VAUGHAN CONCORD GO CENTRE SECONDARY PLAN – Public Meeting #1 BACKGROUND Stormwater

121107 PUBLIC MEETING1 FINAL website low res · Title: 121107_PUBLIC MEETING1_FINAL_website_low res.pptx Author: Emma West Created Date: 11/14/2012 12:14:19 PM

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 121107 PUBLIC MEETING1 FINAL website low res · Title: 121107_PUBLIC MEETING1_FINAL_website_low res.pptx Author: Emma West Created Date: 11/14/2012 12:14:19 PM

VAUGHAN CONCORD GO CENTRE SECONDARY PLAN – Public Meeting #1

BACKGROUND Stormwater

Page 2: 121107 PUBLIC MEETING1 FINAL website low res · Title: 121107_PUBLIC MEETING1_FINAL_website_low res.pptx Author: Emma West Created Date: 11/14/2012 12:14:19 PM

VAUGHAN CONCORD GO CENTRE SECONDARY PLAN – Public Meeting #1

Background Review –Stormwater 3 •  Development constraints

associated with the tributaries, including the TRCA regulation limits.

•  The north parcel top of bank has been staked and resulted in a refinement of the floodlines