140
7/23/2019 140-P-005 With Calculated DP ISO-final http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 1/140 user Input 1 put data for Stream eam No. kg/h Volume m3/h ss Flowrate for Case study kg/h nsity kg/m3 cosity cp mperature ecular !eight ecific heat ratio Cp/C" minal #ipe Si$e in ut %nside Diameter in h. No. aight &ength m ui"alent &ength )*y +ser, m ughness m ut &ine #ress. Drop kg/cm tation of Velocity tation of #ress. Drop mber of Fittings (Mode1) gate/*all/plug ea glo*e ea *utterfly ea check ea 0 el*o ea 12 el*o ea ee *ranch ea ee through ea m put Data for Device scription ssure kg/cm)g, ssure Drop kg/cm "ation m er Design for CV 4 ase &/V/Mi5ed wrate Mass mpress.Fact. 6

140-P-005 With Calculated DP ISO-final

Embed Size (px)

Citation preview

Page 1: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 1/140

user Input

1쪽

put data for Stream

eam No.

kg/h

Volume m3/h

ss Flowrate for Case study kg/h

nsity kg/m3

cosity cp

mperature ℃

ecular !eight

ecific heat ratio Cp/C"

minal #ipe Si$e in

ut %nside Diameter in

h. No.

aight &ength m

ui"alent &ength )*y +ser, m

ughness m

ut &ine #ress. Drop kg/cm

tation of Velocity

tation of #ress. Drop

mber of Fittings (Mode1)

gate/*all/plug ea

glo*e ea

*utterfly ea

check ea

0 el*o ea

12 el*o ea

ee *ranch ea

ee through ea

m

put Data for Device

scription

ssure kg/cm)g,

ssure Drop kg/cm

"ation m

er Design for CV 4

ase &/V/Mi5ed

wrate Mass

mpress.Fact. 6

Page 2: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 2/140

user Input

2쪽

put data for Pump

No.

erencial #ressure kg/cm

nter 'le"ation m

por #ressure kg/cm)a,

ut7ff #ressure kg/cm

Factor 

rmal # press at Suction kg/cm)g,

From '& to 8&& mDri"e ype )Motor/ur*ine,

Page 3: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 3/140

)CV e(n 9 :D Manual e(uation, ;:arometric # 9 <.0<3 *ar= 8ydroMaster V3.

<rev 0 : 24-11-09 ><rev 1 : 2010-05-10 > Z:\Persona !o"ers

1,052-1#'

0,33#'

0,+

0

0

<107C700

S7002

0.010 *ar 0.<0 m

<107#7002B/:1.00 *ar 

0.<0 m

F'711

0.20 *ar 0.200 m

FCV711

0.000 *ar 0.200 m )GH9 0.0

<107'B7003

89 / V9 0.220 *ar 

89 / V9 <@.220 m

<107''700?

S9 0.<10 / 9 *ar S9 <.20 / 9 m

<107C7007N<0

?.300 *ar)g,

<.000 m

S#7<

0.000 *ar 

0.<0 m

'700B/:/C/DS9 0.?20 / 9 *ar 

S9 3.?00 / 9 m

-712

0.000 *ar 

<.000 m

31 2

<?<@

<1

<107V70<

89 / V9 <.000 *ar 

89 / V9 <.200 m

<0 <<

V700

89 0.?00 / V9 *ar 

89 2.000 / V9 m

1, ;/7 Pressure o! 5 .arg $s assume" to .e at t%e gr$",

2, 'auate" =P !or 8?s are prorate" as per t%e pump apa$t@ 

3, Pump sut$on an" &tream 5A*A9 B 10 C, 7engt% $s .ase" on$sometr$s

4, 140-D-009 Eop evat$on $s assume" to .e 5m,

<

<107C7007N0?

?.300 *ar)g,

.000 m

sp73

0.000 *ar 

0.<0 m

?

