1) What is kicking off process to execution phase? a) Test case execution b) build verification c) defect reporting and triaging 2) Activities carried before start of execution: a) Run plan b) defect triaging c) run status report 3) To avoid overlap of data, different access is to be provided to testers and developers: true or false 4 ) This is not example for a test management tool: a) Ration robot b) qc c) test director-----QC is a quality management s/w which manages tests as well as requirement, test director is a test management tool which manages tests, requirement, defects etc. 5) Testers have right to access db server, appl server and external appl true 6) Which data is usually obtained from customers? A) Primary b) secondary c) transaction 7) which of the query are used for clean up: a) Update b) delete c) select d) insert 8) In built management, build consists of:version number and release notes true 9) Who is responsible for release of builds with release notes? a) Project manager b) team leader c) build manager 10) The batch programs, database files used to generate a build is controlled by: a) Configuration tool b) project tool c) management tool

11 Test Execution

  • Upload
    anurag

  • View
    219

  • Download
    1

Embed Size (px)

DESCRIPTION

abcdufh

Citation preview

1) What is kicking off process to execution phase? a) Test case execution b) build verification c) defect reporting and triaging2) Activities carried before start of execution: a) Run plan b) defect triaging c) run status report3) To avoid overlap of data, different access is to be provided to testers and developers: true or false4) This is not example for a test management tool:a) Ration robot b) qc c) test director-----QC is a quality management s/w which manages tests as well as requirement, test director is a test management tool which manages tests, requirement, defects etc.5) Testers have right to access db server, appl server and external appl true6) Which data is usually obtained from customers?A) Primary b) secondary c) transaction7) which of the query are used for clean up:a) Update b) delete c) select d) insert8) In built management, build consists of:version number and release notes true9) Who is responsible for release of builds with release notes?a) Project manager b) team leader c) build manager10) The batch programs, database files used to generate a build is controlled by:a) Configuration tool b) project tool c) management tool11) Smoke testing is carried by:a) Developers b) testing team c) maintenance team12) If the build verification test fails the build is sent to:A) Business analyst b) project manager c) developers d) testers13) All test cases are executed in one stretch. True or false14)sheet consists of pass/fail status, actual result, defect id, tester name, test case document.A) Execution b) test log c) defect log15) Which of the following is not the defect report element?a) Module name b) defect description c) defect id d) actual result16) Password to application is not correct. It isseverityA) Showstopper b) high c) low17) No accuracy in results. it is .severity.a) Low b) high c) medium d) critical18) Personal leave label is incorrect .it is .severitya) Low b) high c) medium d) critical19) Showstoppers must have a target resolution in:A) 1 hour b) 2 to 4 hours c) 8 to 24 hours20) Priority of defect is determined by:A) Build manager b) project manager c) delivery manager21) If defect is documented there is no need of capturing screenshots. True or false22) Defect log is updated in RTM. True or false23) Who will decide to go for UAT?a) Testing team b) developing team c) built managerC) Unknown issues

24 21. Which of the following is not a major task of Exit criteria?a) Checking test logs against the exit criteria specified in test planning.b) Logging the outcome of test execution.c) Assessing if more tests are needed.d) Writing a test summary report for stakeholders.

25 26. Reviewing the test Basis is a part of which phase a) Test Analysis and Designb) Test Implementation and executionc) Test Closure Activitiesd) Evaluating exit criteria and reporting26 27. Reporting Discrepancies as incidents is a part of which phase :- a) Test Analysis and Designb) Test Implementation and executionc) Test Closure Activitiesd) Evaluating exit criteria and reporting27 9. Which of the following is not a part of the Test Implementation and Execution Phase a) Creating test suites from the test casesb) Executing test cases either manually or by using test execution toolsc) Comparing actual resultsd) Designing the Tests

28 Q. 19: Which activity in the fundamental test process creates test suites for efficient test execution?A. Implementation and execution.B. Planning and control.C. Analysis and design.D. Test closure.

29 Q. 14: Which of the following is a MAJOR task of test implementation and execution?A. Measuring and analyzing results.B. Reporting discrepancies as incidents.C. Identifying test conditions or test requirements.D. Assessing if more tests are needed.

