30
The Evolution of Alternate Fee Arrangements Best Practices, Project Management, and Future Predictions

111

Embed Size (px)

DESCRIPTION

111lkllllllllllllllllllllllllllllllllllllllllllllllllllllll

Citation preview

Page 1: 111

The Evolution of Alternate Fee Arrangements

Best Practices, Project Management, and Future Predictions

Page 2: 111

Introduction

• Emmanuel Kyrinis – Sr. Director Product Management, Aderant

Page 3: 111

What We’ll Cover

• Background• Problem Space• The AFA Proposal• Project Management• Next Steps• Your Stories

Page 4: 111

Background

Page 5: 111

A Little Background

• Billable hour still the predominate fee arrangement– Includes discounting

Page 6: 111

A Little Background

• AFA usage increasing primarily around– Fixed/Flat Fee– Blended Rates– Capped Fees

Page 7: 111

A Little Background

• AFA Drivers beyond the economic climate– Gain / Maintain Clients– Manage Risk– Communication

Page 8: 111

Problem Space

Page 9: 111

Problem Space

“Setting price high enough to meet profitability targets and low enough to ensure winning the work.”

“Managing the work so I meet client expectations and projected profitability targets.”

Page 10: 111

Proposal

Page 11: 111

Understanding Past Experience

• Firm Resume– Past relevant matter experience– Team domain expertise

“Provides the starting point for estimating the scope of the new work”

Page 12: 111

Understanding Past Experience

Page 13: 111

Scope / Plan

• Utilize relevant work as a starting point• Ideally matters that utilized Task Based

Billing (TBB) / Work Breakdown Structure (WBS) information

• Alternatively utilize proven templates“Build a project plan to understand the hours and resources required.”

Page 14: 111

Scope / Plan

Page 15: 111

Resource Scheduling

• Sourcing resources and allocating work in a timeline

• For most firms should be looked at as a Phase II concept for rollout

“Scheduling is commonly done once the proposal is accepted.”

Page 16: 111

Resource Scheduling

Page 17: 111

Pricing Models

• Determine objectives for proposal• Regardless of pricing model utilized,

understanding costs is essential• Cost should not necessarily dictate price

Page 18: 111

Pricing Models

Page 19: 111

Additional Thoughts

• Data collected can be utilized to prepare engagement letter using document assembly

• Data collected can be fed backing into accounting system for billing purposes

Page 20: 111

Project Management

Page 21: 111

Setup

• Work Breakdown Structure• Rates• Other engagement terms

Page 22: 111

Tracking

• Data entry of time and expenses– The challenge of time entry

• Updating of schedules• Understanding percentage complete

“Control Costs, Meet Schedules, Manage Risks”

Page 23: 111

Tracking

Page 24: 111

Reporting

• Budget vs Actual• Revisions• eBilling

“Client communication and managing the relationship”

Page 25: 111

Reporting

Page 26: 111

Review

• Update appropriate matter attributes such as scope work types

• Completion notes – How did we do?– What could be improved?

• Update templates

Page 27: 111

Summary

Planning Pricing Management Review

Page 28: 111

Next Steps

Page 29: 111

Next Steps

• AFAs not going away regardless of economic climate

• Project management mainstream for larger transactions and client communication

• Adoption of eBilling budget standards• Integrated software to handle AFAs• Resource/talent management usage