S#

0.000 *ar 

<@.200 m

@

S#20.000 *ar <@.200 m

F$ter

;akGas%

<

<3

S#2

0.000 *ar 

1.200 m

# down;*ar)g,=

d# head;*ar=

&ine si$e;in=

Flowrate;kg/h=

Density;kg/m3=

Viscosity;cp=

Velocity;m/s=

Stra. &ength;m=

'(u". &ength;m=

d# "ari.;*ar=

phase

Stream no

Flowrate;m3/h=

d# "ari;*ar/<00m=

?.2

70.310

<

<0.20

<<0@.<

@<.200

0.200

<.3<<.10

13.?0

0.0<

li(uid

3.3?

0.03

?.<

0.000

<0.20

<@@?.?0

@<.200

0.200

0.1.30

<@.<0

0.001

li(uid

<@.<0

0.03

?.2@0

0.000

3

<0.00

<@@?<.2

@<.200

0.200

<.030.@0

.0

0.00<

li(uid

<@.<0

0.0

<<.??

0.000

1

.02

<@@?<.2

@<.200

0.200

[email protected]

<2.00

0.02

li(uid

<@.<0

0.31

<<.2

0.<@?

2

.02

<@@?<.2

@3.100

0.200

.@<32.00

0.0

0.3<2

li(uid

<@@.2?

0.31@

.01

<.<2

.02

<@@?<.2

[email protected]

0.?00

.1<1.00

@.0

0.?2

li(uid

<<.12

0.30

.030

0.001

?

.02

113.00

[email protected]

0.?00

<.03.00

.00

0.00?

li(uid

@0.?3

0.0@0

@.1??

70.001

@

.02

113.00

@<.00

<.2000

<.<@3.00

.00

0.00?

li(uid

?@.<

0.0@<

@.@?

70.20<

.02

<@@?<.2

@<.00

<.2000

.32<3.00

3.@0

0.<0<

li(uid

<2?.@<

0.30

.0?

70.2

<0

.02

<@@?<.2

@3.300

.3000

.3<<@.00

3@.@0

0.<<

li(uid

<21.@1

0.3<

@.@

70.@2

<<

.02

<@@?.?0

@3<.000

.1000

.3<<0.00

30.00

0.01

li(uid

<22.0@

0.3<1

?.<1

0.12

<

.02

<@@?.?0

@3<.00

.1000

.3<?0.00

<02.00

0.330

li(uid

<22.01

0.3<1

?.103

70.3

<3

.02

<@@?.?0

@3<.00

.1000

.3<<0.00

<2.00

0.01?

li(uid

<22.01

0.3<1

?.<2

0.000

<1

.02

<@@?.?0

@3<.00

.1000

.3<3.00

.00

0.0@

li(uid

<22.01

0.3<1

1.<

0.3

<2

.02

<@@?.?0

@3<.00

.1000

.3<@.00

1.00

0.0?2

li(uid

<22.01

0.3<1

<@

@

li(

Page 4: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 4/140

)CV e(n 9 :D Manual e(uation, ;:arometric # 9 <.0<3 *ar= 8ydroMaster V3.

<rev 0 : 24-11-09 ><rev 1 : 2010-05-10 > Z:\Persona !o"ers\#m

1,052- 1#'

0,33#'

0,+

0

0

Shu

 

 

'& t

Dri"e

<107C700

S70020.010 *ar 

0.<0 m

<107#7002B/:

1.00 *ar 0.<0 m

F'7110.20 *ar 

0.200 m

FCV7110.000 *ar 

0.200 m )GH9 0.0 4,

<107'B7003

89 / V9 0.220 *ar 

89 / V9 <@.220 m

<107''700?S9 0.<10 / 9 *ar 

S9 <.20 / 9 m

<107C7007N<0

?.300 *ar)g,

<.000 m

S#7<

0.000 *ar 

0.<0 m

'700B/:/C/D

S9 0.?20 / 9 *ar 

S9 3.?00 / 9 m

-712

0.000 *ar <.000 m

31 2

<?<@

<1

<107V70<

89 / V9 <.000 *ar 

89 / V9 <.200 m

<0 <<

V700

89 0.?00 / V9 *ar 

89 2.000 / V9 m

<2

S#7

0.00

1.20

1, ;/7 Pressure o! 5 .arg $s assume" to .e at t%e gr$",

2, 'auate" =P !or 8?s are prorate" as per t%e pump apa$t@ 

3, Pump sut$on an" &tream 5A*A9 B 10 C, 7engt% $s .ase" on$sometr$s

<

<107C7007N0?

