38
India’s Project Database Vol. 12 No. 20 l April 15, 2017 www.ProjectReporter.co.in Annual Subscription: `3500/- (Downloadable PDF) ® 148 Projects & Tenders

148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Embed Size (px)

Citation preview

Page 1: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

India’s Project DatabaseVol. 12 No. 20 l April 15, 2017www.ProjectReporter.co.in

Annual Subscription: `3500/- (Downloadable PDF)

®

148 Projects & Tenders

Page 2: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Offer Price 3999`

only

ASAPP Info Global Group Presents 4th Edition of A one stop source for business contacts of the power industry.

POWER INFOBANK is a practical database that contains:Listings of companies, organizations and associations Aprofileofthecompanies-theareasofbusiness,keyoperatingunits,subsidiaries,etc

Namesandcompletecontactdetailsofkeypersonnelofconstituentcompanies

Vitalsectordataandstatistics Power Sector project information

Thebuyers/usersofthisresourceguide/directorywouldbeallthestakeholdersofthepowersectorbeitpowergeneration,distributionandtransmissioncompanies,stateelectricityboards,fuelsuppliers,equipment/componentmanufacturers&suppliers,tenderingauthorities,internationalcompanies,investors,governmentagencies,embassies,construction&infrastructurecompanies,decisionmakers,andmanycompanieswhoaredirectlyandindirectlyrelatedwiththePowersectorinIndia.

Order your copy now, call +91 22 24193000 | 65267837/38or write to [email protected]

A-303,NavbharatEstate,ZakariaBunderRoadSewri(West),Mumbai-400015.Tel.:022-24193000.Fax:022-24175734To order online visit : www.ASAPPinfoGlobal.com/Subscribe

®

MRP ` 5000 only

Page 3: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 3 • April 15, 2017

Highlights

PROJECT SNO.SECTORIndia’s Project Database

India Opportunities � � � � � � � � � � � � � � � � � � � Pg 4Realty Zone � � � � � � � � � � � � � � � � � � � � � � � � � Pg 19Economic Statistics � � � � � � � � � � � � � � � � � � Pg 33Power Statistics � � � � � � � � � � � � � � � � � � � � � Pg 36Road Watch� � � � � � � � � � � � � � � � � � � � � � � � � Pg 37Road Projects � � � � � � � � � � � � � � � � � � � � � � � Pg 38

www.ProjectReporter.co.inPublished by: ASAPP Info Global Services Pvt Ltd, A-303, Navbharat Estates, Zakaria Bunder Road, Sewri (West), Mumbai-400 015. Tel: 022-24193000. Fax: 022-2417 5734.

Editor-in-Chief Pratap Vijay PadodeE-mail: [email protected]@ProjectReporter.co.in

Executive EditorSandeep Sharma*[email protected]

[email protected].: 022-2419 3000 / 6526 7838

Branch Offices• Delhi: Tel: 011 - 4131 5000 / 4656 1818• Bangalore: Tel: 080 - 4556 4556• Pune: Tel: 020 - 2605 2987 / 020-6602 5990• Chennai: 044 - 4299 1234

Representative OfficesAustria, Switzerland & Germany Gunter Schneider - [email protected]

*Responsible for selection of news under the PRB Act. All rights reserved. While all efforts are made to ensure that the information published is correct, PROJECT REPORTER holds no responsibility for any unlikely errors that might have occurred. Printed and Published by Tarun Pal on behalf of ASAPP Info Global Services Pvt Ltd. And Published from A-303, Navbharat Estates, Zakaria Bunder Road, Sewri (West), Mumbai-400 015. Editor : Pratap Vijay Padode.The information on products and projects on offer is being provided for the reference of readers. However, readers are cautioned to make inquiries and take their decisions on purchase or investment after consulting experts on the subject. PROJECT REPORTER holds no responsibility for any decision taken by readers on the basis of information provided herein. Subject to Mumbai Jurisdiction only.

Airport/Aviation � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(1, 74)ATC tower at Vadodara . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74Amusement Park � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(2, 63)Space theme park at Hyderabad . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63Bio-gas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(3)Canal/Dam/Irrigation � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � (75-77)Khadakwasla canal project. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75Chemicals & Fertilisers � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � (54)Construction � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � (4-8, 78)Seva sadan bldg at Viramgam . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4Technical bldg at Adampur . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8Convention Centre � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(9)Drugs/Pharma� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(10)Electrification � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(55)Freights & Logistics� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � (11)CFS in Kolkata . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11Housing � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(12)ICT � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(56)Industrial Estate � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(13)IT/ITES � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(57)Logistics Park� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(14)Lubricants � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(16)Metro Rail � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � (17, 18, 58, 64, 65, 79, 80)Mumbai Metro 3 corridor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17Mumbai Metro 7 project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79Mining � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(19, 20)Talaipalli mining project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20Oil & Gas � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(21, 59)Offshore contract from ONGC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59Petrochemical � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(22)Ports and Shipping � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(60)Power� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(23, 24, 66, 67, 81)1370 MW coal power project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23Pre-Engineered Building Systems � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(61)R&D Centre � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(25)Railways � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � (26-29, 68)Karad-Chiplun railway line . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29Real Estate � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(82)Roads/Highways/Bridges � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � (30-41, 83-86)Jind-Gohana-Sonepat road . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32Grade separator at Cyber Towers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41Escalator planned for 137 FOBs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83Cable stayed bridge at Durgam . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86Smart Cities � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � (42-44)IT MAC centre for Surat . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42Solar Energy � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � (45, 46, 69-72, 87)Solar micro grid project at Kalingapur . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 70Solar Panel � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(47)Telecom � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � (48-50, 88, 89)Mobile phone unit at Lonavala . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49Water Sector � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � (51-53)Adyar riverfront development . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52Wind Energy � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(62, 73, 90)Wind turbine order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62

PROJECTS ARE CLASSIFIED AS FOLLOWS:

Conceptual / Planning Stage (1 to 53)

Contract Award (54 to 62)

Project Update / Commissioned Project (63 to 73)

Project Under Implementation (74 to 90)

Realty Projects (91 to 99)

Consultancy Bids (100 to 108)

B2B Opportunities (109 to 124)

Industrial Projects (125 to 148)

Page 4: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 4 • April 15, 2017

AAI PLANS TAXI TRACK AT VADODARA AIRPORTAirports Authority of India (AAI) plans to set up the taxi track and extension of the basic strip at the Vadodara airport. The process to acquire 21 acre land has started. As of now there is only single runway at the airport, due to this another aircraft cannot land or take-off, till the time the landed aircraft occupies the runway. The taxi track would help to sort out this issue.

HAL TO MANUFACTURE KAMOV HELICOPTERS IN JV WITH RUSSIAN COMPANIES

India and Russia had finalised a broad agreement in October 2016 for the JV between Hindustan Aeronautics Ltd (HAL) and two Russian defence majors Russian Helicopters and Rosoboronexport. Russian Government

has recently approved the proposal to set up an Indo-Russian joint venture for production of Kamov military helicopters for India as part of $1 billion deal inked in 2015.

REVIVAL OF JEWAR AIRPORT PROJECTThe long proposed airport at Jewar in Greater Noida seems to be in the revival mode. Chief minister Yogi Adityanath has directed all concerned to get the required approvals and ensure that the project is completed at the earliest. The airport at Jewar was proposed 15 years back. Once the nod from the Civil Aviation ministry is in place, land would be acquired for the project. So far about 400 acre of land is marked for the project. The airport project is likely to boost the manufacturing units and other business located in Noida and Greater Noida.

HOUSING

LUCKNOW HOUSING PROJECT COMMENCESPradhan Mantri Awas Yojana aims to provide affordable housing units to urban dwellers. The first project under this scheme commenced in Lucknow. The project is spread over 10 acre land located on Kanpur Road, about 5-km from Amuasi airport. The work has already started. The project aims to complete around 2500 flats by 2020. The project will be a part of smart city township. All smart solutions like customer portal, traffic management system, Wi-Fi zone, PNG gas, iconic tower, open and green spaces, optical fibre accessibility will be accessible to the flat owners even in the LIG and EWS category.

INDIA OPPORTUNITIESAUTOMOBILE

VOLVO CONSIDERS ASSEMBLY PLANT IN INDIASwedish luxury car maker Volvo Auto India is contemplating plans to set up its assembly plant in India. The plant can cater to the growing demand for luxury cars as well help the company to cut out steep import duties.

KIA MOTORS PLANS MANUFACTURING FACILITY

Kia Motors is having plans to set up manufacturing unit in India. The company is close to finalizing the land deal with the Government of Andhra Pradesh government in this regard. As

per media reports, the company have chosen Sri City against the other locations like Pantnagar in Uttarakhand and Gujarat explored earlier. Investment to the tune of around Rs 5000 crore is targeted in first phase. Initially 20,000 cars per annum will be manufactured and it would be scaled up to 30,000 cars in the second phase.

AVIATION /AIRPORT

KUSHINAGAR AIRPORT DEVELOPMENT PROJECTGovernment of Uttar Pradesh is developing Kushinagar airport spread over 300 acre of land. Government of Uttar Pradesh has recently approved an additional sum of Rs 50 crore for the project. The overall budgetary amount approved so far is around Rs 120 crore. Funds would be used for the development of a 3 km-long runway, a taxi way, tarmac and a boundary wall. The works are likely to get over by July, 2017. The work on the air traffic control office construction is expected to start by the end of the year. To take this project forward in the absence of any private developer citing non-viability issues, the state government has now agreed to hand over construction of the terminal building to Airports Authority of India.

GUWAHATI AIRPORT UPGRADATION PROJECT

Upgradation of Guwahati airport is in the offing. The project comprises constructing a new passenger and cargo terminal at Guwahati airport. Assam Industry

Minister, Chandra Mohan Patwary has assured that the Union Ministry of Civil Aviation is likely to invest Rs 1000 crore for the project. Once the project is in place, the passenger handling capacity will increase. It is also proposed to build a warehouse facility in the airport.

Page 5: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 5 • April 15, 2017

India Opportunities

BDA TO CONSTRUCT 50,000 FLATS UNDER RAM GANGA AWASYA YOJNABareilly Development Authority (BDA) plans to construct 50,000 residential flats to accomodate around 2 lakh people under the Ram Ganga Awasya Yojna. The project will come up on 269 hectare of land. BDA is all set to construct 200 duplex flats on a 50 acre land to start with. Once the required resources are in place, the work will start. The project would also have a sewage treatment plant, parking facility, green plantation and a substation.

HYDRO POWER

NHPC COMMISSIONS FIRST UNIT OF PARBATI HEP, STAGE-II (4X200 MW)

Hydro power major has recently commissioned first unit of (4x200 MW) Parbati HE Project, Stage-II, located in District Kullu, Himachal Pradesh. Further tests of the unit are in progress. The water of Jiwa Nallah has been

diverted into main Head Race Tunnel through Drop Shaft for this task. Subsequently, spinning/testing of other Units are also to be achieved in a similar manner.

LAMINATES

RUSHIL DECOR TO COME UP WITH MDF UNIT AT ATCHUTAPURAMRushil Decor Ltd has decided to set up a unit for manufacturing medium-density fibre at Atchutapuram in Visakhapatnam. The new unit will have a capacity of 600 cubic metre per day. The project involves an outlay of Rs. 559 crore in a phased development.

MINING

NLC INDIA TO INCREASE LIGNITE MINING CAPACITYNLC India Ltd (NLCIL) plans to increase its lignite mining capacity to 62.15 million tonnes per annum (MTPA) by 2025, from its present capacity of 30.60 MTPA. S K Acharya, chairman and managing director, NLCIL, said the company registered robust growth y-o-y basis. Lignite production registered 8.49 per cent growth while power generation registered 14.06 per cent growth during the year.

OIL & GAS

H-ENERGY PROPOSES JHBDPL EXTENSION BY 80 KMH-Energy Pvt Ltd (HEPL) plans to extend the proposed 2,539-km Jagdishpur-Haldia and Bokaro-Dhamra pipeline (JHBDPL) by 80 km to evacuate gas from the company’s proposed LNG terminal off the Bengal coast. The company has submitted this request to the Centre. The estimated cost of the project is Rs. 12,940 crore with 40 per cent viability gap funding from the Centre.

ESSAR OIL PLANS DOUBLING OF PETRO PUMPSEssar Oil Ltd operates India’s second largest private sector refinery and has the largest private sector oil retail network. The company has reported robust growth across its refining and retail functions in FY 2016-17. The refinery throughput grew by almost 10% to 20.95 million tonne, compared to 19.10 million tonne in the previous fiscal. Retail sales went up by 75% to 2.8 million KL from 1.6 million KL in FY 2015-16. The retail network grew by almost 67%: Essar Oil had 3,499 operational outlets as on 31 March 2017, while 2,631 others were under various stages of implementation. At 2.8 million KL, the retail sales volume also increased significantly by 75%.Lalit Kumar Gupta, MD & CEO, Essar Oil, said: “This year, we achieved the highest ever throughput since the commencement of commercial operations at the Vadinar Refinery in May 2008. Our retail growth was quite remarkable and we received Platts’ Global Energy Award for Downstream Company of the Year in December. I congratulate the entire Essar Oil team for delivering such a stellar performance.”The company plans to double the number of petrol pumps targeting 5,600 in 12-18 months. Around Rs 1,200 crore is likely to be invested as per earlier media reports in the up gradation of certain units at the 20 million tonne Vadinar refinery in Gujarat.

REAL ESTATE

EZZY GROUP TO INVEST RS 800 CRORE IN REALTY PROJECTSEzzy Group has invested Rs 200 crore to develop 1 million square feet of luxury housing in Andalusia, Gallery Central and EzzyTower projects. In the next four years Rs 600 crore will be invested in the residential property market in Bengaluru.

ROADS/HIGHWAYS/BRIDGES

IMPROVEMENT ON MOHGAON TO KHAWASA SECTIONNational Highways Authority of India (NHAI) has currently invited bids through etendering from experienced firms/ organizations Short Term Improvement on Mohgaon to Khawasa section from Km 623.150 to Km 652.000 of NH-7 in the State of Madhya Pradesh. The project is estimated to cost Rs 1.38 crore.

FOUR LANING OF NH-6 STRETCH PASSING THROUGH KHAMGAONMinistry of Road Transport & Highways through National Highways Authority of India is engaged in the development of National Highways and as part of this endeavour, it has been decided to undertake Up-gradation of Four Laning of Old NH-6

Page 6: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 6 • April 15, 2017

India Opportunities

from Km. 296+000 to Km. 304+000 passing through Khamgaon City in the State of Maharashtra through an Engineering, Procurement and Construction (EPC) Contract. The completion is targeted in 12 months. The project is estimated to cost Rs 70.68 crore.

