Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
1
HOLD NGYÖRÜK
2 3
CONSTRUCTION AND UNDERTAKING
MALL AND HOTELS
7
65
71
79
83
87
PRODUCTION
AGRICULTURE AND HUSBANDRY
REAL ESTATE INVESTMENT PARTNERSHIP
SOCIAL RESPONSIBILITY
4 5
Yörük Holding, was founded in 1983 as ‘Abdurrahman Nafiz Yörük’ Private Company and prospered steadily by the efforts of its founders, Abdurrahman Nafiz Yörük and Fatih Yörük, continues its activities in the construction sector in areas of highway, bridge, viaduct, tunnel, rail system lines, railroads, subways, airports, pists, apron, housing estates, penal institution, sports facilities, dams, irrigation facilities, conveyance tunnels and marine structures construction. Moreover, Yörük Holding, presents it self in areas such as Production Plants, Malls and Hotels, Agriculture and Husbandry, Real Estate Partnerships and Social Resposibility Projects, plays an active role in new areas day by day.Yörük Holding proves its quality and credibility with intemational certificates such as ISO 9001:2000 Quality Management Standards, ISO 14001:2004 Environmental Standard and OHSAS 18001 Occupational Healthand Quality Management Systems Standard.
With its enterpreneurial attitude and engineering abilities, Yörük Holding has covered a successful distance in construction and undertaking works. It aimed to succeed in areas other than the construction sector and took its steps accordingly. As aide as a servant to development and growth of Turkey, it has always aimed to be the an example of trust, development and success since the day it was established.
Yörük Holding, contributed to the quality parameters of each area involved and has the vision of acting in compliance with the best interest of the economy of the country, has realized many projects since the day it was established.
Yörük Holding, has succesfully accomplished numerous projects throughout Turkey, aims to be amongst the largest companies in Turkey.
Yörük Holding, by focusing primarily in steady, sustainable, functional and aesthetic features in every project, has greatly contributed to the national and particularly regional development. The business principle of the Holding and its perfectionism in production, provides an example to its competitors in the sectors it is interested in.
OUR VISION To keep customer satisfaction at the highest level with the understanding of quality service in the sectors where we operate, to
be among the leading companies in the fields of activity of which it is specialized, to develop honesty with respect to institutions, employers and employees, to develop relations with professionalism and trust principle; Besides all these, it is our basic vision to
make the best contribution to the national economy and to obtain a share in national development.
OUR MISSIONTo provide value for the community, employees, partners and solution partners in all business areas in which we operate; It
is our main mission to carry out its activities in a manner that is respectful to human and environment and to be aware of its responsibilities within the framework of sustainability.
ABOUT US OUR HISTORYThe foundations of the Holding was established by ‘Abdurrahman Nafiz Yörük Private Company in 1983.In 1990, its field of activities were expanded and the private company became Yörük İnşaat Co. Ltd.In 1992, YTY İnşaat Co. Ltd., which is one of the corner Stones of Yörük Holding, started its activities ith concrete plants, sand and stone quarries and petroleum offices. In 1998, YTY Asfalt Inc. was founded, which worked in areas such as highways, divided roads, bridges, tunnel and viaducts. In 2008, Yörük Yapı Co. Ltd., which has the same title with the Holding, was founded for many fields of activities such as highway Works, tunnel and bridge Works, building superstructure Works, marine structures and coastal roads etc. In 2010, Statik Su Yapı Inc. was founded, which includes dams, ponds, conveyance tunnels, irrigation channels etc. In 2011, in order to be able to work in areas such as highways and building superstructures, the company’s Board of Management founded Cemiloğlu İnşaat Inc. in memory of Cemil Yörük, father of the CEO Mr. Abdurrahman Nafız Yörük. In 2011, Adfa Taahhüt Inc. was founded, which works in areas such as railroads, railed system lines, tunnel construction and building superstructures.
6 7
CONSTRUCTION AND UNDERTAKING
Yörük Holding has been realizing prestigious infrastructure and superstructure projects by the participation of both private sector and government all around Turkey.
İSTANBUL EMLAK KONUT ISPARTAKULE HOUSES
VAN EDREMİT 468 PERMANENT DISASTER HOME CONSTRUCTION
VAN AUTISTIC CHILDREN EDUCATION CENTER
VAN İMAM HATİP HIGH SCHOOL
VAN ERCİŞ PENAL INSTITUTION CONSTRUCTION
VAN PENAL INSTITUTION
KÜTAHYA PENAL INSTITUTION CONSTRUCTION
ESENLER SPORTS COMPLEX CONSTRUCTION
UNKAPANI AND GALATA BRIDGES RENEWAL WORK
YENİŞEHİR BRIDGE CONSTRUCTION
KANATLI DAM AND ITS FACILITIES
YEŞİLVADİ BEYLERDERESİ POND CONSTRUCTION
MALATYA YONCALI IRRIGATION TUNNEL CONSTRUCTION
SEYDİŞEHİR- 13th AREA BORDER ALACABEL TUNNEL CONSTRUCTION
MALATYA 2nd ARMY AVIATION COMMAND AIRPORT CONSTRUCTION
VAN MURADİYE STATE HIGHWAY
TUZLA COASTAL ROAD
8 9
housing
İSTANBUL EMLAK KONUT ISPARTAKULE HOUSES Project Name: İstanbul Emlak Konut Ispartakule Houses 1st Phase Section 1 House, Commercial and Substracture and Landscaping Contracts Date of Contract: September 18th, 2015
Related Institution: Emlak Konut Real Estate Investment Partnership Inc.
