1 Ethernet Roadmap Release 21 January 2015 Jason Hopkinson [email protected]

11 Ethernet Roadmap Release 21 January 2015 Jason Hopkinson [email protected] [email protected]

Embed Size (px)

Citation preview

Page 1: 11 Ethernet Roadmap Release 21 January 2015 Jason Hopkinson jason.p.hopkinson@bt.com jason.p.hopkinson@bt.com

11

Ethernet Roadmap Release21 January 2015

Jason [email protected]

Page 2: 11 Ethernet Roadmap Release 21 January 2015 Jason Hopkinson jason.p.hopkinson@bt.com jason.p.hopkinson@bt.com

2

Confidentiality & legal statement

• The information contained in this presentation slide-pack is confidential information for discussion purposes only and should not be disclosed without British Telecommunications plc (BT's) permission. Please treat it accordingly and do not forward, republish or permit unauthorised access.

• Please note that BT has taken reasonable care to check that the information contained in this Presentation slide-pack is accurate at the time of issue, however, it is subject to change. In relation to any products/services referred to in this document which are currently under development and/or trial, BT gives no undertaking or other commitment that the product/service will be made commercially available.

• References to any such service and time scales contained within this document are indicative and estimates for information purposes only and these and other information do not constitute any contractual or other obligation.

• Applicable BT standard terms and conditions apply.

• © British Telecommunications plc,

• 2015 British Telecommunications plc

• Registered office: 81 Newgate Street London EC1A 7AJ

• Registered in England no: 1800000

Page 3: 11 Ethernet Roadmap Release 21 January 2015 Jason Hopkinson jason.p.hopkinson@bt.com jason.p.hopkinson@bt.com

3

Agenda

Agenda topic Speaker

Release AR update – no developments to present Jason Hopkinson & development leads

Release AS – key developments – (preview) Jason Hopkinson & development leads

Ethernet roadmap overview & new node rollout Jason Hopkinson

Other updates / information:

• Product Handbook update• T&C changes• Data Centre launches and current capability for 1

Gig & 10 Gig• Hull Access

• EFM Etherflow bandwidth – 1Mbit/s increments between 10Mbit/s and 35Mbit/s

Jason Hopkinson

Andy Hurley

Q&A

Page 4: 11 Ethernet Roadmap Release 21 January 2015 Jason Hopkinson jason.p.hopkinson@bt.com jason.p.hopkinson@bt.com

4

Release AR developments

Area Detail OwnerProduct position & benefits Deploye

d date

B2BEthernet B2B

Gateway - accurate quote integration

Philip Stefanov See detail below in AS – will cover across 2 releases Now AS

Release AS developments

Area Detail Owner

Product position & benefits Deployed date

B2BEthernet B2B Gateway - accurate quote integration

Philip Stefanov

• The ability to raise accurate quotes (as opposed to indicative quotes from the Pricing tool) via the Ethernet B2B, as well as progress B2B orders from accurate quotes raised on eCo+.

• Reduced need to access BT’s portals and to manually re-key information, reduced trading costs.

• Products covered: Etherway copper, fibre, Etherflow

Page 5: 11 Ethernet Roadmap Release 21 January 2015 Jason Hopkinson jason.p.hopkinson@bt.com jason.p.hopkinson@bt.com

55

Ethernet Roadmap & new node rollout

Jason [email protected]

Page 6: 11 Ethernet Roadmap Release 21 January 2015 Jason Hopkinson jason.p.hopkinson@bt.com jason.p.hopkinson@bt.com

