITDuctBanks
41 IPCBT D/EW0041 D EW ITDuctBanks
42 IPCBT D/EW0042 D EW ITDuctBanks
43 IPCBT D/EW0043 D EW ITDuctBanks
CIVIL
1IP
CR
A/ICF
0001
A
ICF
Road
2 IPCRA/ICF0002 A ICF Road
3 IPCRA/ICF0003 A ICF Road
4 IPCRA/ICF0004 A ICF Road
5 IPCRA/ICF0005 A ICF Road
6 IPCRA/ICF0006 A ICF Road
7IP
CR
A/ICF
0007
A
ICF
Road
8 IPCRA/ICF0008 A ICF Road
9 IPCRA/ICF0009 A ICF Road
10 IPCRB/ICF0010 B ICF Road
11 IPCRA/B0011 A B Road
12 IPCRA/B0012 A B Road
13IP
CR
A/B
0013
A
B
Road
14 IPCRA/B0014 A B Road
15 IPCRA/B0015 A B Road
16 IPCRA/B0016 A B Road
17 IPCRA/B0017 A B Road
18 IPCRA/B0018 A B Road
3
3
7/25/2019 15.2.1-Interface Management Plan_ R3
24/31
SADARA PROJECT Document No. A554-R-730-IN-GEN-INT-001Revision: 3
SDL BUILDING CONSTRUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: TENDER
Contains Confidential Information of Both Dow and Saudi AramcoPage 24 of 31
19 IPCRB/ICF0019 B ICF Road
20 IPCRB/ICF0020 B ICF Road
21 IPCRB/ICF0021 B ICF Road
22 IPCRC/ICF0022 C ICF Road
23 IPCRD/C0023 D C Road
24IP
CR
D/C
0024
D
C
Road
25 IPCRD/C0025 D C Road
26 IPCRD/C0026 D C Road
27 IPCRA/C0027 A C Road
28 IPCRA/C0028 A C Road
29 IPCRA/C0029 A C Road
30IP
CR
A/C
0030
A
C
Road
31 IPCRD/C0031 D C Road
32 IPCRD/PREP0032 D PREP Road
33 IPCRD/PREP0033 D PREP Road
34 IPCRD/PREP0034 D PREP Road
35 IPCRD/PREP0035 D PREP Road
36IP
CR
D/C
036
D
C
Road
37 IPCRC/ICF0037 C ICF Road
38 IPCRC/ICF0038 C ICF Road
39 IPCRD/ICF0039 D ICF Road
40 IPCRD/PREP0040 D PREP Road
41 IPCRD/ICF0041 D ICF Road
3
3
7/25/2019 15.2.1-Interface Management Plan_ R3
25/31
SADARA PROJECT Document No. A554-R-730-IN-GEN-INT-001Revision: 3
SDL BUILDING CONSTRUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: TENDER
Contains Confidential Information of Both Dow and Saudi AramcoPage 25 of 31
42 IPCRD/PREP0042 D PREP Road
43 IPCRD/PREP0043 D PREP Road
44 IPCRD/ICF0044 D ICF Road
37 IPCCA/B0001 A B StormDitches
38 IPCCA/B0002 A B StormDitches
39IP
CC
A/ICF
0003
A
ICF
Storm
Ditches
40 IPCCA/ICF0004 A ICF StormDitches
41 IPCCA/ICF0005 A ICF StormDitches
42 IPCCB/ICF0006 B ICF StormDitches
43 IPCCC/PREP0007 D C StormDitches
44 IPCCD/C0008 D C StormDitches
45 IPCC 0009Intentionally
Not
Used
46 IPCCD/C0010 D C StormDitches
47 IPCCC/A0011 C A StormDitches
48 IPCCA/C0012 A C StormDitches
49 IPCC 0013Intentionally Not
Used
50IP
CC
C/A
0014
C
A
Storm
Ditches
51 IPCCA/RC0015 A RC StormDitches
52 IPCCD/C0016 D C StormDitches
53 IPCCD/C0017 D C StormDitches
54 IPCCC/RC0018 C RC StormDitches
3
7/25/2019 15.2.1-Interface Management Plan_ R3
26/31
SADARA PROJECT Document No. A554-R-730-IN-GEN-INT-001Revision: 3
