Page 1: 11 Overall project organisation and achievements after one year - 1 1 Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer Overall

1

1 1Overall project organisation and achievements after one year - 1

Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer

Overall project

organisation

and achievements

after one year

Odile

Fanton d’Andon

ACRI-ST

Page 2: 11 Overall project organisation and achievements after one year - 1 1 Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer Overall

2Overall project organisation and achievements after one year - 2

Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer

Objectives

• Satisfy emerging demand for validated merged ocean colour derived information

• Demonstrate the current state of the art in merging together data streams from different ocean-colour sensors:

MERIS, SeaWifs, MODIS-AQUA, POLDER-Parasol

• Provide a long time-series (10 years) of ocean-colour information

• Put in place the capacity to continue production of such time series in the future

• Demonstrate a global NRT ocean-colour service based on merged satellite data

Context ESA DUE project i.e. driven by end users: IOCCG, IOCCP, UK

Met-Office

Background

Page 3: 11 Overall project organisation and achievements after one year - 1 1 Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer Overall

3Overall project organisation and achievements after one year - 3

Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer

CONSORTIUM

ACRI-ST (France) Prime contractor / management Processor / Production University of Plymouth (UK) User requirements follow up/ design justification / merging

NIVA (Norway) Validation (DDS)

Brockman Consult (Germany) Tools development / Web server

ICESS (USA), DLR (Germany) & LOV(France) Scientific support

Page 4: 11 Overall project organisation and achievements after one year - 1 1 Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer Overall

4Overall project organisation and achievements after one year - 4

Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer

Project Organisation ESA

GlobCOLOUR Simon Pinnock

ACRI-ST

Project ManagementO. Fanton d’Andon

UoPQuality Assurance

S. Lavender

System DevelopmentTeam ManagementN. Fomferra (BC)

ValidationCoordination

D. Durand (NIVA)

DLRA. Neumann

GC- merging groupCoordination

S. Lavender (UoP)

LOVD. Antoine

ICESSS. Maritorena

LOVA. Morel

ICESSD. Siegel

UoPS. Lavender (UoP)

NIVAK. Sørensen

Web DevelopmentM. Paperin (BC)

ACRI-ST

FPS/DDS production

P. Garnesson

ACRI-ST

NRT demonstrationP. Garnesson

GlobCOLOUR Service

P. Garnesson

UoPPPS production

S. Lavender

GlobCOLOUR Processor J. Demaria

GlobCOLOUR ToolsR. Quast (BC)

ACRI-ST

A. Mangin

Page 5: 11 Overall project organisation and achievements after one year - 1 1 Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer Overall

5Overall project organisation and achievements after one year - 5

Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer

3 years DUE project; 3 phases St

art o

f Glo

bCOLO

UR

15 Nov2005

User

’s m

eetin

g at

UNES

CO

Requ

irem

ent b

asel

ine

3-4 Jan2006

Web

site

www.g

lobc

olou

r.inf

o

Valid

atio

n pr

otoc

ol

15 Jan2006

MER

IS/M

ODIS

/Sea

WiF

S/PO

LDER

Char

acte

risat

ion

10 July2006

Avai

labi

lity

of tw

o 4-

mon

th c

ompa

rabl

e

dat

a se

ts (P

PS)

15 Oct.2006

Firs

t us

er’s

wor

ksho

p at

LOV

Fina

l sel

ection

of th

e m

ergi

ng m

etho

d

4-6 Dec.2006

End ofphase 1

Phase 1 : Demonstration of feasibility

Page 6: 11 Overall project organisation and achievements after one year - 1 1 Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer Overall

6Overall project organisation and achievements after one year - 6

Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer

15 May2007

Del

iver

y of

Dat

a Pr

oces

sing

sys

tem

15 Aug2007

Full

valid

atio

n re

port

15 Nov2007

2nd

user

’s w

orks

hop

at N

IVA

Fina

l val

idat

ion

pres

enta

tion

~15 Nov2007

End ofphase 2

Phase 2

Start ofphase 2

Avai

labi

lity

of fu

ll pr

oduc

t set

FPS

1997

-200

6

&

Dia

gnos

tic D

ata

Set a

nd T

ools

15 Mar2007

Prog

ress

mee

ting

at U

ser p

rem

ises

Prog

ress

mee

ting

at U

ser p

rem

ises15 July2007

3 years DUE project; 3 phases

Page 7: 11 Overall project organisation and achievements after one year - 1 1 Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer Overall

7Overall project organisation and achievements after one year - 7

Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer

15 Jan2008

3rd

user

’s w

orks

hop

at E

SRIN

Fina

l res

ults

pre

sent

atio

n

~15 Nov2008

End ofphase 3

Phase 3

Start ofphase 3

Del

iver

y of

the

FPS

2007

NRT d

emon

stra

tion

Del

iver

y to

ope

ratio

nal o

cean

ogra

phy

3 years DUE project; 3 phases

Page 8: 11 Overall project organisation and achievements after one year - 1 1 Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer Overall

