1
PAGE 1 OF 1 Michigan Department of Transportation 1452 (05/19) TRUSS, TYPE C & D INSTALLATION INSPECTION REPORT To be completed in conjunction with Truss, Type C & D Installation Inspection Procedure and submitted to the Structural Fabrication Unit. File Naming Convention: 1452 SN-CS-JN Date.pdf GENERAL INFORMATION STRUCTURE # CONTROL SECTION JOB NUMBER DATE REGION COUNTY ROUTE LOCATION DESCRIPTION GPS LAT ______________________________ __________ GPS LONG __________________________________ ____ STRUCTURE INFORMATION TRUSS STANDARD PLAN # SIGN CONNECTION STANDARD PLAN # FOUNDATION STANDARD PLAN # SIGN LEGEND VISUAL INSPECTION CHORD TO UPRIGHT CONNECTION WELDS BOLTS STRUCTURE BASE & FOUNDATION WELDS FOUNDATION CHORD TO CHORD CONNECTION BOLTS ANCHOR BOLT ID # LH RH ANCHOR BOLT INSPECTION (LH/RH) 1 2 3 4 5 6 7 8 SOUNDING ANCHOR NUTS 1 2 3 4 5 6 7 8 ANCHOR BOLT PROJECTION (P) 1 2 3 4 5 6 7 8 STAND-OFF DISTANCE (S) 1 2 3 4 5 6 7 8 ULTRASONIC TESTING REMARKS INSPECTOR COMPANY

1452 Truss, Type C & D Installation Inspection Report of Transportation 1452 (0 /19) TRUSS, TYPE C & D INSTALLATION INSPECTION REPORT To be completed in conjunction with Truss, Type

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 1452 Truss, Type C & D Installation Inspection Report of Transportation 1452 (0 /19) TRUSS, TYPE C & D INSTALLATION INSPECTION REPORT To be completed in conjunction with Truss, Type

PAGE 1 OF 1Michigan Department

of Transportation 1452 (05/19)

TRUSS, TYPE C & DINSTALLATION INSPECTION REPORT

To be completed in conjunction with Truss, Type C & D InstallationInspection Procedure and submitted to the Structural Fabrication Unit.

File Naming Convention: 1452 SN-CS-JN Date.pdf

GENERAL INFORMATIONSTRUCTURE # CONTROL SECTION JOB NUMBER DATE

REGION COUNTY ROUTE

LOCATION DESCRIPTION

GPS LAT______________________________ __________ ○

GPS LONG__________________________________ ____ ○

STRUCTURE INFORMATION

TRUSSSTANDARD PLAN #

SIGN CONNECTION STANDARD PLAN #

FOUNDATION STANDARD PLAN #

SIGN LEGEND

VISUAL INSPECTION

CHORD TO UPRIGHT CONNECTIONWELDSBOLTS

STRUCTURE BASE & FOUNDATIONWELDSFOUNDATION

CHORD TO CHORD CONNECTION BOLTSANCHOR BOLT ID # LH

RH

ANCHOR BOLT INSPECTION (LH/RH)1 2 3 4 5 6 7 8

SOUNDINGANCHOR NUTS

1 2 3 4 5 6 7 8ANCHOR BOLTPROJECTION (P)

1 2 3 4 5 6 7 8STAND-OFFDISTANCE (S)

1 2 3 4 5 6 7 8ULTRASONICTESTING

REMARKS

INSPECTOR COMPANY