UPGRADATION OF NH-6 IN BOREGAON MANJU CITYNational Highways Authority of India (NHAI) has decided to undertake upgradation of NH-6 (AH-46) in Boregaon Manju City from Km.230.300 to Km.233.400 to four lanes with paved shoulder configuration in the state of Maharashtra through an Engineering, Procurement and Construction (EPC) Contract. The estimated cost of the project is Rs 33.51 crore. The completion is targeted in 12 months.

FLYOVER CONSTRUCTION AT BUTIBORI MIDC T-JUNCTIONThe Ministry of Road Transport & Highways through National Highways Authority of India is engaged in the development of National Highways and as part of this endeavour, it has been decided to undertake Construction of Flyover at Butibori MIDC T-Junction at Km.26.280 on NH-44 (Old NH - 7) in the State of Maharashtra through an Engineering, Procurement and Construction (EPC) Contract.

SMART CITIES

EOI INVITED FOR SMART BUS STOPS IN VIZAGGreater Visakhapatnam Municipal Corporation has invited expression of interest for designing, setting up, operating and maintaining of Smart Bus stops and Smart public toilets in Visakhapatnam Smart City in area based development on Public Private Partnership (PPP) Basis.

SMC PLANS TO SET UP 167 MLD STPSurat Municipal Corporation plans to assign the design, construction, erection, testing and commissioning of (i) Augmentation of existing Sewage Pumping Station, (ii) Augmentation of existing 66 MLD up to 167 MLD Capacity STP and (iii) 40 MLD net Output TSTP to generate Industrial grade water including operation and maintenance of all the above for 10 years period under Smart City, Surat.

NMCG APPROVES STP WORTH RS. 2100 CRORENational Mission for Clean Ganga has recently approved 26 projects at an estimated cost of Rs 2154.28 Crore under Namami Gange programme. New sewage treatment capacity to the tune of 188 million litre per day would be approximately created in the states of Uttar Pradesh, Jharkhand and Delhi. Using the sanctioned funds around 596 mld of existing STP capacity would be rehabilitated, 30 mld of existing STP capacity would be upgraded, interception and diversion works are likely to be undertake along with building sewerage network of 145.05 km. Sanctioned projects are as under:

Creation of new STP capacity and I&D works Sl.No

Name of the project town

Project Cost (Rs in Cr)

STP Capacity (MLD)

1 Haridwar (Jagjeetpur and Sarai)

273.37 82

2 Joshimath 48.43 3.783 Rudraprayag 13.15 0.5254 Karnaprayag 12.09 0.155 Kirtinagar 4.23 0.66 Rishikesh 158.01 277 Muni Ki Reti 80.45 12.58 Chamoli, Gopeshwar 61.63 4.379 Badrinath 18.24 1.0110 Srinagar 22.51 111 Nandprayag 6.46 1.512 Ramana, Varanasi 150.95 5013 Rajmahal 50.23 3.5 Total 899.75 187.935

Rehabilitation of existing STP capacity14 Jagjeetpur,Haridwar 14.6 2715 Vrindavan 33.82 516 Okhla, Delhi 665.78 564 Total 714.2 596

Up gradation of existing STP capacity17 Tapovan, Rishikesh 2.19 3.5

18 Uttarkashi 10.03 2

19 Sarai,Haridwar 9.63 18

20 Swargashram 4.52 3

21 Srinagar-Garhwal 15.41 3.5

Total 41.78 30I&D Works

22 Jagjeetpur, Zone A, B, C, D, E of Haridwar

85.14

23 Sarai, Zone F in Haridwar 31.46

Total 116.6 Sewerage Network

24 Karmalichak, Patna 277.42 96.54

25 Replacement of rising mains in Kondli

59.13 8.14

26 Rising main from Bharat Nagar to Pitampura

45.4 6.16

Total 381.95 145.05

Under Namami Gange Programme, 100% central funding is being made for new projects. The completion of these projects will help in reducing the pollution load on the river Ganga as discharge of untreated effluent is one of the major source of pollution in river Ganga.

**Images used are for illustration purpose only.

Page 7: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

PROJECTS

CONCEPTUAL / PLANNING STAGE

Page 8: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 8 • April 15, 2017

*Figures are approximate ( `. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Conceptual/Planning Stage

1 Maharash-tra Airport Develop-ment Company Ltd (MADC)

The Greenfield airport project at Pune may come up in Purandar taluka. The project would take at least five years to be operational.

Pune Maharashtra

NA Atul R.Thakare, Marketing Manager, 8th Floor, World Trade Centre, Cuffe Parade, Mumbai - 400005, Maharash-tra. T: 022-49212121, 49212122, 49212109, F: 22163814, [email protected], (Vishwas Patil, Vice-Chairman and Managing Director)

Airport/Aviation

2 Wonderla Holidays Ltd

Amusement parks operator plans investment in the Chennai park proposed to come up on 50-acre site near Mahabalipuram. As of now land acquisition is on the verge of comple-tion.

Chennai Tamil Nadu

350.00 Bimalendu Tarafdar, Head (Market-ing), 28th km, Mysore Road, Banga-lore-562109, Karnataka. T: 080-22010333-322, [email protected], (Arun K Chittilappilly, MD)

Amuse-ment Park

3 Panvel Municipal Council (PMC)

Plans to revive the defunct 5 MT bio-gas plant located in the market yard area on Uran road. Tender will be floated soon.

Navi Mumbai Maharashtra

0.25 Mangesh Chitle, Additional Commissioner, Old Panvel, Panvel, Navi Mumbai-410206, Maharashtra. T: 022-27458040, (Rajendra Nimbalkar, Commissioner)

Bio-gas

4 Viramgam Nagarpalika

Plans to assign the construction of New Nagar Seva Sadan bulding for Viramgam Nagarpalika. The comple-tion is targeted in 12 months.

Viramgam Gujarat

1.99 Chief Officer, Viramgam Nagarpalika, Nr.Sereswar Gate, Koteswari Plot, Nagar seva sadan, Viramgam, Gujarat. T: 02715-231210, 9067819234

Construc-tion

5 Haryana Public Works Department (B & R)

Plans to assign the construction of Government College for Women at Village Unhani (Kanna) in Mohinder-garh District.

Mohinder-garh District. Haryana

11.23 D.V.S. Dahiya, Superintending Engineer, PWD B & R Branch, Rewari circle, Ghari Bolni Road, Re-wari-123401, Haryana. T: 01274-256936, M: 9416051055, [email protected]

Construc-tion

6 Public Works Depart-ment, Bhopal

Plans to undertake construction / renovation / re-construction of composite building for Directorate for Education Department at Bhopal.

Bhopal Madhya Pradesh

1.80 Shashikant Nimade, Chief Architect, PWD, Nirman Bhawan, Bhopal, Madhya Pradesh. T: 0755-2555297, 2551372, [email protected]

Construc-tion

7 State Bank of India (SBI)

Construction of multi storied bank’s buildings (Office/Residence) at different places of Odisha.

Odisha NA Assistant General Manager, (Premises & Estate), PT.J.N.Marg, Bhubaneswar-751001, Odisha. T: 0674-2394637, 2392402, 2392281, F: 2396696, [email protected]

Construc-tion

8 Military Engineer Services (MES)

Construction of three technical buildings at AF station Adampur.

Adampur Punjab

Punj Bhardwaj, CWE (AF) Wac Palam, Delhi Cantt-110010, Delhi. T: 011-25675321, F: 25671907

Construc-tion

9 Department of industrial policy and promotion (DIPP)

DIPP is finalising a proposal to set up the SPV for building India's largest exhibition cum convention centre in Delhi. DIPP along with Niti Aayog, the urban development ministry and the departments of economic affairs and expenditure would be the partners in the SPV. The convention centre will have 6,000 seating capacity, 10 exhibition halls, 3,500 hotel rooms and retail space.

Delhi 26000.00 Chandradeep Kumar Jha, Director, Udyog Bhawan, New Delhi-110011, Delhi. T: 011-23063345, 23062318, 23061204/23061222-29, [email protected]

Convention Centre

10 Aurobindo Pharma Ltd

Plans to expand its Active Pharmaceu-ticals Ingredients (API) manufacturing capacity at its existing plant in Ranasthalam mandal in Srikakulam district.

Srikakulam District Andhra Pradesh

250.00 Dr Vijay Kaiwar, Head Business Development - CRAMS, APL Research Centre-2, Survey No. 71 & 72, Indrakaran Village, Sanga Reddy Mandal, Medak District-502329, Telangana. T: 8455223700, [email protected]

Drugs/Pharma

Page 9: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 9 • April 15, 2017

*Figures are approximate ( `. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Conceptual/Planning Stage

11 Allcargo Logistics Ltd

Plans to set up a container freight station (CFS) in Kolkata which would involve investment of Rs 40 crore for land in the current fiscal.

Kolkata West Bengal

NA Pramod Kokate, Chief Commercial Officer, Avvashya House, 3rd Floor, CST Road, Kalina, Santacruz (East), Mumba -400098, Maharashtra. T: 022-66798100, F: 022-66798185, [email protected], (Prakash Tulsiani, Executive Director)

Freights & Logistics

12 Central Public Works Department (CPWD)

Plans to assign the construction of 32 nos. Type-II residential quarter at 54th Bn. ITBP, Bhalukpong, Assam including water supply, sanitary installations and internal electrical installation.

Tezpur Assam

5.85 Executive Engineer, ER-ADG (ER), II-NEZ, I - Guwahati Circle II, Tezpur, Assam. T: 03712-222585, 222658, F: 222658, [email protected]

Housing

13 Chhattis-garh State Industrial Develop-ment Corporation Ltd

Infrastucture development works including, roads, drainage, culverts, water supply system & street light for the proposed New Industrial area/IIDC at Lakhanpuri, Tahsil- Charama, Distt-Kanker at (C.G.).

Kanker district Chhattisgarh

30.33 Executive Engineer, 1st Floor, Udyog Bhawan, Ring Road No.1, Telbandha, Raipur-492006, Chhattisgarh. T: 0771-6002071,72,73, F: 2583794, [email protected]

Industrial Estate

14 Surat Municipal Corporation (SMC)

The civic body plans to build a logistic park on the outskirts of the city at Haripura village. The project would be taken up under Smart City mission of the central government alongside the National Highway 8.

Surat Gujarat NA J M Patel, Deputy Commissioner (Planning & Development), Surat Mahanagar Seva Sadan, Gordhandas Chokhawala Marg, Muglisara, Surat - 395003, Gujarat. T: 0261-2420073 (PABX - 256), M: 9724345006, [email protected]

Logistics Park

15 Allcargo Logistics Ltd

Plans to set up a logistics park at Jhajjar in the state of Haryana. Land is likely to be acquired at Rs 200 crore.

Jhajjar Haryana

200.00 Pramod Kokate, Chief Commercial Officer, Avvashya House, 3rd Floor, CST Road, Kalina, Santacruz (East), Mumbai -400098, Maharashtra. T: 022-66798100, F: 022-66798185, [email protected], (Prakash Tulsiani, Executive Director)

Logistics Park

16 Petronas Lubricants Interna-tional (PLI)

The manufacturing and marketing arm of the Malaysian National Oil Corpora-tion plans investment towards setting up a lubricants plant with 110 million litre capacity in Patalganga.

Raigad District Maharashtra

NA Petronas Lubricants (India) Pvt Ltd, Business Point, 2nd Floor, 204- 205, Western Express Highway, Andheri East, Mumbai – 400069, Maharash-tra. T: 022-67717500.

Lubricants

17 Mumbai Metro Rail Corporation (MMRC)

Plans to start the tunnelling work for the 33.5-km long Metro 3 corridor from October 2017. The metro line from Colaba in the southern tip of the megapolis to Seepz (Andheri) in the north. The MMRC hopes build 200 metres of tunnels every day.

Mumbai Maharashtra

23136.00 S.K. Gupta, Director (Projects), NaMTTRI Building, Plot No. R-13, ‘E’- Block, Bandra Kurla Complex, Bandra (East), Mumbai 400051. T: 022-26384604, [email protected], [email protected]. (Ashwini Bhide, Managing Director)

Metro Rail

18 Department of Trans-port, Govern-ment of Uttar Pradesh

The state government is contemplating plans for a metro rail corridor in Gorakhpur.

Gorakhpur Uttar Pradesh

NA K. Ravinder Naik, Transport Commis-sioner, Tehri Kothi, M. G. Road, Lucknow - 226001, Uttar Pradesh. T: 0522-2613978, 2629235, M: 8005441001, [email protected]

Metro Rail

19 Bharat Aluminium Company (Balco)

Vedanta-controlled company plans to expand bauxite production at Mainpat in Surguja district of Chhattisgarh. It is proposed to increase the production capacity from 750,000 tonne per annum to 2.25 million tonne per annum (mtpa).

Surguja District Chhattisgarh

NA Ashish Dilwaria, Asso General Manager - Corporate Affairs, 7, 2nd & 3rd Floor, Core 6, Scope Office Complex, Lodhi Road, New Del-hi-110003, Delhi. T: 011-49166200, 24360091, M: 9811478100

Mining

Page 10: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 10 • April 15, 2017

*Figures are approximate ( `. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Conceptual/Planning Stage

20 NTPC Ltd Plans investment in Talaipalli project located in Raigarh district for mining 18 million tonne of coal per annum. The commercial production from Talaipalli block is targeted by November, 2019.

Raigarh District Chhattisgarh

3004.00 Deepna Mehta, DGM-Corp Comm, NTPC Bhawan, Scope Complex, 7, Institutional Area, Lodi Road, New Delhi- 110003. Delhi. T: 011-24387195, 24368283, 24360100, F: 24361018, M: 9650990565, [email protected], [email protected], (A K Jha, Director Technical)

Mining

21 ONGC Ltd Plans investment in its three allotted block in the Krishna-Godavari basin. The deepwater block, KG-DWN-98/2 is divided into clusters I, II and III. Expression of interest (EoI) is invited from international consultants and service providers for developing Cluster-III.

Offshore 65000.00 Pallab Bhattacharya, Chief of Corporate Communications, Pandit Deen Dayal Upadhyay Urja Bhavan, 5A, Nelson Mandela Marg, Vasant Kunj, New Delhi-110070, Delhi. T: 011-26752021, F: 26129091, M: 7042693999, [email protected], (Tapas Kumar Sengupta, Director-Offshore)

Oil & Gas

22 Reliance Industries Ltd (RIL)

Plans expansion and debottlenecking of its Dahej petrochemical facility in Gujarat. The environment clearance is in place.

