25
Map No EA Co Rte PM Nickname Legal Description Work Description Cost Estimate Ad Date 1001 01-45490 DN 197 3.2 Ruby 2 IN DEL NORTE COUNTY NEAR FORT DICK FROM 1.3 MI TO 0.5 MI SOUTH OF RUBY VANDEVENTER COUNTY PARK (PM 3 2/4 0) WIDENING $910,000 2/1/2018 1002 01-46480 HUM 101 1.1 Richardson Grove Operational Improvement Project IN HUMBOLDT COUNTY NEAR GARBERVILLE FROM 0.5 MI SOUTH TO 0.5 MI NORTH OF RICHARDSON GROVE UC STAA OPERATIONAL IMPROVEMEN T PROJECT $7,807,000 9/1/2018 1003 01-48110 DN 197 4.5 Ruby 1 IN DEL NORTE COUNTY NEAR CRESCENT CITY AT THE ENTRANCE TO RUBY VAN DEVENTER COUNTY PARK WIDENING $480,000 11/1/2017 1004 01-0A040 LAK 175 R25 Lak 175 - Middletown Shoulders IN LAKE COUNTY NEAR MIDDLETOWN FROM 0.1 MI EAST OF PUTAH CREEK BRIDGE #14-021 TO DRY CREEK BRIDGE #14-020 SHOULDER WIDENING $9,995,000 7/2/2018 1005 01-26204 MEN 101 47.2 Geometric Upgrades @ Sherwood Road IN MENDOCINO COUNTY IN WILLITS FROM SHERWOOD ROAD TO 0.1 MI NORTH OF SHERWOOD ROAD SHERWOOD ROAD GEOMETRIC UPGRADES - WILLITS BYPASS $4,783,000 1/2/2018 1006 01-26203 MEN 101 46.3 Relinquishment of Old 101 IN MENDOCINO COUNTY IN WILLITS FROM ROUTE 20 TO 0.9 MILE NORTH OF ROUTE 20 WILLITS BYPASS RELINQUISHM ENT $3,442,000 1/2/2018 1007 01-0C440 HUM 101 102.9 Trinidad Rehab Safety Roadside IN HUMBOLDT COUNTY NEAR TRINIDAD AT THE TRINIDAD NORTHBOUND SRRA, SOUTHBOUND SRRA & SAVAGE CREEK WATER INLET REHABILITATE SAFETY ROADSIDE REST AREAS $4,228,000 8/10/2018 1008 01-0C470 DN 199 33.41 Collier Rest Area Rehab IN DEL NORTE COUNTY NEAR IDLEWILD AT COLLIER TUNNEL ROADSIDE REST AREA REHABILITATE SRRA $3,508,000 8/15/2018 1009 01-0C710 HUM 101 77 Wabash-Fairfield Safety IN HUMBOLDT COUNTY IN EUREKA FROM 0.3 MI SOUTH TO 0.2 MI NORTH OF WABASH AVENUE IMPROVE INTERSECTIO N $2,434,000 11/14/2018 1010 01-0C750 LAK 029 9.6 Lake 29/Hartmann Road Roundabout IN LAKE COUNTY NEAR MIDDLETOWN FROM PUTAH CREEK BRIDGE TO 0.9 MILES SOUTH OF HIDDEN VALLEY LAKE IMPROVE INTERSECTIO N $4,718,000 1/15/2018 12 Month Look Ahead North Region Projects September 2017-2018 1 of 18

12 Month Look Ahead North Region Projects … STREET $0 11/20/2017 1013 01-0C870 HUM 283 0.13 Rio Dell ADA IN HUMBOLDT COUNTY NEAR RIO DELL AT THE EEL RIVER BRIDGE #4-$0 12/15/2017

Embed Size (px)

Citation preview

Page 1: 12 Month Look Ahead North Region Projects … STREET $0 11/20/2017 1013 01-0C870 HUM 283 0.13 Rio Dell ADA IN HUMBOLDT COUNTY NEAR RIO DELL AT THE EEL RIVER BRIDGE #4-$0 12/15/2017

Map No EA Co Rte PM Nickname Legal DescriptionWork

Description Cost

EstimateAd Date

1001 01-45490 DN 197 3.2 Ruby 2 IN DEL NORTE COUNTY NEAR FORT DICK FROM 1.3 MI TO 0.5 MI SOUTH OF RUBY VANDEVENTER COUNTY PARK (PM 3 2/4 0)

WIDENING $910,000 2/1/2018

1002 01-46480 HUM 101 1.1 Richardson Grove Operational Improvement Project

IN HUMBOLDT COUNTY NEAR GARBERVILLE FROM 0.5 MI SOUTH TO 0.5 MI NORTH OF RICHARDSON GROVE UC

STAA OPERATIONAL IMPROVEMENT PROJECT

$7,807,000 9/1/2018

1003 01-48110 DN 197 4.5 Ruby 1 IN DEL NORTE COUNTY NEAR CRESCENT CITY AT THE ENTRANCE TO RUBY VAN DEVENTER COUNTY PARK

WIDENING $480,000 11/1/2017

1004 01-0A040 LAK 175 R25 Lak 175 -Middletown Shoulders

IN LAKE COUNTY NEAR MIDDLETOWN FROM 0.1 MI EAST OF PUTAH CREEK BRIDGE #14-021 TO DRY CREEK BRIDGE #14-020

SHOULDER WIDENING

$9,995,000 7/2/2018

1005 01-26204 MEN 101 47.2 Geometric Upgrades @ Sherwood Road

IN MENDOCINO COUNTY IN WILLITS FROM SHERWOOD ROAD TO 0.1 MI NORTH OF SHERWOOD ROAD

SHERWOOD ROAD GEOMETRIC UPGRADES - WILLITS BYPASS

$4,783,000 1/2/2018

1006 01-26203 MEN 101 46.3 Relinquishment of Old 101

IN MENDOCINO COUNTY IN WILLITS FROM ROUTE 20 TO 0.9 MILE NORTH OF ROUTE 20

WILLITS BYPASS RELINQUISHMENT

$3,442,000 1/2/2018

1007 01-0C440 HUM 101 102.9 Trinidad Rehab Safety Roadside

IN HUMBOLDT COUNTY NEAR TRINIDAD AT THE TRINIDAD NORTHBOUND SRRA, SOUTHBOUND SRRA & SAVAGE CREEK WATER INLET

REHABILITATE SAFETY ROADSIDE REST AREAS

$4,228,000 8/10/2018

1008 01-0C470 DN 199 33.41 Collier Rest Area Rehab

IN DEL NORTE COUNTY NEAR IDLEWILD AT COLLIER TUNNEL ROADSIDE REST AREA

REHABILITATE SRRA

$3,508,000 8/15/2018

1009 01-0C710 HUM 101 77 Wabash-Fairfield Safety

IN HUMBOLDT COUNTY IN EUREKA FROM 0.3 MI SOUTH TO 0.2 MI NORTH OF WABASH AVENUE

IMPROVE INTERSECTION

$2,434,000 11/14/2018

1010 01-0C750 LAK 029 9.6 Lake 29/Hartmann Road Roundabout

IN LAKE COUNTY NEAR MIDDLETOWN FROM PUTAH CREEK BRIDGE TO 0.9 MILES SOUTH OF HIDDEN VALLEY LAKE

IMPROVE INTERSECTION

$4,718,000 1/15/2018

12 Month Look Ahead North Region Projects September 2017-2018

1 of 18

Page 2: 12 Month Look Ahead North Region Projects … STREET $0 11/20/2017 1013 01-0C870 HUM 283 0.13 Rio Dell ADA IN HUMBOLDT COUNTY NEAR RIO DELL AT THE EEL RIVER BRIDGE #4-$0 12/15/2017

Map No EA Co Rte PM Nickname Legal DescriptionWork

Description Cost

EstimateAd Date

12 Month Look Ahead North Region Projects September 2017-2018

1011 01-0A840 MEN 271 17.7 McCoy Creek Bridge Replacement

IN MENDOCINO COUNTY NEAR PIERCY FROM 0.67 MILES NORTH OF HIGHWAY 271/101 SEPARATION (#10-0217) TO 0.42 MILES SOUTH OF THE SIDEHILL VIADUCT (#10-0100)

REPLACE BRIDGE

$4,131,000 7/1/2018

1012 01-0C680 HUM 101 77.9 Broadway/Fifth IN HUMBOLDT COUNTY IN EUREKA FROM NORTHBOUND COMMERCIAL STREET TO 4TH STREET AND FROM 5TH STREET TO E STREET

$0 11/20/2017

1013 01-0C870 HUM 283 0.13 Rio Dell ADA IN HUMBOLDT COUNTY NEAR RIO DELL AT THE EEL RIVER BRIDGE #4-

$0 12/15/2017

1014 01-0C920 MEN 001 55 Caspar Pedestrian Enhancement

IN MENDOCINO COUNTY AT CASPAR FROM 0.2 MILES SOUTH TO 0.1 MILES NORTH OF CASPAR STREET

SAFETY LIGHTING AND PEDESTRIAN ENHANCEMENTS

$230,000 10/15/2017

1015 01-44060 MEN 001 38.5 Construct Turnouts

IN MENDOCINO COUNTY AT VARIOUS LOCATIONS FROM 0.3 MILE SOUTH OF NAVARRO BLUFF ROAD TO 0.5 MILE SOUTH OF BLUE SLIDE GULCH BRIDGE

CONSTRUCT TURNOUTS

$607,000 10/4/2017

1016 01-0E140 DN 199 33.1 Restore Collier Tunnel Communication

IN DEL NORTE COUNTY AT VARIOUS LOCATIONS FROM 0.4 MILE SOUTH OF COLLIER TUNNEL TO 0.2 MILE SOUTH OF THE OREGON STATE LINE