30 Q. 59: Bug life cycle A. Open, Assigned, Fixed, ClosedB. Open, Fixed, Assigned, ClosedC. Assigned, Open, Closed, FixedD. Assigned, Open, Fixed, Closed31 Q. 63: A project that is in the implementation phase is six weeks behind schedule.The delivery date for the product is four months away. The project is not allowed to slip the delivery date or compromise on the quality standards established for his product. Which of the following actions would bring this project back on schedule? A. Eliminate some of the requirements that have not yet been implemented.B. Add more engineers to the project to make up for lost work.C. Ask the current developers to work overtime until the lost work is recovered.D. Hire more software quality assurance personnel.32 Q. 197: Test are prioritized so that:A. You shorten the time required for testingB. You do the best testing in the time availableC. You do more effective testingD. You find more faults33 Q. 243: Consider the following statementsi. An incident may be closed without being fixedii. Incidents may not be raised against documentation iii. the final stage of incident tracking is fixingiv. The incident record does not include information on test environmentsv. Incidents should be raised when someone other than the author of the software performs the testA. ii and v are true, I, iii and iv are false B. i and v are true, ii, iii and iv are false C. i, iv and v are true, ii and iii are false D. i and ii are true, iii, iv and v are false E. i is true, ii, iii, iv and v are false

34 Q. 283: Which of the following is not phase of the Fundamental Test Process?A. Test Planning and ControlB. Test implementation and ExecutionC. Requirement AnalysisD. Evaluating Exit criteria and reporting35 Q. 316: What type of testing will you perform on internet banking solution? A. System integration B. Functional testing C. Non-functional testing. D. Requirements testing 36 Q. 8: Which of the following would you NOT usually find on a software incident report?A. The name and/or organisational position of the person raising the problem.B. Version of the Software Under Test.C. Suggestions as to how to fix the problem.D. Actual and expected results37 Q. 19: Which activity in the fundamental test process creates test suites for efficienttest execution?A. Implementation and execution.B. Planning and control.C. Analysis and design.D. Test closure.38 Q. 25: Which of the following activities should be performed during the selection andimplementation of a testing tool?i) Investigate the organisation's test process.ii) Conduct a proof of concept.iii) Implement the selected tool on a project behind schedule to save time.iv) Identify coaching and mentoring requirements for the use of the selected tool.Options:A. i, ii, iii.B. ii, iii, iv.C. i, iii, iv.D. i, ii, iv.39 Q. 91: Which of the following is the task of a Tester?i. Interaction with the Test Tool Vendor to identify best ways to leverage test tool on theproject.ii. Prepare and acquire Test Dataiii. Implement Tests on all test levels, execute and log the tests.iv. Create the Test SpecificationsA. i, ii, iii is true and iv is falseB. ii,iii,iv is true and i is falseC. i is true and ii,iii,iv are falseD. iii and iv is correct and i and ii are incorrect

40 Q. 121: Test Implementation and execution has which of the following major tasks?i. Developing and prioritizing test cases, creating test data, writing test procedures andoptionally preparing the test harnesses and writing automated test scripts.ii. Creating the test suite from the test cases for efficient test execution.iii. Verifying that the test environment has been set up correctly.iv. Determining the exit criteria.A. i,ii,iii are true and iv is falseB. i,,iv are true and ii is falseC. i,ii are true and iii,iv are false41 Q. 383: Which set of metrics can be used for monitoring of the test execution?A. Number of detected defects, testing cost;B. Number of residual defects in the test object.C. Percentage of completed tasks in the preparation of test environment; test casespreparedD. Number of test cases run / not run; test cases passed / failed42 Q. 392: A test engineer is testing a Video Player (VCR), and logs the following report:Title: Fast Forward stops after 2 minutes. It happens every timeExpected result: Fast forward continues till the end of the tapeSeverity: HighPriority: UrgentWhat important information did the engineer leave out?A. Identification (Software and hardware) of the VCRB. Actual resultC. History of the reportD. Ideas for the test case improvement43 Q. 481: Which of the following is NOT true of test coverage criteria?A. Test coverage criteria can be measured in terms of items exercised by a test suite.B. A measure of test coverage criteria is the percentage of user requirements covered.C. A measure of test coverage criteria is the percentage of faults found.D. Test coverage criteria are often used when specifying test completion criteria.