49
A Guide to Chicago Plan Commission Projects Development Manual

12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or [email protected] in Room 905 This sheet allows staff to research the site prior

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

A Guide to Chicago Plan Commission Projects

Development Manual

Page 2: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Development Manual for Chicago Plan Commission Projects 2

Page 3: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Development Manual for Chicago Plan Commission Projects 3

Page 4: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Contact Loretta Walsh312-744-4182 or

[email protected] Room 905

This sheet allows staffto research the site

prior to your meeting

Intake Meeting/Pre-Filing

Development Manual for Chicago Plan Commission Projects 4

Page 5: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Intake Meeting Zoning Analysis Form

Development Manual for Chicago Plan Commission Projects 5

Page 6: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Contact Loretta Walsh312-744-4182 or

[email protected] Room 905

Applicant shouldprovide contextmap/aerial andpreliminary site

plans/elevations asavailable

Meetings are held in Room905 every Wednesday

morning for 30 minutes(10:30, 11:00 and 11:30);PD staff, landscape, design

and sustainable expertsfrom DHED will be in

attendance

Sent within 10days of intake

meeting

This sheet allows staffto research the site

prior to your meeting

Intake Meeting/Pre-Filing

Development Manual for Chicago Plan Commission Projects 6

Page 7: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Applicationshould address

commentsprovided in

intakeresponse letter

Submit application to DHEDGerald Garcia 312-744-9038 [email protected]

in Room 905

Only completeapplications

will beaccepted

Filing a PD or Industrial Corridor Application

Applications shouldbe filed one-week

prior to City Council

Development Manual for Chicago Plan Commission Projects 7

Page 8: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Requirements for PD/Industrial Corridor Applications

Applications must include:• Ordinance with metes and bounds description of the subject property• Site, landscape, green roof and phasing/sub-area plans• Aerials, right-of-way and boundary maps• Building elevations• Bulk Table (PD only)• PD Statements (PD only, template available on DHED website)• Chicago Builds Green Form (as applicable, available on DHED website)• Economic Disclosure Statement(s)• Supplemental reports (traffic, landscaping, environmental impact, etc)• Public notice of filing and hearing(s) and associated affidavits

Development Manual for Chicago Plan Commission Projects 8

Page 9: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Legislative Process for PD and IndustrialCorridor Applications

Development Manual for Chicago Plan Commission Projects 9

Page 10: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

DHED Internal Review Process

Fully-dimensioned

site andlandscape

plans must beincluded, alongwith contextual

data andimagery

Development Manual for Chicago Plan Commission Projects 10

Page 11: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Site plans must include:• North arrow and scale bar• Proposed PD or project boundaries• Location and dimensions of, and indications of any access to:

• All existing structures (to remain) with entrances indicated• All proposed structures (to be built) with entrances indicated• All exterior and interior open space• All curb cuts, parking lots/spaces, drive aisles and loading berths

• Public and private street layout and all on-street parking• Pedestrian circulation areas and outdoor amenity spaces• Distances between all buildings (existing and proposed)

Fully-Dimensioned Site Plans

Development Manual for Chicago Plan Commission Projects 11

Page 12: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Fully-Dimensioned Site Plans

Development Manual for Chicago Plan Commission Projects 12

Page 13: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Fully-Dimensioned Site Plans

Development Manual for Chicago Plan Commission Projects 13

Page 14: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Site Plan Existing and Proposed Structure Call-Out

Development Manual for Chicago Plan Commission Projects 14

Page 15: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Fully-Dimensioned Floor Plans

Development Manual for Chicago Plan Commission Projects 15

Page 16: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Landscape plans must include:• North arrow and scale bar• Proposed PD or project boundaries• Location, species and dimensions of:

• All existing trees (to remain)• All proposed trees (to be installed) and any planter boxes• All landscaped areas, distinguished from grass covered areas

• All surface and construction materials must be identified• Plant legend identifying all species and provides associated symbols• Storm water detention/retention mechanisms (surface features only)• Elevation or contour changes• Landscape, parkway tree vehicular-use area calculations• Ornamental fence indications, dimensions and design

Fully-Dimensioned Landscape Plans

Development Manual for Chicago Plan Commission Projects 16

Page 17: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Fully-Dimensioned Landscape Plans

Development Manual for Chicago Plan Commission Projects 17

Page 18: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Landscape Plan Proposed Species Details

Development Manual for Chicago Plan Commission Projects 18

Page 19: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

3 BEDROOM2 BEDROOMSTUDIOS

GREEN ROOFTOTAL NET ROOF AREA = 14,150 SF25% GREEN ROOF = 3,535 SF

Proposed Green Roof

Development Manual for Chicago Plan Commission Projects 19

Page 20: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Renderings, maps and images must include:• North arrow and scale bar• Proposed PD or project boundaries• Aerial photograph indicating development within one half mile• Map indicating land-uses within same radius:

• Residential, commercial, industrial, open space, water, transit, etc• Photographs of structures or land-uses adjacent to subject property• Provide visual description of surrounding area

Contextual Information

Development Manual for Chicago Plan Commission Projects 20

Page 21: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

1

23

6

6

5

4

7

Calumet River

130th Street

Golden Gate -Riverdale

Beaubien WoodsForest Preserve

CompleteComplete

CompleteComplete

CompleteComplete

CompleteComplete

TBDTBDTBDTBD

TBDTBD

TBDTBD

TBDTBD

7

Aerial Photograph

Development Manual for Chicago Plan Commission Projects 21

Page 22: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Area Land-Use Map

Development Manual for Chicago Plan Commission Projects 22

Page 23: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Fully-Dimensioned Colored Elevations with Materials

Development Manual for Chicago Plan Commission Projects 23

Max. Ht. 40’ Eve. Strut Ht. +/-23’

Ht. 29’ Max. Ht. 40’

Page 24: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Contextual Rendering

Development Manual for Chicago Plan Commission Projects 24

Page 25: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Contextual Rendering

Development Manual for Chicago Plan Commission Projects 25

Page 26: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Contextual Rendering

Development Manual for Chicago Plan Commission Projects 26

Page 27: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Contextual Rendering

Development Manual for Chicago Plan Commission Projects 27

Page 28: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Contextual Rendering

Development Manual for Chicago Plan Commission Projects 28

proposed building

Page 29: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

DHED Internal Review Process

Applicant must contact:CDOT: Maureen West

CFD: John JavorkaMOPD: Chris Zafaris

DHED distributesapplications to other Citydepartments; any and all

comments must beaddressed by the applicant

DHED staff reviewsproposal in light of

surroundingenvironment, existing

plans, design andfactors detailed in the

CZO

DHED may issue morethan one letter as the

project proceedsthroughout the review

process

It is theapplicant’s

responsibility torespond in a

timely manner

After submitting acomplete packet, the

applicant’s teamshould be preparing

to send Notice ofHearing in the event

the application isplaced on the next

CPC agenda

DHED will takeno more than 4days to reviewfinal hearingpacket and

alert applicantof hearing date

Fully-dimensioned

site andlandscape

plans must beincluded, alongwith contextual

data andimagery

Development Manual for Chicago Plan Commission Projects 29

Page 30: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Chicago Plan Commission Calendar

Mar. 2Mar. 1Feb. 28Feb. 27Feb. 26Feb. 25Feb. 24

Mar. 9Mar. 8

20-Days

Submission

Mar. 7Mar. 6Mar. 5Mar. 4Mar. 3

Jan. 26Jan. 25Jan. 24Jan. 23Jan. 22Jan. 21Jan. 20

Feb. 23Feb. 22Feb. 21

CPC hearing

Feb. 20Feb. 19Feb. 18Feb. 17

Feb. 16Feb. 15Feb. 14Feb. 13Feb. 12Feb. 11Feb. 10

Feb. 9Feb. 8Feb. 7Feb. 6

15-Days

CPC notice

Feb. 5Feb. 4Feb. 3

Feb. 2Feb. 1

20-Days

submission

Jan. 31Jan. 30Jan. 29Jan. 28Jan. 27

SaturdayFridayThursdayWednesdayTuesdayMondaySunday

Development Manual for Chicago Plan Commission Projects 30

Page 31: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Chicago Plan Commission Items

Final materials must include:• Area zoning and land use maps• Site, landscape, green roof and phasing/sub-area plans• Sustainable information, parking determinations and vehicular access• Building elevations with design details, heights and materials (no signage)• PD boundary and property line map (as applicable)• PD Statements, Bulk Table and PD exhibits (as applicable)• Draft Plan Commission PowerPoint• Notice mailings and associated addresses• Economic Disclosure Statements• Evidence of approval from all applicable City departments

Development Manual for Chicago Plan Commission Projects 31

Page 32: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Images that are included with ordinance and must take the following form:• North arrow and scale bar• Area zoning and land-use maps• Right-of-way and boundary maps• Site, landscape, green roof and phasing/sub-area plans

• Each on own sheet•Building elevations

• Black and white only• Fully-dimensioned (including building heights)• Material call-outs• Legible text

• Full-size (24” x 36”) not required for Plan Commission hearing

Planned Development Exhibits

Development Manual for Chicago Plan Commission Projects 33

Page 33: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Existing Zoning Map

Development Manual for Chicago Plan Commission Projects 33

Page 34: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Existing Land-Use Map