Bharuch district Gujarat

13250.00 Tushar Pania, Vice President (Corporate Communication), Makers Chambers - IV, Nariman Point, Mumbai - 400021, T: 022-22785000, F: 22785185, M: 9820088536, [email protected]

Petrochem-ical

23 NLC India Ltd

Plans to acquire GMR Group’s 1,370 MW coal power project in Chhattis-garh. Consultants will be hired soon to advise further.

Chhattisgarh NA P Selvakumar, Director, Block - 1, Neyveli - 607801, Cuddalore District, Tamil Nadu. T: 04142-252496, 252280, [email protected], (Dr. Sarat Kumar Acharya, MD)

Power

24 NLC India Ltd

Plans to acquire Hyderabad-based Ind-Barath Power Infra Ltd’s 700 MW plant in Odisha. Consultants will be hired soon to advise further.

Odisha NA P Selvakumar, Director, Block - 1, Neyveli - 607801, Cuddalore District, Tamil Nadu. T: 04142-252496, 252280, [email protected], (Dr. Sarat Kumar Acharya, MD)

Power

25 Panasonic India Pvt Ltd

Consumer electronic major plans to set up R&D unit in Bengaluru in associa-tion with Tata Elexi.

Bengaluru Karnataka

NA Radhika Kalia, Associate Director-Corporate Affairs & CSR, 12th Floor, Ambience Island, Nh-8, Gurgaon -122002, Haryana. T: 0124-4751300, 4596600, F: 4751333, M: 9560498767, [email protected]

R&D Centre

26 East Coast Railway

Plans to undertake development Of Visakhapatnam Railway Station. The project comprises upgrading the level of passenger amenities by new construction / renovation and include redevelopment of station buildings, platform surfaces, circulating area, etc. Request for qualification and technical proposal is invited.

Visakhapat-nam Andhra Pradesh

200.00 1) Sanjiv Garg, Divisional Railway, Manager (Engg.), Khurda Road, Khurda, Odisha. T: 0663-2490567, 0674-2490567, 2490567, [email protected] 2) Chief Engineer / Planning, Rail Sadan, Chandrasekharpur, Bhubaneswar - 751017, Odisha.

Railways

27 Indian Railways

Plans to take up construction of Kolhapur-Vaibhavwadi railway line on priority. Indian Railways also proposes to extend this line to the Vijaydurg port.

Kolhapur Maharashtra

NA Ved Prakash, Director (Information & Publicity), Rail Bhavan, Raisina Road, New Delhi-110001, Delhi. T: 011-23381224, M: 9810039038, [email protected]

Railways

28 JWS Jaigarh Port Ltd

The port has signed a memorandum of understanding with the Konkan railway to construct a rail line that will connect the port with Dingni railway station. Jaigarh port is estimated to invest Rs 770 crore out of the overall project cost of Rs 1,100 crore.

Jaigarh Maharashtra

1100.00 Rupesh Chaudhari, Dy. Manager (Purchase), JSW Centre, Bandra Kurla Complex, Near MMRDA Grounds, Bandra East, Mum-bai-400051, Maharashtra. T: 022-42861000, F: 42863000, [email protected], [email protected] (Bhartula VJK Sharma, MD)

Railways

Page 11: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 11 • April 15, 2017

*Figures are approximate ( `. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Conceptual/Planning Stage

29 Konkan Railway Corporation Ltd

Karad-Chiplun railway line announced in the last railway budget has moved forward. The Government of Maha-rashtra and the Konkan Railway Corporation Ltd have roped in a private sector partner for the construction of this line and MOU was signed in this regard on August 14, 2016 in Mumbai.

Karad Maharashtra

NA T K Dinesh Kumar, General Manager (Infra), Belapur Bhavan, Plot No 6,Sector 11, CBD Belapur, Navi Mumbai-400614, Maharashtra. T: 022-27587359, 27572015-18, [email protected], (Sanjay Gupta, Interim CMD and Director of Operations)

Railways

30 Ministry of Road Transport and Highways

Plans to convert the existing Guwahati bypass from Khanapara to Jalukbari into a six lane highway.

Guwahati Assam

NA Sudip Chaudhary, Chief Engineer (Planning), Transport Bhawan, 1, Parliament Street, New Delhi-110001, Delhi. T: 011-23739027, [email protected]

Roads/Highways/Bridges

31 Haryana PWD (B & R)

Bhiwani-Hansi-Barwala-Tohana-Punjab border road upgradation project on NH-148B involves six-laning of the road stretch.

Bhiwani Haryana

NA P K Bagari, Executive Engineer (Bhiwani), Haryana PWD B&R, Sector 19-B, Chandigarh-160019, Haryana. T: 0172-2568063, 01664-242436, M: 9991143543

Roads/Highways/Bridges

32 Haryana PWD (B & R)

Jind-Gohana-Sonepat road upgrada-tion project on NH-352A. The project comprises six-laning of Jind-Gohana-Sonipat stretch covering 85.9 km. DPR will be prepared in next month.

Chandigarh Haryana

NA Bhupender Singh EE(PI), Sector 19-B, Chandigarh-160019, Haryana. T: 0172-2568063, 0130-2244690, M: 9467807464 , [email protected] (Rakesh Manocha, Engineer-in-Chief)

Roads/Highways/Bridges

33 Haryana Public Works Department

Plans to assign the construction of high level bridge having 9 span 21 m each over Markanda River crossing link road from NH-72 to Galouri in Yamuna Nagar District.

Yamuna Nagar District Haryana

11.60 Sandeep Goyal, Executive Engineer, Provl. Divn. PWD B&R Br.Narain-garh-134203, Haryana. T: 01734-284035, M: 9417200394, [email protected]

Roads/Highways/Bridges

34 Department of Transport and Public Works, Jammu and Kashmir

Plans renovation and widening of important Hasti-Sarthal Devi Ji Road under CRF

Jammu & Kashmir

20.00 Tariq Ahmad Khan, Director Planning, PWD R&B Jammu, Jammu & Kashmir. T: 0191-42506167, 2566075, M: 9419033434, [email protected]

Roads/Highways/Bridges

35 State Highways Authority of Jharkhand

Plans to assign strengthening and widening / reconstruction of the Chattarpur-Japla (MDR-127) road to two lane with paved shoulder on EPC mode.

Japla Jharkhand

97.42 S K Sinha, Member (Technical), Booty Road, Ranchi-834008, Jharkhand. T: 0651-2361306, 2400747, F: 2400239, [email protected]

Roads/Highways/Bridges

36 National Highways Authority of India (NHAI)

The work on the proposed 262-km-long, six-lane, access-controlled Chennai- Bengaluru Expressway project is likely to begin by March, 2018.

Bengaluru Karnataka

NA R. K. Suryawanshi, Project Director, Survey No.13. Nagasandra Village, 14th Km. Bangalore-Tumkur Road, Hesaragatta, Bangalore - 800073, Karnataka. T: 080-28394403, M: 9686841639, [email protected]

Roads/Highways/Bridges

37 Brihan-mumbai Municipal Corporation

Plans to build coastal road. Approval received from the ministry of environ-ment and forests recently.

Mumbai Maharashtra

15000.00 Pawar Ashok Padamsingh, Chief Engineer-Road, Transport & Bridges, 134 E, Shahid Bhagat Singh Road, Near Amar Building, A Ward Office, Fort, Mumbai - 400001, Maharashtra. T: 022-22607000, [email protected], [email protected], (Ajoy Mehta, Municipal Commissioner)

Roads/Highways/Bridges

38 Mumbai Metropoli-tan Region Develop-ment Authority (MMRDA)

Plans to assign the widening and improvement of BKC Junction at CST Road.

Mumbai Maharashtra

NA P. D. Mamdapure, Engineer-in-Chief, Engineering Division, 2nd Floor, A wing Bandra Kurla Complex Bandra (East), Mumbai -400051. T: 022-26594034, 26594000, [email protected]

Roads/Highways/Bridges

Page 12: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 12 • April 15, 2017

*Figures are approximate ( `. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Conceptual/Planning Stage

39 Rajasthan Public Works Department

Plans to widen road from Keer ki Chowki to Fatehnagar that connects NH 27 to SH 9.

Udaipur district Rajasthan

60.30 Anil Garg, Chief Engineer (NH), Chief Engineer Office, Jacob Road, Jaipur-302006, Rajasthan. T: 0141-5110502, 5110570, M: 7742453586, [email protected]

Roads/Highways/Bridges

40 Jaipur Develop-ment Authority (JDA)

JDA has recently approved the construction of the underpass, proposed between SMS Hospital and the trauma care centre across the road.The work is likely to begin soon.

Jaipur Rajasthan

15.00 V M Johari, Executive Engineer-ROB/RUB II, Room No.CCC-TF-301, CCC Building, Ram Kishore Vyas Bhavan, Indira Circle, Jawaharlal Nehru Marg, Jaipur-302004, Rajasthan. T: 0141-2575151,2575252, M: 9929099416

Roads/Highways/Bridges

41 Greater Hyderabad Muncipal Corporation

Plans to assign the construction of elevated rotary cum grade separator at Cyber Towers junction including widening and strengthening of existing AT-grade road under engineering, procurement and construction (EPC)/turnkey basis.

Hyderabad Telangana

NA R. Sreedhar, Superintending Engineer (Projects-WZ), Tank Bund Road, Hyderabad, Telangana. M: 9849006071, [email protected], www.ghmc.gov.in

Roads/Highways/Bridges

42 Surat Smart City Develop-ment Ltd

Construction of IT MAC Centre regarding Smart City Project at T.P.S.NO.36 (Althan), F.P. No 01, Surat.

Surat Gujarat 17.08 C Y Bhatt, General Manager, South Zone, Vahivati Bhavan, Udhna main Road, Opp. Satyanagar, Udhna, Surat-394210 , Gujarat. T: 0261-2278429, 2423751-56, M: 9727740899

Smart Cities

43 Mumbai Metropoli-tan Region Develop-ment Authority (MMRDA)

Plans to convert Bandra-Kurla Complex (BKC) into a smart city.

Mumbai Maharashtra

NA P. D. Mamdapure, Engineer-in-Chief, Engineering Division, 2nd Floor, A wing Bandra Kurla Complex Bandra (East), Mumbai -400051. T: 022-26594034, 26594000, [email protected]

Smart Cities

44 Jaipur Smart Mission Ltd (JSML)

Plans to introduce Smart Passenger Information System for Jaipur. The system once installed will benefit commuters to get real time information about JCTSL buses schedule, seat availability, current location, information on Satellite cabs and Jaipur metro transport.

Jaipur Rajasthan

22.00 Sandesh Nayak, IAS, CEO, JMC Building, Pt Deendayal Upadhyay Bhawan, Lalkothi, Tonk Road, Jaipur-302016, Rajasthan. T: 0141-2741346, 2741347, [email protected]

Smart Cities

45 Sagar Cements Ltd

Plans to install 1-MW solar-based captive power plant. Funding planned through borrowings and internal accruals. The commissioning is targeted by June 2017.

Suryapet District Telangana

4.70 Sreekanth Reddy, Executive Director, Plot No. 111 , Road No. 10, Jubilee Hills, Hyderabad - 500033. T: 040-23351571, F: 23356573, M: 9848090286, [email protected] (S Veera Reddy, MD)

Solar Energy

46 Kolkata Municipal Corporation (KMC)

The Parks and Square department of the Corporation plans to illuminate 16 major parks in the city with solar lights. West Bengal government has sanc-tioned Rs 52 crore in this regard. As part of first phase, the solar plants will come up at Desbandhu Park, Santosh Mitra Square, College Square, Md Ali Park, Maddox square, Subhas Sarobar Park among others. The work is likely to start soon.

Kolkata West Bengal

52.00 Somnath Sen, Deputy Chief Engineer, 5, Surendra Nath Banerjee Road, Esplanded, Taltala, Kolkata-700014, West Bengal. T: 033-22861000

Solar Energy

47 Ganges Internation-ale Pvt Ltd

Solar panel mounting structure manufacturer expand its facility to cater to project developers in northern India. The company is looking to expand its existing 1-GW capacity by another 400 MW through the proposed facility.

Pune Maharashtra

40.00 Raja K, Marketing Manager, 163/1, K & Sons Complex, Broadway, Prakasam Road, Chennai-600108, Tamil Nadu. T: 044-25240393, 0413-2678366, [email protected], [email protected]

Solar Panel

Page 13: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 13 • April 15, 2017

*Figures are approximate ( `. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Conceptual/Planning Stage

48 Syntech Technology Pvt Ltd (Gionee)

Smartphone manufacturer Gionee plans to set up its own manufacturing plant at Faridabad spread over 50 acre.

Faridabad Haryana

500.00 Rakesh Sharma, (Manager Corporate),Office No.-309 and 310, 3rd floor, DLF Tower-B, plot No-11, District Centre, Jasola, New Delhi -110025. T: 011-41650410, [email protected] (Arvind Vohra, CEO and MD)

Telecom

49 Magicon Impex Pvt Ltd (Jivi Mobiles)

Plans to set a new manufacturing unit for producing mobile phone at Lonavala. The production capacity would be around 5 lakh units per month.

Lonavala Maharashtra

200.00 Santosh Tiwari (HR & Admin), B-1/625,Janakpuri, New Delhi - 110058. T: 011-25552294, 25552295, 41045357, [email protected], santosh [email protected] (Pankaj Anand, CEO)

Telecom

50 Lenovo-Motorola

Lenovo-Motorola combine plans to set up a manufacturing unit for mobile phones.

NA NA Kumersan, Facility Manager, R S No 19/1 A & 2 A, Cuddalore Main Road, Thavalakuppam, Pondicherry - 605007, UT. T: 0413-2619400, 2619491, M: 7094205710, [email protected], (Dillon Ye, Head Business)

Telecom

51 Bruhat Bangalore Mahana-gara Palike

Plans to undertake development of Devarabeesanahalli Lake, Siddapura Lake & Panathur Lake.

Bangalore Karnataka

9.90 B V Satish, Chief Engineer (Lakes) BBMP, 308, 3rd Floor, Annex Building-3, Head Office Premises, N.R. Square, Bangalore-560002, Karnataka. T: 080-22975520, 22975582

Water Sector

52 PWD, WRD, Govern-ment of Tamil Nadu

Plans to undertake Adyar River makeo-ver project comprising riverfront development, plantation of native species, plugging of sewage outfalls, modular sewage treatment plants, walkways and cycle tracks. The detailed project report for the river restoration from the origin to Thiru-Vi-Ka Bridge is ready.

Chennai Tamil Nadu

1666.00 Bakthavathsalam, Superintending Engineer, Palar Basin Circle, Water Resources Organisation, Chepauk, Chennai - 600005. Tamil Nadu. T: 044-28591231, 28410402, 28410403, F: 28591231, [email protected]

Water Sector

53 Vadodara Municipal Corporation

The civic body is undertaking develop-ment of Tarsali Lake in Vadodara City. The completion period is 12 months.