66

Q1 Q2 Q3 Q4

Coverage

Portfolio

Price / Commerc

ial

Service Experienc

e

NGD Newport Telehouse PoP

10Gb Data Centre Access

Hull PoP

Wholesale Optical tactical10G, 40G & 100G

Etherway Fibre Price reductions

All roadmap items are subject to change and for information purposes only

14/15 Roadmap

Boundary rollout:87 fibre nodes71 EFM nodes

Boundary rollout:14 fibre nodes35 EFM nodes

EFM Expansion – 245 nodes

Telecity Mcr PoP

SunGard Elland PoPEquinix LDN5 PoPTelecity HEX

Telecity Sovereign House

Sco-Locate Edinburgh

EFM Expansion – 252 nodes EFM Expansion – 526 nodes

EFM Mini-PoP EAD

EFM Mini-PoP WBC

VPLS Orchestration

Etherflow 12 month min term

EFM Strategic SBS

EFM Managed Install

Fibre Hybrid Managed Install Trial

EFM Headroom Efficiencies

EFM Price simplification

GEA Price simplification

B2B Trial B2B soft Launch

B2B Address matching

B2B Firm Quote

Etherway Diverse single leg delivery

Pricing tool & eCo+ integration parallel running

Pricing tool & eCo+ integration switch over

Standalone survey Trial

Extended Reach EST trial

Infrastructure discovery trial

Launched In development plan Initial scoping

Invalid modify resolution

Novation process & pricing

EFM 4 & 5 Pair Special Offer

Fibre Expansion – 15 nodes

ELAN Price review

High Bandwidth review

Page 7: 11 Ethernet Roadmap Release 21 January 2015 Jason Hopkinson jason.p.hopkinson@bt.com jason.p.hopkinson@bt.com

77

Q1 Q2 Q3 Q4

Coverage

Portfolio

Price / Commerc

ial

Service Experienc

e

All roadmap items are subject to change and for information purposes only

15/16 Roadmap

Fibre Expansion – 200 nodes Fibre Expansion – 200 nodes Fibre Expansion – 130 nodes

Fibre Managed Install Strategic

Etherway Fibre Price Changes (based upon assumed Openreach obligations)

EAD2 Trials EAD2 controlled launch

Infrastructure discovery launch – Maps & cct Cat plus ECC Indicators

Extended Reach EST launch

Fibre Expansion – 100 nodes

Wholesale Optical Launch 10G, 40G & 100G

Application SLAs

Launched In development plan Initial scoping

EST Trials EST controlled launch

Standalone survey Migrate to Strategic Platform.

Datacentre Cloud access

Additional 5 Data Centre nodes

10G Bespoke Access (OSA)

>1G Etherflow

B2B Amend, Modify & Cease

B2B GEA

21C Optical Services – Service management info

Data Centres – Cross Connect

Jumbo Frames

Openreach address matching

EAD Looping

VDSL Modem Withdrawal

Etherflow (Etherway type) independent CoS pricing

Open UI PoC

3 WECLA Optical PoPs

ScoLocate and T/City Manchester Optical PoPs

NGD Optical PoPHEX + Powergate

Optical PoPs

Page 8: 11 Ethernet Roadmap Release 21 January 2015 Jason Hopkinson jason.p.hopkinson@bt.com jason.p.hopkinson@bt.com

88

Other updates & information

Product Handbook update Jason Hopkinson

T&C Changes Jason Hopkinson

Data Centre Launches & Current Capability for 1G and 10G

Jason Hopkinson

Hull Access Jason Hopkinson

EFM Etherflow bandwidth – 1Mbit/s increments between 10Mbit/s and 20Mbit/s

Andy Hurley

Page 9: 11 Ethernet Roadmap Release 21 January 2015 Jason Hopkinson jason.p.hopkinson@bt.com jason.p.hopkinson@bt.com

99

Other updates & infoJason [email protected]

Page 10: 11 Ethernet Roadmap Release 21 January 2015 Jason Hopkinson jason.p.hopkinson@bt.com jason.p.hopkinson@bt.com

1010

Product Handbook Update

Version 8.5 Published January 2015• Changes include:

• Tidied diagrams• Updated to include change to Etherflow Min term• Corrected some formatting errors.

Version 8.6 currently being planned to include:• Update to Appendix B – Data Centres site specifics.

Page 11: 11 Ethernet Roadmap Release 21 January 2015 Jason Hopkinson jason.p.hopkinson@bt.com jason.p.hopkinson@bt.com

11

Revised Terms & Conditions Published – Impacted documents

BT_Wholesale_Ethernet_Main_Conditions_(Issue_5-0)

BT_Wholesale_Ethernet_Schedule SLA_ 3_(Issue_5-0)

BT_Wholesale_Ethernet_Schedule_Service_2_(Issue_5-0)

BT_Wholesale_Ethernet_Schedule_4_(Issue_5-0)

BT_Wholesale_Ethernet_Schedule_Definitions_1_(Issue_5-0)

Page 12: 11 Ethernet Roadmap Release 21 January 2015 Jason Hopkinson jason.p.hopkinson@bt.com jason.p.hopkinson@bt.com

12

Revised Terms & Conditions Published

Changes Made to facilitate launch of 1G Data Centre Wholesale Ethernet Product Variant.

