Upload
holly-edwards
View
48
Download
1
Embed Size (px)
Citation preview
A 051213 JKWIssued for approval - update to TC drgs
P 151113 JKWPreliminary issue for comment
REV.
CONTRACTORAPPROVALS
FABRICATION
DATE:DATE:
ISSUED FORAPPROVAL
DATE:
ENGINEER OTHERNOTES:FABRICATOR
RELEASE TOSHOP FOR
DESCRIPTION
Released By:
REV.
DATE:
DESCRIPTION
DATE:
Approved By:
ARCHITECTDATE:
DATE DATE
Approved By:Approved By:Approved By:
GA011052
HEYSHAM ONE POWER STATION ISI EQUIPMENT FACILITYMEZZANINE PLATFORMSBBCS
JKW
A
PROJECT
LOCATION
DETAIL OF
CONTRACTOR
ARCHITECT
REVISION
DRAWING NO:CONTRACT NO:CHECKEDDRAWN
0512131
DPL FABRICATIONS LTD
Q
12a
1. STEEL TO BE GRADE S275JR FOR SECTIONS & PLATES AND GRADE S355JOH FOR HOLLOW SECTION2. ALL PLATFORM FLOORING TO BE 12.5mm DURBAR PLT
- 1
Q
12a