Vadodara Telangana

3.85 Paresh Patel, Executive Engineer, Futuristic Planning Cell, Vadodara, Gujarat. M: 9879619935, [email protected]

Water Sector

Contract Award54 Loyal

Equipments Ltd

Bagged an order from Engineers India Ltd for Ramagundam Fertilizer and Chemical Ltd for the supply of KO drum and inter stage separator.

Karimnagar Telangana

1.01 Vinay Yadav, Manager - Application, Block No. 35/1-2-3-4, Village ZAK, Taluka Dahegam - 382330, Ahmedabad, Gujarat. T: 02718-247236, F: 269033, M: 9099039354, [email protected]

Chemicals & Fertilisers

55 IL&FS Engineering and Construc-tion Company

Bagged an order for rural electrification works from Jharkhand Bijli Vitran Nigam for Sahibganj and Pakur districts.

Pakur District Jharkhand

222.70 Tarun Udwala, Head (Corporate Communications), Door No. 8-2-120/113/3, 4th Floor, Sanali Info Park, Road No. 2, Banjara Hills, Hyderabad-500033, Telangana. T: 040-40409333, F: 40409444, [email protected], [email protected]

Electrifica-tion

56 Bharat Sanchar Nigam Ltd

The Government of Karnataka awarded a contract to BSNL for providing broadband connection for five years.

Karnataka 186.00 M M C Sharma, Asst. General Manager (PR), Harish Chandra Mathur Lane, Janpath, New Del-hi-110001, T: 011-23372424, 23766139, [email protected], [email protected]

ICT

Page 14: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 14 • April 15, 2017

*Figures are approximate ( `. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Contract Award

57 Wipro Ltd Bagged contract from Government of Karnataka for establishing a State information highway connecting its 10,000 offices across the State under the Karnataka State Wide Area Network (KSWAN-2).

Karnataka 615.00 Gitanjali Sreepal, Sr Executive (Corporate Communications), Doddakannelli, Sarjapur Road, Bangalore-560035, T: 080-39918018, 28440011, F: 28440256, [email protected], (Azim Premji, Chairman)

IT/ITES

58 Richa Industries Ltd

Bagged an order from Delhi Metro Rail Corporation for constructing the Six Elevated Metro stations on Mukund-pur-Shiv Vihar Corridor and Depot cum Workshop of Jahangirpuri-Badli Corridor Phase III of Delhi MRTS. T

Delhi 35.00 Ranju Rai, Manager (Corp Comm), Plot No-29, DLF Cyber Industrial Area, PH-II, Faridabad-121003, Haryana. T: 0129-4009262, 4133968, M: 9718999257, [email protected]

Metro Rail

59 L&T Hydrocar-bon Engineering

Bagged an offshore project from state-run ONGC related to Neelam Re-Development & B173AC. The project, part of ONGC’s strategy aims to enhance the field life and increase recovery of Neelam field, is scheduled to be completed by April 2019.

Offshore 1656.00 Pallabh Dev, Business Dvelopment Manager, L&T Knowledge City, Ground Floor, West Block-I, N.H.8, Vadodara-390019, Gujarat. T: 0265-2451095, [email protected]

Oil & Gas

60 Essar Ports The company has won bid from Kolkata Port for LNG terminal and storage facility at Haldia port in West Bengal.

Haldia West Bengal

Manish Kedia, Senior VP – Corporate Affairs, Essar House 11, Keshavrao Khadye Marg, Mahalaxmi, Mumbai – 400034, Maharashtra. T: 022-66601100, M: 9819730092, [email protected]

Ports and Shipping

61 Pennar Engineered Building Systems Ltd

The company engaged in manufacture and erection of steel products has recently bagged orders from Hetero Drugs, Amplus Energy Solution, MELPL, S G Pharma, Shahi Exports among others.

Multiple 152.00 Sr. General Manager-Sales & Marketing, 9th Floor (West Wing), DHFLVC Silicon Towers, Kondapur, Hyderabad - 500084. T: 040-40210525-26, M: 9849797397, 9704444612, [email protected], [email protected], (P V Rao, Managing Director)

Pre-Engi-neered Building Systems

62 Suzlon Group

Bagged an order of 50.4 MW to supply 24 units of its S111 turbines of 120 meters from a power producer for its project in Karnataka.

Karnataka NA Viswakumar Menon, Vice President (Cop Comm), One Earth, Hadapsar, Pune-411028, Maharashtra. T: 020-61356135, F: 67022100, M: 9820069928, [email protected], (J P Chalsani, CEO)

Wind Energy

Project Update / Commissioned Project63 Wonderla

Holidays Ltd

Amusement parks operator is awaiting necessary clearances for commission-ing a space theme ride based on virtual reality in Hyderabad park.

Hyderabad Telangana

40.00 Bimalendu Tarafdar, Head (Market-ing), 28th km, Mysore Road, Banga-lore-562109, Karnataka. T: 080-22010333-322, [email protected], (Arun K Chittilappilly, MD)

Amuse-ment Park

64 Bangalore Metro Rail Corporation Ltd (BMRCL)

Plans to complete Phase II Metro line from Baiyappanahalli to Whitefield covering of 72 Km by 2020. The demolisation of structure to make way has started. The contract would be awarded soon and works are likely to start in two months. Fourteen mtro stations are planned at Jyotipuram, KR Puram, Mahadevpura, Garudachar-palya, Doddanekundi Industrial Area, Visvesvaraya Industrial Area, Kundala-halli, Vaidehi Hospital, Satya Sai Hospital, ITPL area, Kadugodi Area, Ujwala Vidyalaya and Whitefield.

Bengaluru Karnataka

NA U.A.Vasanth Rao, Chief Public Relations Officer, 3rd Floor, BMTC Complex, K.H.Road, Shanthinagar, Bangalore- 560027, Karnataka. T: 080-22969300, 22969301, [email protected], (Pradeep Singh Kharola, IAS, MD)

Metro Rail

Page 15: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 15 • April 15, 2017

*Figures are approximate ( `. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Project Update / Commissioned Project

65 Maharash-tra Metro Rail Corporation (Maha Metro)

Maha Metro is a JV formed between the Centre and Maharashtra govern-ment. The JVC is executing Pune Metro project. The first phase has two corridors - a 16.59-km line from PCMC to Swargate and 14.93 km from Vanaz to Ramwadi. The project comprises elevated corridor except 5 km running underground with 31 stations in all. Bids have been invited for the design and construction of elevated viaduct of length 7.150 km of the east-west Corridor between Vanaz and Civil Court. The opening of bids is targeted in May, 2017.

Pune Maharashtra

NA Srinivas Bonala, Aditional City Engineer Projects, PMC Building, Near Mangla Theatre, Shivajinagar, Pune-411005, Maharashtra. T: 020-25506659, 25501000, 25506657, F: 25501104, M: 9689931380, [email protected]

Metro Rail

66 Bharat Heavy Electricals (BHEL)

The company has recently com-menced the commercial operation of its second 800 MW supercritical unit at 2x800 MW Yeramarus Thermal Power Station (TPS) of Raichur Power Corporation Ltd (RPCL) in Raichur district of Karnataka.

Raichur District Karnataka

NA Rohit Singh, DGM-Corp Comm, BHEL House, Siri Fort, New Delhi-110049. T: 011-23365669, 23742017-20, F: 26493021, M: 9910997301, [email protected], (Atal Saraya, Director-Power)

Power

67 Bharat Heavy Electricals (BHEL)

The company has recently commis-sioned 500 MW Unit 6 of NTPC's Feroze Gandhi Unchahar Thermal power plant in Uttar Pradesh.

Unchahar Uttar Pradesh

NA Rohit Singh, DGM-Corp Comm, BHEL House, Siri Fort, New Delhi-110049. T: 011-23365669, 23742017-20, F: 26493021, M: 9910997301, [email protected], (Atal Saraya, Director-Power)

Power

68 Indian Railways

Indian Railways has decided to take up redevelopment of the 400 stations across the country.

Nationwide 8.00 Rajiv Chaudhary, Adviser (Stn. Dev.Engg.), Rail Bhavan, Raisina Road, New Delhi-110001, Delhi. T: 011-23386334, M: 9910487305, [email protected]

Railways

69 SB Energy Holdings

The company has recently com-menced commercial operation of its 350 MW solar power plant in Andhra Pradesh.

Andhra Pradesh

NA Raman Nanda, CEO, SB Energy, No. 03, 1st Floor, Vedammal Avenue, Dr. Subbarayan Nagar, Kodambakkam, Chennai - 600024. T: 044-43565337, [email protected]

Solar Energy

70 Industrial Energy Ltd (IEL)

The joint venture of Tata Power and Tata Steel has recently commissioned a solar micro grid project at Baliapal village in Kalinganagar in Odisha.

Odisha NA Shalini Singh, Head-Corporate Communications, Corporate Center Block A, 34 Sant Tukaram Road, Carnac Bunder, Mumbai - 400009, Maharashtra. T: 022-66657511, 66658282 / 67171007 F: 67171950, 67171953, [email protected], (Cyrus P Mistry, Chairman)

Solar Energy

71 Vikram Solar Pvt Ltd

The company has commissioned 130 MW (2x65 MW) Solar PV Power Plant at Bhadla for NTPC. The company would provide Operations and Maintenance (O&M) service to the plant for a period of five years since the date of commissioning.

Bhadla Rajasthan

NA Kaustuv Sircar, Manager (Corporate Communication), ‘The Chambers’, 8th Floor, 1865, Rajdanga Main Road, Kolkata – 700107, West Bengal. T: 033-24427299, 24427399, 40030408, F: 24420125, [email protected], (Anupam Dhiman, Executive Director - EPC Solar)

Solar Energy

72 Jakson Engineering Ltd

The company is implementing the solar power project with a capacity of 65 MW for NLC India Ltd. Jakson is the EPC contractor for this project. The work is on and the commissioning is likely to complete by June, 2017.

Neyveli Tamil Nadu

295.00 Parshant Kalra, Strategic Head Solar (EPC Division), Phase II (Extension), Noida-201305, Uttar Pradesh. T: 0120-4302600, 4526100, F: 4302646, [email protected], [email protected]

Solar Energy

Page 16: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 16 • April 15, 2017

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Project Update / Commissioned Project

*Figures are approximate ( `. Crore)

73 NTPC Ltd Power major has recently commis-sioned its first wind turbine of 2 MW at Rojmal wind power project in Gujarat having a total capacity of 50 MW.

Gujarat NA Deepna Mehta, DGM-Corp Comm, NTPC Bhawan, Scope Complex, 7, Institutional Area, Lodi Road, New Delhi- 110003. Delhi. T: 011-24387195, 24368283, 24360100, F: 24361018, M: 9650990565, [email protected], [email protected], (A K Jha, Director Technical)

Wind Energy

Project Under Implementation74 Airports

Authority of India

Plans construction of ATC tower cum technical block at Civil Aerodrome, Vadodara.

Vadodara Gujarat

NA Santosh Dhoke, Airport Director, Civil Aerodrome, Harni Road, Va-dodara-390022, Gujarat. T: 0265-2485356, F: 2464249, [email protected]

Airport/Aviation

75 Department of Irrigation, Govt of Maharash-tra

Khadakwasla canal work is likely to complete by June 30, 2018 and save 3.5 TMC water on completion.

Pune District Maharashtra

NA P B Shelar, Executive Engineer, Khadakwasala Irrigation Division, Pune-411011, Maharashtra. T: 020-26127062, M: 7276820645, [email protected]

Canal/Dam/Irrigation

76 Pune Municipal Corporation

Bhama Askhed project fast tracking is sought so than it can provide additional 2.60 TMC water to Pune city especially for Kharadi and Ahmednagar Road areas.

Pune District Maharashtra

NA Vijay Kulkarni, Chief Engineer (Project), Solid Waste Management Department, Shivaji Nagar, Pune-411005, Maharashtra. M: 9689931391, [email protected]

Canal/Dam/Irrigation

77 Pune Municipal Corporation

The Parvati and Cantonment closed pipeline project is facing hurdles due to pending rehabilitation of slums occupying the space all along the pipeline. The completion of this project would save 0.50 TMC water. As of now, around 60% of the work is completed. The rest of the works is targeted by December, 2017.

Pune District Maharashtra

161.00 Vijay Kulkarni, Chief Engineer (Project), Solid Waste Management Department, Shivaji Nagar, Pune-411005, Maharashtra. M: 9689931391, [email protected]

Canal/Dam/Irrigation

78 Oil and Natural Gas Corporation Ltd

The company is implementing renovation of ONGC residential complex at Uran. The project com-prises renovation of A5 to A8 blocks (56 Flats) as part of Phase-II.

Raigad district Maha-rashtra

3.31 1) Narendra Asija, Plant Manager, ONGC, Dronagiri Bhawan, Uran, district Raigad-400702, Maharashtra. T: 022-27222802, 2) Pallab Bhat-tacharya, Head (CC), Pandit Deen-dayal Upadhyaya Urja Bhawan, 5, Nelson Mandela Marg, Vasant Kunj, New Delhi, Delhi. T: 011-26754013, 26129000, 26750998, [email protected]

Construc-tion

79 Mumbai Metropoli-tan Region Develop-ment Authority (MMRDA)

Mumbai Metro 7 project with 14 stations is moving in the fast lane. The construction of piers on several stretches of the alignment is over and second stage of construction is likely to commence. The pier erection on the entire 16.5-km alignment is likely to complete by the end of the year. MMRDA plans to start erecting viaducts for the elevated Dahisar East to Andheri East metro corridor soon. The metro corridor is being extended upto Mira-Bhayander and the overall completion is targeted by 2019.

Mumbai Maharashtra

6200.00 P. D. Mamdapure, Engineer-in-Chief, Engineering Division, 2nd Floor, A wing Bandra Kurla Complex Bandra (East), Mumbai -400051. T: 022-26594034, 26594000, [email protected]

Metro Rail

Page 17: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 17 • April 15, 2017

*Figures are approximate ( `. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Project Under Implementation

80 Lucknow Metro Rail Corporation (LMRC)

Lucknow metro project is progressing at a faster pace considering the 8.5 km long priority corridor on Kanpur Road from Transportnagar to Charbagh. As of now, the Fire department's clear-ance is in place for its Transport Nagar depot along with Krishnanagar and Mawaiya stations.

Lucknow Uttar Pradesh

NA Sada Kant, Director, Administrative Building, Near Dr. Bhimrao Ambedkar Samajik Parivartan Sthal, Vipin Khand Gomti Nagar, Lucknow - 226010, Uttar Pradesh. T: 0522-2304014, F: 2304013

Metro Rail

81 Sagar Cements Ltd

The capacity of coal-based power plant under implementation at Mattampally plant will be revised from 15 MW to 18 MW.