İstanbul Emlak Konut Ispartakule Houses
10 11
It includes a total of 946 houses (614 of them are built by tunnel formwork system and 332 of them are built via conventional mold system), 20 commercial structure via conventional mold system, 12 social facility and covered swimming pool construction, and substructure both in and outside the island, zoning roads and landscaping.
Total area of the construction site is 235 thousand sqm. In the project, which has a 40 thousand sqm closed parking area, 8 thousand sqm of commercial and social area, 11 km road and 16 km general substructure constructions exits. The landscaping area of the project is 57 thousand 212 sqm.
235.000 sqmConstruction
area
İstanbul Emlak Konut Ispartakule Houses İstanbul Emlak Konut Ispartakule Houses
İstanbul Emlak Konut Ispartakule Houses
12 13
Name of the Project: Van City Center Edremit Disaster Zone 13th Phase 468 Permanenet Disaster Housing and Substructure and Landscaping Construction
Date of the Project: March 12th, 2012
Related Institution: T.R. Prime Ministry Housing Development Administration Total construction area is 66 thousand sqm.
Scope of the Work : Superstructure construction, mechanic works, electricity Works, substructure and landscaping.
housing
VAN EDREMİT 468 PERMANENTDISASTER HOUSING CONSTRUCTION
Van Edremit 468 Permanent Disaster Housing Construction
Total Construction Area Is
66.000 Sqm.
Van Edremit 468 Permanent Disaster Housing Construction Van Edremit 468 Permanent Disaster Housing Construction
Van Edremit 468 Permanent Disaster Housing Construction
14 15
Van Edremit 468 Permanent Disaster Housing Construction
Van Edremit 468 Permanent Disaster Housing Construction
16 17
VAN AUTISTIC CHILDREN TRAINING CENTERWitih the social responsibility project, the project which is founded on an approximately 20 thousand sqm land at Edremit, Van, is designed as a education facility for the education of special children. The education facility which is built by materials that ease the use by the special children includes more than one structure which consists of ground floor and basement. Within the structure which has a capacity of 1000 students and 50 classes there are sports areas, conference rooms, game rooms, multi-purpose rooms etc.
education
Van Autistic Chidren Training Center
18 1918 19
Van Autistic Chidren Training Center Van Autistic Chidren Training Center
Van Autistic Chidren Training Center
20 21
education
VAN İMAM HATİP HIGH SCHOOL The project which was realized with the supervision of İstanbul. Metropolitan Municipality General Directorate of Construction, consists of a lodging building with 600 bed capacity, sports center and landscaping construction works. It is built approximately on a 20 thousand sqm area
Van İmam Hatip High School
Capacity for 600 students
50 classes
21
Van İmam Hatip High School
22 23
Name of the Project: Van/Erciş Penal Isntitution Construction Work
Date of the Contract: October 6th, 2017
Related Institution: TR Ministry of Justice General Directorate of Technical Works
penal institution
VAN ERCİŞ PENAL INSTITUTION CONSTRUCTION
Our company which completed Van High Security Type T Penal Institution successfully before has been continuing the construction of Kütahya Penal Institution, and started the construction work of Van Erciş Penal Institution, the deed of which was won recently.
Van Erciş Penal Institution Construction
Van Erciş Penal Institution Construction
Van Erciş Penal Institution Construction
24 25
Project area is situated on the land which belongs to the Ministry of Justice with 117 Lot and 18 Block No. at Haydarbey Neighborhood, Erciş District, Van city. A type T Penal Institution is going to be built as it is in the first Project. The covered area of the total project area (185 thousand sqm) is 65 thousand sqm. In the project, buildings such as type T Penal Institution, Open Penal Institution, Lodging Building with 100 Apartments, Military Police Building, Technical and Administrative Buildings, Big and Small Visitor Buildings, External and Internal Surveillance Towers, Workshops, Entrance Control, Transformer Building and Water Tank are found.
The covered area of the total project area
(185 thousand sqm) is 65 thousand sqm.
Van Erciş Penal Institution Construction
Van Erciş Penal Institution Construction
Van Erciş Penal Institution Construction
26 27
VAN PENAL INSTITUTION Date of the Contract: December 26th, 2012
Related Institution: TR Ministry of Justice General Directorate of Technical Works The project is built on a total of 330 thousand sqm area - 85 thousand sqm of which is closed- in the main district of Van at Agriculture Technical School Village Erciş Road area.
Within the scope of the project, the construction of type T Penal Institution, High Security Penal Institution, Open Penal Institution, Military Police Building, Administrative and Technical buildings, Visitor Buildings, Workshops, Lodging Buildings, Transformer Building, Entrance Control Building, Decontamination Building,
Water Tank, Advancement Building and Surveillance Towers are finished. The final acceptance of the project is realized and it is ready for use.
penal institution
It is built on a total of
330.000 sqm area
Van Penal Institution
Van Penal Institution
28 29
KÜTAHYA PENAL INSTITUTION CONSTRUCTION WORK Name of the Project: Kütahya Penal Institution Construction Work
Date of the Contract: November 25th, 2016
Related Institution: Ministry of Justice General Directorate of Technical Works
Our company which is experienced in the construction of penal institutions has been conducting the construction work of Kütahya Penal Institution successfully. The site of the project is situated inside the Ministry of Justice Penal Institution land in Parmakören area in the central district of Kütahya. The project in question is constructed on a 240 thousand sqm area – 70 thousand of which is closed.
penal institution
Kütahya Penal Institution Construction Work Kütahya Penal Institution Construction Work
Kütahya Penal Institution Construction Work Kütahya Penal Institution Construction Work
30 31
In the project, buildings such as type T Penal Institution, Open Penal Institution, 5 B+Z+4 Lodgings, Military Police Building, Entrance Control Building, Visitor Buildings, Transformer Building, type T Workshop group, Water Tank, Workshops, Bakery, Decontamination Building, Heating Works etc. are present.