RESTORE COLLIER TUNNEL COMMUNICATION

$400,000 2/1/2018

1017 01-0E240 MEN 001 43.3 Mendocino Mitigation Bank

IN MENDOCINO COUNTY ON VARIOUS ROUTES AT VARIOUS LOCATIONS

ENVIRONMENTAL MITIGATION BANK - MEN COUNTY

$5,500,000 6/1/2018

1018 01-0E380 MEN 162 1.2 Repair Drainage Systems

IN MENDOCINO COUNTY AT VARIOUS LOCATIONS FROM 0.5 MILES EAST OF OUTLET CREEK BRIDGE #10-233 TO 0.1 MILES WEST OF SHORT CREEK BRIDGE #10-119

REPAIR DRAINAGE SYSTEMS

$800,000 9/1/2017

1019 01-0E470 MEN 020 37.84 MEN 20 & Potter Valley Road

IN MENDOCINO COUNTY NEAR POTTER VALLEY FROM 0.1 MI WEST OF COLD CR BR#1 #10-40 TO END OF COLD CR BR #2 #10-41

RESURFACING

$2,460,000 4/15/2018

2 of 18

Page 3: 12 Month Look Ahead North Region Projects … STREET $0 11/20/2017 1013 01-0C870 HUM 283 0.13 Rio Dell ADA IN HUMBOLDT COUNTY NEAR RIO DELL AT THE EEL RIVER BRIDGE #4-$0 12/15/2017

Map No EA Co Rte PM Nickname Legal DescriptionWork

Description Cost

EstimateAd Date

12 Month Look Ahead North Region Projects September 2017-2018

1020 01-41550 MEN 128 0 Flynn Creek CAPM & Tapered Edge

IN MENDOCINO COUNTY NEAR NAVARRO FROM JUNCTION OF ROUTE 1 TO MILL CREEK BRIDGE #10-73 & NEAR PHILO FROM INDIAN CREEK BRIDGE #10-67 TO CON CREEK ARCH CULVERT

CAPM and Safety Edge

$16,570,000 6/11/2018

1021 01-0E670 HUM 101 75 Eureka Adaptive Signals Project

IN HUMBOLDT COUNTY IN EUREKA FROM 0.2 MI SOUTH OF THE KMART ENTRANCE TO 6TH STREET

MODIFY SIGNALS

$700,000 10/1/2018

1022 01-49210 HUM 299 21 HUM-299 Reconstruct Drainage

IN HUMBOLDT COUNTY NEAR WILLOW CREEK FROM 0.3 MI EAST OF CHEZEM RD TO 0.3 MI WEST OF WILLOW CREEK BR#4-162

RECONSTRUCT DRAINAGE

$926,000 5/1/2018

1023 01-49350 DN 101 20.31 DN 101 Reconstruct Drainage

IN DEL NORTE COUNTY FROM 0.3 MILES NORTH OF WILSON CREEK BRIDGE #1-05 TO 1.5 MILES SOUTH OF HAMILTON ROAD

RECONSTRUCT DRAINAGE

$480,000 5/1/2018

1024 01-0F140 MEN 020 26.1 Irmulco Rd. IN MENDOCINO COUNTY FROM IRMULCO ROAD TO BROADDUS CREEK BRIDGE

RUBBERIZED HOT MIX ASPHALT GAP GRADED

$1,400,000 4/15/2018

1025 01-0C692 MEN 128 28 Boonville 800MHZ

IN MENDOCINO COUNTY AT THE BOONVILLE

ROADSIDE RADIO STATION

$25,000 11/1/2017

1026 01-0F850 HUM 101 28.5 WEOTT RHMA IN HUMBOLDT COUNTY NEAR WEOTT FROM 0.6 MILE NORTH OF MYERS FLAT SEPARATION TO NEWTON ROAD UNDERCROSSING

RUBBERIZED HOT MIX ASPHALT

$2,200,000 10/1/2017

1027 01-0F880 HUM 299 2.9 ESSEX & GLENDALE Fence Repair

IN HUMBOLDT COUNTY AT GLENDALE FROM ESSEX LANE UC TO GLENDALE UC

FENCE REPAIR

$291,000 6/1/2018

1028 01-0F990 HUM 096 10.99 Hoopa Valley SRTS Oversight

IN HUMBOLDT COUNTY IN HOOPA FROM 0.1 MILE WEST OF LOOP ROAD #2042 TO POST OFFICE ROAD

INSTALL & UPGRADE PEDESTRIAN FACILITIES

$0 10/1/2018

1029 01-0G350 HUM 101 68.2 HUM-101-68.2/93.0 polyester concrete overlay

IN HUMBOLDT COUNTY ON ROUTE 101 AT VARIOUS LOCATIONS

PLACE POLYESTER CONCRETE OVERLAY & METHACRYLATE DECK

$2,214,000 2/1/2018

3 of 18

Page 4: 12 Month Look Ahead North Region Projects … STREET $0 11/20/2017 1013 01-0C870 HUM 283 0.13 Rio Dell ADA IN HUMBOLDT COUNTY NEAR RIO DELL AT THE EEL RIVER BRIDGE #4-$0 12/15/2017

Map No EA Co Rte PM Nickname Legal DescriptionWork

Description Cost

EstimateAd Date

12 Month Look Ahead North Region Projects September 2017-2018

1030 01-0G360 HUM 101 27.7 HUM-101-27.7/63.1 Concrete Overlay

IN HUMBOLDT COUNTY ON ROUTE 101 AT VARIOUS LOCATIONS

PLACE POLYESTER CONCRETE OVERLAY & METHACRYLATE DECK

$4,200,000 2/1/2018

1031 01-0G370 HUM 101 97 Fence Repair near Westhaven

IN HUMBOLDT COUNTY NEAR WESTHAVEN FROM CRANNEL ROAD OVERCROSSING TO LITTLE RIVER BRIDGE

REPAIR FENCE

$110,000 12/1/2017

1032 01-0G620 HUM 101 77.3 DO HVAC System Repair

IN HUMBOLDT COUNTY IN EUREKA AT THE EUREKA DISTRICT OFFICE

HVAC SYSTEM REPAIR

$800,000 4/16/2018

1033 01-0G640 HUM 101 59.5 Fortuna Overlay IN HUMBOLDT COUNTY IN AND NEAR FORTUNA FROM KENMAR ROAD UNDERCROSSING TO FINCH CREEK ROAD UNDERCROSSING

BONDED WEARING COURSE-GAP GRADED

$9,120,000 2/1/2018

1034 01-0G680 MEN 253 0 BELL VALLEY OVERLAY

IN MENDOCINO COUNTY NEAR BOONVILLE FROM 0.5 MILE WEST OF ANDERSON CREEK BRIDGE TO ROUTE 253/101 SEPARATION

HMA OVERLAY

$11,975,000 2/1/2018

1035 01-0G710 HUM 096 0.6 Willow Creek Charging Station

IN HUMBOLDT COUNTY IN WILLOW CREEK AT 0.1 MILE EAST OF WILLOW CREEK BRIDGE #4-135

INSTALL ZERO EMISSION CHARGING STATION

$367,000 4/2/2018

1036 01-0G870 HUM 101 104.9 TRINIDAD OVERLAY

IN HUMBOLDT COUNTY NEAR TRINIDAD AT TRINIDAD NORTHBOUND SAFETY ROADSIDE REST AREA

OVERLAY $200,000 2/1/2018

1037 01-0H320 HUM 101 32.2 Weott Overlay IN HUMBOLDT COUNTY NEAR WEOTT FROM 1.0 MILE SOUTH OF NEWTON RD UC TO SOUTH FORK EEL RIVER BRIDGE #04-0076

OVERLAY $4,155,000 4/1/2018

1038 01-0H330 MEN 101 69.3 Laytonville Overlay

IN MENDOCINO COUNTY NEAR LAYTONVILLE FROM RAMSEY RD TO 4.4 MILES SOUTH OF SPY ROCK RD

OVERLAY $5,135,000 4/15/2018

1039 01-0H340 MEN 101 55.1 Longvale Overlay IN MENDOCINO COUNTY NEAR LONGVALE FROM 0.4 MILE NORTH OF SHIMMINS RIDGE RD TO LONG VALLEY CR BR #10 0099

OVERLAY $10,700,000 4/15/2018

4 of 18

Page 5: 12 Month Look Ahead North Region Projects … STREET $0 11/20/2017 1013 01-0C870 HUM 283 0.13 Rio Dell ADA IN HUMBOLDT COUNTY NEAR RIO DELL AT THE EEL RIVER BRIDGE #4-$0 12/15/2017

Map No EA Co Rte PM Nickname Legal DescriptionWork

Description Cost

EstimateAd Date

12 Month Look Ahead North Region Projects September 2017-2018

1040 01-0H350 LAK 175 0 Lakeport Overlay IN LAKE COUNTY IN AND NEAR LAKEPORT FROM 0.4 MILE WEST OF RUSSIAN RIVER BR #10-0045 TO 1.4 MILES EAST OF MATTHEWS RD

OVERLAY $4,157,000 4/15/2018

1041 01-0H360 MEN 020 0 Upperlake Overlay

IN MENDOCINO AND LAKE COUNTIES NEAR UPPERLAKE FROM 0.2 MILE EAST OF COLD CREEK BR #2 TO 0.8 MILE SOUTH OF OLD LAKE COUNTY RD & COUNTY LINE TO ROUTE 175

OVERLAY $8,145,000 4/1/2018

1042 01-0H370 LAK 020 33.6 Clearlake Overlay IN LAKE COUNTY ABOUT 8 MILES EAST OF CLEARLAKE OAKS FROM 0.6 MILE EAST OF LONG VALLEY RD TO NORTH FORK CACHE CR BR & 1.4 MILE EAST OF ABBOTT MINE RD TO COUNTY LINE

OVERLAY $2,476,000 4/15/2018

2001 02-0E180 PLU 089 29.8 Lake Almanor Bridge Replacement

In Plumas County near Canyon Dam from 0.2 mile south to 0.3 mile north of Lake Almanor Spillway.