8Overall project organisation and achievements after one year - 8

Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer

Users always involved during the project for consultation, advice and final assessment

KO+2: Jan. 2006

Generation and review of Requirements Baseline Document, Design Justification File, and Validation Protocol

KO+8: July 2006 Participation in the Critical Design Review

KO+13: Dec. 2006

User assessment of the Preliminary Product Sets (radiance and biophysical) and selection of final product

Participation in the end of phase 1 review (advisors to ESA) and GlobCOLOUR User Workshop 1 (LOV)

KO+23: Oct. 2007

User assessment of the Final Product Set (10 years) &Full Validation Report

KO+24: Nov. 2007

Participation in the end of phase 2 review as advisors to ESA

KO+24: Nov. 2007

Participation in the GlobCOLOUR User Workshop 2 (NIVA)

KO+36: Nov. 2008

Participation in the GlobCOLOUR User Workshop 3 (ESRIN)

User’s involvement

Page 9: 11 Overall project organisation and achievements after one year - 1 1 Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer Overall

9Overall project organisation and achievements after one year - 9

Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer

Main achievements of phase 1 Initial merging candidates and products selection according to users requirements Characterisation

Cross characterisation Characterisation against in situ data

System Globcolour processor Globcolour tools Web

Service/production Diagnostic Data Set Preliminary Products Set

ValidationTrade-off assessment and merging method selection

Achievements today

Page 10: 11 Overall project organisation and achievements after one year - 1 1 Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer Overall

10Overall project organisation and achievements after one year - 10

Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer

Analyse user requirements & scope of L3 products: climatological trends, variability studies, operational monitoring, assimilation into models

Select two (three) methods considering:1) One method at normalised water leaving radiances level2) One method at derived ocean colour parameters level

Select 4 months of global observations to build up the PPS

Select best merging technique for the FPS 

Initial merging candidates and products selection

Page 11: 11 Overall project organisation and achievements after one year - 1 1 Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer Overall

11Overall project organisation and achievements after one year - 11

Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer

GlobCOLOUR products 

Global ocean colour data set at 4.6 km resolution covering 1997-2006 daily, weekly, monthly products:Chlorophyll-a concentration (Chla) Diffuse attenuation coefficient (in-water) (Kd) Fully normalised water leaving radiances (available bands) Coloured dissolved and detrital organic materials (CDM) Total suspended matter (TSM) or particulate backscattering coefficient (bbp) Aerosol optical thickness (AOT@865nm) Data quality flags Cloud fraction Excess of radiance at ~ 555 nm (turbidity index) (EL555) Error estimates per pixel for each layer all of these data layers are available for both case 1 & case 2 waters; some of them are not official

New potential : PAR, euphotic layer, Secchi disk depth, heated layer..

Page 12: 11 Overall project organisation and achievements after one year - 1 1 Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer Overall

12Overall project organisation and achievements after one year - 12

Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer

Analyse user requirements & scope of L3 products: climatological trends, variability studies, operational monitoring, assimilation into models

Select two (three) methods considering:1) One method at normalised water leaving radiances level2) One method at derived ocean colour parameters level

Averaging / Weighted Averaging / GSM

Select 4 months of global observations to built up the PPS

Select best merging technique for the FPS 

Initial merging candidates and products selection

Page 13: 11 Overall project organisation and achievements after one year - 1 1 Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer Overall

13Overall project organisation and achievements after one year - 13

Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer

Analyse user requirements & scope of L3 products: climatological trends, variability studies, operational monitoring, assimilation into models

Select two (three) methods considering:1) One method at normalised water leaving radiances level2) One method at derived ocean colour parameters level

Averaging / Weighted Averaging / GSM

Select 4 months of global observations to built up the PPS July 2002; October 2002; January 2003; April 2003

Select best merging technique for the FPS 

Initial merging candidates and products selection

Page 14: 11 Overall project organisation and achievements after one year - 1 1 Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer Overall

14Overall project organisation and achievements after one year - 14

Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer

Analyse user requirements & scope of L3 products: climatological trends, variability studies, operational monitoring, assimilation into models

Select two (three) methods considering:1) One method at normalised water leaving radiances level2) One method at derived ocean colour parameters level

Averaging / Weighted Averaging / GSM

Select 4 months of global observations to built up the PPS July 2002; October 2002; January 2003; April 2003

Select best merging technique for the FPSWeighted Averaging / GSM - see David Antoine’s presentation 

Initial merging candidates and products selection

Page 15: 11 Overall project organisation and achievements after one year - 1 1 Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer Overall