SDL BUILDING CONSTRUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: TENDER
Contains Confidential Information of Both Dow and Saudi AramcoPage 26 of 31
55 IPCCD/C0019 D C StormDitches
56 IPCCD/C0020 D C StormDitches
57 IPCCB/C0021 B C StormDitches
58 IPCCB/RC0022 B RC StormDitches
59 IPCCB/C0023 B C StormDitches
60IP
CC
B/C
0024
B
C
Storm
Ditches
61 IPCCC/ICF0025 C ICF StormDitches
62 IPCCC/ICF0026 C ICF StormDitches
PIPING
1 IPPB/A0001 B A SanitarySystem
2IP
P
B/A
0002
B
A
Return Chilled
Water
3 IPPB/A0003 B ASupply ChilledWater
4 IPP 0004IntentionallyNotUsed
5 IPP 0005IntentionallyNotUsed
6 IPP 0006Intentionally
NotUsed
7 IPP 0007IntentionallyNotUsed
8 IPPB/A0008 B A PotableWater
9 IPPB/A0009 B A CompressedAir
3
SADARA PROJECT D t N A554 R 730 IN GEN INT 001
7/25/2019 15.2.1-Interface Management Plan_ R3
27/31
SADARA PROJECT Document No. A554-R-730-IN-GEN-INT-001Revision: 3
SDL BUILDING CONSTRUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: TENDER
Contains Confidential Information of Both Dow and Saudi AramcoPage 27 of 31
10 IPPB/A0010 B AReturn ChilledWater
11 IPPB/A0011 B ASupply ChilledWater
12 IPPB/A0012 B A SanitarySystem
13IP
P
B/C
0013
B
C
Return Chilled
Water
14 IPPB/C0014 B CSupply ChilledWater
15 IPPB/C0015 B C PotableWater
16 IPPB/C0016 B C PotableWater
17 IPPB/C0017 B C SanitarySystem
18IP
P
B/C
0018
B
C
Sanitary
System
19 IPPD/C0019 D C SanitarySystem
20 IPPD/C0020 D C PotableWater
21 IPPB/C0021 B C UtilityWater
22 IPPB/C0022 B C CompressedAir
23 IPPB/C0023 B C PotableWater
24IP
P
C/A
0024
C
A
Potable
Water
25 IPPC/A0025 C A UtilityWater
26 IPPC/A0026 C A SanitarySystem
27 IPPD/C0027 D CSupply ChilledWater
28 IPPD/C0028 D C Return Chilled
SADARA PROJECT D t N A554 R 730 IN GEN INT 001
7/25/2019 15.2.1-Interface Management Plan_ R3
28/31
SADARA PROJECT Document No. A554-R-730-IN-GEN-INT-001Revision: 3
SDL BUILDING CONSTRUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: TENDER
Contains Confidential Information of Both Dow and Saudi AramcoPage 28 of 31
Water
29 IPP 0029IntentionallyNotUsed
30 IPPD/C0030 D C PotableWater
31 IPP 0031IntentionallyNotUsed
32 IPPA/C0032 A C PotableWater
33 IPPA/C0033 A CReturn ChilledWater
34 IPPA/C0034 A CSupply ChilledWater
35
IP
P
0035
Intentionally
Not
Used
36 IPPD/C0036 D C SanitarySystem
37 IPPD/C0037 D C SanitarySystem
38 IPPD/C0038 D C PotableWater
39 IPPD/C0039 D C SanitarySystem
40 IPPD/C0040 D C SanitarySystem
41
IP
P
D/B
0041
D
B
Potable
Water
42 IPP 0042Intentionally Not
Used
43 IPPB/C0043 B C SanitarySystem
44 IPP 0044Intentionally NotUsed