The project is built on a 240.000
sqm area
Kütahya Penal Institution Construction Work Kütahya Penal Institution Construction Work
Kütahya Penal Institution Construction Work
Kütahya Penal Institution Construction Work
32 33
ESENLER SPORTS COMPLEX CONSTRUCTION İşin Adı: Esenler Sports Complex Construction
Date of the contract: April 25th, 2014
Total construction area is 40 thousand sqm. Inside, there is a two-storey car park on 15 thousand 729 sqm (for 500 vehicles), the surrounding of the game area is 1686 sqm, standard audience tribune area is 4 thousand 226 sqm, protocol audience tribune area is 292 sqm, game area is on 7 thousand 914 sqm area.
The capacity of the stadium is 5 thousand 600 people, and 114 of the seats are seperated for protocol.
The structure is composed of three main parts which are stadium, amateur sports and Car park. For amateur clubs and mat sports, 4 practice saloons of 256 sqm are built. Game area is 7 thousand 914 sqm, and artificial grass was used in its construction. Also, it has a FIFA certificate.
sports
Esenler Sports Complex Constrution
Esenler Sports Complex Constrution
34 35
It is for 5600 people, and 114 of it are
seperated as protocol.
Esenler Sports Complex Constrution
Esenler Sports Complex Constrution
Esenler Sports Complex Constrution
Esenler Sports Complex Constrution
36 37
bridge
UNKAPANI AND GALATA BRIDGES RENEWAL WORKSName of the Project: Unkapanı and Galata Bridges Renewal and Reinforcement Construction
Date of the Contract: October 21st, 2014
Related Institution: İstanbul Metropolitan Municipality General Directorate of Construction Works
The whole sunken load bearing system of the present Unkapanı Atatürk Bridge consists of 24 floats. Within the scope of this tender, 10 of these 24 floats were renewed. The construction of these floats were realized in our shipyard, and they are mounted at the construction site.
Grouts are changed on Galata Bridge.
Unkapanı And Galata Bridges Renewal Works
10 of 24 barges are renewed.
Unkapanı And Galata Bridges Renewal Works
Unkapanı And Galata Bridges Renewal Works
38 39
bridge
YENİŞEHİR BRIDGE CONSTRUCTIONDate of the Contract: October 31st, 2017
Related Institution: Çarşamba Municipality Civil Works Department
Yeni Şehir Bridge, which is built as a draw bridge on two pillars at the city center, is 164 meters long and 16 meters wide. The bridge which has two towers 34 meters long is going to ease the traffic of the city center with intersections, car and pedestrian roads.
Yenişehir Bridge Construction
164 meters long
and 16 meters wide
Yenişehir Bridge Construction
Yenişehir Bridge Construction
40 41
dam
Name of the Project: KANATLI DAM AND ITS FACILITIES CONSTRUCTION
Date of the Contract: August 27th, 2014
Related Institution: State Hydraulic Works 9th District General Directorate, Elazığ
Period of the work: 1460 Days
Kanatlı Dam is constructed as a clay core, semi pervious, solid web type dam on Bulanık Creek, one of the branches of Peri River in Upper Fırat Basin, Kovancılar District, Elazığ city.
Kanatlı Dam And Its Facilities
It is aimed with Kanatlı Dam that
an annual contribution of
38 621 836,95 TL provided to the
national economy.
KANATLI DAM AND FACILITIES
Kanatlı Dam And Its Facilities Kanatlı Dam And Its Facilities
42 43
The height of the dam from the river bed is 75,33 m, 78,83 m from its base, the drainage area is 81,20 psm, annual average flow is 36,76 hm3, minimum water level is 1279 m, maximum water level is 1324,4 m, and active volume is 35,24 hm3.
The body height of the dam is 78,83 m. Total storage volume of the dam is 43,90 million m3.
It will irrigate a total of 70 thousand 900 decar agricultural land at 19 accomodational unit inside the borders of Kovancılar and Karakoçan District in Elazığ city.
It is aimed with Kanatlı Dam that 38 621 836,95 TL annual contribution to the national economy, 580,73 TL increase in income per decar, and employment opportunties for 17 thousand 730 people are provided.
Kanatlı Dam And Its Facilities Kanatlı Dam And Its Facilities
Kanatlı Dam And Its Facilities
44 45
pond
YEŞİLVADİ BEYLERDERESİ POND CONSTRUCTION
Name of the Project: Yeşilvadi (Beylerderesi) Pond Construcion Work
Date of the Contract: January 12th, 2016
Related Institution: State Hydraulic Works 9th District General Directorate, Malatya
The pond in question is 48,75 m heigh from the base, 38,75 m from the river bed, its maximum water level is 907,68 m, minimum water level is 889,73 m, active volume is 4.287 hm³, crest elevation is 909,25 m, crest length is 249 m and drainage area is 294,5 sqkm.
Yeşilvadi Beylerderesi Pond Construction
Project will provide a contribution of 5.660.200 TL
annually to the national
economy.
Yeşilvadi Beylerderesi Pond Construction
46 47
With the water that is going to be stored in Yeşilvadi Dam which was built withing the scope of “1071 POND” project realized in order to ensure the irrigated farming in rural lands outside the big irrigation projects and meeting the need for drinking water the irrigation of 6 thousand 220 decar land will be detemined.
The height of Yeşilvadi (Beylerderesi) Dam which is built with roller compacted concrete is 39 m; and after waste outlet derivation cut-and-cover production is finished, water is derived.
With the project, 910 TL additional income per decar, a contribution of 5.660.200 TL annually to the national economy, and employment for 1866 people will be provided.