BRIDGE REPLACEMENT

$9,810,000 9/11/2017

2002 02-3E720 TEH 036 42.1 East Red Bluff CAPM

IN TEHAMA COUNTY IN AND NEAR RED BLUFF FROM EAST SAND SLOUGH BRIDGE TO 0.6 MILE EAST OF STICE ROAD.

Rehabilitate pavement by replacing AC surfacing then placing an AC overlay.

$4,920,000 9/11/2017

2003 02-3E740 SHA 299 7.6 Dri Whiskey IN SHASTA COUNTY AT AND NEAR SHASTA FROM 0.5 MILE WEST OF CRYSTAL CREEK ROAD TO TRINITY ALLEY

Pavement Preservation

$13,362,000 6/11/2018

2004 02-4E020 SHA 299 77.8 Johnson Park 3R In Shasta County near Burney from 0.2 mile west of Sonoma Street to 0.3 mile west of route 89.

Pulverize pavement and shoulder widening.

$7,502,000 11/13/2017

2005 02-4E680 SIS 097 21.8 Grass Lake SRRA Sewer/Water Restoration

IN SISKIYOU COUNTY ABOUT 19 MILES SOUTH OF MACDOEL AT GRASS LAKE SAFETY ROADSIDE REST AREA

Rehabilitate Water and Sewer Systems

$1,950,000 12/25/2017

2006 02-4F200 SHA 044 59.4 Hat Creek Bridge replacement

In Shasta County near Old Station from 0.3 mile west to 0.2 mile east of Hat Creek Bridge.

Bridge Replacement

$4,800,000 6/4/2018

2007 02-4F210 MOD 299 0 Butte & Ash Creek Bridge Replacement

In Modoc County near Adin at Butte Creek Bridge and at Ash Creek Bridge.

Bridge Replacement

$5,926,000 9/3/2018

5 of 18

Page 6: 12 Month Look Ahead North Region Projects … STREET $0 11/20/2017 1013 01-0C870 HUM 283 0.13 Rio Dell ADA IN HUMBOLDT COUNTY NEAR RIO DELL AT THE EEL RIVER BRIDGE #4-$0 12/15/2017

Map No EA Co Rte PM Nickname Legal DescriptionWork

Description Cost

EstimateAd Date

12 Month Look Ahead North Region Projects September 2017-2018

2008 02-4F420 LAS 036 26.6 Skyline Extension $3,500,000 4/23/2018

2009 02-4F510 SHA 005 0 Shasta 5 CRZ In Shasta County in and near Redding from Tehama County line to Siskiyou County line.

Collision Severity Reduction

$4,420,000 6/4/2018

2010 02-4F540 SIS 005 R15.3 Black Butte OH Br replacement

In Siskiyou County near Weed from 0.1 mile south of Deetz Road Undercrossing to 0.6 mile north of Black Butte Overhead 02-00004L.

Bridge Replacement - Southbound Only

$9,974,000 6/25/2018

2011 02-4F550 SIS 089 20.9 Mud Creek Br Replacement

In Siskiyou County near McCloud from 0.2 mile south to 0.2 mile north of Mud Creek Bridge.

Bridge Replacement

$2,946,000 9/5/2017

2012 02-4F860 TRI 036 26.7 Ditch Gulch Curve Improvement

IN TRINITY COUNTY ABOUT 9 MILES EAST OF FOREST GLEN FROM 0.6 MILE WEST TO 0.1 MILE WEST OF ROUTE 3

Curve Improvement

$5,981,000 5/7/2018

2013 02-4F990 LAS 036 22.4 Susanville Capital Maintenance Paving

In Lassen County in and near Susanville from 0.3 mile east of Eagle Lake Road to Route 395.

Cold Plane AC PVMT, AC Overlay, Curb Ramps, Drainage and Guardrail.

$10,700,000 9/11/2017

2014 02-4G250 TRI 003 32.8 Trinity 3 Storm Water Mitigation

In Trinity County near Weaverville at various locations from 0.1 mile north of East Weaver Road to 0.4 mile north of Rush Creek Campground Road.

Drainage Improvements

$2,140,000 12/4/2017

2015 02-4G240 SIS 005 R25.2 North Edgewood Overhead Upgrade

In Siskiyou County about 5 miles north of Weed at the North Edgewood Overhead.

Strengthen and upgrade bridge

$4,755,000 9/18/2017

2016 02-4G280 TEH 036 8.96 Dry Feather Culverts

In Tehama County at and near Dry Creek from Feather River Road to 0.3 mile east of County Road A-13.

Culvert Rehabilation

$140,000 3/24/2018

2017 02-4G300 SIS 005 58 Collier SRRA Break Room

In Siskiyou County about 8 miles north of Yreka at 0.1 mile south of Klamath River Road Undercrossing.

Construct Break Room

$175,000 2/28/2018

2018 02-4C150 SIS 096 23.4 96 Culverts In Siskiyou County at and near Happy Camp from 0.1 mile west of Swillup Creek Bridge to 3.6 miles east of Thompson Creek Bridge.

Replace or Rehabilitate Drainage Systems

$1,679,000 6/18/2018

6 of 18

Page 7: 12 Month Look Ahead North Region Projects … STREET $0 11/20/2017 1013 01-0C870 HUM 283 0.13 Rio Dell ADA IN HUMBOLDT COUNTY NEAR RIO DELL AT THE EEL RIVER BRIDGE #4-$0 12/15/2017

Map No EA Co Rte PM Nickname Legal DescriptionWork

Description Cost

EstimateAd Date

12 Month Look Ahead North Region Projects September 2017-2018

2019 02-4G520 SHA 005 R28 Pit River Deck Improvements

In Shasta County about 6 miles north of Shasta Lake from 0.2 mile south to 0.9 mile north of Pit River Bridge Overhead.

Bridge Deck Maintenance

$8,043,000 4/25/2018

2020 02-4G570 SHA 005 1 I-5 Worker's Safety

In Shasta County at various locations from 0.1 mile north of Fourth Street Overcrossing to 0.3 mile north of Fawndale Overcrossing.

Worker Safety - Relocate Roadside Facilities

$2,460,000 6/4/2018

2021 02-4C403 SHA 005 R6.2 Redding to Anderson Little Easy Six Lane

In Shasta County in and near Anderson from 0.6 south of Riverside Avenue Overcrossing to 0.4 mile south of Churn Creek Road Overcrossing.

Widen to six lanes

$11,020,000 12/24/2018

2022 02-4C404 SHA 005 R5.5 Redding to Anderson Big Easy Six Lane

In Shasta County in and near Anderson from 0.2 mile south of North Street Undercrossing to Knighton Road Overcrossing.

Widen to 6 lanes

$13,035,000 12/24/2018

2023 02-0H450 PLU 070 11.5 Opapee Curve Improvement

In Plumas County about 3 miles west of Belden from 2.1 miles to 1.6 miles west of Chipps Creek Bridge.

Curve Improvement

$2,030,000 8/20/2018

2024 02-0H110 TEH 036 36.4 Meister Curve Improvement

In Tehama County near Red Bluff from Nevis Road to 0.5 mile east of Nevis Road.

Curve Improvement

$2,000,000 4/2/2018

2025 02-0H630 LAS 139 6.3 Lower Antelope Summit Curve Improvement

In Lassen County about 6 miles north of Susanville from 1.1 miles south of Antelope Radio Street to Antelope Radio Street.

Curve Improvement

$3,630,000 6/11/2018

2026 02-0H800 PLU 070 0 Soda Rush Fish Passage

In Plumas County near Rich Bar at Rush Creek Bridge and at 1.2 miles west of Route 89 at Soda Creek Bridge.

Fish Passage $1,000,000 11/5/2018

2027 02-0H900 BUT 070 41.9 Feather River Aquatic Passage

In Butte County at various locations from 0.9 mile east of North Fork Feather River Bridget to 0.6 mile west of Arch Rock Tunnel.

Install fish passage

$5,570,000 11/5/2018

2028 02-1H110 LAS 299 25.58 Adin Maintenance Facility-DES Brokered Project

In Lassen County about 11 miles east of Bieber at Adin Maintenance Station.

Rehabilitate Maintenance Station

$4,880,000 11/5/2018

7 of 18

Page 8: 12 Month Look Ahead North Region Projects … STREET $0 11/20/2017 1013 01-0C870 HUM 283 0.13 Rio Dell ADA IN HUMBOLDT COUNTY NEAR RIO DELL AT THE EEL RIVER BRIDGE #4-$0 12/15/2017

Map No EA Co Rte PM Nickname Legal DescriptionWork

Description Cost

EstimateAd Date

12 Month Look Ahead North Region Projects September 2017-2018

2029 02-1H200 TEH 005 39.6 Cottonwood CMS Power

In Tehama County about 8 miles north of Red Bluff from 0.8 mile north to 2.1 miles north of Snively Road Overcrossing.

Provide CMS Sign power

$65,000 9/11/2017

2030 02-1H340 TEH 005 R14.1 Teh 5 Willow Creek Bridge Drainage Easement

In Tehama County near Corning at various locations from South Fork McClure Creek Bridge to Oak Creek Bridge.

