12
Mar 15, 2022 1 Khan Younis Waste Water Treatment Plant Management Arrangements

12-May-151 Khan Younis Waste Water Treatment Plant Management Arrangements Khan Younis Waste Water Treatment Plant Management Arrangements

Embed Size (px)

Citation preview

Apr 18, 2023 1

Khan Younis Waste Water Treatment Plant

Management Arrangements

Khan Younis Waste Water Treatment Plant

Management Arrangements

KY WWTP Project PartnersKY WWTP Project Partners

Apr 18, 2023 2

Kuwait Fundfor Arab Economic

Development

Islamic Development

Bank

Government of Japan

United Nations Development Programme

Palestinian Water Authority

Coastal Municipalities Water Utility

Municipality of Khan Younis

Partners Donors

Project Organization Structure

Project Organization Structure

Apr 18, 2023 3

Project BoardProject Board

Main BeneficiaryDeputy Head of PWA, CMWU Director,

Mayor of Khan Younis Municipality

Main BeneficiaryDeputy Head of PWA, CMWU Director,

Mayor of Khan Younis Municipality

ExecutiveUNDP/PAPP Deputy Special

Representative

ExecutiveUNDP/PAPP Deputy Special

Representative

Main SupplierGovernment of Japan and Kuwait Fund / Islamic Development Bank

Main SupplierGovernment of Japan and Kuwait Fund / Islamic Development Bank

Programme Overall technical Assurance

UNDP/PAPP Programme Analyst

Programme Overall technical Assurance

UNDP/PAPP Programme Analyst

Project SupportProject Support

Project ManagerProject Manager

Local Construction Company for

Construction of Emergency Pressure Pipeline

Local Construction Company for

Construction of Emergency Pressure Pipeline

International Construction Company For

Construction of KY WWTP, Phase I

International Construction Company For

Construction of KY WWTP, Phase I

International Construction Supervision Firm in Joint Venture with Local Firm

International Construction Supervision Firm in Joint Venture with Local Firm

UNDP/PAPP Project Implementation Unit

UNDP/PAPP Project Implementation Unit

Technical Quality Assurance UNDP/PAPP

Technical Quality Assurance UNDP/PAPP

Local Construction Company for

Construction of Electrical Power Line

Local Construction Company for

Construction of Electrical Power Line

Apr 18, 2023 4

• Quality assurance, accountability and transparency

• International standards of procurement

• Experience in financial management of large scale programmes

• Internal and external audits at local and headquarter levels

• Global knowledge networks and international experience

• Coordination mechanisms to access materials into Gaza

Role of the United Nations Development

Programme

(UNDP)

Role of the United Nations Development

Programme

(UNDP)

Apr 18, 2023 5

• Assign a Programme Analyst and PIU for quality control and

assurance, monitoring and follow-up of project issues for

effective implementation .

• Receive and administer the funds from Donors.

• Prepare Agreements with all counterparts.

• Review all received progress reports from the CMWU to

ensure full accountability and compliance.

Role of the United Nations Development

Programme

(UNDP)

Role of the United Nations Development

Programme

(UNDP)

Apr 18, 2023 6

• Recruit an international firm for pre contractual services and

construction supervision.

• Review the project tender documents followed by tendering

process according to Global UNDP procurement rules and

regulations.

• Evaluate the received tenders and award the contract with PWA

and CMWU Cooperation .

• Fully accountable for the full implementation of the project

components excluding infiltration.

Role of the United Nations Development

Programme

(UNDP)

Role of the United Nations Development

Programme

(UNDP)

Apr 18, 2023 7

• Ensure that the executive board of the project meet on

quarterly basis to discuss the project progress and challenges;

• Ensure the full visibility of the donors and highlight the role of

counterparts.

• Coordinate with UNDSS to provide security update on daily

basis for all staff.

• Report to donor on quarterly basis and when needed.

Role of the United Nations Development

Programme

(UNDP)

Role of the United Nations Development

Programme

(UNDP)

Apr 18, 2023 8

• Follow up on the land acquisition issue for the infiltration

basins;

• Secure the power supply needed to run the treatment facility;

• Agreement with UNDP on cooperation and implementation;

• Review and Approve any changes to the detailed designs and

specifications of the project that had already been approved in

the design stage as of Dec. 2010 ;

• Assign focal persons to ensure that the quality is maintained in

the tendering and implementation stages.

Role of the Palestinian Water Authority (PWA)

Role of the Palestinian Water Authority (PWA)

Apr 18, 2023 9

• Assign a mechanical and electrical engineer at the construction

stage and report directly to the Project Manager;

• Responsible for the implementation of the infiltration basins;

• Receive the funds from UNDP/PAPP to manage the capacity

development component and prepare progress reports in that

respect;

• Assign a team responsible for operation and maintenance, during

the one year operation stage.

• Follow up on the land acquisition issue for the infiltration basins.

Role of Coastal Municipalities Water Utility (CMWU)

Role of Coastal Municipalities Water Utility (CMWU)

Apr 18, 2023 10

• Work closely with counterparts to secure the land for the

infiltration basins and the construction permits;

• Support in presenting the project objectives to the residents of

Khan Younis Governorate;

• Play a key role with UNDP/PAPP in responding to the

residents’ concerns;

• Participate at the project board as senior beneficiary of the

project and attend quarterly and annual review meetings.

Role of Khan Younis Municipality (KY M)Role of Khan Younis Municipality (KY M)

Apr 18, 2023 11

Quality of KY WWTP ProjectQuality of KY WWTP Project

• Project Manager• International consultant • Two project engineers • One electromechanical engineer • One project Assistant

TOOLS1. Day to day management. 2. Weekly meetings.3. Shop drawings, work plans and

method statements. 4. Approval of materials. 5. Financial processes utilizing Global

Atlas system.6. Monthly, quarterly, annual reports.7. As built drawings.

• Project Board (PWA role as regulator)• Program Analyst

TOOLS1. Progress quarterly meetings with

all stakeholders.2. Quality assurance monitoring

forms.3. Highlight reports to project board

in case of issues.4. Donor reports.5. UNDP financial / administrative

system (HR, procurement, finance)6. Internal and external Auditing

(financial and programmatic).

Quality Assurance Quality Control

Press for detail