?.300 *ar)g,

.000 m

sp73

0.000 *ar 0.<0 m

?

S#

0.000 *ar 

<@.200 m

@

S#20.000 *ar 

<@.200 m

F$ter ;akGas%<

<3

S#20.000 *ar 

1.200 m

# down;*ar)g,=

d# head;*ar=

&ine si$e;in=

Flowrate;kg/h=

Density;kg/m3=

Viscosity;cp=

Velocity;m/s=

Stra. &ength;m='(u". &ength;m=

d# "ari.;*ar=

phase

Stream no

Flowrate;m3/h=

d# "ari;*ar/<00m=

2.000

70.3?

<

.02

<@@?.?0

@3<.00

.1000

.3<

3.00.00

0.0@

li(uid

<22.01

0.3<1

Page 5: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 5/140

auat$on

5쪽

 

'D "ata 29,4++ 29,4++

v name F'D-442 F'D-442

v P1 +,125 +,125

v P2 5,0*3 5,0*3

v !oG 12))+2,+00 12))+2,+00

v "ens )31,200 )31,200

'v vaue 114,0*0 114,0*0

P%ase $Cu$" $Cu$"

oop 1,000 3,000

over "es$gn 1,000 1,000 

Page 6: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 6/140

auat$on

*쪽

Page 7: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 7/140

auat$on

+쪽

Page 8: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 8/140

auat$on

)쪽

Page 9: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 9/140

auat$on

9쪽

Proh

Page 10: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 10/140

auat$on

10쪽

ibit to access

Page 11: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 11/140

auat$on

11쪽

Page 12: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 12/140

auat$on

12쪽

Page 13: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 13/140

auat$on

13쪽

Page 14: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 14/140

auat$on

14쪽

Page 15: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 15/140

auat$on

15쪽

Page 16: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 16/140

auat$on

1*쪽

Page 17: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 17/140

auat$on

1+쪽

Page 18: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 18/140

auat$on

1)쪽

Page 19: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 19/140

auat$on

19쪽

Page 20: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 20/140

auat$on

20쪽

Page 21: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 21/140

auat$on

21쪽

Page 22: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 22/140

auat$on

22쪽

Page 23: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 23/140

auat$on

23쪽

Page 24: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 24/140

auat$on

24쪽

Page 25: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 25/140

auat$on

25쪽

Page 26: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 26/140

auat$on

2*쪽

Page 27: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 27/140

$nput

2+ 쪽

 

