19
7/30/2019 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs http://slidepdf.com/reader/full/129339363-3g-sgsn-sgn3-periodic-rau-improvement-rs 1/19 REQUIREMENT SPECIFICATION 3G-SGSN SGN3 PERIODIC ROUTING AREA UPDATE BEHAVIOUR IMPROVEMENT RS Owner: Jarmo Parviainen  Author: Timo Leppäkorpi Status: Approved Version: 2.0 Document ID: Document ID Location: PI Keywords: 3G-SGSN, RAU, paging Document description This document describes the improved behaviour of the 3G-SGSN in a case when the UE is out of radio coverage when the periodic routing area update should happen. Approved by 20.2.2003 Jarmo Parviainen

129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

Embed Size (px)

Citation preview

Page 1: 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

7/30/2019 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

http://slidepdf.com/reader/full/129339363-3g-sgsn-sgn3-periodic-rau-improvement-rs 1/19

REQUIREMENT SPECIFICATION

3G-SGSN SGN3 PERIODIC ROUTING AREA UPDATE BEHAVIOUR IMPROVEMENT RS

Owner: Jarmo Parviainen Author: Timo LeppäkorpiStatus: ApprovedVersion: 2.0Document ID: Document IDLocation: PIKeywords: 3G-SGSN, RAU, paging

Document description

This document describes the improved behaviour of the 3G-SGSN in a case whenthe UE is out of radio coverage when the periodic routing area update shouldhappen.

Approved by

20.2.2003 Jarmo Parviainen

Page 2: 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

7/30/2019 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

http://slidepdf.com/reader/full/129339363-3g-sgsn-sgn3-periodic-rau-improvement-rs 2/19

REQUIREMENT SPECIFICATION 2 (19)

NET/IMN/Hki Site/PaCo PDO v. 2.0T.Leppäkorpi 20.2.2003

CONTENTS

REQUIREMENT SPECIFICATION......................................................................................1

SCOPE OF THE DOCUMENT ............................................................................................ 3

1 INTRODUCTION ................................................................................................................4

2 REFERENCES ...................................................................................................................5

3 TERMS AND ABBREVIATIONS ....................................................................................... 6

4 SYSTEM DEFINITION .......................................................................................................7

5 REQUIREMENTS FOR FEATURE ................................................................................... 8

6 DESCRIPTION OF THE FEATURE ..................................................................................9

7 REQUIREMENTS FOR SW IMPLEMENTATION ...........................................................10

8 EFFECTS ON CAPACITY AND HW ...............................................................................12

9 EFFECTS ON USERINTERFACES ................................................................................13

10 ADDITIONAL INFORMATION FOR TESTING OF FEATURE .....................................14

11 DOCUMENTATION .......................................................................................................15

12 CONTACT INFORMATION ..........................................................................................16

13 FURTHER DEVELOPMENT .........................................................................................17

14 WORK AMOUNT ESTIMATES .....................................................................................18

15 DOCUMENT HISTORY .................................................................................................19

133221259.doc CONFIDENTIAL

Page 3: 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

7/30/2019 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

http://slidepdf.com/reader/full/129339363-3g-sgsn-sgn3-periodic-rau-improvement-rs 3/19

REQUIREMENT SPECIFICATION 3 (19)

NET/IMN/Hki Site/PaCo PDO v. 2.0T.Leppäkorpi 20.2.2003

0. SCOPE OF THE DOCUMENT

The purpose of this document is to define the effects of Periodic Routing Area

Update Improvement  to Nokia Packet Core SGSN. The Periodic Routing AreaUpdate Improvement  is related to 3GPP release 4. The Requirement Specificationdescribes the implementation alternative at detailed level of component interfacesand component functionality at logical level.

133221259.doc CONFIDENTIAL

Page 4: 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

7/30/2019 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

http://slidepdf.com/reader/full/129339363-3g-sgsn-sgn3-periodic-rau-improvement-rs 4/19

REQUIREMENT SPECIFICATION 4 (19)

NET/IMN/Hki Site/PaCo PDO v. 2.0T.Leppäkorpi 20.2.2003

1 INTRODUCTION

This feature makes possible for operator to configure the time how long the PDP

contexts are kept after expiry of MS reachable timer if the mobile is out of coverage.