45 IPP 0045 Intentionally Not
SADARA PROJECT Document No A554 R 730 IN GEN INT 001
7/25/2019 15.2.1-Interface Management Plan_ R3
29/31
SADARA PROJECT Document No. A554-R-730-IN-GEN-INT-001Revision: 3
SDL BUILDING CONSTRUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: TENDER
Contains Confidential Information of Both Dow and Saudi AramcoPage 29 of 31
Used
46 IPP 0046Intentionally NotUsed
47 IPP 0047Intentionally NotUsed
48
IP
P
0048
Intentionally Not
Used
49 IPP 0049Intentionally NotUsed
50 IPPB/A0050 B A SanitarySystem
51 IPPB/A0051 B A PotableWater
52 IPPB/A0052 B A CompressedAir
53 IPPC/A0053 C A PotableWater
54 IPPC/A0054 C A CompressedAir
55 IPPC/A0055 C A UtilityWater
56 IPPC/EW0056 C EW SanitarySystemMUSSALA&CAF4
57 IPPC/EW0057 C EW PotableWaterMUSSALA&CAF4
58 IPPD/BRINE0058 D BRINE SanitarySystem GATE4
59 IPPD/BRINE0059 D BRINE PotableWater GATE4
60 IPPD/EW0060 D EW PotableWater GATE5
61 IPPD/ICF0061 D ICF SanitarySystem GATE5
62 IPPD/ICF0062 D ICF SanitarySystem GATE7
63 IPPD/ICF0063 D ICF PotableWater GATE73
3
3
3
SADARA PROJECT Document No A554-R-730-IN-GEN-INT-001
7/25/2019 15.2.1-Interface Management Plan_ R3
30/31
SADARA PROJECT Document No. A554-R-730-IN-GEN-INT-001Revision: 3
SDL BUILDING CONSTRUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: TENDER
Contains Confidential Information of Both Dow and Saudi AramcoPage 30 of 31
64 IPPD/ICF0064 D ICF SanitarySystemPEDESTRIANSOUTH
65 IPPD/ICF0065 D ICF PotableWaterPEDESTRIANSOUTH
66 IPFB/A0001 B A Firewater
67IP
F
0002
Intentionally
NotUsed
68 IPF 0003IntentionallyNotUsed
69 IPF 0004IntentionallyNotUsed
70 IPF 0005IntentionallyNotUsed
71IP
F
B/C
0006
B
C
Firewater
72 IPFB/C0007 B C Firewater
73 IPF 0008IntentionallyNotUsed
74 IPF 0009IntentionallyNotUsed
75 IPFC/A0010 C A Firewater
76 IPFB/C0011 B C Firewater
77 IPF 0012IntentionallyNotUsed
78 IPF 0013IntentionallyNotUsed
79 IPF 0014 Intentionally
3
SADARA PROJECT Document No. A554-R-730-IN-GEN-INT-001
7/25/2019 15.2.1-Interface Management Plan_ R3
31/31
SADARA PROJECT Document No. A554 R 730 IN GEN INT 001Revision: 3
SDL BUILDING CONSTRUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: TENDER
Contains Confidential Information of Both Dow and Saudi AramcoPage 31 of 31
NotUsed
80 IPF 0015IntentionallyNotUsed
81 IPF 0016Intentionally NotUsed
82IP
F
0017
Intentionally Not
Used
83 IPFA/PREP0018Intentionally NotUsed
84 IPF 0019IntentionallyNotUsed
85 IPFB/C0020 B C Firewater
86 IPFB/A0021 B A Firewater
87IP
F
C/A
0022
C
A
Firewater
88 IPFB/C0023 B C Firewater
89 IPFC/EW0024 C EW Firewater 3