Suryapet District Telangana

23.00 Sreekanth Reddy, Executive Director, Plot No. 111 , Road No. 10, Jubilee Hills, Hyderabad - 500033. T: 040-23351571, F: 23356573, M: 9848090286, [email protected] (S Veera Reddy, MD)

Power

82 Salarpuria Sattva Group

Knowledge City project is under implementation. The company is building 6.5 million sq. ft of office space. The completion is targeted in in 4-5 years. The company has recently bought 10 acre of premium land in Hyderabad Hitec City from BPTP.

Hyderabad Telangana

NA Manka Raju Yadav, GM Projects, Salarpuria Cyber Park, Adjacent to Shilpa Ramam, Survey Num-67/P, Hitech City, Hyderabad 50008, Telangana. T: 040-23117212, 23117211, M: 8886177662, [email protected], (Bijay Agarwal MD)

Real Estate

83 Bruhat Bengaluru Mahana-gara Palike (BBMP)

BBMP plans to install elevators and escalators in 137 footover-bridge projects planned. Nine Skywalk are already launched, work on seven Skywalk is in progress, work on 30 Skywalk to start soon.

Bengaluru Karnataka

NA Executive Engineer, Road Infrastruc-ture- Mahadevapura, N.R. Square, Bengaluru - 560002, Karnataka. T: 080-22441076, M: 9480683059, [email protected]

Roads/Highways/Bridges

84 Supreme Infrastruc-ture India Ltd

Panvel Indapur Road BOT Project is being implemented by the company. As of now, the company has completed construction of one way flyover at Mankoli Junction on NH-3 Thane – Na-shik road. Around 60% of the work is completed.

Panvel Maharashtra

559.00 Ganesh Gholap, Assistant General Manager, Supreme House, Plot No 94/C, Pratap Gad, Opp. IIT Main Gate, Powai, Mumbai-400076, Maharashtra. T: 022-61289700, M: 8425830012, [email protected], (Vikram Sharma, MD)

Roads/Highways/Bridges

85 National Highways Authority of India (NHAI)

The 7.2 km long Pardi flyover is in delay mode. The completion is targeted by March, 2019.

Nagpur Maharashtra

448.00 N L Yavatkar, Project Director, P.I.U-Nagpur Plot No.159, Bungalow No.2 Shubhankar Apartment, Ambazari Hill Top, Ram Nagar, Nagpur - 440033, Maharashtra. T: 0712-2249589, [email protected]

Roads/Highways/Bridges

86 Greater Hyderabad Municipal Corporation

The construction of cable stayed bridge is in progress across Durgam Cheruvu Lake at Madhapur in Hyderabad under engineering procurement and construction (EPC) mode.

Hyderabad Telangana

146.00 R. Sreedhar, Superintending Engineer (Projects-WZ), GHMC, 6th floor, CC Complex, Tank Bund, Hyderabad-500063, Telangana. T: 040-23225397, M: 9849006071

Roads/Highways/Bridges

87 Fortum India Pvt Ltd

The company is currently setting up 100-MW solar power plant in Karna-taka. The commissioning is targeted during the first half of 2017.

Karnataka NA Deepkamal Kaur, Corporate Commu-nications, Level 7, Tower A, Building 5, DLF Cyber City Complex, Gurgaon 122002, Haryana. T: 0124-4418800, [email protected], [email protected], (Sanjay Aggarwal, Managing Director)

Solar Energy

88 Mahanagar Telephone Nigam Ltd

Plans to install and commission 1,800 mobile towers over the next 8-10 months in Delhi to improve coverage and data speeds for its subscribers.

Delhi 400.00 Pravin Kumar Purwar, CMD, 5th Floor, Mahanagar Doorsanchar Sadan, 9, CGO Complex, Lodhi Road, New Delhi-110003, Delhi. T: 011-24310212/24320051, 24319020, [email protected]

Telecom

Page 18: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 18 • April 15, 2017

Sno Organisation Project Title / Details Location Budget* Contacts Sector

*Figures are approximate ( `. Crore)

Project Under Implementation

MoRTH plans Ring road around Jammu and Srinagar cityMinister of Road Transport & Highways and Shipping Nitin Gadkari has announced that `7000 crore will be invested in J&K highways projects over the next two years. The ministry plans to construct a ring road around Jammu at a cost of `2,100 crore and another one around Srinagar at a cost of `2200 crore. The work on this project is likely to start in the next three months.

47,350 km of PMGSY road constructed in 2016-17Ministry of Rural Development has mentioned in one of its recent release that during the period 2011-14, the average rate of construction of PMGSY roads was 73 km per day, which increased to 100 km per day during 2014-15 and 2015-16. For the year 2016-17, a record of 130 km per day has been achieved, which is the highest average annual construction rate, in the last 7 years.

Multi-modal terminal at SahibganjMulti-modal terminal on River Ganga is planned at Sahibganj in Jharkhand. The project is the second out of three multi-modal terminals to be constructed on National Waterway-1 from Varanasi to Haldia covering a distance of 1390 km. Inland Waterways Authority of India is developing NW-1 under the Jal Marg Vikas Project with the technical and financial assistance of World Bank at an estimated cost of `5369 crore. The project would enable commercial navigation of vessels with capacity of 1500-2,000 DWT.

89 Wistron Corporation

Taiwan based electronics manufacturer aims to assemble two million handsets a month in India. The company plans to expand it's Delhi plant capacity and is setting up a new unit at Bengaluru.

Bengaluru Karnataka

NA 158, Singshan Road, Neihu, Taipei, 11469, Taiwan, R.O.C. T: 886-2-6616-9999, F: 886-2-6612-5188, http://www.wistron.com

Telecom

90 Archimedes Green Energys

Hyderabad-based company is setting up a state of the art manufacturing plant spread over two acre land at Medchal. The company will manufac-ture India’s first rooftop wind turbine. The unit can produce 1500 kW of energy at wind speeds of 5m/s.

Medchal Telangana

50.00 Suryaprakash Gajjalla, Chief Executive Officer, 3-5-944, 220-221, 2nd Floor, Panchavati Mall, Narayan-guda, Hyderabad - 500029, Telan-gana. T: 9885162668, [email protected], [email protected]

Wind Energy

Page 19: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 19 • April 15, 2017

Realty Zone

Tejinder Pal Setia, Chairman, Mona Townships Pvt Ltd shares his view with Sandeep Sharma about his company, real estate projects, features and amenities, after effects of demonetisation, upcoming and ongoing projects, market scenario in NCR, project funding, green building development, impact of RERA and technological supremacy. Edited excerpts...

Could you brief us about your real estate projects?Mona Townships Pvt Ltd has stamped its class as one of the most sought after

real estate developers of the region in just 12 years of its inception on account of its unwavering commitment to rise to the expectations of customers. We have an array of exciting projects under our belt across Delhi, NCR and Punjab, which are spread over an area of 2.5 million sq ft. Excelling in creating world-class residential, commercial and recreational spaces, we have six projects in Zirakpur and Mohali, four of which are operational, including Mona Greens, VIP Road, Zirakpur; Mona Greens II, Gazipur, Zirakpur; Mona Aeroviews, Swastik Vihar, Zirakpur and Mona Paradise Apartments, Sector 127, Mohali.

Construction is going on in full swing on the other two projects, including Mona City in Sector 115, Mohali, and our flagship mixed-use project J90, which is coming up over 14 acres in Sector 90, Mohali.

What kind of features and amenities do you incorporate in your projects to ensure customers delight?

Our philosophy has always revolved around “Reinventing Growth”, and this has made all the difference. We are customer-centric. For us, customers come first. Our foremost concern is to ensure that our buyers get their money’s worth. Unlike many other real estate developers, we take care about the minutest details and make it a point to offer only ready-to-move properties after having all arrangements in place. We have always incorporated modern facilities in all our projects and features like proper ventilation/lighting, energy-efficient design and ample open spaces.

How is the real estate market shaping up in NCR? Do you see any upside after demonetization effect has waned out?

Demonetisation will not have much of an impact on property prices in Tier 2 cities of the northern region like Mohali and Chandigarh because their real estate market is largely driven by end users. These cities will also escape the fallout of demonetisation on account of their small pocket size, which is in the range of 30-35 lakh. The secondary market will also gain momentum in the next few months. In the long run, demonetisation will actually benefit the real estate industry.

Are you exploring any other geography apart from NCR / Punjab?We will surely go for expansion beyond NCR and Punjab, but not in the immediate

future.

Technologically how far your construction is positioned against the leading developers in the region?

The biggest challenge in the real estate market is the fierce competition, and very few real estate developers are able to win the trust of customers. However, at Mona Townships, the very foundation of our company is built on trust. We stand out from the rest for our ability to deliver projects in time while maintaining the highest construction standards. Not every real estate developer can match timely delivery and quality construction as we do. We are where we stand today because we have turned these challenges into opportunities. In every township we have used state-of-the-art engineering techniques that not only add to the strength and stability of the structures but also reduce maintenance charges.

Page 20: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Realty Zone

How do you fund your projects?Mona Townships is funded by internal accruals and has tie-ups with

leading banks.

Are you into green building development? We, at Mona Townships, have always tried to make all our projects as eco-

friendly as can be, whether it is the flats at Mona Greens and Mona Aeroviews or the apartments in Mona Paradise. All our buildings are designed to be energy-efficient. Our structures are well-ventilated and located and designed in such a way that they trap maximum natural light and use minimum electricity. Jade Business Park, an integral component of our flagship J90 project, is a demonstration of a refreshing green business concept destined to set new trends. The project has lush-green, open surroundings to breathe life into your business. Replete with all modern facilities, the workspaces will have large window openings for natural lighting and cross-ventilation, well-lit and ventilated corridors, power back-up, three-tier security, recreational green parks and cafeterias on terraces. Our state-of-the-art engineering techniques are intended to improve productivity.

What can be the impact of Real Estate Regulatory Act, 2016 (RERA) on the real estate companies and the buyers at large?

RERA and the new tax regime in the form of GST promise to revive the realty sector, which ranks among the top in the country in terms of employment generation. RERA will bring much needed transparency in the real estate business. It’s likely to help build trust among all the stakeholders, be it builders, customers, property advisers or employees. It is a very balanced Act which has something good for everyone.

Project Reporter • 20 • April 15, 2017

CHENNAI-NASHRI TUNNEL PROJECTPrime Minister Narendra Modi has recently dedicated India’s longest highways tunnel - the Chenani- Nashri tunnel in Jammu & Kashmir. The tunnel is a part of the 286-km-long four-laning of the Jammu-Srinagar National Highway. The structure consists of a 9 km long, two-laned main tunnel with a parallel escape tunnel of same length. The two tunnels are connected by 29 cross passages at regular intervals along the entire length of the tunnel. These cross passages can be used for evacuation of vehicles and commuters in case of breakdown or any other emergency. There are two minor bridges on the south and north sides and 4-lane approach roads with Toll Plazas on both ends of the tunnel. The maximum height permitted in the tunnel is 5 meters and for checking the height special sensors have been installed just before the toll points at both ends.

The tunnel has an efficient, transverse ventilation system. There are inlets bringing fresh air at 8 metre intervals and outlet for exhaust every 100 metres. There is also a fully-integrated control system with ventilation, communication, power supply, incident detection, SOS call box and fire fighting. Fitted with intelligent traffic mechanism, the tunnel has fully automatic smart control and no human intervention will be required for its operations. The tunnel is also equipped with advanced scanners to ward off any security threat. Very few tunnels in the world have this kind of fully integrated tunnel control.

The project is also environment friendly. The time saving on the Jammu- Srinagar route will further result in fuel saving of approximately `27 lakhs per day. Besides, the construction of the tunnel has avoided large –scale deforestation.

The Chenani-Nashri tunnel will have a very positive impact on the state economy.

Page 21: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

REALTY PROJECTS

Page 22: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 24 • April 15, 2017

Realty Projects

91 | Eldeco Accolade

Details: The project is coming up at Sohna in Gurgaon spread across 13 acre of land. The project offers 8 towers with G+18 floors, having 809 units of 2 and 3 BHK apartments. Apart from basic amenities, the project offers Cricket Pitch, Badminton Court, Basketball Court, Jogging Track, Skating Rink, Lawn Tennis Court, Multipurpose Court, Squash Court, Swimming Pool, Jacuzzi, Party Lawn, Cafeteria, Grocery Shop, etc.

Location: Gurgaon HaryanaCompletion: December 2018Type: Group HousingStage: Under Construction

Eldeco Infrastructure & Properties Ltd

Contacts: 201-212, 2nd Floor, Splendor Forum, Jasola District Centre, New Delhi - 110 025, Delhi. T: 011-40655000/100, [email protected]

92 | The Presidio

Details: The project is coming up at Sector 31 in Faridabad spread across 1.75 acre of land. The project offers 3 towers with G+15 floors, having 78 units of 3 and 4 BHK apartments. The amenities include Badminton Court, Basketball Court, Jogging Track, Lawn Tennis Court, Multipurpose Court, Squash Court, Swimming Pool, Landscape Garden, Paved Compound, Rain Water Harvesting, Library, etc.

Location: Faridabad HaryanaCompletion: December 2018Type: Residential ApartmentStage: Under Construction

Sarvome Developers Pvt Ltd

Contacts: Sector 45, Opposit Rail Vihar, Faridabad 121 003, Haryana. T: 0129-2477888

93 | Today Royal Elegancia

Details: The project is coming up at Sector 73, Gurgaon spread over 5 acre of land. The project offers 3 towers with G+16 floors, having 97 units of 4 BHK residential apartments. Apart from basic amenities, the project offers Badminton Court, Basketball Court, Swimming Pool, Table Tennis, Grocery Shop, Landscape Garden, etc.

Location: Gurgaon HaryanaCompletion: October 2017Type: Residential ApartmentStage: Under Construction

Today Homes & Infrastructure Pvt Ltd

Contacts: Upper Ground Floor 1 to 11, Ambadeep Building, K.G Marg, New Delhi - 110001, Delhi. T: 011-43693600

Architect: Gian P. Mathur and Associates Pvt Ltd, C-55, East Of Kailash, New Delhi-110065, Delhi. T: 011-46599599

Page 23: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 25 • April 15, 2017

Realty Projects

94 | Aadi Allure

Details: The project is coming up at Kanjur Marg (East) Mumbai spread over 4 acre of land. The project offers 5 towers with G+20 floor having 420 units of 1 and 2 BHK apartments. The amenities include Banquet Hall, Carrom, Gazebo, Multipurpose Hall, Sauna, Senior Citizen Sitout, Jogging Track, Multipurpose Court, Spa, Steam Room, etc.