133221259.doc CONFIDENTIAL

Page 5: 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

7/30/2019 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

http://slidepdf.com/reader/full/129339363-3g-sgsn-sgn3-periodic-rau-improvement-rs 5/19

REQUIREMENT SPECIFICATION 5 (19)

NET/IMN/Hki Site/PaCo PDO v. 2.0T.Leppäkorpi 20.2.2003

2 REFERENCES

2.1 External References

/1/ 3GPP TS 23.060 v.4.7.0

/2/ 3GPP TS 24.008 v.4.9.0

2.2 Internal References

/A/ PDC00298

/B/ SGN3 Release Feature Requirements

133221259.doc CONFIDENTIAL

Page 6: 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

7/30/2019 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

http://slidepdf.com/reader/full/129339363-3g-sgsn-sgn3-periodic-rau-improvement-rs 6/19

REQUIREMENT SPECIFICATION 6 (19)

NET/IMN/Hki Site/PaCo PDO v. 2.0T.Leppäkorpi 20.2.2003

3 TERMS AND ABBREVIATIONS

3.1 Terms

MS reachable timer 

Time supervision in SGSN to supervise when the Mobile Subscriber (UE) wasprevious time reachable.

3.2 Abbreviations

NMS Network Management System

RAU Routing Area Update

UE User Equipment

133221259.doc CONFIDENTIAL

Page 7: 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

7/30/2019 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

http://slidepdf.com/reader/full/129339363-3g-sgsn-sgn3-periodic-rau-improvement-rs 7/19

REQUIREMENT SPECIFICATION 7 (19)

NET/IMN/Hki Site/PaCo PDO v. 2.0T.Leppäkorpi 20.2.2003

4 SYSTEM DEFINITION

4.1 Background and Relevant Stakeholders

This feature has been initiated internally.

4.2 Benefits for Operator 

 Avoiding unnecessary signalling over the radio interface.

4.3 Affected Network elements and interfaces

SGSN

NMS

4.4 Interworking features

None.

4.5 Restrictions

None.

4.6 Compliancy Information

This feature is compliant with the standards.

133221259.doc CONFIDENTIAL

Page 8: 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

7/30/2019 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

http://slidepdf.com/reader/full/129339363-3g-sgsn-sgn3-periodic-rau-improvement-rs 8/19

REQUIREMENT SPECIFICATION 8 (19)

NET/IMN/Hki Site/PaCo PDO v. 2.0T.Leppäkorpi 20.2.2003

5 REQUIREMENTS FOR FEATURE

There was no Feasibility Study for this feature, so the requirement has taken from

the Release Feature Requirements /B/.

5.1 Requirement 1

Modified implementation:

When MS reachable timer expires, SGSN suspends paging, and PDP contexts arekept.

If UE returns to radio coverage, it will perform a routing area update, and SGSNresumes paging.

If UE does not return to radio coverage, after implementation dependent time theSGSN performs an implicit detach.

133221259.doc CONFIDENTIAL

Page 9: 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

7/30/2019 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

http://slidepdf.com/reader/full/129339363-3g-sgsn-sgn3-periodic-rau-improvement-rs 9/19

REQUIREMENT SPECIFICATION 9 (19)

NET/IMN/Hki Site/PaCo PDO v. 2.0T.Leppäkorpi 20.2.2003

6 DESCRIPTION OF THE FEATURE

This feature makes the 3G SGSN behaviour more intelligent in case the UE is out of 

coverage when it should send Periodic Routing Area Update.

3G SGSN release 3 implementation will be enhanced so that SGSN suspendspaging when MS reachable timer expires. PDP contexts are kept for a while and if UE does not return to radio coverage, the SGSN performs an implicit detach after implementation dependent time.

6.1 Current functionality

In SGN1 the SGSN adds 4 minutes to MS reachable timer and after that the pagingis suspended and the subscriber is detached if the RAU did not receive.