Yeşilvadi Beylerderesi Pond Construction
Yeşilvadi Beylerderesi Pond Construction Yeşilvadi Beylerderesi Pond Construction
48 49
conveyance tunnel
Name of the Project: Malatya Yoncalı Irrigation Conveyance Tunnel Construction Work
Date of the Contract: Novemer 17th, 2016
Related Institution: General Directorate of State Hydraulics
Period of the Work: 1000 Days
Within the scope of Yoncalı Irrigation Project, a 9 thousand 262 m long tunnel with an inner diameter of 4,5 m covered with concrete inside will be built via a “Tunnel Boring Machine” (TBM).
The front facade is rock filled concrete covered dam.
MALATYA YONCALI IRRIGATION CONVEYANCE TUNNEL CONSTRUCTION
Malatya Yoncalı Irrigation Conveyance Tunnel Construction
The front facade is rock filled concrete
covered dam.
Malatya Yoncalı Irrigation Conveyance Tunnel Construction
50 51
The conveyance tunnel which will be built within this project is going to irrigate the productive agricultutal lands of 23 settlements.
Approximately 175 thousand hectar agricultural land will be irrigated with the project. 44,05 km of main channel will be constructed for the irrigation network of 175 thousand decar land.
It is aimed with the project that 83.327.759,98 TL contribution to the national economy and employement for 52 thousand people are provided.
Within the scope of the project, approximately 460 thousand m3 tunnel entrance structure portal dig and 1 million m3 tunnel exit structure portal dig production is present.
Malatya Yoncalı Irrigation Conveyance Tunnel Construction
Malatya Yoncalı Irrigation Conveyance Tunnel Construction Malatya Yoncalı Irrigation Conveyance Tunnel Construction
52 53
tunnel
SEYDİŞEHİR- 13th AREA BORDER ALACABEL TUNNEL CONSTRUCTION Name of the Project: Between Seydişehir-13BlHd State Highway Km:27+000 and 37+900(G)/70+228(İ)-61+910 Alacabel Tunnel and Its Access Roads and Soil Grading, Art structures, Bridge, Tunnel and Concrete Compacted Road Construction. Date of the Contract: May 18th, 2016
Related Institution: TR Highway Authority 13th Regional Directorate, Konya
The tunnel is 19 thousand 200 meters; 7 thousand 360 meters is dublex tube tunnel and 11 thousand 800 meters is divided road. Also, witihn the scope of the project, there are three junctions one of which is with a bridge. There are 9 bilateral turnouts and emergency crossovers between the tunnels.
Seydişehir- 13Th Area Border Alacabel Tunnel Construction Seydişehir- 13Th Area Border Alacabel Tunnel Construction
Seydişehir- 13Th Area Border Alacabel Tunnel Construction
54 55
Within the scope of the project, 1 million 430 thousand m3 tunnel excavation via the new Austrian method, 2 million 950 thousand m3 borrowed pit, split and lateral borrow excavation, 430 thousand tons of plantmix base and subbase, productions such as 145 thousand sqm bituminous hot mix and 3500 tons of bituminous hot foundation will be present. When Alacabel Tunnel between Antalya-Konya highway is completed, 25 million TL annually in labor force and 17,6 million TL in fuel oil is planned to be saved.
Also, another important aspect of the project is that it shortens Konya-Antalya highway 28 km. With this project which is going to eliminate slopes and turns, drivers will be able to have a safe and a comfortable journey.
7360 m doublex tube
tunnel construction
Seydişehir- 13Th Area Border Alacabel Tunnel Construction Seydişehir- 13Th Area Border Alacabel Tunnel Construction
Seydişehir- 13Th Area Border Alacabel Tunnel Construction
56 57
airport
Name of the Project: 2nd Army Aviation Command Maintenance Hangar Construction, Connection Road between Maintenance Hangar and Barracks Main Road (9X40 M), Apron (45X150 M). Taxi Way (20X154 M) New Constructed Building and Facility Needs, Big Maintenance Needs Date of the Contract: December 29th, 2016
Related Institution: Ministry of Defence General Directorate of Logistics
MALATYA 2nd ARMY AVIATION COMMAND MILITARY AIRPORT CONSTRUCTION
Within the scope of the work, constructions of environmental security and heat channel, hangar building, cable channels and manhole, sewer line, base drainage, drinking water pipe, tower building, connection roads, car park and landscaping, pist, apron and taxi ways, field drainage, transformer-generator building, rain water deplacement, fire building water depot and landscape, subterranian drainage, field and substructure, runway lighting, runway electrical substructure and transformer installation are found.
Malatya 2Nd Army Avıatıon Command Military Airport Construction Malatya 2Nd Army Avıatıon Command Military Airport Construction
Pist, Apron and Hangar
58 59The main runway is 2 thousand 318 m and 45 m wide, and 30 tons of straight and ribbed iron bars, 20 tons of welded wire, 170 thousand tons of subbase and base plates are used during the construction. 32 thousand m3 special concrete (350 doses) and 70 thousand tons of aggregate concrete is used in order to achieve this concrete.
The width of the berm is 7,5 m, and a binder plate was produced with 5 thousand 100 tons of bituminous aggregate on this berm.
The length of the side runway is 2 thousand 168 m, its width is 30 m, and the width of the berm is 3 m. During its construction,18 tons of straight and ribbed iron bars, 20 tons of welded wire, 93 thousand tons of subbase and base plates, 19 thousand 500 m3 special concrete (350 doses), and approximately 38 thousand tons of aggregate concrete is used in order to achieve this concrete. 1000 tons of bituminous asphalt binder plate is made.