Location: Mumbai MaharashtraCompletion: June 2018Type: Residential TowersStage: Under Construction

Aadi Properties LLP

Contacts: Anna Godbole Marg, Kanjurmarg (E), Mumbai, Maharashtra. T: 8080173434, [email protected]

95 | Apex Landmark

Details: The project is coming up at Dronagiri, Navi Mumbai spread over 1 acre of land. It offers G+16 storeyed tower with G+15 floors, having 96 units of 1, 2 and 3 BHK apartments. The amenities include Carrom, Gazebo, Party Lawn, Temple, Theatre, CCTV Camera Security, Earthquake Resistant, Entrance Lobby, etc.

Location: Navi Mumbai MaharashtraCompletion: December 2019Type: Residential ApartmentStage: Under Construction

Apex Realty

Contacts: Brijen Shah, Partner, 245,2nd Floor, Satra Plaza, Sector 19D, Vashi, Navi Mumbai-400703, Maharashtra. T: 022-27810763

96 | Gauri Excellency

Details: The project is coming up at Kandivali (West) spread over 3 acre of land. The project offers 2 towers with 4 level podium + 30 floors, having 312 units of 1 and 2 BHK apartments. The amenities include Jogging Track, Badminton Court, Chess, Table Tennis, Yoga/Meditation Area, Entrance Lobby, Wi-Fi Connectivity, Landscape Garden, Rain Water Harvesting, etc.

Location: Mumbai MaharashtraCompletion: December 2019Type: Residential ApartmentStage: Under Construction

Gauri Group

Contacts: Ground Floor, Akash Palace, Maratha Colony, Near Saraswat Bank Dahisar East, Mumbai 400068, Maharashtra. T: 022-28282400

Architect: Vijay Turbadkar, Architect, Mulund (W), Mumbai - 400080, Maharashtra. T: 022-25643229

Architect: STAPL Soyuz Talib Architects, Plot No. 5, Kesar Solitaire Building, Sanpada Sector 19, Navi Mumbai - 400703, Maharashtra, T: 022-27810763

Architect: Hafeez Contractor, Architect, Fort, Mumbai-400023, Maharashtra. T: 022-22661920

Page 24: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 26 • April 15, 2017

Realty Projects

97 | Rajshree Orchid

Details: The project is coming up at Ghatkopar (East) in Mumbai. The project offers Stilt + 16 Story tower with G+17 floors, having 64 units of 2 BHK residential apartments. Apart from basic amenities, the project offers Earthquake Resistant, Entrance Lobby, Gated Community, High Speed Elevators, Rain Water Harvesting, etc.

Location: Mumbai MaharashtraCompletion: July 2019Type: Residential ApartmentStage: Under Construction

Rajshree Builders

Contacts: 102, Karma Sandesh - 2, Off Hingwala Lane, Ghatkopar (East), Mumbai-400077, Maharashtra. T: 022-21026764

98 | Sarthak Belva

Details: The project is coming up at Pisoli, Pune. It cpmprises 1 tower with G+13 floors, having 112 units of 2 BHK residential apartment. Apart from basic menities, the project offers arthquake Resistant, Entrance Lobby, Gated Community, RO System, Security Cabin, Landscape Garden, Natural Pond, Sewage Treatment, etc.

Location: Pune MaharashtraCompletion: December 2018Type: Residential ApartmentStage: Under Construction

Sarthak Housing Enterprises Pvt Ltd

Contacts: 813, Siddharth Towers, BLD No 1/A, Sangam Press Rd, Kothrud, Pune - 411 029, Maharashtra. T: 020-25465544

99 | Malles Akankssha

Details: The project is coing up at Perumbakkam Chennai South spread across 4.34 acre of land. The project offers 66 Villas and 105 apartments with G+2 floors, having 4 BHK villas and 2 BHK apartments. The amenities include Power Back up Lift, Vastu Compliant, Indoor Games, Jogging Track, CCTV Camera Security, DTH Television, Earthquake Resistant, Entrance Lobby, Gated Community, Piped Gas, etc.

Location: Chennai Tamil NaduCompletion: December 2018Type: Residential ApartmentStage: Under Construction

Malles Constructions

Contacts: Suresh, Marketing Head, Tanjore Road, T Nagar, Chennai-600017, Tamil Nadu. T: 044-494555555, M: 9600022616

Architect: Arkitectura Architect, 41 Palm, Gayathri Nagar, Medavakkam, Chennai - 600100, Tamil Nadu. T: 044 43800150, [email protected]

Page 25: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 27 • April 15, 2017

CONSULTANCY BIDS100 | Construction of new campus of Nilambar Pitambar UniversityJSBCCL/RFP-01/2017-18 | Providing consultancy services for preparation of detailed project report (DPR) including design, drawings and detailed estimate and PMC services for construction of new campus of the proposed Nilambar Pitambar University at Medininagar, Palamu.Submission Date: 05/05/2017Location: Palamu JharkhandJharkhand State Building Construction Corporatoin LtdContacts: Nodal Officer, Project Building, PO: Dhurwa, Ranchi-834004, Jharkhand. T: 0651-2446257/2446258/2446259, [email protected]

101 | Laying of water supply system to 110 villagesBWSSB/CE(P)/ACE(CMC)/TA/AE/1383/2016-17 | PMC services for providing and Laying of water supply system to 110 villages of BBMPand UFW reduction in core area & construction and rehabilitation of GLR in Malleshwaram, Bangalore.Submission Date: 02/05/2017Location: Bangalore KarnatakaBangalore Water Supply And Sewage BoardContacts: Satish, Malleshwaram, Bangalore, Karnataka. T: 080-22945108 102 | 25 MLD water supply schemeIADB/ENGG/PMC/EPTND-EP-02/17880/2016-17 | PMC for the work of providing 25 MLD water supply scheme to Badanaguppe-Kellamballi Industrial Area Chamarajanagar Taluk & District with Kabini river as source including construction of Intake well, Jack well cum pump house, Construction of GLSR, Laying of Raw water pipe line, Electromechanical works, HT Main supply distribution line, Electrical works for various components and other allied works.Submission Date: 10/05/2017Location: Chamarajanagar district KarnatakaKarnataka Industrial Areas Development Board

Contacts: PRO, KIADB 4th & 5th Floor, East Wing, Khanija Bhavan, Race Course Road, Bengaluru-560001, Karnataka. T: 080-40931272, 22265383, 22267900, [email protected]

103 | Development of new township at ThatipurMPHB/TENDER NO - 838 | Appointment of consultant for preparation of DPR, architectural services, transaction advisory and project management consultancy (PMC) including SQC (Supervision & Quality Control), for development of new township at Thatipur, Gwalior under re-densification Policy 2016 of Govt. of Madhya Pradesh.Submission Date: 09/05/2017Tender Value (Rs): 2500000000Location: Gwalior Madhya PradeshMP Housing and Infrastructure Development BoardContacts: P.K. Hedau, Executive Engineer, Deen Dayal Nagar Gwalior, Madhya Pradesh. T: 0751-2470150, F: 2477664 M: 9406912100, [email protected]

104 | Coastal Berth at JN PortPPD/M/PMC/T-77/2017 Dt. 03.04.2017 | Project management consultancy services for construction of Coastal Berth at JN Port.Submission Date: 12/05/2017 Location: Navi Mumbai MaharashtraJawaharlal Nehru Port Trust (JNPT)Contacts: Chief Manager (Port Planning and Development Department), Administration Building, Sheva, Navi Mumbai 400707, Maharashtra. T: 022-27244154/4156, F: 27244178, [email protected]

105 | Modification to rob at JNPT Navi mumbaiIPRCL/MUMBAI/PROJECT/JNPT/6/9/PMC | Project management consultancy services for execution of the works involved in development of integrated common rail yard facility and modification to rob at JNPT Navi mumbai Maharashtra.

Submission Date: 16/05/2017Location: Navi Mumbai MaharashtraJawaharlal Nehru Port Trust (JNPT)Contacts: MD, IPRCL corporate office, 4th floor, Nirman Bhawan, M.P.Road, Mazgaon (E), Mumbai- 400010, Maharashtra. T: 022-69000437

106 | Consultant for area based development projectsTMC/PRO/Smart City/05 ID:2017_TMC_206366_1 | Appointment of principal consultant for area based development projects as part of implementation of Smart City Mission in Thane city.Submission Date: 28/04/2017Location: Thane MaharashtraThane Smart City LtdContacts: Sunil Chavan IAS, CEO, TSCL, Thane Municipal Corporation, Thane, Maharashtra. T: 022-25375468, M: 8689980444, [email protected]

107 | Second electric Loco shed at BondamundaIRCON/CIVIL/5019/NELS.BNDM/e-TENDER/OT-22 | Project management consultancy for all civil, electrical and related works related to construction of second electric Loco shed at Bondamunda, Rourkela, Odisha.Submission Date: 01/05/2017Location: Rourkela OdishaIrcon International LtdContacts: Chief Project Manager, Room No.408,4 Floor, Palika Bhawan, sector Xiii, R.K.Puram, New Delhi-110066, Delhi. T: 011-26885876, 29565666

108 | Design and implement smart city projects001/CEO/KSCL/17-18 | Selection of project management consultant (PMC) to design, develop, manage and implement smart city projects.Submission Date: 02/05/2017 Location: Kanpur Uttar PradeshKanpur Smart City LtdContacts: Manish Kumar Singh, Chief Engineer, Kanpur-208002, Uttar Pradesh. T: 0512 2551416, 253215, F: 2531662, (Umesh Pratap Singh, CEO)

Page 26: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 28 • April 15, 2017

Aviation/Airport

109 | O&M of SVP AirportNA | Request for proposal invited for the operation and maintenance of select areas of Sardar Vallabhbhai Patel International Airport at Ahmedabad, Gujarat.Submission Date: 02/05/2017 Location: Ahmedabad GujaratAirports Authority of IndiaContacts: M.P.Juneja, Dr.Anup K.Pujari, C Block Third Floor, Rajiv Gandhi Bhawan, Safdarjung Airport, New Delhi-110003. T: 011-24632994, F: 24623580 (Pankaj Jain, Executive Director (KID), [email protected]

110 | O&M of Jaipur International AirportRequest for proposal invited for the operation and maintenance of select areas of Jaipur International Airport.Submission Date: 02/05/2017 Location: Jaipur RajasthanAirports Authority of IndiaContacts: M.P.Juneja, Dr.Anup K.Pujari, C Block Third Floor,Rajiv Gandhi Bhawan, Safdarjung Airport, New Delhi-110003.T: 011-24632994, F: 24623580 (Pankaj Jain, Executive Director (KID), [email protected]

Metro Rail

111 | Water ATM at selected Metro StationsRequest for Proposal for installation and operation of Water ATM at selected Metro Stations of DMRC.Submission Date: 11/05/2017Location: DelhiDelhi Metro Rail Corporation LtdContacts: Sr. Dy. Chief Engineer/ Property Business-II, 4th Floor, B Wing, Metro Bhawan, Fire Bridge Lane, Barakhamba Road, New Delhi-110001.T: 011-234184170, 120-4200462, 0120-4001002, [email protected], [email protected]

Power

112 | Package-C3 of smart transmission networkRVPN/EHV/ANMSP/TN-7 | Establishment of OPGW network including supply, installation of OPGW, hardwares and other accessories under Package-C3 of smart transmission network and asset management system (Part-B).Submission Date: 15/05/2017Tenders Value (`): 1264000000Location: RajasthanRajasthan Rajya Vidyut Prasaran Nigam LtdContacts: Ashok Agarwal, SE SPL, Office of SE (Automation N/M SPL Projects), Vidyut Bhawan, Janpath, Jyoti Nagar, Jaipur, Rajasthan. M: 9413382624, [email protected]

Smart Cities

113 | Smart Classrooms in VisakhapatnamGVSCCL/Projects/06(Smart Class Rooms)/34/2016-17/dt:23-03-2017 Tenders are invited for RFP for procurement of implementing agency for Modernizing Greater Visakhapatnam Municipal Corporation (GVMC) Schools (6 Schools) as Smart Campus -”Smart Classrooms” in Visakhapatnam under Smart City Mission.Submission Date: 27/04/2017 Location: Visakhapatnam Andhra PradeshGreater Visakhapatnam Smart City Corporation LtdContacts: Managing Director, Room No 306, 1st Floor, GVMC Asilmetta, Thenneti Bhavan, Viskahapatnam, Andhra Pradesh. T: 0772-9995934, [email protected]

114 | Public bicycle sharing system in VisakhapatnamGVSCCL/Projects/04(PBS)/32/2016-17/

dt:13-03-2017 | Expression of interest for designing, setting up & operating a public bicycle sharing system in Visakhapatnam Smart City in area based development - ABD on Public Private Partnership (PPP) Basis. Submission Date: 28/04/2017 Location: Visakhapatnam Andhra PradeshGreater Visakhapatnam Smart City Corporation LtdContacts: Managing Director, Smart City, Room No:306, Asilmetta, Thenneti Bhavan, Visakhapatnam, Andhra Pradesh. M: 7729995934

115 | Implementation of existing roads as smart streetsGVSCCL/Projects/03/(smart streets)/2016-17 | Tenders are invited for Development & Implementation of existing roads as smart streets (Kurupam circle to Lepakshi junction & Siripuram junction to The Park Hotel) under implementation of Smart City Mission, Visakhapatnam.Submission Date: 20/04/2017Location: Visakhapatnam Andhra PradeshGreater Visakhapatnam Smart City Corporation Ltd-38001847Contacts: Managing Director & CEO, Room No.306, C/o.GVMC, Tenneti Bhavan, Asilmetta, Visakhapatnam-530002, Andhra Pradesh. T: 0891-274630, M: 7729995934, [email protected]

116 | Construction of Sewage Pumping StationGM (Drainage & SWM)/SSCDL/ABD(6B &7)/1/2016-2017 | Tenders are invited for design, construction, erection, testing and commissioning of (i) Augmentation of existing Sewage Pumping Station, (ii) Augmentation of existing 66 MLD up to 167 MLD Capacity STP and (iii) 40 MLD net Output TSTP to generate Industrial grade water including operation and maintenance of all the

B2B OPPORTUNITIES

Page 27: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 29 • April 15, 2017

B2B Opportunities

above (i), (ii) and (iii) for 10 Years Period Under Smart City, Surat.Submission Date: 17/04/2017 Location: Surat GujaratSurat Smart City Development LtdContacts: General Manager (Drainage & SWM), Second Floor, Room Number 88, Conference Hall, Muglisara, Surat – 395003, Gujarat. T: 0261-2423751-56, M: 9724345215

