Standardise an operation Measure the standardise operation
Gauge measurements against requirements
Innovate to meet requirements and increaseproductivity
Standardise the new, improved operations
Continue ad infinitium
7/27/2019 12892302 Total Quality Management Session 2
3/57
7/27/2019 12892302 Total Quality Management Session 2
4/57
Control Charts Histogram
Pareto Chart
Check Sheet Cause & Effect Diagram
Flowchart
Scatter Diagram
7/27/2019 12892302 Total Quality Management Session 2
5/57
An effective method of monitoring processesthrough control charts
Monitors processes and variations
Helps reduce waste Identification of bottleneck, wait times
Reduction in time required to produce
7/27/2019 12892302 Total Quality Management Session 2
6/57
7/27/2019 12892302 Total Quality Management Session 2
7/57
7/27/2019 12892302 Total Quality Management Session 2
8/57
Variable Control Charts
Attribute Control Charts
7/27/2019 12892302 Total Quality Management Session 2
9/57
R Chart S Chart
p-chart
np-chart c-chart
u-chart
CUSUM Chart (Cumulative Sum Chart)
Time Series Model Regression Control
X
X
7/27/2019 12892302 Total Quality Management Session 2
10/57
7/27/2019 12892302 Total Quality Management Session 2
11/57
It is the method for determining the size andfrequency so that each sample represents apoint in time or space
It is a way to collect data that best representsa process state that is unknown
7/27/2019 12892302 Total Quality Management Session 2
12/57
chart tracks the subgroup average from theprocess
R chart tracks the range within eachsubgroup
Both the charts give the process level andprocess variation at same time as well aspresence of special causes
X
x
7/27/2019 12892302 Total Quality Management Session 2
13/57
7/27/2019 12892302 Total Quality Management Session 2
14/57
7/27/2019 12892302 Total Quality Management Session 2
15/57
Similar to X-bar and R chart but used whensubgroup size is 11 or more
It uses standard deviation instead of range
Used to monitor the effects of processimprovement theories
7/27/2019 12892302 Total Quality Management Session 2
16/57
Is a control chart for attribute of data
Measures the proportion detective items in asubgroup
7/27/2019 12892302 Total Quality Management Session 2
17/57
7/27/2019 12892302 Total Quality Management Session 2
18/57
Similar to P-chart, with two differences All subgroup size must be same
Is used to track attribute data in terms of numbersrather than proportion
7/27/2019 12892302 Total Quality Management Session 2
19/57
Is used to track attribute data in terms ofcounts per subgroup
All subgroups must be the same size
7/27/2019 12892302 Total Quality Management Session 2
20/57
Graphically summarises and displays thedistribution of a process or data set
7/27/2019 12892302 Total Quality Management Session 2
21/57
It is used to graphically summarise and displaythe relative importance of the differencesbetween groups of data
It has two vertical axis
Left-side vertical axis is labelled frequency Right-side of the vertical axis is the cumulative
frequency It is used to represent the most common
occurring defect, most common source ofdefects, most frequent reasons for customercomplaints, etc.
7/27/2019 12892302 Total Quality Management Session 2
22/57
7/27/2019 12892302 Total Quality Management Session 2
23/57
It is used to collect data in real-time and at thelocation where data is generated
Types of check sheets Classification A trait such as a defect or a failure mode
must be classified into a category Location The physical location of a trait is indicated on
a picture of a part or item being evaluated Frequency The presence or absence of trait is indicated
along with number of occurrences Measurement scale Measurements are indicated by
checking on an appropriate interval on a pre-dividedmeasurement scale
Check-list Items are listed so that as each isaccomplished, it is indicated by a check/tick-mark
7/27/2019 12892302 Total Quality Management Session 2
24/57
7/27/2019 12892302 Total Quality Management Session 2
25/57
Graphical representation of a process,depicting inputs, outputs and units of activity
Represents the entire process at a high ordetailed level of observation, allowinganalysis and optimization of workflow
7/27/2019 12892302 Total Quality Management Session 2
26/57
Reveals the relationship of associationbetween two variables
Answers the following questions Are two variables related?
If yes, linearly or non-linearly
7/27/2019 12892302 Total Quality Management Session 2
27/57
Capability Maturity Model Capability Maturity Model Integration
IDEAL
7/27/2019 12892302 Total Quality Management Session 2
28/57
Types of defects in software Logical error
Incorrectly assigned variable
Typing errors
7/27/2019 12892302 Total Quality Management Session 2
29/57
It is industry specific quality model forsoftware development
Focuses on Zero-Defect softwaredevelopment
Software Development Life Cycle (SDLC)provides a structured way to develop anapplication and helps in early decision
making SDLC helps reduce the total cost of software
development
7/27/2019 12892302 Total Quality Management Session 2
30/57
Create and evaluate concept Analysis to define requirements Define architecture Design tests Specify computer program Write and revise computer program, its
documentation and instruction Put the program together, with inspection and
testing For published software, release a beta test
version Final release and customer support
7/27/2019 12892302 Total Quality Management Session 2
31/57
7/27/2019 12892302 Total Quality Management Session 2
32/57
7/27/2019 12892302 Total Quality Management Session 2
33/57
Initial Each person learns and does the job any way he/she can.