15Overall project organisation and achievements after one year - 15

Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer

Global (glob) Chlorophyll case 1 - 2003

Characterisation

Sensors cross characterisation  

see Samantha Lavender’s presentation

Page 16: 11 Overall project organisation and achievements after one year - 1 1 Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer Overall

16Overall project organisation and achievements after one year - 16

Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer

Characterisation against in situ data (Chla, nLw, Kd)

Characterisation

see Samantha Lavender’s presentation

SeaWIFS MODIS/A MERIS

Achievement: Statistical uncertainties have been derived and are used for merging

Page 17: 11 Overall project organisation and achievements after one year - 1 1 Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer Overall

17Overall project organisation and achievements after one year - 17

Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer

Globcolour processor

System

Main modules:

Pre-processing Spatial binning Temporal binning Merging QC

System is ready for systematic production

MERISL2

SeaWIFSOcean color L2

AquaOcean color L2

ParasolOcean Color L2

Preprocessing Preprocessing Preprocessing Preprocessing

(1) Spatial binning

(2) Temporal binningin daily mode

(3) Merging

(4) Temporal binningin periodic mode

MERISL3 track

SeaWIFSL3 track

MODIS/AquaL3 track

ParasolL3 track

MERISL3 daily

SeaWIFSL3 daily

MODIS/AquaL3 daily

POLDEROcean Color L3d

Daily merged4.63km/0.25°/1°/QL

8-days4.63km/0.25°/1°/QL

Monthly4.63km/0.25°/1°/QL

DDS L2Sensor (4.63km)

DDS L3Merged (4.63km)

DDS L2Sensor (1km)Diagnostic

sites table

Level 3 data archive

Level 2 data archive

DDS data archive

Daily level 3 data cache

DDS L3Sensor (4.63km)

Page 18: 11 Overall project organisation and achievements after one year - 1 1 Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer Overall

18Overall project organisation and achievements after one year - 18

Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer

Globcolour tools

Two tools are required:

Visualisation and pixel-wise analysis with Beam

Support to validation activities

System

First release – v1.3

In progress

see Ralf Quast’s presentation

Page 19: 11 Overall project organisation and achievements after one year - 1 1 Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer Overall

19Overall project organisation and achievements after one year - 19

Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer

GlobCOLOUR ProjectEuropean Node for global Ocean Colour

• Data access• Data products• Methods• Data tools• Calendar• About the Project• Workshops and forum

WWW.globcolour.infoThe European Service for Ocean ColourGlobCOLOUR is an ESA Data User Element Project

The GlobCOLOUR project is demonstrating an EO based service supporting global ocean carbon cycle research. Through this web portal, the project provides scientists with a long time series of consistently calibrated global

ocean colour information.

Page 20: 11 Overall project organisation and achievements after one year - 1 1 Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer Overall

20Overall project organisation and achievements after one year - 20

Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer

For methods selection : PPS: Preliminary Products Set

4 monthsS

ervi

ce a

nd

pro

du

ctio

n

For validation / characterisation: DDS: Diagnostic Data Set

1997-2006

For final users : FPS: Final Products Set

see Gilbert Barrot’s presentation

Page 21: 11 Overall project organisation and achievements after one year - 1 1 Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer Overall

21Overall project organisation and achievements after one year - 21

Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer

Diagnostic Data Set and Preliminary Products Set 

Service/production

see Gilbert Barrot’s presentation

Page 22: 11 Overall project organisation and achievements after one year - 1 1 Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer Overall

22Overall project organisation and achievements after one year - 22

Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer

Validation protocol: to define validation process; based on SIMBIOS validation protocol

Validation of level 2 and level 3 products: • Focus on chlorophyll-a, diffuse attenuation coefficient, normalised

water-leaving radiances (LwN). • Perspectives on CDM and TSM

Validation of the PPS and FPS: daily, weekly, monthly products using:• punctual in situ measurements and (for PPS)• time series obtained from long-term buoy measurements or from

regular/ continuous cruises (e.g. ferrybox datasets) (for PPS)

  See S. Lavender, D. Antoine, S.Maritorena ’s presentation

Validation (1/2)

Page 23: 11 Overall project organisation and achievements after one year - 1 1 Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer Overall

23Overall project organisation and achievements after one year - 23

Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer

Inter-comparison with other similar initiatives e.g. NASA REASoN project (preliminary for PPS)

Diagnostic Data Sets: selected from existing validation sites, e.g. IOCCG/SIMBIOS DDS, AMT, ESA MAVT validation sites, Aeronet (for PPS and for characterisation)

 

Validation (2/2)

First validation effort is done – need to be pursued all along the project

More in David Antoine’s presentation

In situAverageWeighted averageGSM01

Page 24: 11 Overall project organisation and achievements after one year - 1 1 Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer Overall

24Overall project organisation and achievements after one year - 24

Globcolour / Medspiration user consultation, Dec 4-6, 2006, Villefranche/mer

Thank youfor yourattention