Drainage Easement and Construct Access Road

$180,000 3/17/2018

2031 02-1H330 MOD 299 51.9 East Cedar Pass Safety

In Modoc County near Cedarville from 0.6 mile west of Cedar Pass Ski Tow Road to Cedar Pass Ski Tow Road

Superelevation Improvement

$3,214,000 9/17/2018

2032 02-1H440 LAS 044 31.9 Worley Ranch Curve Improvement

In Lassen County about 10 miles west of Susanville from 0.3 mile west to 0.4 mile east of Big Springs Road.

Curve Improvement

$2,762,000 8/13/2018

2033 02-2H250 SIS 161 0 Hatfield and Tulelake Drainage Restoration

In Siskiyou County near Tulelake at various locations from 0.6 mile west to 0.2 mile west of Haskins Road

Drainage Restoration

$263,000 3/16/2018

2034 02-2H580 SIS 097 20.19 Grass Lake MS Stormwater Improvements

In Siskiyou County about 20 miles north of Weed at Grass Lake Maintenance Station.

Stormwater improvements

$0 1/22/2018

2035 02-2H720 TRI 299 15.1 Don Juan Point In Trinity County near Burnt Ranch from 1.0 mile east to 1.5 miles east of Trinity River Bridge.

Realign roadway

$930,000 2/12/2018

2036 02-2H730 SHA 044 R0.16 Free Hilltop In Shasta County in Redding at Hilltop Drive Overcrossing.

Install free right turn

$440,000 2/19/2018

2037 02-4F77U MOD 299 0 Caldwell Bridgeway

In Modoc County about 6 miles west of Alturas from 0.3 mile west of Caldwell Creek Bridge to 1.7 mile west of County Road 75.

Bridge Replacement and Roadway Rehabilitation

$14,864,000 1/8/2018

2038 02-4F79U SHA 151 5.5 Shasta Lake Combined

In Shasta County in Shasta Lake City from Pancake Hill Drive to Locust Avenue.

Pedestrian infrastructure and AC Overlay

$2,283,000 11/13/2017

2039 02-3H120 TEH 005 0 SB Corning to Red Bluff Overlay

In Tehama County at and near Corning from Glenn County Line to 0.3 mile north of Branch Coyote Creek Bridge.

AC Overlay $0 12/18/2017

2040 02-3H130 LAS 395 47 Honey Lake Chip In Lassen County at and near Janesville from 1.9 miles south of Lakecrest Drive to 0.2 mile north of Sunnyside Road.

AC Overlay $0 12/18/2017

8 of 18

Page 9: 12 Month Look Ahead North Region Projects … STREET $0 11/20/2017 1013 01-0C870 HUM 283 0.13 Rio Dell ADA IN HUMBOLDT COUNTY NEAR RIO DELL AT THE EEL RIVER BRIDGE #4-$0 12/15/2017

Map No EA Co Rte PM Nickname Legal DescriptionWork

Description Cost

EstimateAd Date

12 Month Look Ahead North Region Projects September 2017-2018

2041 02-3H150 LAS 299 0 Pitville Overlay In Lassen County near McArthur from Shasta County Line to 4.0 miles west of Muck Valley Hydro Road.

AC Overlay $0 10/10/2017

2042 02-3H160 TRI 299 25.7 Big Bar Overlay In Trinity County at and near Big Bar from 1.4 miles east of Little French Creek to 0.4 mile east of Manzanita Creek Bridge.

AC Overlay $0 12/4/2017

2043 02-3H170 MOD 299 0 Alturas and Cedarville CIR

In Modoc County in and near Alturas from 0.3 mile east of Rock Creek Bridge to Warner Street and from 1.9 miles east of Cedar Pass Ski Tow Road to Patterson Street.

Cold in place recycle

$0 3/12/2018

2044 02-3H180 TEH 089 R0 South Park Overlay

In Tehama County near Mineral from Route 36 to Lassen Volcanic National Park.

AC Overlay $0 1/8/2018

2045 02-3H190 SIS 263 49.3 Shasta River Overlay

In Siskiyou County near Yreka from Shasta River Bridge 02-0011 to Shasta River Bridge 02-0014.

AC Overlay $0 1/22/2018

2046 02-3H200 SHA 299 24.6 Shasta College Overlay

In Shasta County in and near Redding from 0.1 mile east of Boulder Drive to Stillwater Creek Bridge.

AC Overlay $0 1/8/2018

2047 02-3H250 PLU 036 12.8 Chester Maint Station AC Gutter Repair

In Plumas County about 1.9 miles west of Chester at the Chester Maintenance Station.

AC Gutter Repair

$0 12/4/2017

2048 02-1H810 SHA 273 6.53 Leftovers Culvert Project

In Shasta County near Anderson and in Redding at various locations from 0.1 mile north of Alexander Street to 0.3 mile north of Westwood Avenue.

Culvert Rehabiliation

$0 2/24/2018

2049 02-1H820 TRI 003 18.3 Deer Lick Springs Culvert Rehab

In Trinity County about 13 miles north of Hayfork at various locations from 0.2 mile south of Summit Creek Road to 0.5 mile south of Trinity River Bridge.

Culvert replacement

$0 12/15/2017

2050 02-1H600 SHA 044 64.19 Plum Valley Rock Fence

In Shasta County near Old Station from 1.3 miles west to 0.3 mile west of Plum Valley Road.

Install rock fence

$0 1/6/2018

2051 02-3H340 PLU 070 33.38 Greenville Wye/Indian Creek Retaining

In Plumas County near Keddie at 0.3 mile east of Indian Creek Bridge.

Construct retaining wall

$291,000 2/12/2018

9 of 18

Page 10: 12 Month Look Ahead North Region Projects … STREET $0 11/20/2017 1013 01-0C870 HUM 283 0.13 Rio Dell ADA IN HUMBOLDT COUNTY NEAR RIO DELL AT THE EEL RIVER BRIDGE #4-$0 12/15/2017

Map No EA Co Rte PM Nickname Legal DescriptionWork

Description Cost

EstimateAd Date

12 Month Look Ahead North Region Projects September 2017-2018

2052 02-0H090 TRI 003 11 Carr Creek Overlay

In Trinity County near Hayfork from 1.2 miles north of East Road to 0.8 mile south of Deer Lick Springs Road.

AC Overlay $0 2/12/2018

2053 02-3H430 TRI 299 54.96 Moon Lim Lee Charging Station

In Trinity County at and near Douglas City at various locations from 0.4 mile east of Little Browns Creek Bridge to 0.8 mile west of Steel Bridge Road.

Install charging stations

$335,000 6/4/2018

2054 02-3H590 SHA 044 L0.4 Continental Street Encampment

In Shasta County in Redding at Continental Street Undercrossing.

Fence Repair $0 1/22/2018

2055 02-3H620 TEH 005 41.65 Bowman Grated Line Drain

In Tehama County near Cottonwood at 0..2 mile north of Bowman Road Overcrossing

Install grated line drain

$291,000 3/20/2018

3001 03-0E960 ED 049 11.7 Diamond Springs Parkway

Near Placerville from Pleasant Valley Rd to Bradley Dr.

Realign and redesignate roadway

$3,000,000 1/2/2018

3002 03-1F040 NEV 020 16.7 NDNev 020, Irrigation Controls and Pumphose

In Nevada City from Sacramento Street overcrossing to Uren Street at junction route 49 North

Install pumphouse and irrigation controllers

$270,000 8/1/2018

3003 03-2F130 ED 050 38 Install sandtraps and pullouts

About 18.0 Miles East of Placerville from 0.8 Mile East of Bridal Veil Falls Road to Strawberry Lodge Drive

Install sandtraps and pullouts

$1,500,000 2/1/2018

3004 03-2F320 YUB 020 8 Loma Rica Rd./Spring Valley Road Widening & Rehab

About 6 miles east of Marysville from 0.1 mile east of Loma Rica Road to 0.2 mile west of Spring Valley Road

Widen shoulders and rehab pavement

$9,950,000 9/15/2018

3005 03-3E050 PLA 080 28.5 Culvert Rehabilitation

In and near Colfax from 0.3 mile south of Weimar overhead to 0.3 mile south of Illinoistown overcrossing

Install culvert liners

$1,042,000 12/1/2017

3006 03-1A920 SUT 020 5 Sutter Bypass Widening & Rehab

Near Yuba City from Sutter Bypass to 0.1 mile west of Lytle Road

Rehabilitate Roadway and widen shoulder, including one structure (Wadsworth Canal Bridge #18-0003).

$21,614,000 7/1/2018

3007 03-2F340 PLA 049 3.1 PLA 49 HMA Overlay

In Auburn from Interstate 80 to 0.1 mile north of Dry Creek Road

HMA overlay $29,000,000 7/25/2018

10 of 18

Page 11: 12 Month Look Ahead North Region Projects … STREET $0 11/20/2017 1013 01-0C870 HUM 283 0.13 Rio Dell ADA IN HUMBOLDT COUNTY NEAR RIO DELL AT THE EEL RIVER BRIDGE #4-$0 12/15/2017

Map No EA Co Rte PM Nickname Legal DescriptionWork

Description Cost

EstimateAd Date

12 Month Look Ahead North Region Projects September 2017-2018

3008 03-2F590 YUB 020 20.1 Smartsville Near Lake Wildwood, from 0.4 mile east of McGanney Lane to Yuba/Nevada County line; also in Nevada County, from Yuba/Nevada County line to Mooney Flat Road.

Shoulder widening and curve improvements

$19,200,000 4/15/2018

3009 03-2F980 COL 020 31.8 Colusa Rehab In Colusa, between Market St and Butte Vista Way.

