Upload
brian-paul-salvan-ragudo
View
216
Download
0
Embed Size (px)
DESCRIPTION
straight line
Citation preview
LEGEND:
NEW PCCP
STRAIGHT LINE DIAGRAM
ROAD UPGRADING (UNPAVED TO PAVED) BASED ON
GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR
UPGRADING TO PAVED ROAD STANDARDS (HDM - 4
PROJECT ANALYSIS) (INTERMITTENT SECTIONS) 2.
SECONDARY ROADS B. TALABA – SUMMIT – PANAON RD
– K0179+426 – K0179+867, KO179+897 – KO180+072
KO179+426 - KO179+864.93 (AS PER PROGRAM)
KO179+895.25 - KO180+051.86
EXISTING PCCP
BEGINNING OF PROJECT
K0 179 + 426
K0 180 + 200 K0 180 + 400
K0 180 + 600
K0 181 + 000
K0 180 + 000
K0 180 + 800
K0 179 + 200 K0 179 + 400
K0 179 + 600
K0 180 + 000
K0 179 + 000
K0 179 + 800
END OF PROJECT
K0 179 + 864.93
BEGINNING OF PROJECT
K0 179 + 895.25
END OF PROJECT
K0 180 + 051.86
L = 438.93 l.m. L = 104.75 l.m.
L = 51.86 l.m.
PREPARED BY:
NOEL N. GOB
PROJECT ENGINEER