117 | Integrated Command & Control Centre in Vadodara1093/2016-17 | Request for Proposal (RFP) for selection of implementation agency for Integrated Command & Control Centre (CCC) and Smart Features in Vadodara City.Submission Date: 25/04/2017 Tenders Value (`): 830000000Location: Vadodara GujaratVadodara Municipal CorporationContacts: Director (IT), IT Department, Khanderao Market, Vadodara-390001, Gujarat. T: 0265-2435646, F: 2433060, [email protected]

118 | Garbage transfer station at Sangam NagaMPISCDL/TENDER NO -27 & Work No: 1 | Tenders are invited for construction of garbage transfer station at Sangam Nagar under Smart City Mission.Submission Date: 17/04/2017 Tenders Value (`): 10700000Location: Madhya Pradesh IndoreIndore Smart City Development LtdContacts: Anoop Goyal, Executive Engineer, 107-109, Palika Plaza, Phase II, M.T.H Compound, Indore, Madhya Pradesh. T: 0731-2535572, M: 7440443342, [email protected], [email protected], (Rohan Saxena, CEO)

119 | GTS at Star Square MR-10MPISCDL/TENDER NO -29 & Work No: 1 | Tenders are invited for construction of garbage transfer station at Star Square MR-10 Indore under Smart City Mission.Submission Date: 17/04/2017 Tenders Value (`): 11200000

Location: Madhya Pradesh IndoreIndore Smart City Development LtdContacts: Anoop Goyal, Executive Engineer, 107-109, Palika Plaza, Phase II, M.T.H Compound, Indore, Madhya Pradesh. T: 0731-2535572, M: 7440443342, [email protected], [email protected], (Rohan Saxena, CEO)

120 | Garbage transfer station at IT ParkMPISCDL/TENDER NO -28 & Work No: 1 | Tenders are invited for construction of garbage transfer station at IT Park Indore under Smart City MissionSubmission Date: 17/04/2017Tenders Value (`): 13600000Location: Madhya Pradesh IndoreIndore Smart City Development LtdContacts: Anoop Goyal, Executive Engineer, 107-109, Palika Plaza, Phase II, M.T.H Compound, Indore, Madhya Pradesh. T: 0731-2535572, M: 7440443342, [email protected], [email protected], (Rohan Saxena, CEO)

Water Treatment

121 | 5.0 MLD Conventional Water Treatment Plant03 /SAC/EE/PHED/2016-17 | Design, Drawing, Construction, testing and commissioning of all civil works and providing, installation of mechanical & electrical equipment’s of 5.0 Mld Capacity Conventional Type Water Treatment Plant and Trial Run With Supply of All Required Chemical for 12 Month Under Harratikra Group Water Supply Scheme.Submission Date: 25/04/2017Tenders Value (`): 18900000Location: ChhattisgarhPublic Health Engineering DepartmentContacts: Executive Engineer, Harratikra Group Water Supply, Scheme, District - Surajpur, Chhattisgarh. T: 0771-266573, 2582223

122 | 400 MLD water treatment plant4 / 2017-18 | Tenders are invited for

operation and maintenance with comprehensive repair work of 400 MLD water treatment plant, clear water pump house, and raw water pump house etc. Located at Jaspur for 36Months of AMC.Submission Date: 20/04/2017Tenders Value (`): 74094000Location: Ahmedabad GujaratAmdavad Municipal CorporationContacts: Municipal Commissioner, Dudheshwar water Works,Administration Building, Shahibaug, Ahmedabad-380004, Gujarat. T: 079-25391811, [email protected], [email protected]

123 | R.C.C. intake well cum pump houseDWSD/RPWSS/Dhanbad/24/2016-17 (Rate Bid) | Detailed survey, designing and drawing, construction of R.C.C. intake well cum pump house, R.C.C.Gang Way, water treatment plant capacity - 62.00 MLD, clear water reservoir capacity 1153910.00 Liter, ESR-1 6.0 Lakh Litre capacity with 12 M staging.Submission Date: 20/04/2017Tenders Value (`): 3668794000Location: JharkhandDrinking Water & Sanitation Department, Govt. of JharkhandContacts: Executive Engineer, Drinking water & Sanitation Division No.-01, Dhanbad, Jharkhand. T: 0326-2311259, F: 2480345

Waterproofing

124 | Waterproofing on roof slab of NSP station2017_DMRC_193984_1 | Providing waterproofing on roof slab of NSP station, New Delhi.Submission Date: 20/04/2017Tenders Value (`): 9628000Location: New Delhi DelhiDelhi Metro Rail Corporation LtdContacts: Office of Chief Project Manager-2,Delhi Metro Rail Corporation,Opposite Inderlok Metro Station, Shehzada Bagh, Inderlok, New Delhi 110035. T: 011-23121134, F: 23121485

Page 28: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 30 • April 15, 2017

INDUSTRIAL OPPORTUNITIES

Page 29: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 31 • April 15, 2017

Industrial Projects

125 | LG Polymers India Pvt LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 13/02/2017 for the manufacture of Engineering plastic compounds.Location: Visakhapatnam, Andhra PradeshContact: Mahesh Marwaha (DGM), D No.7-1, Rr Venkatapuram, Gopalapatnam, Rr V. Post, Visakhapatnam - 530029, Andhra Pradesh-530029. T: 891-2520455-58, F: 2520338 / 528, M: 9618666136, [email protected]

126 | Ramabhadra Industries Pvt LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 16/02/2017 to set up electric power generation, transmission and distribution business.Location: Anantappur, Andhra PradeshContact: P. Venkatapathi Raju, 35-1-9 Ramabhadra Complex , Rastrapathi Road, Tanuku, West Godavari-534211, Andhra Pradesh . ,M-M: 8819222075, 8819224545

127 | Sri Ramadas Paper Boards Pvt LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 15/02/2017 to set up electric power unit.Location: East Godavari, Andhra PradeshContact: N. Venkata Reddy,, 60 8 18A, P&T Colony, Near Raja Theatre, Korukonda Rd Rajahmundry, East Godavari - 533105, Andhra Pradesh. T: 0883-2461147, 2463317, F: 2444117

128 | Vibrant Greentech India Pvt LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 15/02/2017 to set up electric power generation unit based on windmills.Location: Anantappur, Andhra PradeshContact: A-24/25, Apie, IDA, Industrial Area, Balanagar, Rangareddy- 500037, Telangana. T: 040-23771849, www.viaitsolutions.com 129 | C & S Electric LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 17/02/2017 to set up unit for miniature

circuit breaker (MCB)Location: Kamrup, AssamContact: 222 Okhla Indl. Estate, Near Modi Mill, Phase-III, New Delhi-110020. T: 011-30887520,29, F: 26847154, 26829063, [email protected]

130 | Ram Ratna Wires LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 16/02/2017 to set up unit for manufacturing submersible winding wire-PVC.Location: Silvassa, Dadra & Nagar HaveliContact: S. No.142/2, Madhuban Dam Road, Hanuman Ji Mandir, Karad, Rakholi, Silvassa, Dadra And Nagar Haveli- 396240. T: 260-2641333 , 2641868.

131 | Aaditya Paptech Pvt LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 13/02/2017 to set up unit for multilayer paper and paper board.Location: Gandhinagar, GujaratContact: Radheshyam Pokar (Director), Survey No.31 32, Pahadiya, Dehgam Bayad Road, Dehgam, Gandhinagar - 382315, Gujarat. T: 02716-296020, M: 9925033264, [email protected]

132 | Abode Granito LlpIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 17/02/2017 for the manufacturing of soluble vitrified tiles.Location: Gujarat, GujaratContact: S. No.233/1, Wind Mill Rd, Nichi Mandal, Morbi, Nichi Mandal, Morbi, Gujarat- 363642, [email protected]

133 | BASF India LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 17/02/2017 to set up unit automotives coolant.Location: Bharuch, GujaratContact: Plot No.4B, Birla Copper Road, Near Birla Copper, GIDC, Dahej, Bharuch -392130, Gujarat.

134 | Cruso Granito Pvt LtdIndustrial Entrepreneurs Memorandum

(IEM) was filed with Department of Industrial Policy & Promotion on 13/02/2017 for the manufacture of vitrified tiles.Location: Gujarat, GujaratContact: Mahesh Ramjibhai Kundariya, Director, Nos.168/1P, 168/2P2, 169P1 &P2, 170P, 8A, Nh At Vaghasiya, Tal: Wankaner Vaghasiya, Morbi-363621, Gujarat. M: 9909908884, [email protected]

135 | Jadeja Industries Pvt LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 15/02/2017 to set up particle board unit.Location: Gujarat, GujaratContact: Keshrisinh Indrasinh Jadeja, Director, P/1, Lunsar Road, Opp. Getco, Jetparda Crossing, Bhojpara, Morbi, Gujarat- 363621. [email protected]

136 | Hema Engineering Industries LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 17/02/2017 MANUFACTURE OF OTHER FABRICATED METAL PRODUCTS N.E.C.Location: Solan, Himachal PradeshContact: Bast 153, Vill.Belideyor, Pargana, Tehsil Nalagarh, Nalagarh, Solan, Himachal Pradesh-17410 .

137 | Aditya Birla Solar LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 14/02/2017 to set up solar power plant.Location: Belgaum, KarnatakaContact: Devajyoti Bhattacharya, Director, A-4, Aditya Birla Centre, S K Ahire Marg, Near Old Passport Office, Worli, Mumbai - 400030. T: 022- 66525000, [email protected]

138 | Aditya Birla Solar LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 14/02/2017 to set up solar power plant.Location: Kolar, KarnatakaContact: Devajyoti Bhattacharya, Director, A-4, Aditya Birla Centre, S K Ahire Marg, Near Old Passport Office, Worli, Mumbai - 400030. T: 022- 66525000, [email protected]

139 | Clean Solar Power (Gulbarga )Industrial Entrepreneurs Memorandum (IEM) was filed with Department of

Page 30: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 32 • April 15, 2017

Industrial Projects

Industrial Policy & Promotion on 16/02/2017 to set up solar power generation unit.Location: Raichur, KarnatakaContact: Ujjwal Munjal, Director, 212 Hero Future, Hdfc Bank Titan, Okhla Phase-III, New Delhi -110020, Delhi. [email protected]

140 | Clean Solar Power (Tumkur ) Pvt LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 16/02/2017 to set up solar power generation unit.Location: Chamarajanagar, KarnatakaContact: Ujjwal Munjal, Director, 212 Hero Future, Hdfc Bank Titan, Okhla Phase-III, New Delhi -110020, Delhi. [email protected]

141 | Clean Solar Power (Tumkur ) Pvt LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 16/02/2017 to set up solar power generation unit.Location: Tumkur, KarnatakaContact: Ujjwal Munjal, Director, 212 Hero Future, Hdfc Bank Titan, Okhla Phase-III, New Delhi -110020, Delhi. [email protected]

142 | Clean Solar Power (Tumkur ) Pvt LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 16/02/2017 to set up solar power generation unit.

Location: Koppal, KarnatakaContact: Ujjwal Munjal, Director, 212 Hero Future, Hdfc Bank Titan, Okhla Phase-III, New Delhi -110020, Delhi. [email protected]

143 | Maini Precision Products LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 13/02/2017 for the manufacture of aluminium from alumina and by other methods and products of aluminium alloys.Location: Bangalore (Urban), KarnatakaContact: B165, 3rd Cross, Peenya Industrial Estate, Peenya, Bangalore-560058, (Urban) Karnataka. T: 080-40724000, 28394116, F: 41272500, [email protected], www.mainiprecisionproducts.com

144 | Nihit Logistics Park Pvt LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 15/02/2017 to set up industrial / warehouse & logistics park.Location: Kolar, KarnatakaContact: Ashwin Govindan Moolyil (Director), One Indiabulls C, 16th Flr Tower 2A, S.B.Marg, E.Road, Kamala Mills, Lower Parel, Mumbai-400013, Maharashtra. [email protected]

145 | Mawmluh Cherra Cements LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 13/02/2017 to set up ordinary portland cement.Location: East Khasi Hills, MeghalayaContact: A. Laitphlang, Taxation Building, Opp.All India Radio, Near Raj Bhawan,

Lower Lachumiere , Shillong, East Khasi Hills Meghalaya-793001. T: 0364-2225293, M: 9402136019, [email protected] (Sanjay Kumar Goyal, MD)

146 | Modern Automotives LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 15/02/2017 to set up unit for forging pressing of metal products/steel metal products.Location: Punjab, PunjabContact: Jaswant Singh (Purchase Head), Near Focal Point, Chattarpura, Mandi Gobindgarh-147301, Punjab. T: 01765-242920, M: 9876738432.

147 | RS Infra Transmission LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 17/02/2017 to set up unit for hot rolled and cold rolled products of steel.Location: Jaipur, RajasthanContact: A-241, 242, Rd. No.6D, In Front Of Bsnl, VKI Area, Jaipur, Rajasthan-302013. T: 0141-4197788, 99, 2332955

148 | Fleetguard Filters Pvt LtdIndustrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 14/02/2017 to set up unit for manufacturing air filter.Location: Krishnagiri, Tamil NaduContact: Venkata Narayanan (Marketing Manager), Plot No.82, Sipcot Ph-Ii, Opp.Adhiyaman Engineering College, Hosur, Mornapalli Village, Krishnagiri, Tamil Nadu - 635126. T: 4344-260930, M: 8220008398

Advertise in Project Reporter Digital Edition and reach out to 50,000 Prospects from all over India.

India’s Project Database

Vol. 12 No. 13 l January 1, 2017

www.ProjectReporter.co.in

Annual Subscription: `3500/- (Downloadable PDF)

®

174Projects & Tenders

For Advertising: Contact Sandeep Sharma on +91-22-24193000 / 24193096 Email: [email protected]

Page 31: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 33 • April 15, 2017

ECONOMIC STATISTICS

INDEX OF EIGHT CORE INDUSTRIES (BASE: 2004-05=100) FEBRUARY, 2017

TThe summary of the Index of Eight Core Industries (base: 2004-05) is given at the Annexure.The Eight Core Industries comprise nearly 38 % of the weight of items included in the Index of Industrial Production (IIP). The combined Index of Eight Core Industries stands at 180.1 in February, 2017, which was 1.0 % higher compared to the index of February, 2016. Its cumulative growth during April to February, 2016-17 was 4.4 %.

COAL

Coal production (weight: 4.38 %) increased by 7.1 % in February, 2017 over February, 2016. Its cumulative index during April to February, 2016-17 increased by 2.8 % over corresponding period of previous year.

CRUDE OIL

Crude Oil production (weight: 5.22 %) declined by 3.4 % in February, 2017 over February, 2016. Its cumulative index during April to February, 2016-17 declined by 2.8 % over the corresponding period of previous year.