In SGN2 the SGSN adds 4 minutes to MS reachable timer and after that the pagingis suspended. After that the SGSN waits half of the Purge timer period until thesubscriber is detached if the RAU did not receive.

6.2 Functionality defined in standards

The UE receives the periodic RAU timer from the SGSN in the Attach Accept or RAU Accept message. Upon expiry of the periodic RAU timer, the UE shall start aperiodic routeing area update procedure. If the UE is out of coverage when theperiodic RA update timer expires, it waits until it returns to coverage (cell that

supports packet-domain services) and starts the RAU procedure after that. Defaultvalue for the periodic RAU timer is 54 min.

The SGSN has the mobile reachable timer that is slightly longer than the periodicRAU timer used by UE. The mobile reachable timer is stopped when theCONNECTED state is entered and the timer is reset and started when the statereturns to IDLE. After expiry of the mobile reachable timer, the SGSN stops pagingbut may keep the PDP contexts or perform an implicit detach. Default value for themobile reachable timer is 4 minutes greater than the periodic RAU timer (Defined in24.008 chapter 11.2.2 Timers of GPRS mobility management /2/).

133221259.doc CONFIDENTIAL

Page 10: 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

7/30/2019 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

http://slidepdf.com/reader/full/129339363-3g-sgsn-sgn3-periodic-rau-improvement-rs 10/19

REQUIREMENT SPECIFICATION 10 (19)

NET/IMN/Hki Site/PaCo PDO v. 2.0T.Leppäkorpi 20.2.2003

7 REQUIREMENTS FOR SW IMPLEMENTATION

7.1 Mobility Management

7.1.1 Requirement 1: Use of the “PRAU timer” (Mandatory)

This requirement is based on higher level requirement 1.

Description:

The SMM has to be modified so that instead of the fixed “half of the purge timer” thenew configurable “PRAU timer” will be used.

133221259.doc CONFIDENTIAL

UE SGSNRN C

Paging

Paging

MS Reachable Timer 

expires: stop paging,

start PRAU timer 

Paging

Paging

Routing Area Update

If the RAU comes,

stop the PRAU timer,

start MS reachable

timer and continue the

PDP contexts

Detach

If PRAU timer expires

(RAU did not come),

remove the PDP

contexts and detach

the subscriber 

Detach

Routing Area Update

Page 11: 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

7/30/2019 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

http://slidepdf.com/reader/full/129339363-3g-sgsn-sgn3-periodic-rau-improvement-rs 11/19

REQUIREMENT SPECIFICATION 11 (19)

NET/IMN/Hki Site/PaCo PDO v. 2.0T.Leppäkorpi 20.2.2003

7.2 NMS

7.2.1 Requirement 2: Management of the “PRAU timer” (Mandatory)

This requirement is based on higher level requirement 1.

Description:

The NMS has to offer a user interface to manage the new “PRAU timer”configuration. The limits for the timer are minimum 0 and maximum 720 minutes(=12 hours) and the default is 0.

133221259.doc CONFIDENTIAL

Page 12: 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

7/30/2019 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

http://slidepdf.com/reader/full/129339363-3g-sgsn-sgn3-periodic-rau-improvement-rs 12/19

REQUIREMENT SPECIFICATION 12 (19)

NET/IMN/Hki Site/PaCo PDO v. 2.0T.Leppäkorpi 20.2.2003

8 EFFECTS ON CAPACITY AND HW

The longer the “PRAU timer” is set, the more it takes resources because the PDP

contexts are kept longer. On the other hand some signaling is saved if the mobilereturns to coverage and the PDP contexts do not need to be re-activated.

133221259.doc CONFIDENTIAL

Page 13: 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

7/30/2019 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

http://slidepdf.com/reader/full/129339363-3g-sgsn-sgn3-periodic-rau-improvement-rs 13/19

REQUIREMENT SPECIFICATION 13 (19)

NET/IMN/Hki Site/PaCo PDO v. 2.0T.Leppäkorpi 20.2.2003

9 EFFECTS ON USERINTERFACES

9.1 Effects on Operator Interfaces

The operator can control the “PRAU timer” by the NMS.