A hangar building which includes 3 thousand sqm concrete technical personel division and 5 thousand sqm steel construction helicopter area was built. Approximately 1250 tons of structural steel is used in the construction of the building.
Malatya 2Nd Army Avıatıon Command Military Airport Construction
Malatya 2Nd Army Avıatıon Command Military Airport Construction
60 61
highway
Date of the Contract: September 5th, 2017
Related Institution: TR General Directorate of Highways
It includes the construction of 46,9 km long Van-Muradiye state highway as two two-lane road by improwing the standards of the existing road. Also, it is contracted that the road which is with surface dressing is to be built as Bituminous Hot Mix. In the above mentioned construction work, important items such as 3 milion 350 thousand m3 digging, 1 million 315 thousand tons of plantmix foundation and subbase, 1 million 370 thousand sqm of 21 cm BHM, 55 thousand m3 concrete, 2 thousand 500 tons of iron bars, 120 thousand m3 stone fill, 35 thousand 600 sqm prefabricated concrete parquet construction and 65 thousand 800 m prefabricated concrete curb production are present.
VAN MURADİYE STATE HIGHWAY
Van Muradiye State Highway Van Muradiye State Highway
62 63
Two two-lane 47 km bituminous hot mix state
highway
Van Muradiye State Highway Van Muradiye State Highway
Van Muradiye State Highway
64 65
marine structures and landscape
TUZLA COASTAL ROAD
Tuzla Coastal Road Tuzla Coastal Road
Tuzla Coastal Road
Name of the Project: Tuzla Coastal Road, Square Arrangement and Marine Structures Construction
Date of the Project: July 15th, 2015
Related Institution: İstanbul Metropolitan Municipality General Directorate of Construction Within the scope of the project, a 295 thousand tons of rockfill at a legth of 980 m was built; it was made with various sizes of rocks from 0-0,25 tons to 4-6 tons. It covers an area of 21 thousand sqm.
66 67
Tuzla Coastal Road Tuzla Coastal Road
Tuzla Coastal Road
68 69
MALL AND HOTEL
YÖRÜK MALL AND HOTEL PROJECT
We have realized our first project of 11 storeys and 26 thousand sqm mall of which 12 thousand sqm is a hotel in Van city center.
70 71
mall and hotel
YÖRÜK MALL AND HOTEL PROJECT It is built at the busiest avenues of Van city on the land which was previously the old Government Office. The construction site which is close to the State Hospital, Court House, Police Headquarters, State Theatre and other commercial areas, is also situated at an area on which commercial life is dense. It is a prospective center of attention in Van.
Our Mall and Hotel construction is planned as a total of 18 floors in which 3 basement floors + ground floor+ 4 floors of MAll and 10 floors for accomodation are found. In the project in which 4 floors are designed as Mall, a total of 50 stores are present. Other than these, ATMs, cafeteria and food areas, bowling, movie theather and recreational zones are found. Also, large pedestrian paths and resting places for visitors are found. A closed car park is present on the basement floors so that parking lots are sufficient enough not to cause any problems.
We aim with the project will increase the economic, social and cultural potential of Van city that the city develop and create employment opportunities.
Yörük Mall And Hotel Project Yörük Mall And Hotel Project
Yörük Mall And Hotel Project
72 73
18 floors total8 floors mall and
10 floors of accomodation
Yörük Mall And Hotel Project
Yörük Mall And Hotel Project
74 75
PRODUCTION
ASPHALT PLANT
CONCRETE PLANT
AGREGA BREAKING-SIFTING PLANTS
We are producing the materials we need in our construction works via aphalt plant, concrete plant and agrega breaking-sifting plant etc.
76 77
production
ASPHALT PLANTSim - Amman Plant Cb 180 180 tons/hour Bitume Tank Capacity 1400 tons Fuel Oil Tank Capacity 50 tons Bitüm Emulsion Plant 20 tons/hour Annual Capacity 600 thousand tons
It is a Premier Impact Breaker (PDK) type facility. Their capacities are 300 tons/h. Materials produced are used in city and village roads, asphalt plants, ready-mixed concrete plants, concrete construction materials production facilities etc.
Aspahlt Plant Aspahlt Plant
Aspahlt Plant
78 79
production
CONCRETE PLANT There are four different Concrete Plants in our Holding. EIA area of our plant which is established on Van Erciş Road is 32 thousand sqm. Other three concrete plants are used for construction works which are contracted by our Holding. Also, our plants are members of “Turkish Conc-rete Association”. Daily concrete production capacity is 5000 m3, and annual production capacity is approximately 1 million 500 thousand cbm. All the materials used are in compliance with TSI and CE standards.
Concrete Plant Concrete Plant
80 81
production
AGREGA CRUSHING–SIFTING FACILITIES Our facility is situated on a 100 hectar area. The service building is also present in the facility area. Annual production capacity is 450 thousand tons. In addition to this, we have crusher groups in our contracted sites. In our facilities, 0,5 material, type A, B and C materials are produced.
The whole operation process is realized in compliance with the Occupational Health and Safety regulations. Production conditions in our facilities are realized in compliance with TSI and CE standards.
Agrega Crushing–Sifting Facilities Agrega Crushing–Sifting Facilities
82 83
AGRICULTURE AND HUSBANDRY
ERDEMLİ WALNUT YARD
Agriculture and husbandry, which is one of the lines of work in our Holding includes investments which are gıing to be made on this subject. We entered the sector with the walnut yard consisting of 40 thousand walnut trees in Erdemli, Mersin.