Development Manual for Chicago Plan Commission Projects 34

Page 35: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Planned Development and Sub Area Boundary Map

Development Manual for Chicago Plan Commission Projects 35

Page 36: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Right-of-Way Adjustment Map

Development Manual for Chicago Plan Commission Projects 36

Page 37: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Site Plan

Development Manual for Chicago Plan Commission Projects 37

Page 38: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Landscape Plan and Species Detail

Development Manual for Chicago Plan Commission Projects 38

Page 39: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Green Roof Plan

Development Manual for Chicago Plan Commission Projects 39

Page 40: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Elevations

Development Manual for Chicago Plan Commission Projects 40

Page 41: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Chicago Plan Commission Hearing

The item is introduced by DHEDstaff, a full PowerPoint

presentation is given by thedevelopment team and to

conclude the officialrecommendations presented by

DHED staff

Development Manual for Chicago Plan Commission Projects 41

Page 42: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Next Steps in the Legislative Process for PD andIndustrial Corridor Applications

It is the applicant’sresponsibility to

coordinate the COZhearing

The applicant willpresent the project

to the COZ

The applicant maynow submit for abuilding permit

Development Manual for Chicago Plan Commission Projects 42

Page 43: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Part II Review/Permit Submittal

Comments andcorrections are

recorded onelectronic system

and revisions mustbe addressed

DHED confirms thatsubmitted plans

match thoseapproved by City

Council or at CPC, inthe case of LPO

PD and LPOprojects only

Development Manual for Chicago Plan Commission Projects 43

Page 44: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Site Plan Approval

The site plan, bulktable and PDstatements

approved by CityCouncil play a majorrole in the review of

the request

The original PDordinancedetails the

requirementsof the

submittal (aslisted in the

CZO)Most often, SitePlan Approval is

required for largerPD in which fully

developedarchitectural

drawings are notfinalized for a

portion of the site

The format of thispresentationmirrors theoriginal CPC

presentation interms of visuals

and content;following the CPCreview, the ZoningAdministrator willprovide a signedapproval letter

that will becomepart of the official

PD file

Development Manual for Chicago Plan Commission Projects 44

Page 45: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Minor Change Requests and Amendments

A fee of $1,500is now

required forthe processing

of MinorChange

applications;approvals areonly valid for

12 months

The necessaryreview items

are included inPD; packet

shouldgenerally

include a landuse map, site

plan andelevations

The applicant mayfile an applicationto amend the PD;an amendment is

processed as a newPD application

The applicant maynow submit for

permits with DOB

Development Manual for Chicago Plan Commission Projects 45

Page 46: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Lakefront Protection Applications

Submit application to LorettaWalsh in Room 905

Complete Application Includes:• Project narrative• Site, landscape, green roof and phasing/sub-area plans• Aerials, right-of-way and boundary maps• Building elevations• Underlying zoning information• Lakefront Policy and Purpose responses• Chicago Builds Green Form• Economic Disclosure Statement(s)• Draft Plan Commission PowerPoint• Supplemental reports (traffic, landscaping, environmental impact, etc)• Public notice of filing and hearing(s) and associated affidavits

Development Manual for Chicago Plan Commission Projects 46

Page 47: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

DHED Internal Review Process

DHED may issue morethan one letter as the

project proceedsthroughout the review

process

It is theapplicant’s

responsibility torespond in a

timely manner

After submitting acomplete packet, the

applicant’s teamshould be preparing

to send Notice ofHearing in the event

the application isplaced on the next

CPC agenda

DHED will takeno more than 4days to reviewfinal hearingpacket and

alert applicantof hearing date

Fullydimensioned

site andlandscape

plans must beincluded, alongwith contextual

data andimagery

Development Manual for Chicago Plan Commission Projects 47

DHED staff reviewsproposal in light of

surroundingenvironment, existing

plans, design andfactors detailed in the

LPO

Applicant must contact:CDOT: Maureen West

CFD: John JavorkaMOPD: Chris Zafaris

DHED distributesapplications to other Citydepartments; any and all

comments must beaddressed by the applicant

Page 48: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

Chicago Plan Commission Hearing

The item is introduced by DHEDstaff, a full PowerPoint

presentation is given by thedevelopment team and to

conclude the officialrecommendations presented by

DHED staff; upon approval,applicant may submit for

permits with DOB

Development Manual for Chicago Plan Commission Projects 48

Page 49: 12.11.02 - Development Manual for Chicago Pl · Contact Loretta Walsh 312-744-4182 or loretta.walsh@cityofchicago.org in Room 905 This sheet allows staff to research the site prior

A Guide to Chicago Plan Commission Projects

Development Manual

Comments, Questions…