Anika Garments (pvt)
Ltd.I/1, Gha Part, 4th foor, Section-2,Mirpur (23.80979, 90.308!9"
1th Septe#$er 2013
7/23/2019 14258
http://slidepdf.com/reader/full/14258 2/14
Limit density of loading inbonded
warehouse on Level 4
7/23/2019 14258
http://slidepdf.com/reader/full/14258 3/14
Loadi3
Material rolls stackedto ceiling height andon escape
routes inbonded warehouse
urrent storagedensity is
withindesign capacity.
!lan and height restrictions tobe introduced to prevent futureoverloading.
7/23/2019 14258
http://slidepdf.com/reader/full/14258 4/14
4
heck on roof structure forlocalised high
loading by water tanks
re"uired
7/23/2019 14258
http://slidepdf.com/reader/full/14258 5/14
Loadi5
Level #$ lusterof % polytanks
mounted on concrete plinths
of varyingthicknesses
heck re"uired to
see if beam andslab (and
columns) havebeen
designed toaccommodatethese loads.
7/23/2019 14258
http://slidepdf.com/reader/full/14258 6/14
6
olumn capacity reduced byelectrical
bo&es
7/23/2019 14258
http://slidepdf.com/reader/full/14258 7/14olumn
7
olumns typicallyhave electrical bo&esrecessed into twofaces at every 'oor (mm deep)
*erify that thereduction in thecapacity of thecolumn has
beenaccounted for.
7/23/2019 14258
http://slidepdf.com/reader/full/14258 8/148
heck on structures that arenot on thedrawings
7/23/2019 14258
http://slidepdf.com/reader/full/14258 9/14Additional
9
Lightweight steel structure
+teel canopy
L, slab e&tension
Minor e&tensions to building
not on the
drawings andwithout a permit.
-esign to be checked asbuilt drawings to beproduced and a permit to be
7/23/2019 14258
http://slidepdf.com/reader/full/14258 10/14
Additional1
obtained.
7/23/2019 14258
http://slidepdf.com/reader/full/14258 11/1411
!riority Actions
7/23/2019 14258
http://slidepdf.com/reader/full/14258 12/14
!roblems observed
/01M ,$ %oncrete &tren'th in cou#n&.
/01M 2$ no. )ater tan*& ocate+ in a cu&ter on the roo #ounte+on concrete
pinth&.
/01M 3$ %ou#n capacit re+uce+ $ eectrica $oe&.
/01M 4$ ++itiona &tructure& at 'roun+ ee not on the +rain'&1. ten&ion to concrete &a$2. Stee canop3. i'htei'ht &tee &tructure
/01M $ Materia& &tac*e+ co&e to ceiin' in +en&e &pace+ pie&ithin the
$on+e+ arehou&e on ee 4.
7/23/2019 14258
http://slidepdf.com/reader/full/14258 13/1413
/tem o. 5bservation 6ecommended Action !lan 6ecommended0imeline
1%oncrete &tren'th in
cou#n&.actor n'ineer to reie +e&i'n, oa+& an+cou#n& &tre&&e& in area i+enti5e+ a$oe.
%7weeks
2%oncrete &tren'th in
cou#n&.6eri in &itu concrete &tre&&e& either $ core&or ei&tin' cin+er &tren'th +ata or thei+enti5e+ cou#n&.
%7weeks
3%oncrete &tren'th in
cou#n&.
Pro+uce an+ actie #ana'e a oa+in' pan ora foor pate& ithin the actor 'iin'con&i+eration to foor capacit an+ cou#ncapacit.
%7month
s
4
no. )ater tan*&ocate+ in a cu&ter onthe roo #ounte+ on
concrete
pinth&.
6eri that $ea#/&a$ ha& &ucient capacit to&upport
u 5e+ ater tan*& pu& concretepinth
%7month
s
!%ou#n capacit
re+uce+ $
eectrica $oe&.
Proi+e cacuation& &hoin' the &tructuraa+euac o a cou#n& ta*in' into accountthe oa+in' pan& an+ re+uction in capacit+ue to eectrica $oe&. hi& &hou+ $e +oneor current 9 &tore con&truction an+ or an
uture eten&ion
%7month
s
7/23/2019 14258
http://slidepdf.com/reader/full/14258 14/14
/tem o. 5bservation 6ecommended Action !lan 6ecommended0imeline
++itiona &tructure& at'roun+ ee not on the+rain'&:
1. ten&ion to concrete&a$,
2. Stee canop,
3. i'htei'ht &tee
actor n'ineer to reie +e&i'n, oa+& an+cou#n& &tre&&e& in area i+enti5e+ a$oe.
%7month
s
7Materia& &tac*e+ co&e toceiin' in +en&e &pace+pie& ithin the $on+e+arehou&e on ee 4.
n&ure that &tac*& o #ateria& ithin the$on+e+ arehou&e are &eparate+ $ a 0.!#'ap a aroun+
%7month
s
8Materia& &tac*e+ co&e toceiin' in +en&e &pace+pie& ithin the $on+e+arehou&e on ee 4.
%reate controe+ oa+in' pan& or a foor&+e&i'natin' here &tora'e can $e pace+an+ can not $e pace+. ;e&i'nate+ area&#u&t $e co##unicate+ to the actor#ana'e#ent
%7month
s