9.2 Effects on Subscriber Interfaces

None.

133221259.doc CONFIDENTIAL

Page 14: 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

7/30/2019 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

http://slidepdf.com/reader/full/129339363-3g-sgsn-sgn3-periodic-rau-improvement-rs 14/19

REQUIREMENT SPECIFICATION 14 (19)

NET/IMN/Hki Site/PaCo PDO v. 2.0T.Leppäkorpi 20.2.2003

10 ADDITIONAL INFORMATION FOR TESTING OF FEATURE

It has to be ensured that if the UE returns to coverage after the MS reachable timer 

has been expired but before the “PRAU timer” has been expired, the paging isresumed and the PDP contexts will remain.

If the “PRAU timer” expires, an implicit detach is performed.

The limits of the “PRAU timer” should be tested.

133221259.doc CONFIDENTIAL

Page 15: 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

7/30/2019 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

http://slidepdf.com/reader/full/129339363-3g-sgsn-sgn3-periodic-rau-improvement-rs 15/19

REQUIREMENT SPECIFICATION 15 (19)

NET/IMN/Hki Site/PaCo PDO v. 2.0T.Leppäkorpi 20.2.2003

11 DOCUMENTATION

3G SGSN Session and Mobility Management Feature Description has to be updated

to describe the “essence of the new functionality”. This RS is actually a good sourcematerial.

3G SGSN Installation and Configuration manual has to be updated to describe thenew configuration parameter.

133221259.doc CONFIDENTIAL

Page 16: 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

7/30/2019 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

http://slidepdf.com/reader/full/129339363-3g-sgsn-sgn3-periodic-rau-improvement-rs 16/19

REQUIREMENT SPECIFICATION 16 (19)

NET/IMN/Hki Site/PaCo PDO v. 2.0T.Leppäkorpi 20.2.2003

12 CONTACT INFORMATION

Juha Hyttinen / IS Author (SMM implementation)

Marko Kuosmanen / Implementation CM

Miska Mäkelä / Functional Testing

Timo Siponen / Product Manager 

Jarmo Parviainen / Development Project Manager 

133221259.doc CONFIDENTIAL

Page 17: 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

7/30/2019 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

http://slidepdf.com/reader/full/129339363-3g-sgsn-sgn3-periodic-rau-improvement-rs 17/19

REQUIREMENT SPECIFICATION 17 (19)

NET/IMN/Hki Site/PaCo PDO v. 2.0T.Leppäkorpi 20.2.2003

13 FURTHER DEVELOPMENT

133221259.doc CONFIDENTIAL

Page 18: 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

7/30/2019 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

http://slidepdf.com/reader/full/129339363-3g-sgsn-sgn3-periodic-rau-improvement-rs 18/19

REQUIREMENT SPECIFICATION 18 (19)

NET/IMN/Hki Site/PaCo PDO v. 2.0T.Leppäkorpi 20.2.2003

14 WORK AMOUNT ESTIMATES

Implementation (IS+SI+MT): 40h

Functional Testing: 25h

Documentation:

NMS:

133221259.doc CONFIDENTIAL

Page 19: 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

7/30/2019 129339363 3g Sgsn Sgn3 Periodic Rau Improvement Rs

http://slidepdf.com/reader/full/129339363-3g-sgsn-sgn3-periodic-rau-improvement-rs 19/19

REQUIREMENT SPECIFICATION 19 (19)

NET/IMN/Hki Site/PaCo PDO v. 2.0T.Leppäkorpi 20.2.2003

15 DOCUMENT HISTORY

DATE: 17.1.2003 ISSUE: v 0.1AUTHOR: Timo Leppäkorpi

Summary of the main changes: • first draft

DATE: 20.2.2003 ISSUE: v 1.0AUTHOR: Timo Leppäkorpi Approved by: Jarmo Parviainen

Summary of the main changes: • review changes made

133221259 doc CONFIDENTIAL