Pavement Rehabilitation

$11,644,000 9/1/2017

3010 03-1E060 YUB 070 15.5 Simmerly Slough Near Marysville, from 0.1 mile north of Binney Junction Underpass to 0.3 mile north of Laurellen Road, at Simmerly Slough Br (#16-0019)

Replace bridge $68,297,000 10/24/2018

3011 03-3C001 SAC 005 9.7 I5 HOV Phase 1 In Sacramento County on I-5, from 1.1 miles south of Elk Grove Blvd to US 50 – Add high-occupancy vehicle (HOV) lanes (i.e. bus/carpool lanes) and soundwalls in both directions

Construct HOV lanes

$125,600,000 3/5/2018

3012 03-3F530 ED 050 67.3 Sidehill Viaduct Bridge

Near South Lake Tahoe at Echo Summit Sidehill viaduct bridge 24-0044

Replace bridge $6,000,000 5/1/2018

3013 03-3F550 YOL 275 13.07 Yol-275 Tower Br Fender Replc 3F550 [0313*137]

In West Sacramento at Sacramento River Bridge 22-0021

Sub-nav protection

$8,628,000 3/1/2018

3014 03-3F780 COL 020 31.07 Col 20, Three Overhead Signs

In Colusa on Route 20 at 9th street and at Jay Street, and on Route 45 at 11th Street

Install three overhead signs in Colusa

$175,000 11/1/2017

3015 03-3F800 YUB 020 18.48 Yuba Cut Bank About 15 miles east of Marysville at 0.4 mile east of Yuba River Bridge 16-11

Repair cut bank with rock slope protection

$270,000 11/1/2018

3016 03-3F920 NEV 080 19 Nev 80, Near Truckee, Relocate Floriston Sand House

In Nevada County In Truckee at the Donner Pass Inspection Facility and at Floriston at the Floriston Sand and Salt Houses

REPLACE SANDHOUSE

$2,478,000 10/1/2017

3017 03-2F510 YUB 070 14.12 E Street Bridge curb & ramps

In Marysville at the south side of 1st Street

Install sidewalk and curb ramps

$100,000 2/25/2018

3018 03-2F240 ED 193 0 ED 193, Construct Turnouts

In ElDorado County at various locations between Cool and Georgetown

Construct turnouts

$800,000 3/1/2018

11 of 18

Page 12: 12 Month Look Ahead North Region Projects … STREET $0 11/20/2017 1013 01-0C870 HUM 283 0.13 Rio Dell ADA IN HUMBOLDT COUNTY NEAR RIO DELL AT THE EEL RIVER BRIDGE #4-$0 12/15/2017

Map No EA Co Rte PM Nickname Legal DescriptionWork

Description Cost

EstimateAd Date

12 Month Look Ahead North Region Projects September 2017-2018

3019 03-2F550 SAC 099 17.5 Mack Road, Lengthen Merging Distance

In Sacramento County, In City of Sacramento at Mack Road

Widen on-ramp and reconfigure High Occupancy Vehicle (HOV) ramp meter from Mack Road to Elder Creek

$910,000 9/11/2017

3020 03-0G120 SUT 020 R0 Overlay Near Sutter from Colusa County Line to the Sutter Bypass Bridge 18-0005

RAC Overlay $5,200,000 12/1/2017

3021 03-4F400 SAC 005 33.1 The WIM station on Sac-5

NEAR SACRAMENTO AT 0.3 MILE NORTH OF AIRPORT BOULEVARD OVERCROSSING (WIM STATION)

WEIGH IN MOTION REPAIRS AND CONCRETE PAVEMENT REPLACEMENT

$2,100,000 6/15/2018

3022 03-4F450 SAC 005 9.7 Installation of fiber optic cable

In Sacramento, from 1.1 miles south of Elk Grove Blvd Overcrossing to Route 50.

Installation of fiber optic cable

$6,035,000 3/5/2018

3023 03-4F460 SAC 050 L0 Installation of fiber optics communication lines

In Yolo and Sacramento Counties From 0.1 Mile West of Jefferson Boulevard Undercrossing to Watt Avenue Overcrossing

Installation of fiber optic communication lines.

$5,601,000 4/15/2018

3024 03-4F690 YUB 070 R8 Yub Ditch Lining About 5.5 miles south of Marysville from 0.3 mile to 0.1 mile south of 65 south/70 separation bridge

concrete ditch lining

$270,000 5/1/2018

3025 03-0C472 YOL 016 20.5 Yol 16 SIP at Co Rd 79 & Esparto to I-505

IN YOLO COUNTY NEAR ESPARTO FROM 0.3 MILE WEST TO 0.4 MILE EAST OF COUNTY ROAD 79 AND FROM 0.1 MILE EAST OF PLAINFIELD STREET TO 0.1 MILE EAST OF COUNTY ROAD 90

Shoulder widening, curve correction, left-turn channelization and two-way left-turn lanes.

$18,400,000 2/12/2018

3026 03-4F800 BUT 032 R8.8 Chico ADA Infrastructure

In Butte County in Chico from West 8th Street at Walnut Street to Poplar Street.

ADA infrastructure, including sidewalks, curb ramps, accesible pedestrian traffic signals, cross slopes, and driveways

$2,900,000 12/1/2018

12 of 18

Page 13: 12 Month Look Ahead North Region Projects … STREET $0 11/20/2017 1013 01-0C870 HUM 283 0.13 Rio Dell ADA IN HUMBOLDT COUNTY NEAR RIO DELL AT THE EEL RIVER BRIDGE #4-$0 12/15/2017

Map No EA Co Rte PM Nickname Legal DescriptionWork

Description Cost

EstimateAd Date

12 Month Look Ahead North Region Projects September 2017-2018

3027 03-4F840 ED 050 70.62 Meyers Intersection Improvements

In El Dorado County at the Junction of Route 50 and 89S

convert minor leg stop controlled T-intersection into 3-leg roundabout

$3,992,000 2/2/2018

3028 03-0H100 SAC 005 13 SAC 5 Road Rehab

In Sacramento, from Beach Lake Bridge at Morrison Creek to American River Br (Br#24-68)

Resurfacing, restoration, rehabilitation (3R)

$221,600,000 3/5/2018

3029 03-0H190 SUT 099 40.25 Pennington Road RR Signal

On Sutter 99 at the Pennington Road traffic signal

Install railroad signal preemption for railroad crossing at the Pennington Road traffic signal

$5,000 3/1/2018

3030 03-0H200 BUT 099 3.97 Gridley ADA Improvements

On Butte 99, in the town of Gridley, at the intersection of But-99 and Cherry St

Install median island and ADA improvements

$150,000 2/5/2018

3031 03-0H260 PLA 065 R5 80/65 Aux Lane In and near Roseville and Rocklin, from Route 80 to 0.5 mile south of Pleasant Grove Overcrossing.

Provide an auxiliary lane for WB I-80 connector traffic entering NB SR 65.

$15,050,000 9/10/2017

3032 03-0G420 COL 045 28.8 CIR Princeton IN COLUSA COUNTY ABOUT 9 MILES NORTH OF COLUSA FROM 0.5 MILE NORTH OF PACKER ROAD TO SPENCER ROAD

COLD IN-PLACE RECYCLING AND RUBBERIZED HOT MIX ASPHALT (GAP GRADED) OVERLAY

$2,300,000 1/1/2018

3033 03-0H480 SAC 099 0 RHMA Overlay In Sac County on SR 99 near Galt from SJ County line to Simmerhorn Rd OC and from .7 miles south of Elk Grove Blvd OC to MLK Blvd OC

RHMA Overlay $36,550,000 9/3/2018

3034 03-0H500 ED 050 0 ED 50 MBGR Upgrade

In El Dorado County, from the Sacramento County line to east of Stateline Avenue.

Upgrade MBGR, add concrete barrier to transition to bridge rail and shield bridge columns

$3,546,000 12/1/2018

13 of 18

Page 14: 12 Month Look Ahead North Region Projects … STREET $0 11/20/2017 1013 01-0C870 HUM 283 0.13 Rio Dell ADA IN HUMBOLDT COUNTY NEAR RIO DELL AT THE EEL RIVER BRIDGE #4-$0 12/15/2017

Map No EA Co Rte PM Nickname Legal DescriptionWork

Description Cost

EstimateAd Date

12 Month Look Ahead North Region Projects September 2017-2018

3035 03-0H510 YUB 070 R11 YUB 70 Median Barrier

On Yub-70, from the south end of the Yuba River Bridge OH to south of the Feather River Blvd. Interchange

Remove existing thrie-beam median barrier and oleanders. Pave median and install new concrete median barrier. Correct drainage at the SB off-ramp to N. Beale Rd.

$5,200,000 12/15/2018

3036 03-0H560 PLA 065 R5.4 Galleria 65 NB Ramps

NB 65 at Standord Ranch Rd/Galleria Blvd.

Modify SR 65 Northbound Ramps at Galleria Blvd/ Standford Ranch

$4,343,000 9/10/2017

3037 03-0H630 NEV 174 6.83 Nev 174 & Brunswick Rd Intersection Lighting

In Nevada county on Route 174 at Brunswick Road.

Install intersection lighting.

$125,000 11/10/2017

3038 03-0G530 BUT 070 17 High ADT/RAC Overlay

In Butte County Near Oroville from .4 mile north of Garden Drive OC to Campbell Creek overflow bridge

Cold Plane AC Pavement and RHMA-O (OGFC) Overlay

$2,000,000 10/31/2017

3039 03-0G620 GLE 162 81.6 GLE 162 Paint Bridges

In Glenn County near Butte City at the Sacramento River Overflow and at Campbell Slough Bridge.

paint two bridges

$450,000 1/1/2018

3040 03-0H830 ED 049 10.7 ED-49 Ped/Bike Access

In El Dorado county on Route 49 from Patterson Drive to Missouri Flat Rd.