84 85
agriculture
ERDEMLİ WALNUT YARD Place: Mersin-Erdemli Evdilek Area Harvest will be possible on 2019 from the walnut yard which was planted on 2012. This project have the feature of being the biggest investment project which is founded on a single deed in Turkey. 40 thousand walnut trees are planted on a 3 thousand decar land. 1100 decar of it is the participation of Yörük Holding. The land has an altitude of 1000. The whole circumference of 3 thousand decar land is surrounded with wire fence. It’s irrigation is provided by water which is transported from a 10 thousand km distance.
Erdemli Walnut Yard
86 87
REAL ESTATEINVESTMENT PARTNERSHIP
In order to increase the investment and development potential of real estate, we started Real Estate Investment Partnership projects. In this respect, in order to invest to high income real estates and to such projects, Kısıklı Housing Project was started.
KISIKLI PROJECT
88 89
real estate
Place: İstanbul-Altunizade
We started a residence project on 7 thousand 200 sqm area on Kısıklı Avenue, Altunizade, which is one of the most prestigious areas of İstanbul. It consists of 40 dublex and triplex apartments. The project has a total of 15 thousand sqm construction area and it consists of 8 blocks.
KISIKLI PROJECT
Kısıklı Project Kısıklı Project
90 91
SOCIAL RESPONSIBILITY
CEMİL YÖRÜK ELEMENTARY SCHOOL
OLD VAN HOUSE RESTORATION
As a Holding company, we are realizing social responsibility projects in order to develop and protect the general interests of the society besides our own expedience.
92 93
social responsibility
CEMİL YÖRÜK ELEMENTARY SCHOOL
Cemil Yörük Elementary School
Number of Classes: 8 Number of Teachers: 9 Number of Students: 162
94 95
social responsibility
OLD VAN HOUSE RESTORATION
Old Van House Restoratıon
The restoration of one of the oldest houses of Van, which was built in 1936 by Mr. Abdurrahman Nafiz Yörük and his family was restored. Mr. Abdurrahman Nafiz Yörük and his family use the house as a ceremonial center for bairam holidays.
96 97
EQUIPMENT POOL INFORMATIONADFA Group Machine Park
ID Brand Model Vehicle Tipe Model Year
1 SIM PLENT 180 T/HOUR ASPHALT PLANT 2005
2 VÖGELE SUPER 1800 AB 600 TV-7,5M
FINISHER 2005
3 VÖGELE SUPER1900-2AB600-2TV-7.5M
FINISHER 2009
4 VÖGELE SUPER1900-2AB600-2TV-7.5M
FINISHER 2011
5 HAMM HD 110 ASPHALT ROLLER
2011
6 HAMM GRW 15 ASPHALT ROLLER
2009
7 HAMM GRW 18 ASPHALT ROLLER
2006
8 HAMM HD 110 ASPHALT ROLLER
2006
9 HAMM HD 110 ASPHALT ROLLER
2009
10 HAMM HD12VT ASPHALT ROLLER
2008
11 HAMM HD12VV ASPHALT ROLLER
2011
12 HAMM 3414 LAND ROLLER 2016
13 HAMM 3412 LAND ROLLER 2016
14 HAMM 3412 LAND ROLLER 2016
15 HAMM 3414 LAND ROLLER 2017
16 VİBROMAX VM106D LAND ROLLER 2004
17 HAMM 3412 LAND ROLLER 2011
18 BOMAG BW 213D-4 LAND ROLLER 2008
19 BOMAG BW 213D-4 LAND ROLLER 2011
20 BOMAG BW 213D-4 LAND ROLLER 2013
21 HAMM 3412 LAND ROLLER 2017
22 HAMM 3414 LAND ROLLER 2017
23 MERCEDES 2521 K 6*2 36 DISTRIBUTOR 1998
24 MAN TGS 41.360 8*4 BB
DUMPER TRUCK
2010
25 MERCEDES AXOR 4140 K DUMPER TRUCK
2012
94 JCB 456EZX LOADER 2012
95 JCB 456EZX LOADER 2012
96 JCB 456 E LOADER 2012
97 KOMATSU WA470-6 LOADER 2017
98 ATLAS COPCO D7-11 ROCK DRILL 2008
99 KOMATSU DX 155 DOZER 2010
100 KOMATSU DX 65 DOZER 2008
101 KOMATSU 675-5 GRADER 2011
102 KOMATSU 675-5 GRADER 2017
103 KOMATSU FD80-10 FORKLIFT 2010
104 FIAT 110-90 DT TRACTOR 1998
105 ATLAS COPCO XAS 97 COMPRESSOR 2004
