Limit density of loading inbonded

warehouse on Level 4

Page 3: 14258

7/23/2019 14258

http://slidepdf.com/reader/full/14258 3/14

Loadi3

Material rolls stackedto ceiling height andon escape

 

routes inbonded warehouse

urrent storagedensity is

 

withindesign capacity.

!lan and height restrictions tobe introduced to prevent futureoverloading.

Page 4: 14258

7/23/2019 14258

http://slidepdf.com/reader/full/14258 4/14

4

heck on roof structure forlocalised high

loading by water tanks

re"uired

Page 5: 14258

7/23/2019 14258

http://slidepdf.com/reader/full/14258 5/14

Loadi5

Level #$ lusterof % polytanks

mounted on concrete plinths

of varyingthicknesses

heck re"uired to

see if beam andslab (and 

columns) havebeen

 

designed toaccommodatethese loads.

Page 6: 14258

7/23/2019 14258

http://slidepdf.com/reader/full/14258 6/14

6

olumn capacity reduced byelectrical

bo&es

Page 7: 14258

7/23/2019 14258

http://slidepdf.com/reader/full/14258 7/14olumn

7

olumns typicallyhave electrical bo&esrecessed into twofaces at every 'oor (mm deep)

*erify that thereduction in thecapacity of thecolumn has

 

beenaccounted for.

Page 8: 14258

7/23/2019 14258

http://slidepdf.com/reader/full/14258 8/148

heck on structures that arenot on thedrawings

Page 9: 14258

7/23/2019 14258

http://slidepdf.com/reader/full/14258 9/14Additional

9

Lightweight steel structure

+teel canopy

L, slab e&tension

Minor e&tensions to building

not on the 

drawings andwithout a permit.

-esign to be checked asbuilt drawings to beproduced and a permit to be

Page 10: 14258

7/23/2019 14258

http://slidepdf.com/reader/full/14258 10/14

Additional1

obtained.

Page 11: 14258

7/23/2019 14258

http://slidepdf.com/reader/full/14258 11/1411

!riority Actions

Page 12: 14258

7/23/2019 14258

http://slidepdf.com/reader/full/14258 12/14

!roblems observed

/01M ,$ %oncrete &tren'th in cou#n&.

/01M 2$ no. )ater tan*& ocate+ in a cu&ter on the roo #ounte+on concrete

pinth&.

/01M 3$ %ou#n capacit re+uce+ $ eectrica $oe&.

/01M 4$ ++itiona &tructure& at 'roun+ ee not on the +rain'&1. ten&ion to concrete &a$2. Stee canop3. i'htei'ht &tee &tructure

/01M $ Materia& &tac*e+ co&e to ceiin' in +en&e &pace+ pie&ithin the

$on+e+ arehou&e on ee 4.

Page 13: 14258

7/23/2019 14258

http://slidepdf.com/reader/full/14258 13/1413

/tem o. 5bservation 6ecommended Action !lan 6ecommended0imeline

1%oncrete &tren'th in

cou#n&.actor n'ineer to reie +e&i'n, oa+& an+cou#n& &tre&&e& in area i+enti5e+ a$oe.

%7weeks

2%oncrete &tren'th in

cou#n&.6eri in &itu concrete &tre&&e& either $ core&or ei&tin' cin+er &tren'th +ata or thei+enti5e+ cou#n&.

%7weeks

3%oncrete &tren'th in

cou#n&.

Pro+uce an+ actie #ana'e a oa+in' pan ora foor pate& ithin the actor 'iin'con&i+eration to foor capacit an+ cou#ncapacit.

%7month

s

4

no. )ater tan*&ocate+ in a cu&ter onthe roo #ounte+ on

concrete 

pinth&.

6eri that $ea#/&a$ ha& &ucient capacit to&upport

 

u 5e+ ater tan*& pu& concretepinth

%7month

s

!%ou#n capacit

re+uce+ $ 

eectrica $oe&.

Proi+e cacuation& &hoin' the &tructuraa+euac o a cou#n& ta*in' into accountthe oa+in' pan& an+ re+uction in capacit+ue to eectrica $oe&. hi& &hou+ $e +oneor current 9 &tore con&truction an+ or an 

uture eten&ion

%7month

s

Page 14: 14258

7/23/2019 14258

http://slidepdf.com/reader/full/14258 14/14

/tem o. 5bservation 6ecommended Action !lan 6ecommended0imeline

++itiona &tructure& at'roun+ ee not on the+rain'&:

1. ten&ion to concrete&a$,

2. Stee canop,

3. i'htei'ht &tee

actor n'ineer to reie +e&i'n, oa+& an+cou#n& &tre&&e& in area i+enti5e+ a$oe.

%7month

s

7Materia& &tac*e+ co&e toceiin'  in +en&e &pace+pie& ithin the $on+e+arehou&e on ee 4.

n&ure that &tac*& o #ateria& ithin the$on+e+ arehou&e are &eparate+ $ a 0.!#'ap a aroun+

%7month

s

8Materia& &tac*e+ co&e toceiin'  in +en&e &pace+pie& ithin the $on+e+arehou&e on ee 4.

%reate controe+ oa+in' pan& or a foor&+e&i'natin' here &tora'e can $e pace+an+ can not $e pace+. ;e&i'nate+ area&#u&t $e co##unicate+ to the actor#ana'e#ent

%7month

s