The organisation relies on heroes
Repeatable Departments have their acts together, establish,
procedures, and are following them & keeping them up to
date. But methods are different in different places for nogood reason
Defined The whole organisation has standard methods for standard
activities, and departments have unique procedures wherethey are needed. This is centrally coordinated
Managed The organisation eliminates defects by quality management
and constantly works in order to make things better
Optimising Organisation uses, sustains and continuously improves best
practices
7/27/2019 12892302 Total Quality Management Session 2
34/57
7/27/2019 12892302 Total Quality Management Session 2
35/57
It is the integration of various CMMs CMMI is a framework for business process
improvement
It is a suite of products used for processimprovements
It has Models
Appraisal methods Training Courses
7/27/2019 12892302 Total Quality Management Session 2
36/57
7/27/2019 12892302 Total Quality Management Session 2
37/57
7/27/2019 12892302 Total Quality Management Session 2
38/57
Continuous User focuses on the specific processes that are
considered important for organisations immediatebusiness objectives
Staged Provides a standard sequence of improvements and
can serve as a basis for comparing the maturitylevel of different projects and organisation
It provides easy migration from the SW-CMM toCMMI
7/27/2019 12892302 Total Quality Management Session 2
39/57
CMMI best practices documented are calledCMMI models
CMMI models cover the following areas Development
Acquisition
CMMI for Development (CMMI-DEV)
CMMI for Acquisition (CMMI-ACQ)
CMMI for Services (CMMI-SVC)
7/27/2019 12892302 Total Quality Management Session 2
40/57
Is a usable, understandable approach tocontinuous improvement by outlining the stepsnecessary to establish a successful improvementprogram
Consists of 5 stages
I Initiating Laying the ground work for a successful improvement effort
D Diagnostic Determining where you are relative to where you want to be
E Establishing Planning the specifics of how will you reach your destination
A Acting Doing the work according to the plan
L - Learning Learning from the experience and improving the ability to
adopt new technologies in future
7/27/2019 12892302 Total Quality Management Session 2
41/57
7/27/2019 12892302 Total Quality Management Session 2
42/57
ISO 9000 is a family of standards for qualitymanagement systems
ISO 9000:2000 QMS Fundamentals and Vocabulary
ISO 9001:2000 QMS Requirements
ISO 9004:2000 QMS-Guidelines for performance improvements
7/27/2019 12892302 Total Quality Management Session 2
43/57
Requirements Scope
Normative Reference
Terms and definition
Quality management system
Management responsibility
Resource management
Product realisation Measurement, analysis and improvement
7/27/2019 12892302 Total Quality Management Session 2
44/57
7/27/2019 12892302 Total Quality Management Session 2
45/57
7/27/2019 12892302 Total Quality Management Session 2
46/57
Quality policy is a formal statement frommanagement, closely linked to business andto customers needs
Quality policy is understood at all levels and
by all employees Documentation and audits are conducted
periodically Records should show how and where raw
materials and products are processed to allowproducts and problems to be traced to thesource
7/27/2019 12892302 Total Quality Management Session 2
47/57
Map all processes, monitor & control them Monitoring, measurement and analysis tools
must be properly maintained and calibrated
Determine customer requirements and createsystems for communicating with customer
Perform periodic internal audits and meetings
7/27/2019 12892302 Total Quality Management Session 2
48/57
7/27/2019 12892302 Total Quality Management Session 2
49/57
Its a business management strategydeveloped by Motorola
It seeks to identify and remove the causes ofdefects in manufacturing or business process
7/27/2019 12892302 Total Quality Management Session 2
50/57
One Sigma = 690,000 DPMO = 31% efficiency Two Sigma = 308,000 DPMO = 69.2% efficiency
Three Sigma = 66,800 DPMO = 93.32% efficiency
Four Sigma = 6,210 DPMO = 99.379% efficiency
Five Sigma = 230 DPMO = 99.977% efficiency
Six Sigma = 3.4 DPMO = 99.9997% efficiency
7/27/2019 12892302 Total Quality Management Session 2
51/57
7/27/2019 12892302 Total Quality Management Session 2
52/57
D -Define high level project goals and thecurrent process
M-Measure key aspects of the current processand collect relevant data
A-Analyse the data to verify cause and effectrelationships. Determine what the relationshipsare and attempt to ensure that all the factorshave been considered
I-Improve or optimise the process based on data
analysis using techniques like design ofexperiments
C-Control to ensure that any deviations fromtarget are corrected before they result in defects
7/27/2019 12892302 Total Quality Management Session 2
53/57
7/27/2019 12892302 Total Quality Management Session 2
54/57
7/27/2019 12892302 Total Quality Management Session 2
55/57
7/27/2019 12892302 Total Quality Management Session 2
56/57
D-Define design goals that are consistent withcustomer demands and the enterprise strategy
M-Measure and identify characteristics that arecritical to quality (CTQ), product capabilities,
production process capability and risks A-Analyse to develop and design alternatives,
create high level design and evaluate designcapability to select the best design
D-Design details, optimise the design and plan
for design verification V-Verify the design, setup pilot runs,
implement the production process andhand it over to process owners