NATURAL GAS

The Natural Gas production (weight: 1.71 %) declined by 1.7 % in February, 2017 over February, 2016. Its cumulative index during April to February, 2016-17 declined by 1.9 % over the corresponding period of previous year.

REFINERY PRODUCTS (93% OF CRUDE THROUGHPUT)

Petroleum Refinery production (weight: 5.94%) declined by 2.3 % in February, 2017 over February, 2016. Its cumulative index during April to February, 2016-17 increased by 5.9 % over the corresponding period of previous year.

FERTILIZERS

Fertilizer production (weight: 1.25%) declined by 5.3 % in February, 2017 over February, 2016. Its cumulative index during April to February, 2016-17 increased by 2.1 % over the corresponding period of previous year.

STEEL (ALLOY + NON-ALLOY)

Steel production (Weight: 6.68%) increased by 8.7 % in February, 2017 over February, 2016. Its cumulative index during April to February, 2016-17 increased by 9.1 % over the corresponding period of previous year.

CEMENT

Cement production (weight: 2.41%) declined by 15.8 % in February, 2017 over February, 2016. Its cumulative index during April to February, 2016-17 declined by 0.7 % over the corresponding period of previous year.

ELECTRICITY

Electricity generation (weight: 10.32%) increased by 1.5 % in February, 2017 over February, 2016. Its cumulative index during April to February, 2016-17 increased by 5.0 % over the corresponding period of previous year.

Note: Data are provisional. Revision has been made based on revised data received for corresponding month of previous year in respect of Coal, Crude Oil, Refinery Products, Fertilizer, Steel, Cement and Electricity. Accordingly, indices for the month of February, 2016 have been revised. 2: Since October, 2016, Electricity generation data from Renewable sources is also included.

Page 32: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 34 • April 15, 2017

PERFORMANCE OF EIGHT CORE INDUSTRIESYEARLY INDEX & GROWTH RATE (BASE YEAR: 2004-05=100)

INDEX

GROWTH RATES (in %)

ECONOMIC STATISTICS

#Refinery Products’ yearly growth rate of 2012-13 is not comparable with other years on account of inclusion of RIL (SEZ) production data since April, 2012.

Sector Weight 2011-12 2012-13 2013-14 2014-15 2015-16 Apr-Feb 2015-16

Apr-Feb 2016-17

Coal 4.379 141.5 148.1 150.0 162.2 169.3 164.6 169.2

Crude Oil 5.216 112.1 111.4 111.2 110.2 108.7 108.8 105.7

Natural Gas 1.708 149.7 128.1 111.5 106.0 101.5 102.0 100.1

Refinery Products 5.939 133.7 172.5 175.0 175.6 183.2 181.5 192.3

Fertilizers 1.254 103.8 100.2 101.8 101.7 114.4 114.0 116.4

Steel 6.684 174.0 181.1 201.9 211.4 210.5 209.6 228.8

Cement 2.406 175.2 188.7 194.5 205.3 215.3 212.6 211.1

Electricity 10.316 149.3 155.3 164.6 178.5 192.4 192.1 201.7

Overall Index 37.903 145.3 154.7 161.2 168.5 174.7 173.5 181.2

Sector Weight 2011-12 2012-13 2013-14 2014-15 2015-16 Apr-Feb 2015-16

Apr-Feb 2016-17

Coal 4.379 1.3 4.6 1.3 8.1 4.4 4.7 2.8

Crude Oil 5.216 1.0 -0.6 -0.2 -0.9 -1.4 -1.0 -2.8

Natural Gas 1.708 -8.9 -14.5 -13.0 -4.9 -4.2 -3.6 -1.9

Refinery Products 5.939 3.1 29.0 1.5 0.3 4.3 3.7 5.9

Fertilizers 1.254 0.4 -3.4 1.5 -0.1 12.5 11.6 2.1

Steel 6.684 10.3 4.1 11.5 4.7 -0.5 -0.8 9.1

Cement 2.406 6.7 7.7 3.1 5.6 4.9 4.2 -0.7

Electricity 10.316 8.1 4.0 6.0 8.4 7.8 7.5 5.0

Overall Index 37.903 5.0 6.5 4.2 4.5 3.7 3.5 4.4

Page 33: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 35 • April 15, 2017

PERFORMANCE OF EIGHT CORE INDUSTRIESMONTHLY INDEX & GROWTH RATE (BASE YEAR: 2004-05=100)

INDEX

GROWTH RATES (in %)

ECONOMIC STATISTICS

Source: Ministry of Commerce & Industry

Sector Coal Crude Oil Natural Gas

Refinery Products

Fertilizers Steel Cement Electricity Overall Index

Weight 4.379 5.216 1.708 5.939 1.254 6.684 2.406 10.316 37.903

Feb-16 190.5 102.3 96.9 184.1 115.3 216.0 232.5 192.0 178.2

Mar-16 221.1 108.1 96.0 201.9 119.1 219.7 244.6 196.3 188.0

Apr-16 154.9 104.4 94.0 190.3 94.2 212.3 225.2 203.1 176.4

May-16 164.8 108.7 100.3 188.3 116.9 237.6 227.0 203.9 183.7

Jun-16 164.6 104.8 98.2 190.4 115.6 225.0 237.7 198.6 180.4

Jul-16 140.9 108.7 102.2 200.3 114.1 207.6 212.8 193.2 173.7

Aug-16 126.4 108.3 101.0 191.5 127.1 237.3 203.3 194.6 176.0

Sep-16 135.2 103.0 98.2 186.1 122.0 233.4 206.4 199.8 176.1

Oct-16 166.3 107.7 104.1 198.5 123.8 234.0 221.3 216.4 188.1

Nov-16 192.4 101.6 100.9 188.0 121.8 209.2 187.1 202.7 178.2

Dec-16 204.6 107.9 103.4 202.4 117.2 237.3 200.7 204.8 189.1

Jan-17 207.7 108.6 103.5 199.3 118.8 248.3 205.1 206.6 191.8

Feb-17 204.0 98.8 95.3 179.8 109.2 234.7 195.7 194.9 180.1

Sector Coal Crude Oil Natural Gas

Refinery Products

Fertilizers Steel Cement Electricity Overall Index

Weight 4.379 5.216 1.708 5.939 1.254 6.684 2.406 10.316 37.903

Feb-16 3.3 0.7 1.2 10.9 18.3 6.1 13.5 15.8 9.4

Mar-16 1.7 -5.1 -10.5 10.8 22.9 3.4 11.9 11.3 6.4

Apr-16 -0.9 -2.3 -6.8 17.9 7.8 6.1 4.4 14.7 8.5

May-16 5.5 -3.3 -6.9 1.2 14.8 3.2 2.4 4.6 2.8

Jun-16 12.0 -4.3 -4.5 3.5 9.8 2.4 10.3 8.1 5.2

Jul-16 5.1 -1.8 3.3 13.7 -4.3 -0.5 1.4 1.6 3.0

Aug-16 -9.2 -3.9 -5.7 3.5 5.7 17.0 3.1 0.1 3.2

Sep-16 -5.8 -4.1 -5.5 9.3 2.0 16.3 5.5 2.2 5.0

Oct-16 -1.6 -3.2 -1.4 15.1 0.8 16.9 6.2 2.8 6.6

Nov-16 6.4 -5.4 -1.7 2.0 2.4 5.6 0.5 10.2 4.9

Dec-16 4.4 -0.8 0.0 6.4 -4.7 14.9 -8.7 6.0 5.6

Jan-17 4.8 1.3 11.9 -1.5 -1.6 11.4 -13.3 4.8 3.4

Feb-17 7.1 -3.4 -1.7 -2.3 -5.3 8.7 -15.8 1.5 1.0

Page 34: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 36 • April 15, 2017

POWER STATISTICS

Source: CEA

Electricity Generation for Feb, 2017 (BU)Type Achievement Targets Achievement % Change

w.r.t. 2016Feb-16 Feb-17 Feb-17Thermal 79.893 81.624 79.455

Hydro 6.087 7.307 6.600

Nuclear 2.999 3.543 2.839

Bhutan Import 0.032 0.156 0.070

All India 89.011 92.630 88.964 -0.05

93.000

92.000

91.000

90.000

89.000

88.000

87.000

89.011

Feb-16 Feb-17

92.630

BU

All India Installed Capacity (MW) Region-wise as on 28.02.2017Thermal Nuclear Hydro RES Grand Total

Region Coal Gas Diesel TotalNorthern 46524.50 5781.26 0.00 52305.76 1620.00 19246.78 10246.98 83419.52

Western 72713.01 11203.41 0.00 83916.42 1840.00 7447.50 16861.14 110065.05

Southern 39652.50 6473.66 761.58 46887.74 2320.00 11739.03 21721.42 82668.19

Eastern 29847.87 100.00 0.00 29947.87 0.00 4738.12 896.63 35582.62

North-East 310.00 1771.05 36.00 2117.05 0.00 1242.00 280.44 3639.49

Islands 0.00 0.00 40.05 40.05 0.00 0.00 11.40 51.45

ALL INDIA 189047.88 25329.38 837.63 215214.89 5780.00 44413.43 50018.00 315426.32

Note: Captive Genaration is not included in the total. RES as on 31.12.2016.

350000.00

300000.00

250000.00

200000.00

150000.00

100000.00

50000.00

0.00Thermal

Thermal Nuclear Hydro RES Total Captive

Nuclear Hydro RES Total Captive

Total = 315426.32

215214.89

5780.0044413.43 50018.00

315426.32

40726

Page 35: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 37 • April 15, 2017

Road Watch

Source: NHAI

FOUR LANING OF JABALPUR TO LAKHNADON SECTION

Project DetailsFour laning of Jabalpur to Lakhnadon section of NH-7 from Km 465.500 to Km 546.425 in the state of Madhya Pradesh under NHDP Phase IV on EPC mode.

Name of Authority National Highways Authority of India

Contractor Name Larsen & Toubro Ltd

Authority Engineer Theme Engineering services Pvt Ltd

Project Cost `742.60 Crore

Agreement Signing Date August 2015

Date of Commencement 1st November 2015

Contract Period 910 days

Date of Completion June 2018

Current Status 24 Per Cent work is completed

ContactsLt. Col. Sharad chand singh, Project Director, Plot No. 1388, Near Jain Dental Clinic, Ahinsa Chowk, Vijay Nagar, Jabalpur – 482002, Madhya Pradesh. T: 0761-4047042, M: 9918582333, [email protected]

Page 36: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

Project Reporter • 38 • April 15, 2017

Road Projects

*Partial list **To be continued in next issue.... Source: NHAI

PROJECT AS ON 28TH FEBRUARY2017

Stretch NH No Length (Km)

Total Project Cost

(` Cr.)State Name Award Date Category Agency

Project Awarded Under BOT

Six laning of Chittorgarh - Udaipur section of NH-76 PKG-III

76 93.5 1100.19 Rajasthan September 2016

NHDP Phase V

TRIL Roads Pvt Ltd

Six Laning from Km.287.400 to Km.401.200 section of NH-8 PKG-V ( Gujarat - 13 km & Rajasthan - 100.80 km)

8 113.8 1244.1 Rajasthan/Gujarat

September 2016

NHDP Phase V

IRB Infrastructures Developers Ltd

Six laning of Kishangarh Udaipur Ahmedabad section (Near Gulabpur - end of Chittorgarh Bypass)- PKG-2

79 124.87 1239.82 Rajasthan September 2016

NHDP Phase V

IRB Infrastructure Developers Ltd

6 Laning of Kishangarh to Gulabpura section of NH-79A and NH-79 (PKG-1)

79&79A 90 1031.95 Rajasthan December 2016

NHDP Phase V

IRB Infrastructure developers Ltd

Project Awarded Under EPC

Six Laning of Kamrej - Chalthan 8 16.25 425.6 Gujarat May 2016 NHDP Phase

V

State Construction Integrated Works of Administrative Department of Verkhona Rada of Ukraine and UniqueConstruction

2 laning with PS Tonk - Sawaimadhopur 116 66.8 320.3 Rajasthan August 2016 NHDP Phase

IV

H G Infra Engineering Pvt Ltd

4 laning of Hubli - Hospet section of NH-63 63 143.29 1664.2 Karnataka August 2016 NHDP Phase

IVB

BSCPL Infrstructure Ltd - KNR Constructions Ltd

4 Laning of Hospet - Bellary - Karnataka /AP Border

63 95.37 1167.42 Karnataka August 2016 NHDP Phase IVB Gammon India Ltd

Four Laning of Barhi - Hazaribagh 33 41.27 323.72 Jharkhand August 2016 NHDP Phase

IIIRamky Infrastructure Ltd

Four Laning of UP/Haryana border - Yamunanagr -Saha-Barwala-Panchkula section NH-73 (PKG-3)

73 19.2 248.97 Haryana August 2016 NHDP Phase III

Gawar Construction Ltd

Page 37: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

ASAPP Info Global Services Pvt. Ltd.

ASAPPinfoGlobal.com

ASAPP Info Global Services Pvt. Ltd.

ASAPPinfoGlobal.comASAPP Info Global Services Pvt. Ltd.

ASAPPinfoGlobal.com

PROJECT REPORTER - ELECTRONIC EDITION (DOWNLOADABLE PDF)

Tenure Cover Price You Save You Pay1 Year (24 Issues) 3,500 - 3,5002 Year (48 Issues) 7,000 1,050 5,9503 Year (72 Issues) 10,500 2,100 8,400

To SubscribeCall: 022 2419 3000 Email: [email protected]

Subscribe Online: www.ProjectReporter.co.in

Page 38: 148 Projects & Tenders - School of Planning and … Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 To order online visit

ASAPP Info Global Group Presents 3rd Edition of

• Databaseofcompaniesfromthecementsectorcomprising–manufacturers,dealers,suppliers,cementplantmachinery,consultants,cementconcreteblock,RMC,cementproducts,cementstorage/transportandalliedindustries

• Sectoroverview

• Aprofileofthecompanies-theareasofbusiness,keyoperatingunits,subsidiaries,etc

• Namesandcompletecontactdetailsofkeyexecutives

• Vitalsectordataandstatistics• Projectopportunities–around200projects

wherecementrequirementexists

A unique, integrated business directory on Cement Industry

Cement Infobank is a practical database with a wealth of information that includes:

Contact: [email protected]: + 91 22 2419 3000

NOW!ORDER YOUR

COPY

A-303,NavbharatEstate,ZakariaBunderRoad,Sewri(West),Mumbai-400015.Tel.:022-24193000.Fax:022-24175734Email:[email protected]

To order online visit : www.ASAPPinfoGLOBAL.com/Subscribe

®

` 5000/-` 3999/-

ISSN 2277-6532 Date of Publication: 1st & 15th of Every Month.