Widen shoulders to 8 ft to provide pedestrian/bicycle access along highway

$900,000 12/1/2018

3041 03-0H920 NEV 080 50.7 Whitmore Sand house

Whitmore Maintenance Station

Repair and paint Whitmore Maint Station

$150,000 11/1/2018

3042 03-1H060 YOL 050 0.72 Yolo Guardrail In Yolo county on Route 50 at the 50/80 Connector.

Removal of existing MBGR, installation of MGS, reconstruction of shoulder hinge point

$140,000 9/12/2017

3043 03-0F352 PLA 065 R5.9 Galleria Blvd Ramp Meter

In Placer County, on Rt 65 at Galleria Blvd

Install Ramp Meters at Galleria Blvd

$2,670,000 9/10/2017

3044 03-1H380 SAC 099 32.5 W. Elkhorn Aux Lanes

In Sacramento County in Sacramento from I-5 Connector to West Elkhorn Blvd OC

Construct auxiliary lane

$4,340,000 11/30/2017

14 of 18

Page 15: 12 Month Look Ahead North Region Projects … STREET $0 11/20/2017 1013 01-0C870 HUM 283 0.13 Rio Dell ADA IN HUMBOLDT COUNTY NEAR RIO DELL AT THE EEL RIVER BRIDGE #4-$0 12/15/2017

Map No EA Co Rte PM Nickname Legal DescriptionWork

Description Cost

EstimateAd Date

12 Month Look Ahead North Region Projects September 2017-2018

3045 03-1H390 BUT 162 14.72 But 162 Ped Crossing @ 14th St in Oroville

In Butte County, in Oroville, at 14th Street

Construct crosswalk and ped-activated beacon

$150,000 1/15/2018

3046 03-0G700 YOL 128 0.9 Yolo 128 MBGR In Yolo County on Route 128

Replace aging metal beam guard railing

$281,000 12/1/2017

3047 03-0G720 YOL 005 R10.5 RHMA Overlay In Yolo County at various locations from County Road 98 to County Road 6.

RHMA Overlay $2,000,000 2/1/2018

3048 03-0G730 BUT 162 R7.7 Cold Plane AC Pavement and Place RHMA-G

In Butte County near Oroville from 2.0 mile West of Rt 99 to .1 mile East of Par 4 Way Intersection

Cold Plane AC Pavement and Place RHMA-G

$4,000,000 12/1/2017

3049 03-0G740 COL 020 33.1 RHMA Overlay In Colusa County from Butte Vista Way to Sacramento River Bridge.

RHMA Overlay $2,500,000 2/1/2018

3050 03-0G750 ED 050 R28.8 RHMA Overlay In El Dorado County from Sawmill Undercrossing to South Fork American River Bridge

Hot Mix Asphalt (Type-A) Overlay

$6,500,000 2/1/2018

3051 03-0G760 GLE 162 37.6 RHMA Overlay IN GLENN COUNTY ABOUT 10 MILES WEST OF ELK CREEK FROM COUNTY ROAD 307 TO AIRPORT ROAD

RUBBERIZED HOT MIX ASPHALT (GAP GRADED) OVERLAY

$5,000,000 1/1/2018

3052 03-0G770 SAC 050 12.3 Cold Plane AC Pavement & RHMA-O Overlay

In Sacramento County in and near Folsom from 0.3 mile west of Sunrise Boulevard to El Dorado County line

Cold Plane Asphalt Concrete Pavement and Rubberized Hot Mix Asphalt-Open Graded (Open Graded Friction Course)

$7,000,000 2/1/2018

3053 03-0G810 YOL 275 13.01 YOL-275-Br#22-0021 Mech/Elect

In Yolo County on Route 275

Mech/Elect Rehab Work

$1,890,000 2/1/2018

3054 03-0G830 NEV 174 0 Nev County Culvert Rehab

In Nevada County near Grass Valley on Hwy 174 at Various Locations from Placer County Line to .2 miles North of Shelby Rd, and on Hwy 49 about .6 miles South of Alta Sierra Drive

Culvert Rehab. $279,000 2/1/2018

3055 03-1H790 SAC 051 7.83 Auburn & Watt Public Storage

In Sac County, 0.15 miles North of Auburn Blvd Ramp OC (Br#24-0123).

Place new culvert

$90,000 4/1/2018

3056 03-2H080 SAC 160 7.4 Sac CMS In Sac County on Route 160, south of the State Route 12/160 Junction.

Install CMS sign

$250,000 2/15/2018

15 of 18

Page 16: 12 Month Look Ahead North Region Projects … STREET $0 11/20/2017 1013 01-0C870 HUM 283 0.13 Rio Dell ADA IN HUMBOLDT COUNTY NEAR RIO DELL AT THE EEL RIVER BRIDGE #4-$0 12/15/2017

Map No EA Co Rte PM Nickname Legal DescriptionWork

Description Cost

EstimateAd Date

12 Month Look Ahead North Region Projects September 2017-2018

3057 03-2H090 NEV 049 6.3 Nev 49 Superelevation

In Nevada County on Route 49, from approx. 0.2 miles north of Cherry Creek Rd to approx. 0.2 miles north of Mother Lode Dr/Oak Dr.

Superelevation correction

$475,000 4/15/2018

3058 03-2H290 PLA 080 7.21 Rocklin Ramp Meter Repair

On Placer 80, in the City of Rocklin, on WB I-80 at Sierra College Blvd.

Repair two existing non-operational ramp meters.

$0 9/8/2017

3059 03-2H300 NEV 080 19.25 Rehab/Upgrade Donner CHP

In Nevada County on Route 80 in Truckee at the Donner Pass CHP Truck Inspection Facility

Rehab/Upgrade Truck Inspection Facility

$550,000 9/1/2018

3060 03-2H310 SAC 050 0.4 HQ Shop Storage Facility

In Sacramento, on Route 50, at the HQ Equipment Shop.

Construct HQ Shop storage facility.

$0 4/1/2018

3061 03-0G900 YOL 045 0.1 Replace AC Surfacing & RHMA-G overlay

In Yolo County in and near Knights Landing from Sycamore Slough Bridge to Colusa County line.

Replace Asphalt Concrete Surfacing and Rubberized Hot Mix Asphalt (Gap Graded) Overlay

$0 11/1/2017

3062 03-0G930 YOL 113 11.3 Yolo 113 Concrete Overlay

In Yolo county near Woodland from 0.2 mile North of Churchill Downs Avenue to 0.1 mile South of County Road 17 South.

PCC Concrete Overlay

$0 4/1/2018

3063 03-2H840 YUB 070 10.15 D3 Mat Lab Fire System Repairs

District 3 Materials Lab located in Yuba County at 5340 Arboga Road, Olivehurst

Bring fire/security systems up to current standards.

$0 1/5/2018

3064 03-2H860 SAC 160 4.54 Sac 160 Levee Rdwy Repair

In Sacramento County near Rio Vista from 0.3 miles east of W. Sherman Island Road to 1.5 miles west of Jct Rte 12.

Remove and replace roadway structural section and stabilize slope

$0 1/5/2018

3065 03-0G950 NEV 080 2.48 9 Bridges In Nevada county on I-80 at multiple locations.

Remove AC, place methacrylate polyester concrete overlay, and/or repair bridge joints on 9 structures.

$1,100,000 2/1/2018

3066 03-3H150 YOL 016 1.5 YOL 16 Install 760 feet Soldier Pile Wall

In Yolo County on Route 16 approx. 1.2 miles west of the Colusa/Yolo County Line.

Install soldier pile wall

$0 1/26/2018

16 of 18

Page 17: 12 Month Look Ahead North Region Projects … STREET $0 11/20/2017 1013 01-0C870 HUM 283 0.13 Rio Dell ADA IN HUMBOLDT COUNTY NEAR RIO DELL AT THE EEL RIVER BRIDGE #4-$0 12/15/2017

Map No EA Co Rte PM Nickname Legal DescriptionWork

Description Cost

EstimateAd Date

12 Month Look Ahead North Region Projects September 2017-2018

3067 03-0H10U SAC 005 9.7 Sac 5 Corridor In Sacramento, from Cosumnes River Boulevard IC to American River Br (Br#24-68)

Resurfacing, restoration, rehabilitation (3R) - and install fiberoptics

$227,635,000 3/5/2018

3068 03-0H26U PLA 065 5 Nickname Required

In and near Roseville and Rocklin, from Route 80 to Galleria Boulevard/Standford Ranch Road.

Provide an auxiliary lane for WB I-80 connector traffic entering NB SR 65.

$0 9/10/2017

3069 03-0G980 PLA 080 44.7 Replace Joint Seals/Slab

In Placer County from Morton Road to Emigrant Gap.

Replace joint seals/slab replacement.

$0 4/1/2018

3070 03-0G990 YOL 084 5 Full Depth Reclimation-Foamed Asphalt

In Yolo County from N. Courtland Rd to 0.4 miles north of Willow Point Road.

CIR w/RHMA Overlay

$4,000,000 4/1/2018

3071 03-1G000 YOL 113 0.2 Replace Joint Seals/Slab Replacement

In Yolo County from Hutchinson Drive to Route 5.

Replace Joint Seals/Slab Replacement.

$5,000,000 4/1/2018

3072 03-1G010 YUB 020 2 RHMA Overlay/DIKE/PCC Island Removal

In Yuba County from Buchanan Street to 0.1 mile east of Levee Road.

RHMA Overlay/DIKE/PCC Island Removal

$1,400,000 4/1/2018

3073 03-3H340 NEV 049 3.37 Nickname Required

In Nevada County, on Route 49 at Brewer Road and at Alta Sierra Dr.

Install loop detection and radar speed feedback signs.