106 ATLAS COPCO XAS 137 COMPRESSOR 2017
107 JCB 4CX BACKHOE LOADER
1997
108 JCB 4CX-4WS-SM BACKHOE LOADER
2010
109 JCB 4CX BACKHOE LOADER
1998
110 JCB 4CX-4WS-SM BACKHOE LOADER
2011
111 JCB 4CX-4WS-SM BACKHOE LOADER
2015
112 JCB 4CX-4WS-SM BACKHOE LOADER
2017
113 JCB 4CX-4WS-SM BACKHOE LOADER
2017
114 JCB 4CX-4WS-SM BACKHOE LOADER
2017
115 FORD CARGO 2524 CRANE 2005
116 MAN 26.270 fn CRANE 1998
117 CHRYSLER AS 26.200 CRANE 1996
118 MEKA BETON SANTRALİ
180 T/HOUR CONCRETE PLANT
2012
119 MEKA BETON SANTRALİ
120 T/HOUR CONCRETE PLANT
2007
120 İMER BETON SAN-TRALİ
100 T/HOUR CONCRETE PLANT
2011
46 MERCEDES AXOR 4140 K DUMPER TRUCK
2011
47 MERCEDES AXOR 4140 K DUMPER TRUCK
2012
48 MERCEDES AXOR 4140 K DUMPER TRUCK
2012
49 MERCEDES AXOR 4140 K DUMPER TRUCK
2011
50 MERCEDES AXOR 3028 K 6*4
DUMPER TRUCK
2005
51 MERCEDES AXOR 3028 K 6*4
DUMPER TRUCK
2005
52 MERCEDES 2521 DUMPER TRUCK
1998
53 DODGE PD 950 AS DUMPER TRUCK
1998
54 MERCEDES 4142 AROCS DUMPER TRUCK
2017
55 MERCEDES 4142 AROCS DUMPER TRUCK
2017
56 MERCEDES 4142 AROCS DUMPER TRUCK
2017
57 MERCEDES 4142 AROCS DUMPER TRUCK
2017
58 MERCEDES 4142 AROCS DUMPER TRUCK
2017
59 MERCEDES 4142 AROCS DUMPER TRUCK
2017
60 MERCEDES 4142 AROCS DUMPER TRUCK
2017
61 MERCEDES 4142 AROCS DUMPER TRUCK
2017
62 MERCEDES 4142 AROCS DUMPER TRUCK
2017
63 MERCEDES 4142 AROCS DUMPER TRUCK
2017
64 MAN TGS 41420 8*4 BB
DUMPER TRUCK
2017
65 MAN TGS 41420 8*4 BB
DUMPER TRUCK
2017
142 HİDROSAN HD 6T DUMPER TRUCK BED
2009
143 NUH TREYLER TKD DUMPER TRUCK BED
2016
144 NUH TREYLER TKD DUMPER TRUCK BED
2016
145 NUH TREYLER TKD DUMPER TRUCK BED
2016
146 NUH TREYLER TKD DUMPER TRUCK BED
147 NUH TREYLER TKD DUMPER TRUCK BED
148 TIRSAN KASSBOHRER TANKER TRUCK BED
2012
149 ALİM AD 3 LOWBED 2004
150 ÖZSAN LOWBED YARI RÖMORK
LOWBED 2011
151 MERCEDES KAMYON 2521 K
SPRINKLER 1997
152 FORD CARGO 2530 D SPRINKLER 2006
153 MERCEDES KAMYON 2521 K
SPRINKLER 1998
154 MERCEDES KAMYON 2521 K
SPRINKLER 1997
155 DODGE XLVPD700AS SPRINKLER 1986
156 MERCEDES 2521 K 6*2 36 SPRINKLER 1998
157 ISUZU NPR 66 SPRINKLER
158 GEN POWER 30 KW POWER GEN-ERATOR
2011
159 GEN POWER 30 KW POWER GEN-ERATOR
2011
160 GEN POWER 165 KW POWER GEN-ERATOR
2011
161 CAT 500 KW POWER GEN-ERATOR
2012
162 CAT 500 KW POWER GEN-ERATOR
2012
163 TEKSAN 115 KW POWER GEN-ERATOR
2004
164 CAT 800 KW POWER GEN-ERATOR
2010
26 MERCEDES AXOR 2528 KL 6*2
DUMPER TRUCK
2009
27 MAN TGS 41.360 8*4 BB
DUMPER TRUCK
2008
28 MERCEDES AXOR 4140 K DUMPER TRUCK
2011
29 MERCEDES AXOR 4140 K DUMPER TRUCK
2011
30 MERCEDES AXOR 4140 K DUMPER TRUCK
2012
31 MERCEDES AXOR 4140 K DUMPER TRUCK
2012
32 MAN TGA 41.360 8*4 BB
DUMPER TRUCK
2008
33 MERCEDES AXOR 4140 K DUMPER TRUCK
2011
34 MAN TGA 41.360 8*4 BB
DUMPER TRUCK
2008
35 MAN TGA 33.360 6*4 BB
DUMPER TRUCK
2008
36 MAN TGA 41.360 8*4 BB
DUMPER TRUCK
2007
37 MERCEDES AXOR 4140 K DUMPER TRUCK
2011
38 MERCEDES AXOR 4140 K DUMPER TRUCK
2012
39 MERCEDES AXOR 3028 K 6*4
DUMPER TRUCK
2009
40 MERCEDES AXOR 3028 K 6*4
DUMPER TRUCK
2009
41 MERCEDES AXOR 3028 K 6*4
DUMPER TRUCK
2009
42 MERCEDES AXOR 3028 K 6*4
DUMPER TRUCK
2009
43 MERCEDES AXOR 3028 K 6*4
DUMPER TRUCK
2005
44 MERCEDES AXOR 3028 K 6*4
DUMPER TRUCK
2009
45 MERCEDES AXOR 3028 K 6*4
DUMPER TRUCK
2009
121 MAN TGA 33.360 6*4 BB
CONCRETE PUMP
2008
122 MAN TGS 41.400 8*4 BB
CONCRETE PUMP
2010
123 MERCEDES AXOR 4140 K CONCRETE PUMP
2012
124 PUTZMEİSTER YER POMPASI CONCRETE PUMP