Facilitates impending launch of 10G Data Centre Option (scheduled for March 2015 launch)

Facilitates impending launch of Hull Access product variant, which is currently in testing and will move to trial in February. Soft launch is targeted for March 2015.

Page 13: 11 Ethernet Roadmap Release 21 January 2015 Jason Hopkinson jason.p.hopkinson@bt.com jason.p.hopkinson@bt.com

1313

Data Centres & Hull Access Product Launches10G Data Centre Option

– Schedule to launch in March 2015 (alternative to our current 1G DC option).

– Forecast requirement with lead time of 120 Days.

– New sites developed subject to demand, we ask client teams frequently.

– Sites built or in plan:

• Equinix LD5 - Built

• Next Generation Newport - Built

• Telecity Joule House – In Plan, scheduled January 15

• Telehouse North – Stage 1 built, Stage 2 to be progressed.

• Global Switch 1 – In Plan, Scheduled Feb 2015

• 6/7 Harbour Exchange - In Plan.

• Sovereign House - In Plan.

Possible Sites Pending Demand & BC agreement

• Level 3 Goswell Road

• Telecity Williams House

• Telecity Powergate

• Interxion London – Now being progressed

Page 14: 11 Ethernet Roadmap Release 21 January 2015 Jason Hopkinson jason.p.hopkinson@bt.com jason.p.hopkinson@bt.com

1414

Reminder - Data Centre Overview of capability

BT 21C Ethernet Core

7750EES 

Page 15: 11 Ethernet Roadmap Release 21 January 2015 Jason Hopkinson jason.p.hopkinson@bt.com jason.p.hopkinson@bt.com

1515

Hull AccessProduct Offering

– BT does not have a footprint or switching capability within the Hull area to provide services directly. BTW has provisioned an Ethernet Edge Switch (EES) within Hull Anson exchange (BT Building) allowing BTW to extend its reach into Hull. Resilient backhaul to is prvided via Malton and Pontefract BT Ethernet enabled exchanges.

– 10M, 100M & 1G Access Options

– We only offer the 1 year terms option.

– Standard or premium for the Etherflow.

– Min 1 year commitment term on both Etherway and Etherflows. (Standard T&C’s)

– No change to the upgrade and down grade terms.

Pricing

• BTW Pricing Tool will be updated to include Hull post codes

• Save price (screen shot or quote reference) and associate with CRF when submitting order.

• Quote should not be more that 7 days old from when order submitted.

• Connection changes and annual rentals applicable for the access.

• The service (Etherflow) will be on an annual rental basis.

Page 16: 11 Ethernet Roadmap Release 21 January 2015 Jason Hopkinson jason.p.hopkinson@bt.com jason.p.hopkinson@bt.com

EFM Etherflow bandwidth – 1Mbit/s increments between 10Mbit/s and 35Mbit/s

Andy Hurley

[email protected]

Page 17: 11 Ethernet Roadmap Release 21 January 2015 Jason Hopkinson jason.p.hopkinson@bt.com jason.p.hopkinson@bt.com

Etherflow Bandwidth options – BTW Pricing Tool screenshot

• Currently, Etherflow Bandwidths are available in 1Mbit/s increments up to 10Mbit/s and then larger increments for higher bandwidths.

• This development will offer customer additional 1Mbit/s incremental bandwidths between 10Mbits/s and 35Mbit/s.

• Launch date is planned for Q3 15/16 depending on customer demand and feedback.

Page 18: 11 Ethernet Roadmap Release 21 January 2015 Jason Hopkinson jason.p.hopkinson@bt.com jason.p.hopkinson@bt.com

1818

Q&A

Page 19: 11 Ethernet Roadmap Release 21 January 2015 Jason Hopkinson jason.p.hopkinson@bt.com jason.p.hopkinson@bt.com

1919

Our next call will be on 20 March 2015

(details to follow via an Ethernet briefing)

Page 20: 11 Ethernet Roadmap Release 21 January 2015 Jason Hopkinson jason.p.hopkinson@bt.com jason.p.hopkinson@bt.com

2020

Thank you for joining us on the call today