$0 3/15/2018

3074 03-1G030 YUB 065 2.21 Remove existing AC Overlay, place Decl on Deck

In Yuba County on Route 65 at Dry Creek Bridge (Br#16-2)

Remove existing AC deck overlay and place reinforced concrete deck on bridge.

$0 12/1/2018

3075 03-1G040 SAC 160 7 Repair Steel Structural Components, 4 Bridges

In Sacramento County on Route 160 at Three Mile Slough Br (#24-0121), Sacramento River (Isleton) Br (#24-0051), Steamboat Slough (#24-0052), and Sacramento River (Paintersville) (#24-0053)

Repair damaged steel structural components

$0 12/1/2018

3076 03-3H400 SIE 049 44.25 Motorcycle Curve In Sierra County on Route 49 from approx. 3.1 miles north of Yuba Pass Campground to 1.0 mile north of Vista Point.

Widen shoulders, improve roadway superelevation, and establish CRZ.

$0 12/1/2018

17 of 18

Page 18: 12 Month Look Ahead North Region Projects … STREET $0 11/20/2017 1013 01-0C870 HUM 283 0.13 Rio Dell ADA IN HUMBOLDT COUNTY NEAR RIO DELL AT THE EEL RIVER BRIDGE #4-$0 12/15/2017

Map No EA Co Rte PM Nickname Legal DescriptionWork

Description Cost

EstimateAd Date

12 Month Look Ahead North Region Projects September 2017-2018

3077 03-3H460 YOL 016 4.04 Rumsey Slide In Yolo County on Route 16 approx. 0.2 miles west of Cache Creek Bridge (Br#22-19)

Protect roadway from rock fall.

$0 9/1/2018

3078 03-1G070 YUB 020 6.05 Abandon and Place Culvert

In Yuba County on Route 20 near Marysville, 1 mile west of Hallwood Blvd.

Abandon and replace culvert.

$0 6/20/2018

3079 03-3H660 SAC 005 23.5 J St OH Shield In Sacramento county on Route 5 at J Street

Add concrete barrier to shield OH sign

$110,000 2/15/2018

3080 03-3H690 SAC 160 46.16 Sac 160 @ Leisure Lane, ADA

In Sacramento County on Route 160 at Leisure Lane Bridge

Construct sidewalk

$0 3/15/2018

3081 03-1G110 SAC 005 22.6 Riverfront Seal Slab

In Sacramento County on Route 5 from Riverfront Slab to J St Offramp.

Methacrylate, Joint Repair, Spall Repair, and improve friction.

$0 10/1/2017

18 of 18

Page 19: 12 Month Look Ahead North Region Projects … STREET $0 11/20/2017 1013 01-0C870 HUM 283 0.13 Rio Dell ADA IN HUMBOLDT COUNTY NEAR RIO DELL AT THE EEL RIVER BRIDGE #4-$0 12/15/2017

Map No

EA Co Nickname Legal Description Work Description Cost Estimate Ad date

1 01-42780 LAK Lak 20/29/53 Culvert Rehab

IN LAKE COUNTY AT VARIOUS LOCATIONS ON ROUTES 20 AND 29

CULVERT REHABILITATION

$3,070,000 4/11/2018

2 01-0C430 MEN 3 MEN Bridges Scour Mitigation

IN MENDOCINO COUNTY ON ROUTE ROUTE 101 IN WILLITS; ON ROUTE 128 APPROX 34.1 MILES WEST OF UKIAH; AND ON ROUTE 20, 8.5 MILES EAST OF ROUTE 101/20 JUNCTION

Bridge Scour Mitigation

$609,000 12/1/2017

3 01-0F860 59V01 Bonded Wearing Course-GG

IN HUMBOLDT AND DEL NORTE COUNTIES NEAR ORICK FROM 2.5 MILES NORTH OF BOYES CREEK VIADUCT TO NORTH PRAIRIE CREEK PARK UNDERCROSSING

BONDED WEARING COURSE-GG

$2,803,000 1/1/2018

4 01-0G690 59V01 ORLEANS SEAL COAT IN HUMBOLDT AND SISKIYOU COUNTIES NEAR ORLEANS FROM KLAMATH RIVER BRIDGE #04-0069 TO SALMON RIVER BRIDGE

RUBBERIZED SEAL COAT

$1,100,000 2/1/2018

5 01-0G740 HUM Humboldt Overlays IN HUMBOLDT COUNTY AT VARIOUS LOCATIONS

HUMBOLDT OVERLAYS

$1,800,000 2/1/2018

6 01-0C810 LAK LAK 20/53 Intersection Improvement

IN LAKE COUNTY NEAR CLEARLAKE OAKS ON ROUTE 20 FROM 0.5 MILE WEST TO 0.2 MILE EAST OF ROUTE 53 AND ON ROUTE 53 FROM 0.4 MILE SOUTH OF ROUTE 20 TO ROUTE 20

IMPROVE INTERSECTION

$6,628,000 3/15/2018

7 01-0H720 59V01 HM South Stripe IN MENDOCINO AND HUMBOLDT COUNTIES AT VARIOUS LOCATIONS

HM SOUTH RE-STRIPE

$4,068,000 2/1/2018

8 01-0H730 59V01 HM North Restripe IN DEL NORTE AND HUMBOLDT COUNTIES AT VARIOUS LOCATIONS

HM NORTH RE-STRIPE

$4,068,000 2/1/2018

12 Month Look Ahead North Region Various Projects September 2017-2018

1 of 7

Page 20: 12 Month Look Ahead North Region Projects … STREET $0 11/20/2017 1013 01-0C870 HUM 283 0.13 Rio Dell ADA IN HUMBOLDT COUNTY NEAR RIO DELL AT THE EEL RIVER BRIDGE #4-$0 12/15/2017

Map No

EA Co Nickname Legal Description Work Description Cost Estimate Ad date

12 Month Look Ahead North Region Various Projects September 2017-2018

9 01-0G880 DN REPLACE PAVEMENT MARKERS

IN DEL NORTE COUNTY AT VARIOUS LOCATIONS

REPLACE PAVEMENT MARKERS

$200,000 2/1/2018

10 02-2E480 SIS 263 Klamath River Bridge In Siskiyou County about 8 miles north of Yreka on Route 96 from 0.5 mile west to 0.2 mile east of Route 263 and on Route 263 from 0.3 mile north of Shasta River Bridge #02-0014 to Route 96.

Bridge Replacement

$13,762,000 9/10/2018

11 02-4F780 59V02 Pave Chain Control Areas Various Locations

In Butte, Lassen, Plumas, Shasta, Siskiyou, and Trinity Counties at various locations.

Improve chain control areas.

$7,400,000 5/28/2018

12 02-0H030 59V02 Feather River Drainage In Butte and Plumas Counties at various locations.

Upgrade drainage systems

$540,000 12/18/2017

13 02-1H940 SHA Bridge Mtce - Sacramento River

In Shasta County on Route 5 at Sacramento River Overhead and on Route 273 at Sacramento River Bridge.

Bridge Maintenance

$400,000 11/27/2017

14 02-1H950 SIS Bridge Maintenance Siskiyou County

In Siskiyou County at various locations

Bridge Maintenance

$550,000 12/18/2017

15 02-2H890 SIS Collier EV Stations In Siskiyou County on Route 5 from 2 miles south of Klamath River Road Undercrossing to 1.2 miles north of Route 96 and on Route 96 at 2 miles east of Route 263.

Install electric vehicle stations

$315,000 4/9/2018

16 02-3H140 59V02 Harrison Gulch and Mad River

In Shasta and Trinity Counties from Trinity County Line to 0.4 mile east of Harrison Gulch Road and from Humboldt County Line to 0.2 mile east of Mad River Road.

AC Overlay $0 12/18/2017

2 of 7

Page 21: 12 Month Look Ahead North Region Projects … STREET $0 11/20/2017 1013 01-0C870 HUM 283 0.13 Rio Dell ADA IN HUMBOLDT COUNTY NEAR RIO DELL AT THE EEL RIVER BRIDGE #4-$0 12/15/2017

Map No

EA Co Nickname Legal Description Work Description Cost Estimate Ad date

12 Month Look Ahead North Region Various Projects September 2017-2018

17 02-3H210 59V02 Lee Summit and Canyon Dam

In Plumas County on Route 70 from Greenhorn Ranch Road to 0.2 mile east of Sloat Road and on Route 89 from 0.3 mile south of Alta Camp Road to Canyon Dam Picnic Area.

Pavement Preservation

$0 2/13/2018

18 02-3H220 59V02 32 County Line Overlay In Butte and Tehama Counties from Butte County Line to 1.6 miles east of Soda Springs Road.

AC Overlay $0 3/16/2018

19 02-4G420 SHA Route 273 Gaps In Shasta County at Various Locations.

Pavement Rehabilitation

$9,801,000 5/29/2018

20 02-2H040 59V02 17/18 Marker Job In Shasta, Siskiyou and Tehama Counties at various locations.

Replace pavement markers

$0 1/16/2018

21 02-3H420 SHA Shasta Glare Fence In Shasta County on Route 5 at various locations from 0.4 mile south of Junction of Route 273 to 0.3 mile north of Pine Grove Overcrossing and on Route 273 from Route 5 to 0.2 mile south of Deschutes Road.

Install Glare Fence $900,000 2/27/2018

22 02-3H530 SHA Anderson and Churn Creek Bridges RSP

In Shasta County in Anderson on Route 5 at Anderson Creek Bridge and near Redding on Route 44 at Churn Creek Bridge.

Place RSP $100,000 3/1/2018

23 02-3H570 SHA Trinity and Eureka Way Signal

In Shasta County in Redding on Route 44 at the Junction of Route 273 and on Route 273 at Trinity Street.