Prohibit to access

Page 28: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 28/140

oop

2)쪽

Page 29: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 29/140

oop

29쪽

Page 30: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 30/140

oop

30쪽

Page 31: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 31/140

oop

31쪽

Page 32: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 32/140

oop

32쪽

Page 33: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 33/140

oop

33쪽

Page 34: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 34/140

oop

34쪽

Page 35: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 35/140

oop

35쪽

Page 36: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 36/140

oop

3*쪽

Page 37: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 37/140

oop

3+쪽

Page 38: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 38/140

oop

3)쪽

Page 39: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 39/140

oop

39쪽

Page 40: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 40/140

oop

40쪽

Page 41: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 41/140

oop

41쪽

Page 42: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 42/140

oop

42쪽

Page 43: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 43/140

oop

43쪽

Page 44: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 44/140

oop

44쪽

Page 45: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 45/140

oop

45쪽

Page 46: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 46/140

oop

4*쪽

Page 47: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 47/140

oop

4+쪽

Page 48: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 48/140

oop

4)쪽

Page 49: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 49/140

oop

49쪽

Page 50: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 50/140

oop

50쪽

Page 51: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 51/140

oop

51쪽

Page 52: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 52/140

oop

52쪽

Page 53: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 53/140

oop

53쪽

Page 54: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 54/140

oop

54쪽

Page 55: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 55/140

oop

55쪽

Page 56: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 56/140

oop

5*쪽

Page 57: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 57/140

oop

5+쪽

Page 58: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 58/140

oop

5)쪽

Page 59: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 59/140

oop

59쪽

Page 60: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 60/140

oop

*0쪽

Page 61: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 61/140

oop

*1쪽

Page 62: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 62/140

oop

*2쪽

Page 63: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 63/140

oop

*3쪽

Page 64: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 64/140

oop

*4쪽

Page 65: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 65/140

oop

*5쪽

Page 66: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 66/140

oop

**쪽

Page 67: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 67/140

oop

*+쪽

 