2011
125 GOMACO GP 2600 CONCRETE PAVER
2013
126 DIECI MIXER L4700 CONCRETE MİXER
2012
127 MAN TGS 41.360 8*4 BB
TRANSMİXER TRUCK
2010
128 MAN TGS 41.360 8*4 BB
TRANSMİXER TRUCK
2012
129 MAN TGA 41.360 8*4 BB
TRANSMİXER TRUCK
2012
130 MAN TGS 41.360 8*4 BB
TRANSMİXER TRUCK
2010
131 MAN TGS 41.360 8*4 BB
TRANSMİXER TRUCK
2011
132 MAN TGA 41.360 8*4 BB
TRANSMİXER TRUCK
2011
133 MAN TGA 41.360 8*4 BB
TRANSMİXER TRUCK
2012
134 MAN TGS 18.400 4*2 BLS
TOW TRUCK 2012
135 MAN TGS 18.400 4*2 BLS
TOW TRUCK 2012
136 MAN 33372 DFS TOW TRUCK 1998
137 MAN TGX 18440 4*2 BLS
TOW TRUCK 2011
138 MAN TGX 18,400 4*2 BLS
TOW TRUCK 2010
139 MERCEDES CEKICI ACTROS 1845 LS E6
TOW TRUCK 2017
140 HİDROSAN HD8T DUMPER TRUCK BED
2010
141 HİDROSAN HD8T DUMPER TRUCK BED
2012
66 MAN TGS 41420 8*4 BB
DUMPER TRUCK
2017
67 MAN TGS 41420 8*4 BB
DUMPER TRUCK
2017
68 MAN TGS 41420 8*4 BB
DUMPER TRUCK
2017
69 MAN TGS 41420 8*4 BB
DUMPER TRUCK
2017
70 MAN TGS 41420 8*4 BB
DUMPER TRUCK
2017
71 MAN TGS 41420 8*4 BB
DUMPER TRUCK
2017
72 MAN TGS 41420 8*4 BB
DUMPER TRUCK
2017
73 MAN TGS 41420 8*4 BB
DUMPER TRUCK
2017
74 KOMATSU PC300-7 EXCAVATOR 2004
75 HİTACHİ ZX 400 EXCA-VATOR
EXCAVATOR 2008
76 JCB JS290LC EXCAVATOR 2010
77 KOMATSU PC300-8 EXCAVATOR 2011
78 KOMATSU PC300-8 EXCAVATOR 2011
79 KOMATSU PC300-8 EXCAVATOR 2011
80 KOMATSU PC350LC-8 EXCAVATOR 2011
81 KOMATSU PC450LC-8 EXCAVATOR 2010
82 KOMATSU PC 500-8 EXCAVATOR 2014
83 KOMATSU PC 500-8 EXCAVATOR 2014
84 KOMATSU 390 EXCAVATOR 2017
85 KOMATSU 390 EXCAVATOR 2017
86 KOMATSU 390 EXCAVATOR 2017
87 RAMMER G 88 ALFATEK 30-35 TONS 2012
88 RAMMER G 88 ALFATEK 30-35 TONS 2008
89 HİTACHİ 310 LODER LOADER 2008
90 KOMATSU WA430-6 LOADER 2008
91 KOMATSU WA470-6 LOADER 2010
92 JCB 456 E LOADER 2010
93 KOMATSU WA430-6 LOADER 2011
165 ALİMAR 75 KW POWER GEN-ERATOR
2017
166 WACKERNEUSON TEPE LAMBASI CONSTRUC-TION EQUIP-MENT
2010
167 ISUZU NPR 595-04 LIGHT TRUCK 2007
168 MERCEDES AXOR 3240 DUMP TRUCK 2013
169 MERCEDES SPRİNTER LIGHT TRUCK 1999
170 FORD TRANSİT LIGHT TRUCK 2008
171 AUDI A6 2.0 TDİ AUTOMOBILE 2009
172 AUDİ A6 AUTOMOBILE 2015
173 RENAULT FLUENCE BUSİNESS 1.5 DCI
AUTOMOBILE 2016
174 RENAULT FLUENCE BUSİNESS 1.5 DCI
AUTOMOBILE 2016
175 TOYOTA 4*4 HILUX PICK-UP TRUCK
2013
176 TOYOTA 4*4 HILUX PICK-UP TRUCK
2009
177 RENAULT KANGO PICK-UP TRUCK
2012
178 FORD connect PICK-UP TRUCK
2012
179 TOYOTA 4*4 HILUX PICK-UP TRUCK
2012
180 TOYOTA 4*4 HILUX PICK-UP TRUCK
2005
181 RENAULT KANGO PICK-UP TRUCK
2015
182 BMW 116 AUTOMOBILE 2012
183 TOYOTA RAV 4 PERSONAL VEHICLE
2014
184 RENAULT FLUENCE BUSİNESS 1.5 DCI
PERSONAL VEHICLE
2011
185 AUDI A5 SPORT-BACK 2,0 TDI
PERSONAL VEHICLE
2012
186 RANGE ROVER 3.0 td6 HSE PERSONAL VEHICLE
2012
187 MERCEDES 1517 ATEGO PETROL TANKER
2005
188 ISUZU NPR 595-04 PETROL TANKER
1996
189 ISUZU NPR 66 PETROL TANKER
1998
190 ISUZU NPR 66 PETROL TANKER
2015
191 FM GRUP 10 TONS TOWER CRANE
2013
192 FM GRUP 8 TONS TOWER CRANE
2013
193 NACE 350 T/HOUR STONE PİT 2008
194 ZE MAKİNA 250 T/HOUR STONE PİT 2012
195 NURTAL MAKİNA 600 T /HOUR PLANTMIX 2012
196 UĞUR MAKİNA 400 T/HOUR PLANTMIX 2004
197 NURTAL MAKİNA 100 T/HOUR SAND SIEV-ING FACILITY
2012
198 YONTAR MAKİNA 500 AD/GÜN CONCRETE PIPE PRO-DUCTION FACILITY
2013
199 OPET PETROL PETROL STATION
98 99
CERTIFICATES
100
yorukholding.com
ADDRESS : BURHANİYE DISTRICT. ATİLLA ST. # 4/1 ÜSKÜDAR İSTANBUL/TURKEYPHONE : +90 (216) 422 06 65E-MAIL : [email protected]