Upgrade signals $120,000 5/24/2018

24 02-3H660 59V02 1718 TMC In Lassen, Modoc, Plumas, Shasta, Siskiyou, Tehama and Trinity Counties at various locations.

Upgrade TMC & FEN

$230,000 9/5/2017

3 of 7

Page 22: 12 Month Look Ahead North Region Projects … STREET $0 11/20/2017 1013 01-0C870 HUM 283 0.13 Rio Dell ADA IN HUMBOLDT COUNTY NEAR RIO DELL AT THE EEL RIVER BRIDGE #4-$0 12/15/2017

Map No

EA Co Nickname Legal Description Work Description Cost Estimate Ad date

12 Month Look Ahead North Region Various Projects September 2017-2018

25 03-1F230 59V03 Install Ramp Meters Sacramento, Placer and Yolo counties at various locations

Install Ramp Meters

$12,131,000 3/15/2018

26 03-2F080 YUB Marysville ADA In and near Marysville, on Route 20 from Sutter County Line to Levee Road; also on Route 70 from E Street bridge to 24 Street

Upgrade pedestrian infrastructure

$3,400,000 1/1/2018

27 03-3F090 SAC Various routes - seismic retrofit.

In Sacramento at North Sacramento undercrossing 24-0111L and Sacramento River Bridge 24-0053 and in San Joaquin County at Mokelumne River bridge 29-0197 R/L

Seismic retrofit on 4 bridges

$16,578,000 7/15/2018

28 03-3F130 59V03 ADA curb ramps In Butte, El Dorado, Placer, Sacramento, and Yuba Counties at various locations

ADA curb ramps, update pedestrian facilities

$1,582,000 4/15/2018

29 03-3F140 59V03 SAC/YOL Curb Ramp Upgrades

In and near Woodland, from County Road 102 to County Road 13 at various locations; also, in the city of Sacramento, from Seamas Avenue to Richards Boulevard at various locations.

Curb ramp upgardes

$690,000 10/1/2018

30 03-4M760 59V03 Rehab Fences IN SACRAMENTO AND YOLO COUNTIES AT VARIOUS LOCATIONS

Replace and Rehab fencing, 2 locations Sac 51 and Yolo 80.

$350,000 12/1/2017

31 03-4F610 SAC Upgrade MBGR In Sacramento County on Routes 50 and 51 at various locations

Upgrade metal beam guard rail and add concrete barrier

$3,000,000 2/15/2018

32 03-4F630 59V03 Upgrade MBGR In El Dorado, Nevada, and Sierra counties on Routes 49, 89 and 193 at various locations

Upgrade metal beam guard rail to current standards

$1,528,000 11/1/2018

33 03-0H270 YOL YOL-113 Signals At on/off ramp intersections with YOL 113 and YOL 005 and Main Street in Woodland

Modify signal controllers, install interconnect cable, and other associated work

$536,000 2/1/2018

4 of 7

Page 23: 12 Month Look Ahead North Region Projects … STREET $0 11/20/2017 1013 01-0C870 HUM 283 0.13 Rio Dell ADA IN HUMBOLDT COUNTY NEAR RIO DELL AT THE EEL RIVER BRIDGE #4-$0 12/15/2017

Map No

EA Co Nickname Legal Description Work Description Cost Estimate Ad date

12 Month Look Ahead North Region Various Projects September 2017-2018

34 03-0H400 59V03 UPGRADE EMS SIGNS Various locations in District 3

Upgrading EMS signs to LED.

$1,300,000 12/1/2018

35 03-0H410 59V03 AVC REPAIR & INSTALL In various counties on various routes at various locations

Repair and install permanent Automatic Vehicle Classification (AVC) truck data

$9,400,000 12/1/2018

36 03-0H490 59V03 Replace Signs – Various locations

Throughout District 3 on Routes 5, 50, 51, 65, 70, 80, 99, 149 and intersecting routes

Replace signs, sign lighting and install exit signs.

$1,105,000 1/15/2018

37 03-0H860 59V03 ED/PLA ADIEM Replacement

In El Dorado County on Route 50 at various locations from Red Hawk Parkway to approx. 0.1 mile west of Carson Rd; and in Placer County on Route 80 at Douglas Blvd and on Route 89 at approx. Gilardi Rd OC.

Replacement of ADIEM crash cushions with lower maintenance systems

$720,000 2/15/2018

38 03-0F351 SAC Install Ramp Meters SAC VAR

In Sacramento County on Rt 51 and 99 at various locations

Install Ramp Meters

$16,334,000 9/6/2017

39 03-0G790 59V03 Placer/Sac Bridges In Placer and Sacramento counties at various locations

Remove AC; place methacrylate; and/or repair bridge joints on 11 structures

$1,100,000 2/1/2018

40 03-0G800 59V03 Sac/Yub/Sut/Gle/Col Meth & Repair Bridge Joints

BRIDGE DECK MAINTENANCE PRESERVATION ON 9 BRIDGES IN COLUSA, GLENN, SACRAMENTO, SUTTER AND YUBA COUNTIES AT VARIOUS LOCATIONS.

Remove AC, place Methacrylate & repair bridge joints on 9 bridges.

$1,003,000 1/1/2018

41 03-1H880 59V03 Safety, Sac 50 & 99 and Pla 80 High Friction Surface Treatment

In Placer and Sacramento counties on Routes 50, 80, and 99 at various locations

Place High Friction Surface Treatment or Open Graded Asphalt Concrete

$1,000,000 1/5/2018

5 of 7

Page 24: 12 Month Look Ahead North Region Projects … STREET $0 11/20/2017 1013 01-0C870 HUM 283 0.13 Rio Dell ADA IN HUMBOLDT COUNTY NEAR RIO DELL AT THE EEL RIVER BRIDGE #4-$0 12/15/2017

Map No

EA Co Nickname Legal Description Work Description Cost Estimate Ad date

12 Month Look Ahead North Region Various Projects September 2017-2018

42 03-0G860 59V03 Ploy/Joints 6 Bridges In Butte and Glenn counties at various locations.

REMOVE AC; PLACE METHACRYLATE TREATMENT; REPAIR BRIDGE JOINTS, AND INSTALL ACCESS DOORS

$590,000 12/1/2017

43 03-0G870 59V03 Repair Joints/Remove AC on 8 Bridges

In El Dorado, Nevada, and Placer counties at various locations.

Remove AC, place methacrylate, place 6 polyester concrete overlay, repair bridge joints on 11 bridges (Br# 17-0059L, 0059R, 0078, and 0105, 19-0033, 0106L, 0106R, 0107L, 0107R, and 0117, and on 25-0053)

$1,175,000 2/1/2018

44 03-0G880 59V03 Poly/Meth/Joints 7 Bridges In Sacramento, Sutter, and Yolo Counties at various locations

REHABILITATE BRIDGE DECKS

$560,000 12/1/2017

45 03-2H550 59V03 ZEV Charging Stations At various locations in various counties on various routes.

Install ZEV charging stations at SRRA's.

$1,934,000 4/1/2018

46 03-2H650 59V03 Lake Tahoe 28, 89, 267 In Placer, Nevada, and El Dorado Counties at various locations along Route 28, 89, and 267.

Tree Removal $2,210,000 4/21/2018

47 03-2H660 59V03 49/174 Tree Removal In Placer, Nevada, and Yuba Counties at various locations along Routes 49 and 174.

Tree Removal. $2,381,000 4/21/2018

48 03-2H670 SIE Sierra 49/89 Tree Removal In Sierra County at various locations along Routes 49 and 89.

Tree Removal $3,401,000 4/21/2018

49 03-2H680 ED El Dorado 49/193 Tree Removal

In El Dorado County at various locations along Routes 49 and 193

Tree Removal $3,666,000 4/21/2018

6 of 7

Page 25: 12 Month Look Ahead North Region Projects … STREET $0 11/20/2017 1013 01-0C870 HUM 283 0.13 Rio Dell ADA IN HUMBOLDT COUNTY NEAR RIO DELL AT THE EEL RIVER BRIDGE #4-$0 12/15/2017

Map No

EA Co Nickname Legal Description Work Description Cost Estimate Ad date

12 Month Look Ahead North Region Various Projects September 2017-2018

50 03-1G020 59V03 Treat Decks, 6 Bridges In El Dorado and Placer Counties on 6 structures, Br #'s 19-0191L, 19-0191R, 19-0192R, 25-0083, 25-0117, and 25-0119S

Treat decks with methacrylate or polyester concrete

$0 12/1/2018

51 03-1G050 SAC Treat Decks, 5 Bridges In Sacramento County on Routes 5,50, & 80 on 5 structures (Br#24-0175, 24-0203, 24-0218, 24-0263, and 24-0281K)

Treat decks with methacrylate or polyester concrete.

$0 12/1/2018

52 03-1G120 59V03 6" Striping on Route 5 In Sacramento and Yolo Counties on Routes 80, 50, 5, and 99 at various locations.

6' Striping $7,314,000 1/1/2018

53 03-1G130 59V03 6" Striping on Route 80 In Sacramento, Sutter, Butte, Yolo, Colusa, and Glenn Counties on Routes 99 and 5 at various locations.

6" striping $19,215,000 1/1/2018

54 03-1G140 59V03 6" Striping on Route 99 In El Dorado, Placer, Nevada, and Sierra Counties on Routes 50 and 80 at various locations.

6" striping $5,801,000 1/1/2018

55 03-1G150 59V03 Scour Mitigation In ED, NEV, and PLA Counties at various locations

Mitigate scour, drainage, erosion, and rail damage on 10 structures (Br#17-0003, 17-0056, 17-0070, 17-0084L, 19-0103, 25-0007, 25-0017, 25-0019, 25-0031, and 25-0039).

$0 12/1/2018

7 of 7