Page 68: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 68/140

oop

*)쪽

Page 69: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 69/140

oop

*9쪽

Page 70: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 70/140

oop

+0쪽

Page 71: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 71/140

oop

+1쪽

Page 72: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 72/140

oop

+2쪽

Page 73: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 73/140

oop

+3쪽

Page 74: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 74/140

oop

+4쪽

Page 75: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 75/140

oop

+5쪽

Prohibit to access

Page 76: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 76/140

oop

+*쪽

Page 77: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 77/140

oop

++쪽

Page 78: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 78/140

oop

+)쪽

Page 79: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 79/140

oop

+9쪽

Page 80: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 80/140

oop

)0쪽

Page 81: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 81/140

oop

)1쪽

Page 82: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 82/140

oop

)2쪽

Page 83: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 83/140

oop

)3쪽

Page 84: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 84/140

oop

)4쪽

Page 85: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 85/140

oop

)5쪽

Page 86: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 86/140

oop

)*쪽

Page 87: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 87/140

oop

)+쪽

Page 88: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 88/140

oop

))쪽

Page 89: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 89/140

oop

)9쪽

Page 90: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 90/140

oop

90쪽

Page 91: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 91/140

oop

91쪽

Page 92: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 92/140

oop

92쪽

Page 93: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 93/140

oop

93쪽

Page 94: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 94/140

oop

94쪽

Page 95: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 95/140

oop

95쪽

Page 96: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 96/140

oop

9*쪽

Page 97: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 97/140

oop

9+쪽

Page 98: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 98/140

oop

9)쪽

Page 99: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 99/140

oop

99쪽

Page 100: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 100/140

oop

100쪽

Page 101: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 101/140

oop

101쪽

Page 102: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 102/140

oop

102쪽

Page 103: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 103/140

oop

103쪽

Page 104: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 104/140

oop

104쪽

Page 105: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 105/140

oop

105쪽

Page 106: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 106/140

oop

10*쪽

Page 107: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 107/140

oop

10+쪽

Page 108: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 108/140

oop

10)쪽

Page 109: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 109/140

oop

109쪽

Page 110: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 110/140

oop

110쪽

Page 111: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 111/140

oop

111쪽

Page 112: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 112/140

oop

112쪽

Page 113: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 113/140

oop

113쪽

Page 114: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 114/140

oop

114쪽

Page 115: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 115/140

oop

115쪽

Page 116: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 116/140

oop

11*쪽

Page 117: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 117/140

oop

11+쪽

Page 118: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 118/140

oop

11)쪽

Page 119: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 119/140

oop

119쪽

Page 120: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 120/140

oop

120쪽

Page 121: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 121/140

oop

121쪽

Page 122: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 122/140

oop

122쪽

Page 123: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 123/140

oop

123쪽

Page 124: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 124/140

oop

124쪽

Page 125: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 125/140

oop

125쪽

Page 126: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 126/140

oop

12*쪽

Page 127: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 127/140

oop

12+쪽

Page 128: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 128/140

oop

12)쪽

Page 129: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 129/140

oop

129쪽

Page 130: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 130/140

oop

130쪽

Page 131: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 131/140

oop

131쪽

Page 132: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 132/140

oop

132쪽

Page 133: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 133/140

oop

133쪽

Page 134: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 134/140

oop

134쪽

Page 135: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 135/140

oop

135쪽

Page 136: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 136/140

oop

13*쪽

Page 137: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 137/140

oop

13+쪽

Page 138: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 138/140

oop

13)쪽

Page 139: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 139/140

oop

139쪽

Page 140: 140-P-005 With Calculated DP ISO-final

7/23/2019 140-P-005 With Calculated DP ISO-final

http://slidepdf.com/reader/full/140-p-005-with-calculated-dp-iso-final 140/140

Jo* No 9 #C0?3#roKect Name 9 Malaysian lefin #roKect

EGo p%ase stream ana@s$s date 9 0</02/0<#age <10 of <10

Stream for# .est t/o pase stream ana2sis(%0-3-1%%4 1% IN53.) prepared *y 9 :..%M

Process Data First Point Reference Pointflowrate pres temp mw density "isco Cp 8 "ap # 6 pres temp density "isco Cp 8 "ap # 6

kg/h *ar)a, ℃ kg/m3 cp kcal/kgC kcal/kg *ar)a, factor  *ar)a, ℃ kg/m3 cp kcal/kgC kcal/kg *ar)a, factor 

VAP 2?.2 @.1 72?.< 33.0 0.00?@ <. 000.00 @.3?0 <.00 @.3?0 72?.00 <2.<0 0.00?@ <. <00.00 1.000 <.00

LIQ <0<<.2 13.@@0 0.03 .3 13.@@0 0.03 .3

 

Geometry Datano element desc diameter length rough angle -/D D/D< 7"alue no element desc diameter length rough angle -/D D/D< 7"alue

in m m in m m

< pipe <<< 1 < 0.000<2 0 <<

*end *ara 1 0.000<2 0 <.200 <

3 <3

1 <1

2 <2 <

? <?

@ <@

<

<0 0

Calclation !t"t

no eement desc engt ange 6 press temp void 7uait2 densit2 veocit2 ma8" ve fo/ pattern Pressure Drop (bar9m) bar  

m vaue bar(a) # fraction :g9m m9s m9s ; < regime friction gravit2 moment .ota

1 start 0.00 0 @.1<0 72?.<0 0.33< 0.02 332.33 <.0? 0.00'L0

% pipe <<< <.00 0 @.3? 72?.<0 0.33 0.02 331.2 <.0? 0.0 .2'L 2.<'L0 *u*slg .2'71 3.3'7 2.?'7 3.32'7

*end *ara 3.@ 0.000 @.3?2 72?.<0 0.3< 0.02 31<.3 <.02 0.0 1.<'71 0.0'L0 ?.0'7@ <.2?'73

0.00'L0

' 0.00'L0

0.00'L0

Fr

or

E

87

hori$ontal flowaitel and DuklerE <?

 

8B A annular dispersed li(uid8: A dispersed *u**le8C A stratified wa"y8D A stratified smooth>3 ? intermittent (sug and pug) 

DOQ

DO

 "ertical upward flow 8ewitt and -o*ertsE <

V+B A annular

V+: A wispy annular

$@C ? curn$@D ? bubb2 sugV+' A *u**le

D=Q

D=

"ertical downward flowolan and StenningE <

$DA ? annuar $DB ? osciar2VDC A slug and *u**le

1.2 1.6 2.0

1.6

1.2

0.8

0.4

  0

 0 0.4 0.8

VDA

VDB

VDC

2.0

VUA

 1000

  100

  10

  1

  0.1

  1 10 100 1000 10000 100000

VUB

VUC

VUD

VUE

 10000

  1000

10

  1

 0.1

 0.01

 0.001

0.001 0.01 0.1 1 10 100 1000 10000

HAHB

HEHC HD

10000

100

  10

1